DC Power Plants for Telecommunications and Data
Thomas G. CrodaPrincipal Engineer
Presented toPresented to
INFOBATT INFOBATT 20052005
CSI Telecommunication
Engineers
![Page 2: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/2.jpg)
CSI Telecommunications Engineers 2
IntroductionEngineering RequirementsApplicable Standards
![Page 3: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/3.jpg)
CSI Telecommunications Engineers 3
Engineering Considerations
Equipment to be PoweredRequired Reserve TimeMinimum Operating VoltageSize of the Facility
![Page 4: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/4.jpg)
CSI Telecommunications Engineers 4
Plant Size and Design
Load current
Voltage operating range
Required reserve time
Recharge time
Battery sizing
Rundown problems
Allowable plant voltage drop
Grounded (+) conductor
![Page 5: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/5.jpg)
CSI Telecommunications Engineers 5
2000 - 25,000 Amp DC Power PlantDual Level Distribution
BatteryString #11300 AH
1
2
11 12
23
24
BatteryString #N1300 AH
1
2
11 12
23
24
800 AmpBatteryCharger
#1
+ +
Shunt-48 VDC
Return
480 VAC3 Phase
480 VAC3 Phase
PrimaryPower Bay
600 AFuses
12
14
800 AmpBatteryCharger
#N
SecondaryPower Bay
“A” Power
“B” Power
Return
To EquipmentBays
![Page 6: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/6.jpg)
CSI Telecommunications Engineers 6
Load Current
At float voltage
At end of discharge
![Page 7: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/7.jpg)
CSI Telecommunications Engineers 7
Voltage Operating Range
See T1.315 for new equipment (40-57 VDC)
Check specific equipment for its operating range
Float voltage
End of discharge voltage
Equalize voltage
![Page 8: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/8.jpg)
CSI Telecommunications Engineers 8
Required Reserve Time
Regulatory requirementsReliability requirementsEconomic issues
![Page 9: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/9.jpg)
CSI Telecommunications Engineers 9
Recharge Time
Reliability RequirementsRundown ProblemCharger sizing
![Page 10: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/10.jpg)
CSI Telecommunications Engineers 10
Rundown Problem
The problem of more load than the chargers will supportWhat happens with a 1000 Amp load at 54 VDC?Since the entire load is "constant power" the load at 40 VDC is: 54 * 1000 / 40 = 1350 AmpsThe MINIMUM amount of chargers must exceed 1350A.
![Page 11: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/11.jpg)
CSI Telecommunications Engineers 11
Plant Type
Single or Dual Level Distribution ArchitectureSmall plants use single level distributionLarge plants use dual level distribution
![Page 12: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/12.jpg)
CSI Telecommunications Engineers 12
DC Power – Single Point Ground
Minimal current in frameworkBalanced distribution to cancel fields
![Page 13: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/13.jpg)
CSI Telecommunications Engineers 13
Applicable Standards
T1.311 DC Power Systems –Telecommunications Environment Protection T1.315 Voltage Levels for DC-Powered Equipment in the Telecommunications EnvironmentNFPA 70 National Electrical CodeApplicable Local Standards
![Page 14: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/14.jpg)
CSI Telecommunications Engineers 14
Allowable Plant Voltage Drop
2 volts - battery to load0.25 volts - between battery and primary distribution1.0 volt - between primary and secondary distribution0.5 volts - between secondary distribution and load bay0.25 volts - allocated for fuse, circuit breaker, and shunt loss Other allocations are possible
![Page 15: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/15.jpg)
CSI Telecommunications Engineers 15
Battery Sizing Considerations
Average Discharge CurrentAverage Discharge Voltage used for calculating Average Discharge Current45 VDC is a good value (42-48)/2=45VDCIf the load is 1000 ADC at Float (54 VDC), the load at 45 VDC is 1000*54/45 = 1200 ADCUSE THIS VALUE TO SIZE YOUR BATTERY
![Page 16: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/16.jpg)
CSI Telecommunications Engineers 16
Battery DisconnectNot generally used in the telecom industry.If used, it should be 2-pole to completely isolate the battery.Each string should have a separate disconnect so one failure will not fail the plant.
![Page 17: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/17.jpg)
CSI Telecommunications Engineers 17
![Page 18: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/18.jpg)
CSI Telecommunications Engineers 18
![Page 19: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/19.jpg)
CSI Telecommunications Engineers 19
![Page 20: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/20.jpg)
CSI Telecommunications Engineers 20
![Page 21: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/21.jpg)
CSI Telecommunications Engineers 21
![Page 22: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/22.jpg)
CSI Telecommunications Engineers 22
![Page 23: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/23.jpg)
CSI Telecommunications Engineers 23
![Page 24: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/24.jpg)
CSI Telecommunications Engineers 24
![Page 25: Dc power plants for telecom and data](https://reader034.fdocuments.in/reader034/viewer/2022042607/555ccaa4d8b42a64718b5881/html5/thumbnails/25.jpg)
CSI Telecommunications Engineers 25
Questions?