DB-I1-B1-NCP

15
LOAD DISTRIBUTION SCHEDULE DB REF: DB-G-N1E DOHA CONVENTION CENTRE(BP-02B) Ref.Voltage 415/240 FED FROM : SMDB-LL1-N1E2 LOCATION :GROUND FLOOR, SECTOR 2, ELECTRICAL ROOM Phase 3 IFC REF: GN/E2-00-01/02 LOAD DETAILS Frequency 50 PHASE DESCRIPTION QUANTITY CONTROLLED BY LOAD PER CIRCUIT- R Y 1 R1 10 2x1.5+1x1.5 A1 Light @Sector-1&2,parking bay. 6 106 LCP-G-N2 636 Y1 10 2x1.5+1x1.5 8','24-2' ,'A3' & Exit Lights @ S-1&2,Foyer,Admin&Paint Worksho 2+3+2+3 62+39+45+8 LCP-G-N2 370 B1 10 2x1.5+1x1.5 9' &Exit Light Lines @ Sector-2,Stair case,parking bay 8+1 80+8 LCP-G-N2 2 R2 10 2x1.5+1x1.5 A1&Exit Lights @ S-2,Parking Bay 10+4 106+8 LCP-G-N2 1092 Y2 10 2x1.5+1x1.5 24-2''15-2/1'&'18' ,Exit Lights @ S-2,Bistro&Paint workshop 2+1+1+4 68+39+62+8 LCP-G-N2 269 B2 10 2x1.5+1x1.5 A1&Exit Lights @ Sector-2&3, Parking bay 11+6 106+8 LCP-G-N2 3 R3 10 2x1.5+1x1.5 -2''15-2/1'&'18' ,'A2',Exit Lights @ S-2&3,Bistro&Paint worksho 1+2+1+2+3 68+39+62+106+8 LCP-G-N2 444 Y3 10 SPARE 0 B3 10 SPARE 4 R4 10 SPARE 0 Y4 10 SPARE 0 B4 10 SPARE 5 R5 10 SPARE 0 Y5 10 SPARE 0 B5 10 SPARE 6 R6 10 SPARE 0 Y6 10 SPARE 0 B6 10 SPARE TOTAL CONNECTED LOAD PER PHASE(W) 2172 639 INCOMING CABLE: DEMAND FACTOR 1.00 MAXIMUM DEMAND LOAD/PHASE(KW) 2.172 0.639 TOTAL MAXIMUM DEMAND LOAD (KW) 4.567 CONNECTED LOAD CURRENT(A) 7.942 RATING OF INCOMER CKT NO. BREAKER RTG. IN AMPS CKT WIRE SIZE mm 2 LOADS IN Watts/UNIT 40A TP ISOLATOR 1x4C-10mm 2 FIRE RATED CABLE 1C-10mm 2 ECC

description

schedule

Transcript of DB-I1-B1-NCP

Page 1: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DB REF: DB-G-N1E DOHA CONVENTION CENTRE(BP-02B) Ref.Voltage 415/240 V

FED FROM : SMDB-LL1-N1E2 LOCATION :GROUND FLOOR, SECTOR 2, ELECTRICAL ROOM Phase 3 Ǿ

IFC REF: GN/E2-00-01/02 LOAD DETAILS Frequency 50 Hz

PHASE DESCRIPTION QUANTITYLOAD PER CIRCUIT- WATT

REMARKSR Y B

1

R1 10 2x1.5+1x1.5 A1 Light @Sector-1&2,parking bay. 6 106 LCP-G-N2 636

Y1 10 2x1.5+1x1.5 18','24-2' ,'A3' & Exit Lights @ S-1&2,Foyer,Admin&Paint Workshop 2+3+2+3 62+39+45+8 LCP-G-N2 370

B1 10 2x1.5+1x1.5 9' &Exit Light Lines @ Sector-2,Stair case,parking bay 8+1 80+8 LCP-G-N2 648

2

R2 10 2x1.5+1x1.5 A1&Exit Lights @ S-2,Parking Bay 10+4 106+8 LCP-G-N2 1092

Y2 10 2x1.5+1x1.5 24-2''15-2/1'&'18' ,Exit Lights @ S-2,Bistro&Paint workshop 2+1+1+4 68+39+62+8 LCP-G-N2 269

B2 10 2x1.5+1x1.5 A1&Exit Lights @ Sector-2&3, Parking bay 11+6 106+8 LCP-G-N2 1108

3

R3 10 2x1.5+1x1.5 24-2''15-2/1'&'18' ,'A2',Exit Lights @ S-2&3,Bistro&Paint workshop 1+2+1+2+3 68+39+62+106+8 LCP-G-N2 444

Y3 10 SPARE 0

B3 10 SPARE 0

4

R4 10 SPARE 0

Y4 10 SPARE 0

B4 10 SPARE 0

5

R5 10 SPARE 0

Y5 10 SPARE 0

B5 10 SPARE 0

6

R6 10 SPARE 0

Y6 10 SPARE 0

B6 10 SPARE 0

TOTAL CONNECTED LOAD PER PHASE(W) 2172 639 1756

INCOMING CABLE: DEMAND FACTOR 1.00

MAXIMUM DEMAND LOAD/PHASE(KW) 2.172 0.639 1.756

TOTAL MAXIMUM DEMAND LOAD (KW) 4.567

CONNECTED LOAD CURRENT(A) 7.942

RATING OF INCOMER

CKT NO.

BREAKER RTG. IN

AMPS

CKT WIRE SIZE mm2

LOADS IN Watts/UNIT

CONTROLLED BY

40A TP ISOLATOR

1x4C-10mm2 FIRE RATED CABLE

1C-10mm2 ECC

Page 2: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DB REF: DB-G-N2E DOHA CONVENTION CENTRE(BP-02B) Ref.Voltage 415/240 V

FED FROM : SMDB-LL1-N2E1 LOCATION :GROUND FLOOR, SECTOR 5, ELECTRICAL ROOM Phase 3 Ǿ

IFC REF: GN/E2-00-02/03 LOAD DETAILS Frequency 50 Hz

PHASE DESCRIPTION QUANTITYLOAD PER CIRCUIT- WATT

REMARKSR Y B

1

R1 10 2x1.5+1x1.5 A1&Exit Light @Sector-3,parking bay. 11+6 106+8 LCP-G-N6 1214

Y1 10 2x1.5+1x1.5 24-2','15-1','18' & Exit Lights @ S-3,Bistro-2&Paint Workshop 2+1+1+3 39+68+62+8 LCP-G-N6 232

B1 10 2x1.5+1x1.5 A1&Exit @ Sector-4,Janitor,parking bay 10+6 106+8 LCP-G-N6 1108

2

R2 10 2x1.5+1x1.5 24-2''15-2/1','18' &Exit Lights @ S-4,Bistro&Paint workshop 8+5 106+8 LCP-G-N6 888

Y2 10 2x1.5+1x1.5 A1&Exit Lights @ S-4&5,Janitor,Parking bay 10+6 106+8 LCP-G-N6 1108

B2 10 2x1.5+1x1.5 24-2''15-2/1','18' &Exit Lights @ S-4,Bistro&Paint workshop 2+1+1+3 39+68+62+8 LCP-G-N6 232

3

R3 10 SPARE 0

Y3 10 SPARE 0

B3 10 SPARE 0

4

R4 10 SPARE 0

Y4 10 SPARE 0

B4 10 SPARE 0

5

R5 10 SPARE 0

Y5 10 SPARE 0

B5 10 SPARE 0

6

R6 10 SPARE 0

Y6 10 SPARE 0

B6 10 SPARE 0

7

R7 10 SPARE 0

Y7 10 SPARE 0

B7 10 SPARE 0

8

R8 10 SPARE 0

Y8 10 SPARE 0

B8 10 SPARE 0

TOTAL CONNECTED LOAD PER PHASE(W) 2102 1340 1340

INCOMING CABLE: DEMAND FACTOR 1.00

MAXIMUM DEMAND LOAD/PHASE(KW) 2.102 1.340 1.340

TOTAL MAXIMUM DEMAND LOAD (KW) 4.782

CONNECTED LOAD CURRENT(A) 8.316

RATING OF INCOMER

CKT NO.

BREAKER RTG. IN

AMPS

CKT WIRE SIZE mm2

LOADS IN Watts/UNIT

CONTROLLED BY

40A TP ISOLATOR

1x4C-10mm2 FIRE RATED CABLE

1C-10mm2 ECC

Page 3: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DB REF: DB-G-S1E DOHA CONVENTION CENTRE(BP-02B) Ref.Voltage 415/240 V

FED FROM : SMDB-LL1-S1E1 LOCATION :GROUND FLOOR, SECTOR 18, ELECTRICAL ROOM Phase 3 Ǿ

IFC REF: GN/E2-00-02/03 LOAD DETAILS Frequency 50 Hz

PHASE DESCRIPTION QUANTITYLOAD PER CIRCUIT- WATT

REMARKSR Y B

1

R1 10 2x1.5+1x1.5 Exit Light @Sector-18 4 8 LCP-G-S1 32

Y1 10 2x1.5+1x1.5 Exit Light @ Sector-17 5 8 LCP-G-S1 40

B1 10 2x1.5+1x1.5 Exit Light @ Sector-9 12 8 LCP-G-S1 96

2

R2 10 2x1.5+1x1.5 Exit Lights @ Sector-18 12 8 LCP-G-S1 96

Y2 10 2x1.5+1x1.5 36','24-2' Light @ Sector-18,Women Toilet&cleaning 4+3 62+39 LCP-G-S1 365

B2 10 2x1.5+1x1.5 Exit Light @ Sector-18,Entrance-2 4 8 LCP-G-S1 32

3

R3 10 2x1.5+1x1.5 36' Light @ Sector-18,Men&Women Toilet 6 62 LCP-G-S1 372

Y3 10 2x1.5+1x1.5 Exit Light @ Sector-19,Entrance-3 4 8 LCP-G-S1 32

B3 10 2x1.5+1x1.5 36','38-3' Light @ Sector-18&19,Men toilet&Women Preyer hall 3+3 62+35 LCP-G-S1 291

4

R4 10 2x1.5+1x1.5 Exit Lights @ Sector-19&20 12 8 LCP-G-S1 96

Y4 10 2x1.5+1x1.5 Exit Light @ Sector-19,Entrance-4 4 8 LCP-G-S1 32

B4 10 2x1.5+1x1.5 36','24-1' Light @ Sector-19,Men&Women Toilet 6+2 62+32 LCP-G-S1 436

5

R5 10 2x1.5+1x1.5 36','26','28','24-2' Light @ S-19,Women Toilet&Acc.Catalogue 3+2+2+1 62+120+78+39 LCP-G-S1 543

Y5 10 2x1.5+1x1.5 36','16','24-1','24-2' Light @ Sector-19,Coat&Women Toilet 3+2+2+1 62+75+32+39 LCP-G-S1 439

B5 10 2x1.5+1x1.5 80-2','26','80-1','43' &Exit Light @ Sector-17&18 1+1+2+4+1 28+120+28+35+8 LCP-G-S1 352

6

R6 10 SPARE 0

Y6 10 SPARE 0

B6 10 SPARE 0

TOTAL CONNECTED LOAD PER PHASE(W) 1139 908 1207

INCOMING CABLE: DEMAND FACTOR 1.00

MAXIMUM DEMAND LOAD/PHASE(KW) 1.139 0.908 1.207

TOTAL MAXIMUM DEMAND LOAD (KW) 3.254

CONNECTED LOAD CURRENT(A) 5.659

RATING OF INCOMER

CKT NO.

BREAKER RTG. IN

AMPS

CKT WIRE SIZE mm2

LOADS IN Watts/UNIT

CONTROLLED BY

40A TP ISOLATOR

1x4C-10mm2 FIRE RATED CABLE

1C-10mm2 ECC

Page 4: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DB REF: DB-G-S2E DOHA CONVENTION CENTRE(BP-02B) Ref.Voltage 415/240 V

FED FROM : SMDB-LL1-S2E2 LOCATION :GROUND FLOOR,SECTOR-20, ELECTRICAL ROOM Phase 3 Ǿ

IFC REF: GN/E2-00-02/03 LOAD DETAILS Frequency 50 Hz

PHASE DESCRIPTION QUANTITYLOAD PER CIRCUIT- WATT

R Y B

1

R1 10 2x1.5+1x1.5 36','38-3','A3'&exit Light @ Sector-19,Men Preyer hall&Men Toilet 3+3+2+1 62+28 LCP-G-S3 270

Y1 10 2x1.5+1x1.5 Exit Light @ Sector-20,Entrance-5 4 8 LCP-G-S3 32

B1 10 2x1.5+1x1.5 24-2','26','10','28'&Exit Light @ S-21,Coat,Security&Cleaning 1+1+4+1+1 39+120+120+78+8 LCP-G-S3 725

2

R2 10 2x1.5+1x1.5 Exit Lights @ Sector-20,External side 6 8 LCP-G-S3 48

Y2 10 2x1.5+1x1.5 A2&Exit Light @ Sector-21,stair case 3+2 106+8 LCP-G-S3 334

B2 10 2x1.5+1x1.5 A2,A3&Exit Light @ Sector-21. 1+2+2 106+106+8 LCP-G-S3 334

3

R3 10 SPARE 0

Y3 10 SPARE 0

B3 10 SPARE 0

4

R4 10 2x1.5+1x1.5 36' Lights @ Sector-20,Women toilet 3 62 LCP-G-S3 186

Y4 10 SPARE 0

B4 10 2x1.5+1x1.5 36','24-1' Light @ Sector-19,Men&Women Toilet 6+2 62+32 LCP-G-S3 436

5

R5 10 SPARE 0

Y5 10 SPARE 0

B5 10 SPARE 0

6

R6 10 SPARE 0

Y6 10 SPARE 0

B6 10 SPARE 0

TOTAL CONNECTED LOAD PER PHASE(W) 504 366 1495

INCOMING CABLE: DEMAND FACTOR 1.00

MAXIMUM DEMAND LOAD/PHASE(KW) 0.504 0.366 1.495

TOTAL MAXIMUM DEMAND LOAD (KW) 2.365

CONNECTED LOAD CURRENT(A) 4.113

RATING OF INCOMER

CKT NO.

BREAKER RTG. IN

AMPS

CKT WIRE SIZE mm2

LOADS IN Watts/UNIT

CONTROLLED BY

40A TP ISOLATOR

1x4C-10mm2 FIRE RATED CABLE

1C-10mm2 ECC

Page 5: DB-I1-B1-NCP

REMARKS

Page 6: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I12-4-NA4-3 IFC REF: EDG-BMD-6034 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 10,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : MDB-0I3-3 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32

LOCATION FOURTH FLOOR LOAD DETAILS

CKT NO. LOAD SERVED QTY

LOAD WATTS LOAD VA

R Y B R Y B

1 16* 2 x 4 + 1 x 4 MICROWAVE 1 1845 1845 2050

2 40* 2 x 10+ 1 x 10 KITCHEN COOKER OVEN 1 5850 5850 6500

3 32* 4 x 4 + 2x 2.5 KITCHEN GENERAL S/O/HOOD (1) 9 108 972 1080

4 16* 2 x 4 + 1 x 4 REFRIGERATOR 1 346 346 384.44

5 16* 2 x 4 + 1 x 4 DISHWASHER 1 1980 1980 2200

6 16 SPARE 0 0 0 0

7 16 2 x 4 + 1 x 4 BMS-I12-01-016 (ELEC CLOSET) 1 225 225 250

8 63* 2 x 25 + 1 x 16 KITCHEN COOKER HOB 1 9450 9450 10500

9 16 SPARE 0 0 0 0

10 16 SPARE 0 0 0 0

11 16 SPARE 0 0 0 0

12 16 2 x 4 + 1 x 2.5 MSTR,BDRM 1-2 S/O LTG 6 108 648 720

13 16 2 x 4 + 1 x 2.5 MAJLIS,MAID S/O LTG 5 108 540 600

14 16 2 x 4 + 1 x 2.5 MAIN MAJLIS S/O LTG 4 108 432 480

15 16 2 x 4 + 1 x 4 LCP-I12-4-NA4 1 450 450 500

16 16 2 x 4 + 1 x 4 TR CLOSET#1 2 1125 2250 2500

17 16 2 x 4 + 1 x 4 TR CLOSET#2 2 1125 2250 2500

1820 2 x 4 + 1 x 4 TVSS

19

20100 0 SWITCH/DISCONNECTOR/RCD

21

0 0 27238 0 0 30264

TOTAL CL PER PHASE(W / VA) #REF! #REF! #REF! #REF! #REF! #REF!

INCOMING CABLE : DEMAND FACTOR 0.6

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC ESTIIMATED DEMAND LOAD (KVA) #REF!

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) #REF!

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY #REF! #REF! #REF!

MCB AMPS

CKT WIRE SIZE mm2 LOAD IN WATTS/UNIT

Page 7: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I12-4-NA4-2 IFC REF: EDG-BMD-6034 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 10,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : MDB-0I3-3 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32

LOCATION FOURTH FLOOR LOAD DETAILS

CKT NO. LOAD SERVED QTY

LOAD WATTS LOAD VA

R Y B R Y B

1 16 2 x 4 + 1 x 4 FCU-011 (BEDROOMS) 1 2085 2085 2317

2 16 2 x 4 + 1 x 4 APARTMENT EXHAUST VALVES 2 112.5 225 250

3 16* 2 x 4 + 1 x 4 MASTER BATH SHAVER S/O 1 450 450 500

4 32 4 x 4 + 2x 4 MASTER BDRM GENERAL S/O (1) 5 108 540 600

5 16* 2 x 4 + 1 x 4 BEDROOM#2 SHAVER S/O 1 450 450 500

6 16 2 x 4 + 1 x 2.5 BEDROOM 1-2 LTG (AL1,AL2,AD1,AL6,JB,AF1-4) 8,1,2,2,5,2

7 32 4x 4 + 2 x 4 BEDROOM#2 GENERAL S/O (1) 5 108 540 600

8 16* 2 x 4 + 1 x 2.5 MAJLIS,KITCHEN,BDRM 2 AREA LTG

9 16* 2 x 4 + 1 x 4 BATHROOM#1 SHAVER S/O 1 450 450 500

10 32 4 x 4 + 2 x 4 BEDROOM#1 GENERAL S/O (1) 5 108 540 600

11 16* 2 x 4 + 1 x 4 MAID BATHROOM SHAVER S/O 1 450 450 500

12 32 4 x 4 + 2 x 4 MAID GENERAL S/O (1) 4 108 432 480

13 16 2 x 4 + 1 x 4 FCU-012 (MAJLIS) 1 2085 2085 2317

14 40 2 x 10 + 1 x 4 MACHO SHADE CNTRLS 1-4 4 1728 6912 7680

15 16* 2 x 4 + 1 x 2.5 MASTER,DINING,MAIN MAJLIS LTG (AL1,AL5,AD1,F1,AF1-6,AMR-11) 15,6,4,2,1,4

16 16 2 x 4 + 1 x 2.5 BEDROOM LTG (AL1,AL2,AL3,AD1,JB,AL6,AD17,AF1-8) 2,1,3,1,2,2,2,1

17 16 SPARE 0 0 0 0

1820 2 x 4 + 1 x 4 TVSS

19

20100 0 SWITCH/DISCONNECTOR/RCD

21

0 15159 0 0 16843 0

TOTAL CL PER PHASE(W / VA) #REF! #REF! #REF! #REF! #REF! #REF!

INCOMING CABLE : DEMAND FACTOR 0.6

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC ESTIIMATED DEMAND LOAD (KVA) #REF!

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) #REF!

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY #REF! #REF! #REF!

MCB AMPS

CKT WIRE SIZE mm2 LOAD IN WATTS/UNIT

Page 8: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I02-B1M-NTH4-1 IFC REF: P1B - DWG-I01-02-EDG-BMD-6031 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : SMDB-I02-NTH4 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32 ENCLOSURE

LOCATION ELEC LOAD DETAILS

CKT NO. LOAD SERVED QTY

1 16* 2 x 4 + 1 x 4 SPUR OUTLET FOR DAP PANEL 4 108 432 480

2 16* 2 x 4 + 1 x 4 SPUR OUTLET FOR MOTORISED DAMPER 4 108 432 480

3 16* 2 x 4 + 1 x 4 CORRIDOR GENERAL S/O 3 108 324 360

4 16* 2 x 4 + 1 x 4 GARAGE WP S/O 2 108 216 240

5 16* 2 x 4 + 1 x 4 STOR,ELEV PIT GENERAL S/O 1,2 108,540 1188 1320

6 16* 2 x 4 + 1 x 4 MAID GENERAL S/O 4 108 432 480

7 16* 2 x 4 + 1 x 4 KITCHEN MICROWAVE S/O 1 1845 1845 2050

8 32* 4 x 4+ 2 x 4 KITCHEN GENERAL S/O(1) 7 108 756 840

9 40* 2 x10+1 x10 KITCHEN COOKER OVEN/HOB RIGHT 1 5850 5850 6500

10 40* 2 x10+1 x10 KITCHEN COOKER OVEN/HOB RIGHT 1 5940 5940 6600

11 16* 2 x 4 + 1 x 4 KITCHEN REFRIGERATOR S/O 1 346 346 384

12 16* 2 x 4 + 1 x 4 KITCHEN DISHWASHER S/O 1 1980 1980 2200

13 16* 4 x 4 + 2 x 4 KITCHEN HOOD S/O 1 1037 1037 1152

14 32 2 x 6 + 1 x 6 TR CLOSET S/O 2 2250 4500 5000

15 32 2 x 6 + 1 x 6 TR CLOSET S/O 2 2250 4500 5000

16 16 SPARE

17 16 SPARE

1820 2 x 4 + 1 x 4 TVSS

19

20100 SWITCH/DISCONNECTOR/RCD

21

TOTAL CL PER PHASE(W / VA) 29778 33087

INCOMING CABLE : DEMAND FACTOR 0.5

ESTIIMATED DEMAND LOAD (KVA) 16.5

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) 14.9

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY 33.1

MCB AMPS

CKT WIRE SIZE mm2 LOAD IN WATTS/UNIT

LOAD WATTS

LOAD VA

1x2C 25 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

Page 9: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I02-B1M-NTH4-2 IFC REF: P1B - DWG-I01-02-EDG-BMD-6031 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : DB-I02-NTH4 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32 ENCLOSURE

LOCATION ELEC LOAD DETAILS

CKT NO. LOAD SERVED QTY

1 16* 2 x 4 + 1 x 4 UTILITY ROOM WASHER S/O 1 1980 1980 2200

2 25* 2 x 4 + 1 x 4 UTILITY ROOM DRYER S/O 1 3510 3510 3900

3 16* 2 x 4 + 1 x 4 FCU-TA-BM-001 1 283 283 314

4 16* 2 x 4 + 1 x 4 DRIVER GENERAL S/O 4 108 432 480

5 16* 2 x 4 + 1 x 4 BATH SHAVER S/O 1 450 450 500

6 16 2 x 4 + 1 x 4 CORRIDOR GENERAL S/O 2 108 216 240

7 16* 2 x 4 + 1 x 4 BATH SHAVER S/O 1 450 450 500

8 16 2 x 4 + 1 x 4 UTILITY ROO GENERAL S/O 2 108 216 240

9 16 2 x 4 + 1 x 4 BATH EXHAUST VALVE , SEF-TA-BM-001 2,1 315,60 290 322

10 16 2 x 4 + 1 x 4 NAC PANEL 1 512 512 569

11 16 2 x 4 + 1 x 4 MOTORISED SHADE CONTROLS 2 1728 3456 3840

12 16 SPARE

13 16 SPARE

14 16 SPARE

15 16 SPARE

16 32 2 x 6 + 1 x 6 TR CLOSET S/O 2 2250 4500 5000

17 32 2 x 6 + 1 x 6 TR CLOSET S/O 2 2250 4500 5000

1820 2 x 4 + 1 x 4 TVSS

19

2063 SWITCH/DISCONNECTOR/RCD

21

TOTAL CL PER PHASE(W / VA) 20795 23106

INCOMING CABLE : DEMAND FACTOR 0.5

ESTIIMATED DEMAND LOAD (KVA) 11.6

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) 10.4

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY 23.1

MCB AMPS

CKT WIRE SIZE mm2 LOAD IN WATTS/UNIT

LOAD WATTS

LOAD VA

1x2C 25 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

Page 10: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I02-1-NTH4-1 IFC REF: P1B - DWG-I01-02-EDG-BMD-6031 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : DB-I02-NTH4 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32 ENCLOSURE

LOCATION ELEC ( I13.04:A.04 ) LOAD DETAILS

CKT NO. LOAD SERVED QTY LOAD WATTS LOAD VA

1 16 2 x 4 + 1 x 4 SPUR OUTLET FOR MOTORIZED DAMPER 4 108 432 480

2 16 SPARE 0 0

3 16* 2 x 4 + 1 x 4 CORRIDOR GENERAL S/O 3 108 324 360

4 32* 4 x 4 + 2 x 4 LIVING ROOM GENERAL S/O(1) 6 108 648 720

5 16* 2x 4 + 1 x 4 STUDYROOM GENERAL S/O 4 108 432 480

6 16 2 x 4 + 1 x 4 EXHAUST VALVES 3 315 945 1050

7 16* 2 x 4 + 1 x 4 CORR BATHROOM SHAVER S/O 1 450 450 500

8 16* 2 x 4 + 1 x 4 BATHROOM SHAVER S/O 1 450 450 500

9 32* 4 x 4 + 2 x 4 BEDROOM GENERAL S/O(1) 5 108 540 600

10 16* 2x 4 + 1 x 4 MASTER BATH SHAVER S/O 1 450 450 500

11 32* 4 x 4 + 2 x 4 MASTER BEDROOM GENERAL S/O(1) 6 108 648 720

12 32 2 x 6 + 1 x 6 MECHO SHADE CNTRL 1,2&3 3 1728 5184 5760

13 32 2 x 6 + 1 x 6 MECHO SHADE CNTRL 4,5,6 3 1728 5184 5760

14 16 SPARE 0 0

15 16 SPARE 0 0

16 16 SPARE 0 0

17 16 SPARE 0 0

1820 2 x 4 + 1 x 4 TVSS

0 0

19 0 0

2063 SWITCH/DIXCONNECTOR/RCD

0 0

21 0 0

TOTAL CL PER PHASE(W / VA) 15687 17430

INCOMING CABLE : DEMAND FACTOR 0.5

ESTIIMATED DEMAND LOAD (KVA) 8.7

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) 7.8

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY 17.4

MCB AMPS

CKT WIRE SIZE mm2

LOAD IN WATTS/UNIT

1x2C 25 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

Page 11: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I02-0-NTH4-1 IFC REF: P1B - DWG-I01-02-EDG-BMD-6032 100A AMP SWITCH / 100AMP MAINS

DB TYPE INCOMER SWITCH LOAD DETAILS 22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM : DB-I02-NTH4 240 VOLTS, 1 PHASE, 2 WIRE + E SURFACE MOUNTED,IP 32 ENCLOSURE

LOCATION ELEC LOAD DETAILS

CKT NO. LOAD SERVED QTY

1 16 SPARE

2 16 SPARE

3 16* 2 x 4 + 1 x 4 LOBBY GENERAL S/O 2 108 216 240

4 32* 2 x 4 + 1 x 4 LIVING ROOM GENERAL S/O(1) 7 108 756 840

5 16* 2 x 4 + 1 x 4 BATH SHAVER S/O 1 450 450 500

6 16* 2 x 4 + 1 x 4 BATH EXHAUST VALVE 2 315 630 700

7 16* 2 x 4 + 1 x 4 KITCHEN JB 1 100 100 111

8 32* 4 x 4+ 2 x 4 KITCHEN GENERAL S/O(1) 6 108 648 720

9 40* 2 x10+1 x10 KITCHEN COOKER OVEN/HOB RIGHT 1 5850 5850 6500

10 40* 2 x10+1 x10 KITCHEN COOKER OVEN/HOB RIGHT 1 5940 5940 6600

11 16* 2 x 4 + 1 x 4 KITCHEN MICROWAVE S/O 1 1845 1845 2050

12 16* 2 x 4 + 1 x 4 KITCHEN REFRIGERATOR S/O 1 346 346 384

13 32 4 x 4 + 2 x 4 DINING GENERAL S/O(1) 5 108 540 600

14 32 4 x 4 + 2 x 4 DINING GENERAL S/O(1) 6 108 648 720

15 16* 2 x 4 + 1 x 4 PORCH WP S/O 1 108 108 120

16 16 2 x 4 + 1 x 4 SPUR OUTLET FOR DAP PANEL 4 108 432 480

17 16 2 x 4 + 1 x 4 SPUR OUTLET FOR DAP PANEL,CCTV 4 108 432 480

1820 2 x 4 + 1 x 4 TVSS

19

20100 SWITCH/DISCONNECTOR/RCD

21

TOTAL CL PER PHASE(W / VA) 18941 21046

INCOMING CABLE : DEMAND FACTOR 0.5

ESTIIMATED DEMAND LOAD (KVA) 10.5

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) 9.5

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY 21.0

MCB AMPS

CKT WIRE SIZE mm2

LOAD IN WATTS/UNIT

LOAD WATTS

LOAD VA

1x2C 25 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

Page 12: DB-I1-B1-NCP

LOAD DISTRIBUTION SCHEDULE

DOHA LAND - PHASE 1 B

DB NAME DB-I1-B1-NCP SHOP DWG REF : CQB-ETA-CQ002-EGN-DRG-10918,CQB-ETA-CQ002-EPW-DRG-10918, 63A RCCB / 125A MAINS

DB TYPE RCCB LOAD DETAILS 22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM SMDB-I1-B1-N3 415 VOLTS, 3 PHASE, 4 WIRE + E SURFACE MOUNTED,IP 32 ENCLOSURE

LOCATION STOR I12.BM:5.12 LOAD DETAILS

CKT NO. PHASE LOAD SERVED QTYLOAD WATTS LOAD VA LOAD VA LOAD WATTS

QTY LOAD SERVED PHASE CKT NO.R Y B R Y B B Y R B Y R

1

R1

16 25 4 x 4 + 1 x 4 CPCHP-I01-BM-101 1 5.59 5.59 1 CPCHP-I01-BM-102 4 x 4 + 1 x 4 25 16

R2

2Y1 Y2

B1 B2

3

R3

16 25 4 x 4 + 1 x 4 CPCHP-I01-BM-103 1 1.12 1.12 1 CPCHP-I01-BM-104 4 x 4 + 1 x 4 25 16

R4

4Y3 Y4

B3 B4

5

R5

16 25 4 x 4 + 1 x 4 CPCHP-I01-BM-105 1 5.59 5.59 1 CPCHP-I01-BM-106 4 x 4 + 1 x 4 25 16

R6

6Y5 Y6

B5 B6

7

R7

16 25 4 x 4 + 1 x 4 CPCHP-I01-BM-107 1 1.12 1.12 1 CPCHP-I01-BM-108 4 x 4 + 1 x 4 25 16

R8

8Y7 Y8

B7 B8

9

R9 16 SPARE SPACE R10

10Y9 SPACE SPACE Y10

B9 SPACE SPACE B10

11

R11 SPACE SPACE R12

12Y11 SPACE SPACE Y12

B11 SPACE SPACE B12

TOTAL CL PER PHASE(W / VA) TOTAL CL (KVA) TOTAL CL (KW)

INCOMING CABLE : DEMAND FACTOR 0.8 0.0 0.0

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 PVC CPC G/Y ESTIIMATED DEMAND LOAD (KVA) 0.0

*=30mA RCBO **=100mA RCBO ESTIIMATED DEMAND LOAD (KW) 0.0

(1) = RING MAIN PRINCIPLE PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY 0.00 0.00 0.00

MCB AMPS

CONDUIT SIZE mm2

CKT + GND WIRE SIZE mm2

LOAD IN WATTS/UNIT

LOAD IN WATTS/UNIT

CKT + GND WIRE SIZE mm2

CONDUIT SIZE mm2

MCB AMPS