NAVY PROGRAMS DDG 51 Arleigh Burke Aegis Destroyer Executive Summary DDG 51 is operationally effective in open ocean battle space, although ts executon of the ant-ar warfare msson is limited by Standard Missile-2 reliability and performance problems. DDG 51 is less effective in littoral waters where it may encounter asymmetrc, hgh-speed surface threats. Prelmnary ndcatons show that human systems ntegraton, documentation, and training deficiencies found during Aegis Weapon System (AWS) Baseline 7.1.1.1 testing have not been resolved in AWS Baseline 7.1.2.1. System The DDG 51 Guided Missile Destroyer is a combatant ship equipped with: - The AWS AN/SPY-1 three dimensional (range, altitude, and azmuth) mult-functon radar - SQQ-89 Undersea Warfare suite that includes the AN/SQS-53 sonar, SQR-19 passive towed sonar array, and the SH-60B or MH-60R Helicopter (DDG 79 and newer have a hangar to allow the shp to carry and mantan ts own helcopter) - Five-inch diameter gun - Harpoon ant-shp cruse mssles - The Vertcal Launch System that can launch Tomahawk land attack mssles, Standard surface-to-ar mssles, Evolved SeaSparrow Mssles, and Vertcal Launch Ant-Submarne Rocket mssles Mission The Maritime Component commander can employ DDG 51 to: Conduct Ant-Ar Warfare, Ant-Surface Warfare, and Ant-Submarne Warfare Conduct Strke Warfare when armed wth Tomahawk mssles • Conduct offensve and defensve warfare operatons smultaneously when necessary Operate ndependently and wth Carrer or Expedtonary Strke Groups as well as wth other jont or coalton partners Prime Contractors • Bath Iron Works • Northrop Grumman Picture capability, the Standard Missile-6 program, and the Aegs Ballstc Mssle Defense program. Assessment Initial indications are that COTF testers were unable to complete several key tests of AWS Baseline 7.1.2.1. Tests not completed ncluded the followng: - Testng of the ar/surface logc of the Close-In Weapon System (CIWS) due to test tme constrants - Testng of fratrcde ssues between CIWS and the Vertcal Launchng System due to test tme constrants - Surface tracking capability of the SPY-1D(V) Radar due to inadequate crew training Activity Commander, Operational Test and Evaluation Force (COTF) conducted operatonal testng of shps wth AWS Baselne 7.1.2.1 software in USS Gridley (DDG 101) from February to August 2008. COTF conducted operational testing in accordance wth a DOT&E-approved test plan. COTF has not yet issued a final report of this testing. The DDG 51 Test and Evaluation Master Plan (TEMP) 801 has been replaced by the Aegis Enterprise TEMP 1669 (approved October 2008) which covers testing of the AWS 7.1R software baseline planned for DGG 51 class hulls 103 and above n addton to testng of modernzed Aegs crusers and destroyers. This TEMP includes testing of the Navy Integrated Fire Control – Counter Air capability, Single Integrated Air DDG 51 121

Transcript of DDG 51 Arleigh Burke Aegis Destroyer - GlobalSecurity.org · n Av Y P r o G r A M S DDG 51 Arleigh...

Page 1: DDG 51 Arleigh Burke Aegis Destroyer - GlobalSecurity.org · n Av Y P r o G r A M S DDG 51 Arleigh Burke Aegis Destroyer Executive Summary • DDG 51 is operationally effective in

n A v Y P r o G r A M S

DDG 51 Arleigh Burke Aegis Destroyer

Executive Summary• DDG 51 is operationally effective in open ocean battle

space, although �ts execut�on of the ant�-a�r warfare m�ss�on is limited by Standard Missile-2 reliability and performance problems.

• DDG 51 is less effective in littoral waters where it may encounter asymmetr�c, h�gh-speed surface threats.

• Prel�m�nary �nd�cat�ons show that human systems �ntegrat�on, documentation, and training deficiencies found during Aegis Weapon System (AWS) Baseline 7.1.1.1 testing have not been resolved in AWS Baseline 7.1.2.1.

System• The DDG 51 Guided Missile Destroyer is a combatant ship

equipped with:- The AWS AN/SPY-1 three dimensional (range, altitude, and

az�muth) mult�-funct�on radar - SQQ-89 Undersea Warfare suite that includes the

AN/SQS-53 sonar, SQR-19 passive towed sonar array, and the SH-60B or MH-60R Helicopter (DDG 79 and newer have a hangar to allow the sh�p to carry and ma�nta�n �ts own hel�copter)

- Five-inch diameter gun- Harpoon ant�-sh�p cru�se m�ss�les- The Vert�cal Launch System that can launch Tomahawk

land attack m�ss�les, Standard surface-to-a�r m�ss�les, Evolved SeaSparrow M�ss�les, and Vert�cal Launch Ant�-Submar�ne Rocket m�ss�les

MissionThe Maritime Component commander can employ DDG 51 to:• Conduct Ant�-A�r Warfare, Ant�-Surface Warfare, and

Ant�-Submar�ne Warfare

• Conduct Str�ke Warfare when armed w�th Tomahawk m�ss�les• Conduct offens�ve and defens�ve warfare operat�ons

s�multaneously when necessary• Operate �ndependently and w�th Carr�er or Exped�t�onary

Str�ke Groups as well as w�th other jo�nt or coal�t�on partners

Prime contractors• Bath Iron Works• Northrop Grumman

Picture capability, the Standard Missile-6 program, and the Aeg�s Ball�st�c M�ss�le Defense program.

Assessment• Initial indications are that COTF testers were unable to

complete several key tests of AWS Baseline 7.1.2.1. Tests not completed �ncluded the follow�ng:- Test�ng of the a�r/surface log�c of the Close-In Weapon

System (CIWS) due to test t�me constra�nts- Test�ng of fratr�c�de �ssues between CIWS and the Vert�cal

Launch�ng System due to test t�me constra�nts- Surface tracking capability of the SPY-1D(V) Radar due to

inadequate crew training

Activity• Commander, Operational Test and Evaluation Force (COTF)

conducted operat�onal test�ng of sh�ps w�th AWS Basel�ne 7.1.2.1 software in USS Gridley (DDG 101) from February to August 2008. COTF conducted operational testing in accordance w�th a DOT&E-approved test plan.

• COTF has not yet issued a final report of this testing.• The DDG 51 Test and Evaluation Master Plan (TEMP) 801 has

been replaced by the Aegis Enterprise TEMP 1669 (approved October 2008) which covers testing of the AWS 7.1R software baseline planned for DGG 51 class hulls 103 and above �n add�t�on to test�ng of modern�zed Aeg�s cru�sers and destroyers. This TEMP includes testing of the Navy Integrated Fire Control – Counter Air capability, Single Integrated Air

DDG 51 121

Page 2: DDG 51 Arleigh Burke Aegis Destroyer - GlobalSecurity.org · n Av Y P r o G r A M S DDG 51 Arleigh Burke Aegis Destroyer Executive Summary • DDG 51 is operationally effective in

n A v Y P r o G r A M S

122 DDG 51

- Testing against high-speed surface threats due to equipment failures and inadequate crew training

• Initial indications from the FOT&E testing are that the AWS 7.1.2.1 software baseline continues to have limited effect�veness �n l�ttoral waters aga�nst h�gh-speed surface threats. Results also indicate that the Navy has not corrected the human systems �ntegrat�on, documentat�on, and tra�n�ng deficiencies found during AWS Baseline 7.1.1.1 testing.

recommendations• Status of Previous Recommendations. The Navy has closed

three of the four FY05 recommendations and one of the four FY06 recommendations.

• FY08 Recommendation.1. The Navy should complete all planned key operational tests

of AWS software baseline 7.1.2.1 in accordance with the DOT&E-approved test plan.