DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week...

17
DCS 6.03.2007 T0 DCS T0 DCS Answers to DCS Commissioning and Answers to DCS Commissioning and Installation related questions Installation related questions ALICE week 5.04.07 ALICE week 5.04.07 T.Karavicheva and the T0 team T.Karavicheva and the T0 team

Transcript of DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week...

Page 1: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

DCS 6.03.2007

T0 DCST0 DCS

Answers to DCS Commissioning and Answers to DCS Commissioning and Installation related questionsInstallation related questions

ALICE week 5.04.07ALICE week 5.04.07T.Karavicheva and the T0 teamT.Karavicheva and the T0 team

Page 2: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

KEY dates– Commissioning on surface: “C” part of the

detector is at CERN and was checked last October. The “A” part will arrive to the lab at CERN from Finland mid March

– Detector installation in UX: 30 March – 4 April for “C” part. No access till August, when the “A” part goes down (planned 28-29 Aug).

– Accessible for DCS: for tests in June, fully in August

(DCS Commissioning 6-02-07)

Page 3: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

T0-C is at CERN T0-C is at CERN ready for installationready for installation

T0-CT0-C

T0-AT0-A

T0-A T0-A arrived at CERNarrived at CERN

yesterdayyesterday

Page 4: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

SUB-SYSTEMS TO COMPLETE– HV/LV

PVSS: Implemented in PVSS 3.1 and tested with final hardware. Already ported to 3.6, to be tested with the hardware. Action: Tatiana with her student

FSM: Follows HMP and V0 design. Waiting for HW from repair. Target date: end February. Action: Tatiana.

HW:– mainframe: delivered one week ago, but was broken (no

boot screen). Returned to pool, no estimate for the repair time yet. Tatiana will check the status

(DCS Commissioning 6-02-07)

Page 5: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Status [HV/LV]Hardware:SY1527 mainframe – in Lyon 3 x A1733N Power Supply Units –was tested byElectronics pool . A1733N are in T0 lab being tested -2 x A1533 LV Power Supply Unit, 6x10V/2.7A wasreceived at CERN some days ago

Software:1. Use PVSS 3.6t00_dcs project updated to 3.6Framework 3.0.0FSM updated to 3.6ALICE UI 3.0*

•2. Upgrading software version From PVSS V3.1 to PVSS V3.6 doneat home Institutes, not yet tested withfinal hardware.3.Will be tested during the March

*) Start testing 05.03.2007

Page 6: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

(DCS Commissioning 6-02-07)

– FEE fast

• PVSS: DIM server connected to PVSS was used for tests in October. DIM server will be upgraded in February; final PVSS implementation depends on delivery of electronics (7 different types of modules) but will be ready before installation. Action: Tatiana and her student.

• Not yet done( Electronics production not yet completed)

Page 7: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Status [Fast electronics]Delivered at CERN:

-A2818,V2718

Orded:

2 NIM crates with power supplies (PS) PS: Wiener Power supply UEP22 (300W), ( +/-5V / 17A, +/-12V / 3.4A, +/-24V / 3.4A). - Crate: Wiener 5U NIM crate Crate UEN03 12 slot card cage.

2 VME crate PS: Wiener 0P17.0711 Power-Supply 7237 6U (+5V/100A, +/-12V/10A). –

Crate: Wiener 0B06.3B5J1: Card-Cage 7219 VME64x BIN, Local PSU, 21x6U, RP0 access, Mag tolerant.

The crates with PS are expected to be delivered to CERN in March/April 2007. Modules: Electronics production not yet completed

Ordered: 2 CAEN LED 895B

Page 8: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

(DCS Commissioning 6-02-07)

– FEE readout

• PVSS: not implemented. DIM server required to control DRM via A2818 or Ethernet – the software will be copied from TOF (Pietro Antonioli & Ombretta Pinazza), more details beginning of March. Action: Tatiana

• FSM: not implemented – target end March – action Tatiana

• HW• CPDM/TRM: modules received from TOF last October, partial

setup exists. Final modules to be delivered in March

Page 9: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Status [Readout electronics]Delivered at CERN:

2 TRMs, 1 CPDM , A2818 card,T0 Alice box

-DRM (prototype delivered at CERN last weekend) was tested in Bologna

DRM final version –end of April

Ordered : A3486, A1676,A3000(filter)

Software for DCS will be provided by TOF group :1.PVSS project to control ALICE BOX 2. PVSS project to control DRM

Page 10: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

CO

NT

RO

LLO

GIC

V+

V-

S+S-

V+

V-

S+S-

V+

V-

S+S-

DC-DC

DC-DC

DC-DC

CO

NT

RO

LLO

GIC

V+

V-

S+S-

V+

V-

S+S-

V+

V-

S+

S-

DC-DC

DC-DC

DC-DC

HOSTILE AREA

SY

1527

SY

ST

EM

MA

INF

RA

ME

CONTROL ROOM

SY1527

EASY Module

EASY Module

48VPOWERSOURCE

48VSERVICEPOWERSOURCE

BR

AN

CH

CO

NT

RO

LL

ER

- A

16

76

INTERRUPTPOWER FAILURE

Control BusP

ow

er L

ine

P.

Ser

vice

Lin

e

48VBACKUPBATTERY

Cabling for CAEN Easy

• 48V service power

• To power control part of the Easy crates/modules

• Propose to add small power supply in same rack as branch controller

• We will take care of PS and cabling

(From Andre Augustinus)

Taken care of by DCS

In UX racks

In CR racks

Page 11: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Status [Laser Calibration]Laser Attenuator

Ethernet-RS232 interface (Digi One)

Hardware: ready for installationSoftware:1. Standard: PVSS 3.6 + FSM

PVSS exists, tested with hardware

FSM: 1st version exists, but might be modified, depending on the calibration procedure(calibration procedure not yet fixed)

Page 12: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

CFD Control (CANBERRA 454)

ELMB&DAC for CFD.

The versions tested in CERN: PVSS: 3.1 (3.1 with all patches) OPC server for ELMB: 2.9.1 (now avaible 2.9.1 - requires .net Framework 2.0) JCOP Framework: 2.3.6 (with installation tool - now avaible: 2.3.8 for PVSS 3.1 and 3.0 for PVSS 3.6). ELMB Framework 3.3.1 (now avaible: 3.3.3) I will try to update this to newest versions (including PVSS 3.6).

Page 13: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Crate control

-L.Wallet will provide tools for VME crate

Control.

-NIM crate control (the same solution as for

CFD)

-readout VME crate (TOF solution)

Page 14: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.
Page 15: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

[ T0 FSM Hierarchy ]T0_DCS

T0_C

FE

LaserCalibration

HV LV

OR

Delays

CFDs

Read-outCrateControl

L0 inputgenerator

Attenuator

TUT0

MPD

TVDC TRM

DRM

NIM Crate

1-12

PMT

1-2

Showbox

T0_A

Scalers VME Crate

Read-outcrate

Dev

ice

Inte

llect

ual C

ontr

ol

LEDs

Page 16: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

T0 DCS state diagram

DOWNOADING

OFF

STBY_CONFIGURED

STANDBY

READY LOCKED

READY

MOVING_READY

MOVING_STBY_CONF

BEAM_TUNING

MOVING_BEAM_TUN

MOVING_BEAM_TUN

CALIBRATING

DOWNLOADING

DOWNLOADING

GO_STANDBYCONFIGURE (run_mode)CALIBRATE (calib_mode) GO_BEAM_TUNGO_READY

CONFIGURE (run_mode)CALIBRATE (calib_mode)GO_STBY_CONFGO_READY

GO_STBY_CONFGO_BEAM_TUNCALIBRATE (calib_mode)CONFIGURE (run_mode)LOCK

GO_OFFCONFIGURE (run_mode)

GO_STANDBY

UNLOCK

STOP

Page 17: DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

INTEGRATION WITH OTHER ONLINE SYSTEMS

• Test in lab with part of DCS, DAQ, TRG will start in March