VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENT TO JFK AIRPORT – CONTRACT 2 PIN X735.83, Contract D900050 DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 UTILITY REQUIREMENTS Final April 21, 2020

Transcript of DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1...

Page 1: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

VAN WYCK EXPRESSWAY (VWE) CAPACITY

AND ACCESS IMPROVEMENT TO JFK

AIRPORT – CONTRACT 2

PIN X735.83, Contract D900050

DB CONTRACT DOCUMENTS

REQUEST FOR PROPOSALS

PART 4

UTILITY REQUIREMENTS

Final April 21, 2020

Page 2: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

This page is intentionally left blank

Page 3: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 i Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

Table of Contents

PART 4 - UTILITY REQUIREMENTS .......................................................... 1

4-1 SCOPE ............................................................................................................................................. 1

4-2 GENERAL ........................................................................................................................................... 2

4-2.1 Utility Coordination .................................................................................................................... 2 4-2.2 Utility Coordination Manager ..................................................................................................... 2 4-2.3 Utility Relocation Design ............................................................................................................ 3 4-2.4 Scheduling Utility Relocation Work............................................................................................ 3 4-2.5 Utility Design and Construction Constraints .............................................................................. 3 4-2.6 Standard of Care Applicable to Utility Work .............................................................................. 4 4-2.7 Coordination with Utility Owners................................................................................................ 4

4-3 AFFECTED UTILITIES ..................................................................................................................... 4

4-3.1 Design-Builder's Responsibilities .............................................................................................. 4

4-4 COORDINATION REQUIREMENTS ............................................................................................... 5

4-4.1 Prior Department Actions .......................................................................................................... 5 4-4.2 Design Builder's Coordination Requirements ............................................................................ 6 4-4.3 Design Reviews ......................................................................................................................... 7 4-4.4 Meetings and Coordination ........................................................................................................ 7

4-5 STANDARDS AND REFERENCES ................................................................................................. 7

4-6 DESIGN BUILDER RESPONSIBILITIES ......................................................................................... 8

4-6.1 Cost of Temporary Relocations ................................................................................................. 8 4-6.2 Relocation Permits .................................................................................................................... 8 4-6.3 Point of Contact ......................................................................................................................... 8 4-6.4 Instructions and Authorizations ................................................................................................. 8 4-6.5 Verification of Utility Locations and Marking of Locations in the Field ...................................... 9 4-6.6 Components of Utilities .............................................................................................................. 9 4-6.7 Utility Owner's Right to Inspect .................................................................................................. 9 4-6.8 Design-Builder-Caused Changes to Utility Owner Work ........................................................... 9 4-6.9 Abandoned Utilities .................................................................................................................... 9 4-6.10 Quality Control ........................................................................................................................... 9 4-6.11 Changes to Design .................................................................................................................... 9 4-6.12 Design-Builder Design and/or Construction ............................................................................ 10 4-6.13 Design Review ......................................................................................................................... 10 4-6.14 Construction Record ................................................................................................................ 10 4-6.15 Utility Damage Reports ............................................................................................................ 10 4-6.16 Protection of Utility Facilities .................................................................................................... 12

Page 4: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 ii Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-6.17 Utility Relocation Master Plan .................................................................................................. 12 4-6.18 Betterments ............................................................................................................................. 12

4-7 DESIGN AND APPROVAL OF THE UTILITY RELOCATION PLANS ............................................ 12

4-8 SUBMITTALS ................................................................................................................................. 13

4-8.1 Design ...................................................................................................................................... 13 4-8.2 Construction............................................................................................................................. 13

4-9 DB UTILITY WORK AGREEMENTS .............................................................................................. 13

4-9.1 General .................................................................................................................................... 13 4-9.2 Utilities Not Covered by DB Utility Work Agreements ............................................................. 14

4-10 DELIVERABLES ............................................................................................................................ 15

APPENDIX A UTILITY REQUIREMENTS ................................................ 4-1

A-1 UTILITY COMPANIES ......................................................................................................................... 4-1

A-2 UTILITY INVENTORY ......................................................................................................................... 4-2

A-2.1 Telecommunications ............................................................................................................... 4-2 A-2.1.1 Verizon Communications Incorporated .................................................................................. 4-2 A-2.1.2 Charter Communications, Inc. ................................................................................................ 4-2 A-2.1.3 Altice USA, Inc. ....................................................................................................................... 4-2 A-2.2 Electric .................................................................................................................................... 4-3 A-2.2.1 Consolidated Edison, Inc. ....................................................................................................... 4-3 A-2.2.2 Port Authority of New York and New Jersey .......................................................................... 4-3 A-2.3 Natural Gas ............................................................................................................................. 4-3 A-2.3.1 National Grid US ..................................................................................................................... 4-3 A-2.4 Water ...................................................................................................................................... 4-3 A-2.4.1 New York City Department of Environmental Protection ....................................................... 4-3 A-2.5 Storm and Sanitary ................................................................................................................. 4-3 A-2.5.1 New York City Department of Environmental Protection ....................................................... 4-3 A-2.6 Other Utilities .......................................................................................................................... 4-3 A-2.6.1 Fire Department of the City of New York – Communications ................................................. 4-3 A-2.7 Utility Service Connections ..................................................................................................... 4-3

A-3 UTILITY RELOCATIONS BY OTHERS ................................................................................................... 4-4

A-3.1 Telecommunications ............................................................................................................... 4-4 A-3.1.1 Verizon Communications Incorporated .................................................................................. 4-4 A-3.1.2 Charter Communications Inc. (Spectrum) .............................................................................. 4-4 A-3.1.3 Altice USA, Inc. ....................................................................................................................... 4-4 A-3.2 Electric .................................................................................................................................... 4-4 A-3.2.1 Consolidated Edison, Inc. ....................................................................................................... 4-4 A-3.2.2 Port Authority of New York and New Jersey .......................................................................... 4-4 A-3.3 Natural Gas ............................................................................................................................. 4-4

Page 5: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 iii Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A-3.3.1 National Grid US ..................................................................................................................... 4-4 A-3.4 Water ...................................................................................................................................... 4-5 A-3.4.1 New York City Department of Environmental Protection ....................................................... 4-5 A-3.5 Storm and Sanitary ................................................................................................................. 4-5 A-3.5.1 New York City Department of Environmental Protection ....................................................... 4-5 A-3.6 Other Utilities .......................................................................................................................... 4-5 A-3.6.1 Fire Department of the City of New York – Communications ................................................. 4-5

A-4 UTILITY RELOCATIONS BY THE DESIGN-BUILDER ............................................................................... 4-5

A-4.1 Telecommunications ............................................................................................................... 4-5 A-4.1.1 Verizon Communications Incorporated .................................................................................. 4-5 A-4.1.2 Charter Communications, Inc. (Spectrum) ............................................................................. 4-5 A-4.1.3 Altice USA, Inc. ....................................................................................................................... 4-5 A-4.2 Electric .................................................................................................................................... 4-6 A-4.2.1 Consolidated Edison, Inc. ....................................................................................................... 4-6 A-4.2.2 Port Authority of New York and New Jersey .......................................................................... 4-6 A-4.3 Natural Gas ............................................................................................................................. 4-6 A-4.3.1 National Grid US ..................................................................................................................... 4-6 A-4.4 Water Mains ............................................................................................................................ 4-6 A-4.4.1 New York City Department of Environmental Protection ....................................................... 4-6 A-4.5 Storm and Sanitary ................................................................................................................. 4-6 A-4.5.1 New York City Department of Environmental Protection ....................................................... 4-6 A-4.6 Other Utilities .......................................................................................................................... 4-6 A-4.6.1 Fire Department of the City of New York – Communications ................................................. 4-6

A-5 DESIGN BUILD UTILITY DOCUMENTS ................................................................................................. 4-6

APPENDIX B NON-PARTICIPATING AGENCIES ................................... 4-1

APPENDIX C PRELIMINARY DB UTILITY WORK AGREEMENTS ........ 4-1

Page 6: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

This page is intentionally left blank

Page 7: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

PART 4 - UTILITY REQUIREMENTS

4-1 SCOPE

This Part 4 - Utility Requirements provides information on the Design-Builder's overall

responsibilities as they relate to existing and/or new utilities, the manner in which utilities are to

be protected, relocated, upgraded, constructed or incorporated into the construction, and who will

be responsible for the Work.

The Design-Builder's attention is directed to the fact that during the life of this Contract the owners

and operators of utilities may make changes to their facilities. These changes may be made by

the utility employees or by contract within the Project limits of, or adjacent to, this Contract and

may involve temporary and/or permanent Work(s).

Potential utility conflicts shall be identified by the Design-Builder and brought to the attention of

the Department and utility owners. Reference is made to the New York State Department of

Transportation Highway Design Manual, and NYSDOT Standard Specifications and Construction

Materials and all applicable NYSDOT Standards.

The Design-Builder shall abide by this Part 4. The Design-Builder shall also abide by and fulfill

the requirements related to utility facilities or systems included in other Contract Documents.

This Part 4 applies to existing and proposed underground and overhead utilities.

The Design-Builder shall be responsible to verify all utility information provided and to coordinate

with the utilities regarding any necessary modification to the Preliminary DB Utility Work

Agreements (if provided) based on any new information and any further utility work required

beyond that indicated in the Preliminary DB Utility Work Agreements (if provided).

If the Design-Builder’s design requires additional utility relocations beyond those identified in the

Preliminary DB Utility Work Agreements presented in Appendix C, it is the responsibility of the

Design-Builder to suggest revised Preliminary DB Utility Work Agreements in coordination with

the utility owners and submit the revised Preliminary DB Utility Work Agreements to the

Department for approval.

At points where the Design-Builder’s operations are adjacent to utilities, damage to which might

result in considerable expense, loss, or inconvenience, Work shall not begin until all arrangements

necessary for the protection thereof have been made by the Design-Builder and the utility owner.

The Design-Builder shall cooperate with all utility owners (including owners of underground or

overhead utility lines and owners of utilities attached to existing Department structures) in their

removal and rearrangement operations in order that these operations may progress in a

reasonable manner, that duplication of rearrangement Work may be reduced to a minimum, and

that services rendered by those parties will not be unnecessarily interrupted. See also DB §107-

07 addressing Work near underground facilities.

Page 8: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 2 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-2 GENERAL

The Department’s interaction with Utilities located within the Highway Right Of Way (ROW) is

governed by 17 NYCRR (Official Compilation of Codes, Rules and Regulations of the State of

New York) Part 131.

The Department has notified all Utilities, pipeline owners, or other parties who seemingly are

affected by the proposed construction based on the preliminary design plans and endeavor to

have Preliminary DB Utility Work Agreements executed with potentially affected Utilities prior to

the Award of the Contract.

The Design-Builder, in coordination with the Department’s Project Manager (or his designee),

shall meet with all the affected Utility owners or operators for the purpose of discussing the effect

on the utility facilities and to agree on a plan to maintain, protect, relocate, reinstall, or other action

that may be necessary for the work to progress.

Reference is made to General Obligations Law §11-102 which concerns the liability of a Utility for

compensation for damages caused by interference with and/or delay of progress of work under a

State public construction contract.

4-2.1 Utility Coordination

The Design-Builder shall coordinate its design and construction efforts with utility owners as set

forth in Part 2 - General Provisions of the Contract. All design and construction work performed

by the Design-Builder shall be coordinated with the utility owners, and shall be subject to the

Preliminary DB Utility Work Agreements, utility standards and applicable provisions of the

Contract Documents.

The Design-Builder shall notify the Department at least five working days in advance of each

meeting with a utility owner's representative scheduled by the Design-Builder and shall allow the

Department the opportunity to participate in each meeting. The Design-Builder shall also provide

the Department with copies of all correspondence between the Design-Builder and any utility

owner, within seven days after receipt or sending, as applicable.

4-2.2 Utility Coordination Manager

The Design-Builder shall utilize a single dedicated person responsible for managing all utility

coordination. This person shall be referred to as the Utility Coordination Manager. The Design-

Builder’s Utility Coordination Manager shall be responsible for managing all utility coordination,

including, but not limited to, the following:

A) Ensuring that all utility coordination and activities are conducted in accordance with the

requirements of the Contract Documents;

B) Identifying all existing utilities and coordinating any new utility installations;

Page 9: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 3 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

C) Reviewing Department prepared proposed utility permit application packages and

commenting on each permit application as related to the Design-Builder’s utility relocation

drawings;

D) Attending utility meetings, preparing and distributing minutes of all utility meetings, and

ensuring expedient follow-up on all unresolved issues;

E) Distributing all plans, conflict matrixes and changes that affect utility owners and making sure

this information is properly coordinated;

F) Coordinating the execution and performance of Work required for any utility Work needed

within the Project;

G) Preparing and coordinating the execution of Final DB Utility Work Agreements between the

Design-Builder, Department, and utility owners;

H) Assisting with the resolution of utility conflicts;

I) Providing periodic Project updates to the Department’s Project Manager as requested; and

J) Coordination with the Department on any issues that arise concerning reimbursement of

utility work costs.

4-2.3 Utility Relocation Design

The Responsibility for design of relocations covered by a DB Utility Work Agreement (DB-HC140)

shall be as set forth in each such DB Utility Work Agreement. The DB Utility Work Agreements

shall allocate responsibility for the design of utility relocations that are subject to such DB Utility

Work Agreements. The Design-Builder shall clearly indicate the allocation of responsibility for the

design of utility relocations on the Utility Relocation Plans.

4-2.4 Scheduling Utility Relocation Work

The Design-Builder shall allow in its Baseline Progress Schedule and monthly updates, the time

required for utility owners to accomplish the tasks and activities for which they are responsible,

as specified in the Preliminary DB Utility Work Agreements (if applicable), Relocation Plans, and

in this Part 4.

4-2.5 Utility Design and Construction Constraints

All utilities (whether designed and/or constructed by the Design-Builder or the utility owner) within

the Project Limits that are to be newly installed temporarily or permanently, relocated or upgraded

shall be placed in accordance with the NYSDOT's utility regulations and policies, unless otherwise

approved by the Department.

Page 10: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

For each relocation, or installation, the Design-Builder, in coordination with the utility owner, shall

be responsible for verifying that the relocated utility, as designed and constructed, is compatible

with and interfaces properly with the Project. The Design-Builder shall be responsible for

protecting any and all utilities that must be protected in order to permit construction of the Project.

4-2.6 Standard of Care Applicable to Utility Work

The Design-Builder shall be responsible for complying with 16 NYCRR Part 753 ("Part 753"), and

requesting mark outs for utilities that are not members of the One Call System as defined in Part

753. A list of known utility operators that are not members of the One Call System with facilities

within the Project area is included in Appendix B. The Design-Builder shall carry out its work

carefully, and skillfully, and shall support and secure utilities so as to avoid damage and keep

them satisfactorily maintained and functional. The Design-Builder shall not move or remove any

utility without the utility owner's written consent unless otherwise directed by the Department.

The Design-Builder shall be responsible for the cost of repair of any utilities damaged by the

Design-Builder. In the event of any such damage, the Design-Builder shall notify the affected utility

owners and the Department, and shall enter into an agreement with such utility owner allocating

responsibility for design and construction of any such repairs, and the schedule for completing

the repairs. All such repairs made by the Design-Builder shall be performed in a good and

workmanlike manner. If the utility owner undertakes the repairs and the Design-Builder fails to

make any required payment within 30 days after the repairs have been completed and the Design-

Builder's receipt of the utility owner's invoice therefore, the Department will have the right to pay

the utility owner from the Department's funds and/or deduct an amount sufficient to cover the cost

from any moneys due or that may become due the Design-Builder under this Contract.

The Design-Builder shall include provisions for its obligations with respect to utilities in its Quality

Control Plan.

4-2.7 Coordination with Utility Owners

The Design-Builder shall make diligent effort to obtain the cooperation of each utility owner as

necessary for the project. If the Design-Builder becomes aware that a utility owner is not

cooperating in providing needed work or approvals, the Design-Builder shall notify the Department

immediately of such problem. After such notice, the Design-Builder shall continue to diligently

seek to obtain the utility owner's cooperation, and the Department and Design-Builder each shall

assist the other party as reasonably requested by such other party with regard to the problem.

4-3 AFFECTED UTILITIES

4-3.1 Design-Builder's Responsibilities

With respect to utilities for which the Department has identified a specific utility owner and conflict,

the Design-Builder's responsibilities shall include:

Page 11: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 5 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A) Verifying utility locations;

B) Identifying potential conflicts not previously identified;

C) Coordinating and/or designing/constructing utility relocations and/or new utilities and the

protection of existing utilities in accordance with this Part 4 and any additional requirements

of the utility owner(s) as set forth in the relevant Preliminary DB Utility Work Agreement(s)

included in Appendix C hereto; and

D) Preparing and coordinating the execution of Final DB Utility Work Agreements between the

Design-Builder, Department, and utility owners.

With respect to any unknown utilities that are subsequently identified by the Design-Builder, the

Design-Builder shall be responsible for identifying the ownership of each facility or line identified

which requires either relocation or protection, and for all those responsibilities set forth in A

through D, above; provided, however, that with respect to item C, the Design-Builder shall be

responsible for negotiating and entering into a DB Utility Work Agreement with the Department

and the Utility Owner for such previously unknown utilities and/or utilities for which no owner had

been previously identified, and the Design-Builder's responsibilities in item C shall apply with

respect to each such DB Utility Work Agreement.

4-4 COORDINATION REQUIREMENTS

The Design-Builder shall make diligent effort to obtain the cooperation of each utility owner as

necessary for the Project. If the Design-Builder becomes aware that a utility owner is not

cooperating in providing needed work or approvals, the Design-Builder shall notify the Department

immediately of such situation. After such notice, the Design-Builder shall continue to diligently

seek to obtain the utility owner's cooperation, and the Department and Design-Builder each shall

assist the other party as reasonably requested by such other party with regard to the situation.

The Design-Builder shall provide information as required and maintain close coordination with the

Department and utility owners to achieve timely relocations, new installations and new service

connections necessary as part of the Design-Builder's design and construction.

4-4.1 Prior Department Actions

The Department has coordinated its efforts with all known utility owners and has:

A) Developed a contact list;

B) Identified potential utility conflicts; and

C) Developed Preliminary DB Utility Work Agreements as set forth in Appendix C hereto.

Page 12: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 6 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-4.2 Design Builder's Coordination Requirements

The Design-Builder shall be responsible for coordination with utility owners. It is important that

Utility Owners be kept informed of the Design-Builder's activities and schedule. In addition to

satisfying any requirements set forth in applicable Governmental Rules and Standards, including

but not limited to Part 753, the One-Call notification requirements referenced in DB § 107-07, and

in any DB Utility Work Agreements that may have been executed, the Design-Builder shall

undertake the following activities, which have been identified by the Department as important to

utility owners:

A) Keep utility owners well informed of construction schedules and notify the utility owners at

least twenty-four hours in advance of any work in the vicinity of the utility owners' facilities,

that will not impact service;

B) Keep utility owners well informed of changes that affect their facilities;

C) In addition to any required notice, give the utility owners a minimum of 48 hours notice of

potential impacts to service, unless longer notification times are specified elsewhere in this

Part 4 or any DB Utility Work Agreements that may have been executed;

D) Ensure utility owners are involved in making the decisions that affect their own facilities and

services;

E) Cooperate with the utility owners to solve relocation/installation issues to the extent that such

relocations/installations are consistent with the Design-Builder's Scope of Work as otherwise

set forth in the Contract Documents and without causing the Department to incur any

unnecessary expense to the Project, or causing the utility owners to incur unnecessary

expense;

F) Act diligently in continuing the positive relationship that the Department has developed with

the utility owners; and

G) Coordinate with those utility owners who perform their own work by scheduling adequate

time to accomplish their work.

In the event of interruption to utility services as a result of accidental breakage or as a result of

being exposed or unsupported, the Design-Builder shall promptly notify the proper authority

regarding the restoration of service. If any essential service (including water, gas, electric fiber-

optic, cable, telephone or other utility) is interrupted, the Design-Builder shall provide continuous

repair Work until the service is restored. No Work shall be undertaken around fire hydrants until

provision for service has been approved by the local fire authority.

Page 13: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 7 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-4.3 Design Reviews

The Design-Builder shall invite affected utility owners to participate in all pertinent Design-

Builder's and Department's Design Reviews (see Part 3, Section 5).

Some utility owners may design and/or construct any required utility relocations and revisions for

their utilities. The Design-Builder shall be required to incorporate these utility designs into its own

design prior to the Design Review.

4-4.4 Meetings and Coordination

The Design-Builder shall schedule meetings with each utility owner, the Design-Builder and the

Department. These meetings are for the purpose of reviewing all items related to the utility Work,

including all items which affect the Baseline Progress Schedule, the time required to procure

construction material and the period of time utility service may be curtailed. These meetings will

also be used to reach concurrence on the number and extent of known affected utility lines or

issues, to discuss the possible elimination of conflicts, to establish the methods to be used at

each specific location and procedures for addressing conflicts discovered during design and/or

construction.

The Design-Builder shall jointly schedule at least monthly utility meetings with the Department or

their duly authorized representative to discuss project progress, issues, and planned work for all

phases of utility work including design and construction. These meetings shall include the Design-

Builder's and the Department's personnel with responsibilities for utilities. The Design-Builder and

the Department will jointly develop the agenda for these meetings. The Design-Builder shall be

responsible for providing meeting facilities unless otherwise agreed. The Design-Builder shall

keep minutes of the coordination meetings and distribute copies of the minutes to participants,

including representatives of utility owners (even if not present) who have facilities in the areas

reviewed, within five working days after the meeting date.

4-5 STANDARDS AND REFERENCES

The Design-Builder shall perform the utility work in accordance with the Contract Requirements,

including this Part 4, the applicable Standards, Codes and Manuals listed in Part 3 – Project

Requirements and the standards required by the various utility companies affected by the work.

The Design-Builder shall obtain clarification of any unresolved ambiguity prior to proceeding with

design or construction.

The Department will make available to the Design-Builder upon request all information obtained

from utilities, pipeline owners, and other parties that the Department has notified concerning the

proposed construction. Such information will be considered Reference Documents.

Page 14: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 8 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-6 DESIGN BUILDER RESPONSIBILITIES

The Design-Builder shall be responsible for coordinating its design and construction work with

utility work as indicated herein, consistent with and subject to the terms and conditions set forth

in DB §104.

The Design-Builder shall identify and resolve all utility conflicts, and shall coordinate the

construction, relocation, removal and/or protection of each affected utility with the applicable utility

owner. If the Design-Builder discovers utilities not identified in Appendix A of this Part 4 that are

affected by the construction, the Design-Builder shall immediately suspend construction

operations at the site affected by such utility and shall notify the Department within 24 hours of

discovery of such previously unknown utilities. The Design-Builder and the Department shall

cooperate in identifying and notifying the utility owner.

4-6.1 Cost of Temporary Relocations

The Design-Builder shall be responsible for the cost of temporary utility relocations, including the

cost of obtaining temporary easements, necessary to accommodate its own construction

operations and/or methods, other than temporary relocations that are necessary for the

construction of the Project permanent works.

4-6.2 Relocation Permits

Where the Design-Builder is performing utility relocation construction Work, the Design-Builder

shall obtain utility permits, roadway permits and work permits and comply with all applicable utility

regulations. If the Design-Builder has reasonable cause to believe that a utility owner does not

have necessary approvals, or is in violation of the approvals, the Design-Builder shall notify the

Department immediately after discovery.

4-6.3 Point of Contact

The Design-Builder shall coordinate, cooperate and work with the contact person designated by

the utility owner. Table A-1 in Appendix A of this Part 4 presents contact details by utility owner.

4-6.4 Instructions and Authorizations

The Design-Builder shall be responsible for obtaining specific written instructions and

authorization from the utility owner, for any design or construction the Design-Builder performs on

behalf of the utility owner, and for verifying that they are consistent and compatible with the

Design-Builder's design.

Page 15: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 9 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-6.5 Verification of Utility Locations and Marking of Locations in the Field

The Design-Builder shall be responsible for verifying the exact location of each affected utility on

the Project regardless of the information that has been provided by the Department or the utility

owner.

The Design-Builder shall comply with NYCRR 16 Part 753 to mark utility locations.

4-6.6 Components of Utilities

The Design-Builder shall consider necessary appurtenances to each utility facility (such as the

utility source, guide poles, feeder service lines, supports, etc.) as part of the utility.

4-6.7 Utility Owner's Right to Inspect

The utility owner has the right to inspect the work on its facilities that is to be performed by the

Design-Builder.

4-6.8 Design-Builder-Caused Changes to Utility Owner Work

If the utility owner maintains responsibility for the design and/or construction and the Design-

Builder revises the conditions, the Design-Builder shall be responsible for the costs and schedule

delays related to the change.

4-6.9 Abandoned Utilities

Unless otherwise directed by the Department, and the utility owners, the Design-Builder shall

remove abandoned utilities and utilities proposed for abandonment within the New York State

Department of Transportation's Right Of Way. Any work to remove or abandon in place any utilities

shall be considered “Incidental Utility Work” and subject to the provisions of DB §104-04.B.7(e).

4-6.10 Quality Control

The Design-Builder shall provide Quality Control for all the utility relocation work, performed by

the Design-Builder, in accordance with Part 3, Sections 5 and 6.

4-6.11 Changes to Design

All changes to designs that have received the Department's or utility owner's consultation and

written comment and/or utility owner’s approval shall be dealt with in accordance with Part 3,

Section 5, including obtaining the Department's and utility owner's consultation and written

comment and/or approval for the change.

Page 16: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 10 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-6.12 Design-Builder Design and/or Construction

The Design-Builder shall be responsible for the utility relocation design and/or construction as

provided in Part 2 - General Provisions. The Utility Work set forth in Appendix A and the

Preliminary DB Utility Work Agreements set forth in Appendix C (if any) indicate the allocation of

responsibility between the Design-Builder and the identified utility owners for relocation design

and/or construction of the utility facilities. Subject to Part 2 - General Provisions, Design-Builder

is responsible for all relocation costs and the Contract Price includes the price for such Work.

4-6.13 Design Review

The Design-Builder shall submit its utility relocation plans to the Department's Design Quality

Assurance Engineer and to the utility owner for work performed by the Design-Builder, for

consultation and written comment. See also Part 3, Section 5.

4-6.14 Construction Record

The Design-Builder shall maintain a record of the design and construction activities of all utility

facilities that have been performed by the Design-Builder, and have been designed and released

for construction after Notice to Proceed. Individual files shall include a record of the following

information:

A) Design Plans that have been reviewed by the utility owner and received consultation and

written comment by the Department;

B) Notification of construction dates;

C) Record of meetings with utility owner;

D) Signature of utility owner inspector on Design Plans (optional);

E) Record of utility owner inspector present at any time;

F) Any revisions to the Design Plans;

G) Dates of construction completion;

H) All other as-built requirements stipulated in this Part 4;

I) Any executed Final DB Utility Work Agreements (three-party agreements).

4-6.15 Utility Damage Reports

In the event that the Design-Builder damages an existing utility, the Design-Builder shall complete

a utility damage report within 24 hours of damage and submit it to the Department. The Design-

Builder shall report any utility facilities damaged immediately to the utility owner and the

Page 17: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 11 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

Department. The Design-Builder is responsible for developing a utility damage report form to use

in the event a utility is damaged. The report shall be submitted to the Department's Project

Manager. The following information shall be included:

A) Utility Damage Information

1. Exact location;

2. Date and time of incident;

3. Date and time reported;

4. The weather the day of incident;

5. Description of the incident;

6. Who the damage was reported to;

7. Who the damage was repaired by;

8. Representative digital color photographs.

B) Utility Owner Information

1. Utility owner;

2. Utility owner contact;

3. Time utility owner was contacted.

C) Locator Information

1. Locator service;

2. Date of locate request;

3. Locate expiration date;

4. Locate log number;

5. If damaged utility line was marked;

6. Distance from damage to mark.

D) Design-Builder Information

1. Name of supervisor;

2. Name of foreman;

3. Name of witness.

E) Signatures

1. Design-Builder's supervisor;

2. Utility owner;

3. Locator service.

Page 18: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 12 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

4-6.16 Protection of Utility Facilities

The Design-Builder shall prepare a protection plan for all utility facilities to be left in place and

protected. The Design-Builder shall also obtain written approval of the plan from each utility owner

of the specific facility to be protected.

4-6.17 Utility Relocation Master Plan

The Design-Builder shall coordinate with the utilities to prepare a utility relocation master plan

after the Design Builder has advanced the Project design sufficiently to clearly define utility

impacts. The Design Builder shall update the plan at least quarterly throughout the duration of the

Contract. Updates shall be submitted to the Department for consultation and written comment.

4-6.18 Betterments

The Preliminary DB Utility Work Agreements set forth in Appendix C, if any, address any

Betterments that have been agreed to by the Department and utility owners whose facilities are

subject to a DB Utility Work Agreement.

If the Department agrees to the addition of any Betterments to the Work with respect to facilities

covered by the DB Utility Work Agreements, the Department will issue a Change Order pursuant

to DB §104-02 with respect thereto. The Design-Builder shall not be entitled to an increase in the

Contract Price with respect to any Betterments except as allowed under DB §104-04.B.3 and this

DB §104-04.B.4.

If any utility owners whose facilities are subject to a Preliminary DB Utility Work Agreement

request that the Design-Builder design or construct Betterments that are not addressed in the

relevant Preliminary DB Utility Work Agreement, the Design-Builder shall be solely responsible

for any Betterments that the Design-Builder agrees to provide that are not addressed in the

relevant Preliminary DB Utility Work Agreement. Some utility owners with whom the Design-

Builder and the Department will be entering into a DB Utility Work Agreement may request

Betterments to their facilities as a result of required relocations of their lines. The costs of any

such Betterments shall be resolved between the Department, the Design-Builder and the utility

owners in their respective DB Utility Work Agreements. The forms of DB Utility Work Agreements

attached hereto as Appendix C, if any, provide a template provision addressing agreed upon

Betterments. The Department shall have no responsibility, actual or implied, with respect to any

Betterments, and all Betterments shall be subject to the Department's permitting process.

4-7 DESIGN AND APPROVAL OF THE UTILITY RELOCATION PLANS

After the Design-Builder has advanced the Project design sufficiently to clearly define utility

impacts, the Utility Relocation Plans shall be prepared by the Design-Builder. If the utility owner

is preparing the design, the Design-Builder and the Department shall review the Utility Relocation

Plans to be sure that they are consistent with the Design-Builder's design. Upon review by the

Page 19: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 13 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

utility owner and the Design-Builder, and consultation and written comment by the Department,

the utility relocations may be constructed. Any subsequent revisions to the Utility Relocation Plans

will require the review of the affected utility owner and the Department's consultation and written

comment.

4-8 SUBMITTALS

4-8.1 Design

All design work shall be coordinated between the utility owners and the Design Builder. If the

relocation plans are to be developed by the Design-Builder, the Design-Builder shall furnish to the

Department prior to the start of construction of each utility relocation, Utility Relocation Plans and

Project Specifications completed to the levels of design and stages of design development and

reviewed and certified per Part 3, Section 5.

Designs prepared by the utility owner shall be reviewed and approved by the Design-Builder and

receive the Department's consultation and written comment, for consistency and compatibility with

the Design-Builder's design. Prior to construction, the Department will review all designs, whether

by the Design-Builder or the utility owner.

4-8.2 Construction

The Design-Builder shall provide two sets of As-Built Utility Relocation Plans to the Department

and each utility owner for utility relocation work constructed by the Design-Builder. The Design-

Builder should also reflect in the As-Built plans any work that is performed by the utility companies

within the project limits. The As-Built Utility Relocation Plans shall comply with As-Built

requirements stipulated in the Department's Utility Standards and shall include any utilities

abandoned and not removed. The As-Built Utility Relocation Plans shall be part of the Project As-

Built Plans.

4-9 DB UTILITY WORK AGREEMENTS

4-9.1 General

If Preliminary DB Utility Work Agreements have been executed, they will be identified in Part 4 –

Utility Requirements.

Utilities which may be impacted by the Project have been identified in Part 4 – Utility

Requirements.

If Preliminary DB Utility Work Agreements have not been executed and included in the Contract

Documents, the Department, in conjunction with the Design-Builder, shall negotiate with each

affected utility for Relocation of the utility’s facilities after Award and enter into a DB Utility Work

Agreement. The Design-Builder agrees to cooperate as reasonably requested by the Department

in pursuing and executing DB Utility Work Agreements after Award, including attendance at

Page 20: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 14 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

negotiation sessions and review of DB Utility Work Agreements. The Department and the Design-

Builder shall exercise due diligence and good faith efforts in coming to an agreement with each

affected utility. Each DB Utility Work Agreement shall be executed by the Department, the Design-

Builder and the Utility Owner. The Design-Builder shall remain responsible for the coordination

between itself and the utility owner after DB Utility Work Agreements have been executed in order

to maintain the Project schedule.

Issues to be addressed in the DB Utility Work Agreements may include the following:

A) Responsibility for design and/or construction of the relocations;

B) Design requirements and construction specifications;

C) Betterments, including the approach to determining whether an item is a betterment;

D) Notifications to the involved parties;

E) Review of designs and/or cost estimates by the Utility or the Design-Builder, including

timeliness;

F) Emergency response actions and timing;

G) Limitations on timing of construction or interruption of service;

H) Damage repair;

I) Inspections and testing by the Utility and/or Design-Builder;

J) Approvals (including provisions for early start of construction); and

K) Payment for relocation.

If a utility owner requests the Design-Builder to design and/or construct a Betterment, or advises

the Design-Builder that the utility owner intends to design and construct a Betterment, the Design-

Builder shall promptly analyze the impact of such Betterment on the Baseline Progress Schedule

and notify the Department if it appears the Betterment may affect the Critical Path. The Design-

Builder shall use its best efforts to negotiate arrangements with the utility owner that avoid

potential Critical Path impacts.

4-9.2 Utilities Not Covered by DB Utility Work Agreements

If public or private utility lines or pipelines or other appurtenances are encountered during the

course of the Work, which may be impacted by the Work, and which are not covered by an existing

DB Utility Work Agreement, the Design-Builder shall immediately suspend construction operations

at the site of the utility in question. The Design-Builder shall then provide the Department with a

Page 21: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 15 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

written assessment of the potential impacts to the Utilities and Contract Work, including options,

time impacts, schedule impacts, and a proposed action plan. Construction Operations at the site

of the utility in question shall remain suspended until such time that the Department and utility

owner negotiate an agreement for the required action, or the Department provides written

authorization allowing work to proceed without such an agreement. Subject to DB §104-04.B.1,

the Design-Builder will not be allowed adjustments for delays or extra expense with respect to

any such suspension.

4-10 DELIVERABLES

Unless otherwise indicated, all deliverables shall be submitted in both electronic format and

hardcopy format. Acceptable electronic formats include Microsoft Word®, Microsoft Excel®,

Bentley MicroStation version V8, or searchable portable document format (PDF) files, unless

otherwise indicated.

At a minimum, the Design-Builder shall submit the items listed in Table 4.9-1 to the Department.

Table 4.9-1 – Deliverables

Deliverable Number of Copies

Submittal Schedule Hardcopy Electronic

Utility Tracking Report 3 1 (PDF) Weekly until Physical Completion.

Utility Design Sheet 3 1 (PDF) Two days prior to initial meeting with utility owner

DB Utility Work

Agreements

2 1 (PDF) Seven days after construction of the utility

identified

Page 22: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-1 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

APPENDIX A UTILITY REQUIREMENTS

The Department has reviewed the Project limits and has made a preliminary assessment of which

utility facilities located within the Project limits may be impacted by the Project

The Department has conducted advanced utility coordination with the utility companies listed

below.

A-1 UTILITY COMPANIES

Table A-1 lists the utility companies with facilities located on, under or above the Project roadways

and/or structures:

Table A-1 Utility Contacts

Utility Owner Contact Contact # E Mail

Verizon New York,

Inc.

Mr. Rohan

Eccles, P.E. –

Pre-Engineering,

Project Manager

516-758-3742 [email protected]

Consolidated

Edison, Inc.

Mrs. Dennisse

Agugliaro –

Engineering

Supervisor

646-874-2354 [email protected]

National Grid Gas Mr. Justin Yip –

Operations

Supervisor

347-633-5251 [email protected]

New York City

Department of

Environmental

Protection

Mr. Guo Zhan

Wu, P.E. – Chief,

Regulatory

Review

718-595-5191 [email protected]

Calpine

Corporation

Mr. Michael O-

Brien – General

Plant Manager

718-955-0547 [email protected]

Fire Department

City of New York –

Bureau of Facilities

Management, Plant

Operations

Engineering Unit

Mr. Nicholas

Varone – Liaison

to Engineering

718-281-3846 [email protected]

Page 23: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-2 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

Altice USA, Inc. Mr. Al Clark –

Director, Bronx

Construction

Operations

718-861-7382 [email protected]

MCI

Communications,

Inc.

Mr. Howard Tran

– Global

Transport

Engineering &

Implementation

212-547-5913 [email protected]

Charter

Communications,

Inc.

Mr. John Piazza

– Construction

Manager –

Municipal

Interference

718-888-4261 [email protected]

A-2 UTILITY INVENTORY

The types, sizes and approximate locations of utilities present in the immediate Project area are

described below.

A-2.1 Telecommunications

A-2.1.1 Verizon Communications Incorporated

Refer to Verizon Communications Incorporation NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-2.1.2 Charter Communications, Inc.

Refer to Charter Communications, Inc. (Spectrum) NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-2.1.3 Altice USA, Inc.

Refer to Altice USA, Inc. NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

Page 24: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-3 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A-2.2 Electric

A-2.2.1 Consolidated Edison, Inc.

Refer to Consolidated Edison, Inc. NYSDOT Preliminary HC-140 utility work agreement found in

Appendix C of this document.

A-2.2.2 Port Authority of New York and New Jersey

Refer to Port Authority of New York and New Jersey NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-2.3 Natural Gas

A-2.3.1 National Grid US

Refer to National Grid US NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

A-2.4 Water

A-2.4.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-2.5 Storm and Sanitary

A-2.5.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-2.6 Other Utilities

A-2.6.1 Fire Department of the City of New York – Communications

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-2.7 Utility Service Connections

This section is not used.

Page 25: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-4 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A-3 UTILITY RELOCATIONS BY OTHERS

The Design-Builder shall be aware that all time frames for utility relocation work presented in this

section are approximate and are predicated on the assumption of a single relocation to the new,

permanent utility locations. Should the Design-Builder’s design, means and methods require

interim utility relocations, the Design-Builder shall be responsible for coordinating with the affected

utilities to determine the time frames required for any and all interim relocations.

A-3.1 Telecommunications

A-3.1.1 Verizon Communications Incorporated

Refer to Verizon Communications Incorporation NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-3.1.2 Charter Communications Inc. (Spectrum)

Refer to Charter Communications, Inc. (Spectrum) NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-3.1.3 Altice USA, Inc.

Refer to Altice USA, Inc. NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

A-3.2 Electric

A-3.2.1 Consolidated Edison, Inc.

Refer to Consolidated Edison, Inc. NYSDOT Preliminary HC-140 utility work agreement found in

Appendix C of this document.

A-3.2.2 Port Authority of New York and New Jersey

Refer to Port Authority of New York and New Jersey NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-3.3 Natural Gas

A-3.3.1 National Grid US

Refer to National Grid US NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

Page 26: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-5 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A-3.4 Water

A-3.4.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-3.5 Storm and Sanitary

A-3.5.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-3.6 Other Utilities

A-3.6.1 Fire Department of the City of New York – Communications

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-4 UTILITY RELOCATIONS BY THE DESIGN-BUILDER

The Design-Builder shall be responsible for coordinating the relocation of all utility services which

are impacted by the Project, including the maintenance and protection of those utilities not listed

below, participation in all meetings, preparing minutes of meetings, performing plan reviews,

ground preparation, performing survey and markout required for utility relocations as well as

excavating test pits as necessary to facilitate resolution of design utility conflict tables to final

conflict resolution tables. The following sections describe the anticipated Work to be performed

and coordination required with each utility owner.

A-4.1 Telecommunications

A-4.1.1 Verizon Communications Incorporated

Describe any telephone/telecom work for which the Design-Builder will be responsible.

A-4.1.2 Charter Communications, Inc. (Spectrum)

Refer to Charter Communications, Inc. (Spectrum) NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-4.1.3 Altice USA, Inc.

Refer to Altice USA, Inc. NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

Page 27: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-6 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

A-4.2 Electric

A-4.2.1 Consolidated Edison, Inc.

Refer to Consolidated Edison, Inc. NYSDOT Preliminary HC-140 utility work agreement found in

Appendix C of this document.

A-4.2.2 Port Authority of New York and New Jersey

Refer to Port Authority of New York and New Jersey NYSDOT Preliminary HC-140 utility work

agreement found in Appendix C of this document.

A-4.3 Natural Gas

A-4.3.1 National Grid US

Refer to National Grid US NYSDOT Preliminary HC-140 utility work agreement found in Appendix

C of this document.

A-4.4 Water Mains

A-4.4.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-4.5 Storm and Sanitary

A-4.5.1 New York City Department of Environmental Protection

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-4.6 Other Utilities

A-4.6.1 Fire Department of the City of New York – Communications

Refer to New York City Department of Environmental Protection NYSDOT Preliminary HC-140

utility work agreement found in Appendix C of this document.

A-5 DESIGN BUILD UTILITY DOCUMENTS

The Design-Builder shall provide documentation regarding the coordination and locations of the

impacted utilities to the Department’s Project Manager, and the Department’s Project Manager

shall coordinate with Regional Utility Engineer. The required documents are: utility

Page 28: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-7 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

conflict/resolution table with proposed locations, utility plans, and Special Note of Utility

Coordination.

The documentation shall be used to secure the Final DB Utility Work Agreements (DB-HC140)

with each impacted utility company and any required Municipal Agreements.

Page 29: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-1 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

APPENDIX B NON-PARTICIPATING AGENCIES

The Design-Builder shall be aware that the following agencies which are not participants in the

One-Call System may have facilities located within the project limits:

• The New York State Department of Transportation

• Metropolitan Transportation Authority

• New York City Department of Transportation

Contact information, known facilities, and required lead times are indicated in the Table B-1 on

the following page. The Design-Builder shall contact each of these agencies to obtain mark-outs

of their facilities.

Page 30: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-2 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

This page intentionally left blank.

Page 31: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT – CONTRACT 2

4-3 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

Table B - 1: Contact Information for Non-Participating Agencies

Agency Callout

Contact Contact PH# Contact E-mail Known Facilities

Required

Lead Time

for mark out

New York

State

Department

of

Transportati

on

Rajendra Amin 718-482-4734 [email protected] NYCDOT ITS 7 days

minimum

Metropolitan

Transportati

on Authority

(MTA)

Jesse

Heimowitz 718-558-3764 [email protected] Long Island Railroad

7 days

minimum

New York

City

Department

of

Transportati

on

Edward

Campbell 212-839-9643 [email protected]

Street Lights, Traffic

Signals

7 days

minimum

Page 32: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT – CONTRACT 2

4-4 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

This page intentionally left blank

Page 33: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

New York State Department of Transportation

VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK

AIRPORT – CONTRACT 2 4-1 Part 4 - Utility Requirements

PIN X735.83, Contract D900050 Final April 21, 2020

APPENDIX C PRELIMINARY DB UTILITY WORK AGREEMENTS

The work described in this Appendix C (if provided) includes known relocation(s) and other utility

work required to remove known interference(s) with Project elements. The Design-Builder shall

design, locate, and construct the Work in accordance with utility provider(s) details as detailed in

this Appendix C (if provided). The Design-Builder shall consider providing, where possible and if

applicable, a common trench in which to construct the utilities in accordance with the utility

providers' requirements. The Design-Builder shall determine the location of any and all

trenches relevant to the requirements of the Design-Builder's design, as applicable. The Design-

Builder shall include in its Baseline Project Schedule appropriate time as required for all utilities

work. The Design-Builder shall comply with the Work Zone Traffic Control requirements

contained in Part 3 of the Contract Documents at all times when performing the work described

herein.

Any Agreements provided in this Appendix are Preliminary and are between the Department and

utility owner(s). The Design-Builder is expected to coordinate with any and all affected utility

owner(s) and the Department to negotiate and execute 3-party Final Utility Work Agreements

between the Design-Builder, utility owner(s), and Department.

Page 34: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 1 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Contract 2)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, New York City Department of Environmental Protection, of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s design-builder. The said Design-Builder will coordinate with the owner in developing a Final Utility Work Agreement to be entered into by the owner, the Design-Builder and New York State Department of Transportation. I. Existing Facilities The existing New York City Department of Environmental Protection Water facilities presently located in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows for an estimated: $XXXXXXXXXX Queens BIN 1055699 94th Avenue & Atlantic Avenue over Van Wyck Expressway (I-678)

• A 12” lined-cast iron pipe water main runs EW towards the south fascia of 94th Avenue & Atlantic Avenue bridge, between the east and west approaches the bridge.

• A 12” lined-cast iron pipe water main runs EW towards the north fascia of 94th Avenue & Atlantic Avenue bridge, between the east and west approaches the bridge

• To the west of the SB Service Road and Atlantic Avenue intersection, an 8” cast iron pipe water main runs EW along the north side of Atlantic Avenue.

• A 12” ductile iron pipe runs EW on the west approach of the 94th Avenue & Atlantic Avenue Bridge.

• On SB Service Road, A 12” ductile iron pipe runs NS along the west sidewalk, between 91st Avenue and Atlantic Avenue.

• A 12” lined-cylinder pipe water main runs NS along the west sidewalk of the SB Service Road, between 95th Avenue and Atlantic Avenue.

Page 35: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 2 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

• To the east of NB Service Road and 94th Avenue intersection, an 8” cast iron pipe water main runs EW on the south side of 94th Avenue.

• A 12” cast iron pipe water main runs NS across 94th Avenue, between the NE and SE corners of the NB Service Road and 94th Avenue intersection.

• A 12” lined-cylinder pipe water main runs in the NS direction on the NB Service Road north of the NB Service Road and 94th Avenue intersection.

All New York City Department of Environmental Protection facilities listed above shall be supported, protected, maintained, and/or replaced as per the approval of New York City Department of Environmental Protection within the proposed work area by the NYSDOT Design-Builder.

NYSDOT Design-Builder Scope — Bridge Replacement:

a. The NYSDOT Design-Builder shall permanently install 12” steel pipe water main towards the north fascia of the new 94th Avenue & Atlantic Avenue Bridge superstructure. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance with all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall permanently eliminate the existing 12” lined-

cylinder pipe water main located towards the south fascia of the 94th Avenue & Atlantic Avenue Bridge.

c. The NYSDOT Design-Builder shall install a new 12’’ valve in the intersection of

Atlantic Avenue and the Southbound Service Road. Northbound and Southbound Service Roads from Atlantic Ave to 91st Ave (Van Wyck Expressway (I-678) under Long Island Railroad Bridges) Existing Facilities:

• A 12” ductile iron pipe water main runs along the west sidewalk of the SB Service Road, in N-S direction between 91st Avenue and Atlantic Avenue. There are two hydrant connections to the 12’’ ductile iron water main between Atlantic Avenue and 91st Avenue.

• A 12” lined-cast iron pipe water main is located on the NB Service Road, running in the N-S direction between 94th Avenue and Archer Avenue.

o Additionally, this 12” pipe has two fire hydrant connections to water main on the east sidewalk of the NB Service Road.

All New York City Department of Environmental Protection facilities listed above shall be supported, protected, maintained, and/or replaced as per the approval of New York City Department of Environmental Protection within the proposed work area by the NYSDOT Design-Builder.

Page 36: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 3 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall permanently install 12” ductile iron water main and associated appurtenances towards the west sidewalk of the SB Service Road. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance with all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall permanently install 12” ductile iron pipe

water main towards the east end of the NB Service Road. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance with all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

c. The NYSDOT Design-Builder shall permanently remove existing 12” ductile iron pipe water main running along the west sidewalk of the SB Service Road.

d. The NYSDOT Design-Builder shall permanently remove existing 12” lined-cast iron water main running along NB Service Road.

e. The NYSDOT Design-Builder shall install a new fire hydrant and associated

appurtenances on the west sidewalk of the Southbound Service road just north of the proposed 94th Avenue & Atlantic Avenue Bridge, to replace the existing fire hydrant located on the west sidewalk of Southbound Service Road towards the just north of Atlantic Avenue.

f. The NYSDOT Design-Builder shall install a new fire hydrant and associated

appurtenances on the west sidewalk of the Southbound Service road to south of 91st Avenue, to replace the existing fire hydrant located on the west sidewalk of Southbound Service Road.

g. The NYSDOT Design-Builder shall install a new fire hydrant and associated

appurtenances on the east sidewalk of the Northbound Service road just north of the proposed 94th Avenue & Atlantic Avenue Bridge, to replace the existing fire hydrant located on the east sidewalk of Northbound Service Road towards the just north of 94th Avenue.

h. The NYSDOT Design-Builder shall install two new 12’’ valves at the intersection

of Archer Avenue and the Northbound Service Road.

i. The NYSDOT Design-Builder shall install one new 12’’ valve just north of Atlantic Avenue along the Southbound Service Road.

Page 37: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 4 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 38: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 5 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work.

Page 39: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #1A

PG. 6 OF 6 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP WATER

DESIGN-BUILD CONTRACT

REV. 3 Date Modified: 04/09/2020

C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-01 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 40: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 1 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Contract 2)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, New York City Department of Environmental Protection, of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s Design-Builder. The said Design-Builder will coordinate with the owner in developing a Final Utility Work Agreement to be entered into by the owner, the Design-Builder and New York State Department of Transportation. I. Existing Facilities The existing New York City Department of Environmental Protection Sewer facilities presently located in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows. Queens BIN 1055699 94th Avenue & Atlantic Avenue over Van Wyck Expressway (I-678)

• To the west of a manhole on the northern part of the SB Service Road and Atlantic Avenue intersection, a 12” concrete pipe sanitary sewer line runs in the WE direction along Atlantic Avenue.

o A 12” vitrified clay pipe storm sewer line runs in the NW-SE direction, between the same manhole and a catch basin on the north side of Atlantic Avenue.

o A 12” reinforced concrete pipe runs in the NE-SW direction between the same manhole and a catch basin on the eastern corner of Atlantic Avenue and the SB Service Road.

• To the west of a manhole in the middle of the SB Service Road and Atlantic Avenue intersection, A 12” vitrified clay pipe sanitary sewer line runs in the WE direction along Atlantic Avenue.

o A 12” vitrified clay pipe storm sewer line runs in the SW-NE direction between the same manhole and a catch basin on the south side of Atlantic Avenue.

Page 41: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 2 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

• A 36” reinforced concrete pipe combined sewer overflow line running NS on the SB Service Road passes through the intersection.

• To the west of a manhole on the southern part of the NB Service Road and 94th Street intersection, a 15” unknown storm sewer line runs EW in the direction along 94th Street.

o A 15” vitrified clay pipe storm sewer line runs NS from the same manhole along the NB Service Road.

All New York City Department of Environmental Protection facilities listed above which are not affected by the replacement of 94th Avenue & Atlantic Avenue bridge shall be supported, protected and maintained within work area by NYSDOT Design-Builder. NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall permanently relocate both of the existing 12” vitrified clay pipe storm sewer pipe located near the north side of the SB Service Road and Atlantic Avenue intersection and near the south side of the intersection. The NYSDOT Design-Builder shall replace existing drainage structures within pavement reconstruction limits in their entirety (new drainage structures, frames, grates, and storm pipe) and provide supplemental storm sewer facilities as required for proposed roadway/bridge work in accordance with the New York State Department of Transportation Highway Design Manual (NYSDOT HDM) Chapter 8 and New York State Department of Environmental Conservation (NYSDEC). The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall permanently relocat the existing 36” reinforced concrete sanitary sewer pipe west of the proposed abutment so that a minimum of 6’ clear horizontal space is provided between proposed structural features and the outside of the relocated reinforced concrete pipe. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

c. The NYSDOT Design-Builder shall clean and conduct a video inspection on the

existing underground storm sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

d. The NYSDOT Design-Builder shall clean and conduct a video inspection on the

existing underground sanitary sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City

Page 42: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 3 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

Long Island Rail Road over Southbound Service Road

• A 24” reinforced concrete sanitary sewer pipe runs between three manholes north of the LIRR bridges in the NS direction of the South Service Road.

• A 36” reinforced concrete sanitary sewer pipe runs between the same manhole at the north end of the LIRR bridges between two manholes under the bridges and two more manholes south of the bridges in the NS direction of the South Service Road connecting up to the Atlantic Avenue intersection.

• Two 28” unknown storm sewer lines run from catch basins to a sanitary manhole under the center of the LIRR bridges in the NW-SE direction and the NE-SW direction respectively on the South Service Road.

• An 18” unknown storm sewer line runs in EW direction under the SB VWE lanes between a manhole on the SB Service road and a manhole under the SB VWE lanes.

o This 18” storm sewer lines connects to the 36” sanitary sewer pipe and the 54” unknown storm sewer pipe.

All New York City Department of Environmental Protection facilities listed above are unaffected by the replacement of LIRR bridges and shall be supported, protected and maintained within work area by NYSDOT Design-Builder. NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall replace existing drainage structures within pavement reconstruction limits in their entirety (new drainage structures, frames, grates, and storm pipe) and provide supplemental storm sewer facilities as required for proposed roadway/bridge work in accordance with the New York State Department of Transportation Highway Design Manual (NYSDOT HDM) Chapter 8 and New York State Department of Environmental Conservation (NYSDEC). Type 3 Catch Basins shall be placed on the west side of the service road to the north and to the south of the proposed LIRR bridge footings and a Special Shallow Catch Basin shall be placed at the low point underneath of the bridges on the west side. Proposed storm sewer downspouts from the LIRR bridges shall be connected to the proposed storm sewer facilities within the service road. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall permanently relocated the existing 24” and 36” reinforced concrete sanitary sewer pipes west of the proposed wall so that a minimum of 6’ clear horizontal space is provided between proposed structural features and the outside of the relocated reinforced concrete pipes. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental

Page 43: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 4 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

c. The NYSDOT Design-Builder shall clean and conduct a video inspection on the existing underground storm sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

d. The NYSDOT Design-Builder shall clean and conduct a video inspection on the

existing underground sanitary sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

Long Island Rail Road over Northbound Service Road

• A 10” unknown storm sewer pipe runs between catch basins at the intersection of Archer Avenue and North Service Road in the NW-SE direction and connects to a manhole in the NE-SW direction.

o An 18” tile storm sewer pipe runs between a manhole north of the Archer Avenue intersection and the same manhole.

o An 18” unknown storm sewer pipe runs between the same manhole in the EW direction to a manhole in the main trunkline of the SB direction of the Van Wyck Expressway.

• A 12” unknown storm sewer pipe runs between two catch basins in the WE direction of the North Service Road.

o A 12” vitrified clay storm sewer pipe runs between the same catch basin and a manhole in the SN direction of the North Service Road.

o A 12” vitrified clay storm sewer pipe runs between the same manhole and the same manhole in the main trunkline on of the Van Wyck Expressway in the SE-NW direction.

All New York City Department of Environmental Protection facilities listed above are unaffected by the replacement of LIRR bridges and shall be supported, protected and maintained within work area by NYSDOT Design-Builder.

NYSDOT Design-Builder Scope:

Page 44: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 5 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

a. The NYSDOT Design-Builder shall replace existing drainage structures within pavement reconstruction limits in their entirety (new drainage structures, frames, grates, and storm pipe) and provide supplemental storm sewer facilities as required for proposed roadway/bridge work in accordance with the New York State Department of Transportation Highway Design Manual (NYSDOT HDM) Chapter 8 and New York State Department of Environmental Conservation (NYSDEC). The NYSDOT Design-Builder shall avoid impacting the existing Calpine Kennedy facilities under the west side of the service road. Proposed storm sewer downspouts from the LIRR bridges shall be connected to the proposed storm sewer facilities within the northbound VWE. The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall clean and conduct a video inspection on the existing underground storm sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

c. The NYSDOT Design-Builder shall clean and conduct a video inspection on the

existing underground sanitary sewer facilities within the pavement reconstruction limits and up to the nearest upstream and downstream manholes beyond the pavement reconstruction limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

Long Island Rail Road over Van Wyck Expressway (I-678)

• To the north of the LIRR bridges a 15” reinforced concrete storm sewer pipe runs between three catch basins in the EW direction of the expressway connecting to the SB side.

o A 15” unknown storm sewer pipe runs between the same catch basin and a manhole in the center of the SB side of the expressway to the trunkline in the NE-SW direction.

o Another 15” unknown storm sewer runs between a catch basin and the same manhole in the NW-SE direction of the SB side of the Van Wyck Expressway.

• To the south of the LIRR bridges a 15” reinforced concrete storm sewer pipe runs between three catch basins and a manhole in the EW direction of the Van Wyck Expressway connecting to the main trunkline in the center of the SB side of the expressway.

o A 15” reinforced concrete storm sewer pipe runs between a catch basin and the same manhole in the WE direction of the Van Wyck Expressway.

Page 45: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 6 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

• A 54” unknown storm sewer pipe trunkline runs between five manholes under the LIRR bridges and the Atlantic Avenue bridge in the NS direction of the SB side of the Van Wyck Expressway.

• A 15” reinforced concrete pipe connects three catch basins in the EW direction of the NB side of the Van Wyck Expressway.

o A 15” reinforced concrete storm sewer pipe runs between the same catch basin and a manhole in the trunkline of the SB direction of the expressway in the SE-NW direction.

o A 15” reinforced concrete storm sewer pipe runs between a catch basin and the same manhole in the SW-NE direction.

• A 72” unknown storm sewer pipe runs between the same manhole and another further south of the Atlantic Avenue bridge in the NS direction of the Van Wyck Expressway.

All New York City Department of Environmental Protection facilities listed above are unaffected by the replacement of LIRR bridges and shall be supported, protected and maintained within work area by NYSDOT Design-Builder.

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall replace existing drainage structures within the outside shoulders within pavement reconstruction limits in their entirety (new drainage structures, frames, grates, and storm pipe) and provide supplemental storm sewer facilities as required for proposed roadway/bridge work for the ultimate Contract 3 VWE configuration within the Contract 2 Project limits in accordance with the New York State Department of Transportation Highway Design Manual (NYSDOT HDM) Chapter 8 and New York State Department of Environmental Conservation (NYSDEC). The alignment of the New York City Department of Environmental Protection facilities shall be coordinated with New York City Department of Environmental Protection and constructed in accordance to all applicable New York City Department of Environmental Protection standards BY THE NYSDOT DESIGN-BUILDER.

b. The NYSDOT Design-Builder shall clean and conduct a video inspection on the existing underground storm sewer facilities within the Project limits limits and up to the nearest upstream and downstream manholes beyond the Project limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

c. The NYSDOT Design-Builder shall clean and conduct a video inspection on the

existing underground storm sanitary facilities within the Project limits and up to the nearest upstream and downstream manholes beyond the Project limits in accordance with all applicable New York City Department of Environmental Protection standards and specifications. The cleaning and video inspection shall be coordinated with New York City Department of Environmental Protection BY THE NYSDOT DESIGN-BUILDER.

Page 46: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 7 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 47: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 8 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

Page 48: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2A

PG. 9 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – NYCDEP SEWER

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. DRP-01 TO DRP-08 AND UTL-01 TO UTL-17

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 49: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 1 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Contract 2)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, New York City Fire Department (“FDNY” or “Owner”), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s design-builder. The said Design-Builder will coordinate with the owner in developing a Final Utility Work Agreement to be entered by the owner, the Design-Builder and New York State Department of Transportation. The existing New York City Fire Department (FDNY) facilities are to be abandoned, removed, protected/supported or replaced as defined in this agreement. I. Existing Facilities The existing New York City Fire Department facilities presently located in Queens County; New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows: Fire Department cables are installed in both Verizon’s and Fire Department’s conduit systems underground, and/or on the bridges, and/or some aerial facilities are present. These facilities must be supported and properly protected during construction. If this cannot be achieved, relocation must be performed prior to construction. FDNY is not a member of the one call system and will not be notified by them. To request street mark outs of fire communications underground facilities, the Design-Builder must contact Plant Operations Engineering at (718) 281-3846 or (718) 281-3933 at least one (1) month prior to commencement of work. For this agreement, the FDNY will sell the State’s Design-Builder the necessary materials to install the proposed FDNY utility. The State’s Design-Builder shall coordinate all material deliveries with the FDNY and shall schedule all necessary inspections during construction.

Page 50: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 2 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

Queens BIN 1055699 94th Avenue & Atlantic Avenue over Van Wyck Expressway (I-678) Existing Facilities:

• A 3” wrought iron/galvanized steel FDNY conduit runs E-W towards the south fascia of the 94th Avenue & Atlantic Avenue Bridge.

• On the SB Service Road and Atlantic Avenue intersection, a 3” FDNY conduit runs east from an FDNY fire alarm post towards the west approach of the bridge.

All New York City Fire Department facilities listed above which are not affected by the replacement of 94th Avenue & Atlantic Avenue Bridge shall be supported, protected and maintained within the work area by the NYSDOT Design-Builder. FDNY Scope: The Fire Department shall de-energize the fire department cables before construction starts to allow the Design-Builder to remove the underground conduit and cable before demolition. FDNY shall transfer the fire alarm box from the existing post to the new post.

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall permanently install FDNY type A manhole with frame and cover towards the southwest corner of the 94th Avenue and Southbound Van Wyck Service Road intersection, approximately 12’ to the west of an existing FDNY manhole at the intersection of Atlantic Avenue and SB Service Road. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

b. The NYSDOT Design-Builder shall permanently install 1-4” galvanized steel

conduit and 1-4 pair fire alarm cable towards the south fascia of the new 94th Avenue & Atlantic Avenue Superstructure. The steel conduit can transition to schedule 40 U.L. 651 PVC conduit via couplings beyond the bridge abutments. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

c. The NYSDOT Design-Builder shall leave 10 feet of slack of 4 pair cable in the newly installed Type A FDNY manhole towards the west abutment and the existing FDNY manhole towards the east abutment and hermetically seal the ends of cable for the FDNY Communication Electricians to make the final connection.

d. The NYSDOT Design-Builder shall permanently remove existing 3” wrought

iron/galvanized steel conduit towards the south fascia of the 94th Avenue & Atlantic Avenue Bridge.

Page 51: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 3 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

e. The NYSDOT Design-Builder shall install a new fire alarm post & subbase, pedestal bumpers, and a 12 wire terminal box located toward the southwest corner of the 94th Avenue and the Southbound Van Wyck Service Road intersection, approximately 12’ west of the existing fire alarm box (where it shall be clear of proposed ADA crosswalks).The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

f. The NYSDOT Design-Builder shall install 1-4” dia. schedule 40 U.L. 651 PVC

conduit, and 1-4 pair fire alarm cable from the newly installed type A FDNY manhole located toward the southwest corner of the 94th Avenue and Southbound Van Wyck Service Road intersection to a new fire alarm post located toward the southwest corner of the 94th Avenue and Southbound Van Wyck Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

g. The NYSDOT Design-Builder shall leave 10 feet of slack of 4 pair cable in newly installed type A FDNY manhole and hermetically seal the end of cable for the FDNY Communication Electricians to make the final connection. The Design-Builder shall terminate the open end of the cable in the fire alarm post and terminate the cable with enough slack to make the final connections.

h. The NYSDOT Design-Builder shall remove the existing fire alarm post located toward the southwest corner of the 94th Avenue and the Southbound Van Wyck Service Road intersection.

i. The NYSDOT Design-Builder shall notify FDNY 7 days prior to any work being doing on their facilities.

Northbound Service Road from Atlantic Avenue to 91st Avenue (Van Wyck Expressway under Long Island Railroad Bridges (I-678)) Existing Facilities:

• On the NB Service Road, a 3” FDNY conduit runs N-S between 95th Avenue and Archer Ave. and passes through the NB Service Road and 94th Avenue intersection.

• A 3” FDNY conduit runs on the east sidewalk of the NB Service Road between 94th Avenue and Archer Avenue.

o A branch connects to an FDNY fire alarm post on the southeast corner of the NB Service Road and Archer Avenue intersection from a manhole in the intersection.

All New York City Fire Department facilities listed above which are not affected by the replacement of the LIRR Bridge substructures shall be supported, protected and maintained within the proposed work area of LIRR Bridges by the NYSDOT Design-Builder.

Page 52: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 4 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall permanently install FDNY type A manhole with

frame and cover on the Northbound Service Road east sidewalk, approximately 310’ to the north of existing FDNY manhole at the intersection of Atlantic Avenue and Northbound Service Road. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

b. The NYSDOT Design-Builder shall permanently install 1-4” schedule 40 U.L. 651 PVC conduit, and 1-10 pair fire alarm cable between the existing manhole at the intersection of Atlantic Avenue and Northbound Service Road and the newly installed FDNY Type A manhole. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

c. The NYSDOT Design-Builder shall leave 10 feet of slack of 10 pair cable in the

newly installed FDNY type A manhole and the existing FDNY manhole and hermetically seal the end of cable for the FDNY Communication Electricians to make the final connection.

d. The NYSDOT Design-Builder shall permanently install FDNY type A manhole with frame and cover at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

e. The NYSDOT Design-Builder shall permanently install 1-4” schedule 40 U.L. 651

PVC conduit, and 1-10 pair fire alarm cable between the newly installed FDNY Type A manhole on the Northbound Service road east sidewalk and newly installed FDNY Type A manhole at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

f. The NYSDOT Design-Builder shall leave 10 feet of slack of 10 pair cable in the

newly installed FDNY type A manhole on the Northbound Service road sidewalk and the newly installed FDNY type A manhole at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection and hermetically seal the end of cable for the FDNY Communication Electricians to make the final connection.

g. The NYSDOT Design-Builder shall permanently install FDNY slotted type A

manhole with frame and cover on east sidewalk of the Northbound Service road, approximately 54’ to the north of newly installed FDNY type A manhole at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY

Page 53: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 5 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

and constructed in accordance to all applicable New York City Fire Department standards.

h. The NYSDOT Design-Builder shall permanently install 1-4” schedule 40 U.L. 651 PVC conduit, and 1-10 pair fire alarm cable between the newly installed FDNY slotted type A manhole on east sidewalk of the Northbound Service road and the newly installed FDNY type A manhole at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

i. The NYSDOT Design-Builder shall leave 10 feet of slack of 10 pair cable in the

newly installed FDNY slotted type A manhole on east sidewalk of the Northbound Service road and the newly installed FDNY type A manhole at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection and hermetically seal the end of cable for the FDNY Communication Electricians to make the final connection.

j. The NYSDOT Design-Builder shall permanently remove existing FDNY 3” conduit and cables toward the east sidewalk of the NB Service Road between 94th Avenue and Archer Avenue.

k. The NYSDOT Design-Builder shall permanently remove existing FDNY manhole

toward the east sidewalk of the Northbound Service Road under the Atlantic 6 LIRR Bridge.

l. The NYSDOT Design-Builder shall permanently remove existing FDNY manhole

located at the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection.

j. The NYSDOT Design-Builder shall install a new fire alarm post & subbase,

pedestal bumpers, and a 12 wire terminal box located toward the southeast corner of the Archer Avenue and the Northbound Van Wyck Service Road intersection, approximately 12’ east of the existing fire alarm box (where it shall be clear of proposed ADA crosswalks).The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

k. The NYSDOT Design-Builder shall install 1-4” dia. schedule 40 U.L. 651 PVC

conduit, and 1-4 pair fire alarm cable from the newly installed FDNY type A manhole located toward the middle of Archer Avenue Boulevard and Van Wyck Northbound Service Road intersection to a new fire alarm post located toward the southeast corner of the Archer Avenue and the Northbound Van Wyck Service Road intersection. The alignment of the FDNY facilities shall be coordinated with FDNY and constructed in accordance to all applicable New York City Fire Department standards.

l. The NYSDOT Design-Builder shall leave 10 feet of slack of 4 pair cable in newly installed Type A FDNY manhole and hermetically seal the end of cable for the

Page 54: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 6 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

FDNY Communication Electricians to make the final connection. The Design-Builder shall terminate the open end of the cable in the fire alarm post and terminate the cable with enough slack to make the final connections.

m. The NYSDOT Design-Builder shall remove the existing fire alarm post located toward the southeast corner of the Archer Avenue and the Northbound Van Wyck Service Road intersection.

n. The NYSDOT Design-Builder shall notify FDNY 7 days prior to any work being doing on their facilities

Page 55: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 7 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 56: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 8 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State. b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work)

IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

Page 57: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3A

PG. 9 OF 9 PRELIMINARY UTILITY WORK AGREEMENT – FDNY

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/07/2020

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050_______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-01 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 58: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 1 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway (VWE) Capacity and Access Improvement to JFK Airport - Contract 2

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, Port Authority of New York and New Jersey (“Port Authority”), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s design-build contractor. The said design-build contractor will coordinate with the owner in developing a Final Utility Work Agreement to be entered into by the owner, the contractor and New York State Department of Transportation. I. Existing Facilities The existing Port Authority facilities presently located in Queens County; New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows: The following requirements are preliminary and shall apply to the NYSDOT Design-Builder scope of work.

1. Provide a minimum of 1’-4’’ clearance from the existing utility backfill envelope to any new sheeting/shoring and subsurface concrete structures. Design-Builder shall reference the typical construction clearance drawing DWG. SK-CLEARANCE in the Reference Documents section of the RFP. The Design-Builder shall coordinate with the utility owner if new installations are proposed within the 1’-4’’ minimum clearance required.

2. There are no requirements for vibration limitations.

3. 3’’ dia. PVC conduits typically run with and just above or below the 138-kV pipe. The maximum unsupported length of these conduits during any open excavation operations is 6 feet. Reference the temporary support detail drawing DWG. SK-SUPPORT in the Reference Documents section of the RFP.

Page 59: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 2 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

4. 8’’ dia. Schedule 40 steel pipe encases the 138-kV cable in a high-pressure gas filled envelope. This pipe has a protective exterior coating and includes cathodic protection. The maximum unsupported length of this pipe during any open excavation operations is 10 feet. Design-Builder shall reference the temporary support detail drawing DWG. SK-SUPPORT in the Reference Documents section of the RFP.

5. Provide a minimum of 1’-4’’ clearance from the existing utility backfill envelope to any new underground utility piping for gas, water, and sewer systems. Design-Builder shall reference the typical construction clearance drawing DWG. SK-CLEARANCE in the Reference Documents section of the RFP.

6. For steam mains/services six inches and over in size, duct bank systems of six ducts or more and all other pipe type feeders that are external heat sources provide a minimum face-to-face separation of not less than twelve feet for horizontal runs nor less than two feet for right-angle crossings.

7. For steam mains under six inches in size and for power duct bank systems of four ducts or less, the separation shall be not less than six feet in a horizontal direction and 1.5 feet in a vertical direction.

8. Limit loading to standard AASHTO H-20 loading conditions from existing surface without prior approval.

9. No specific utility shutdown requirements are identified at this time. This will be reviewed again, if required, when the final limits of all facility rework have been determined by the Design Builder.

10. Material lead time is anticipated to be 10-12 months, if required.

11. There is no potential slack in this system for the underground steel pipe. There is some flexibility to allow for deflection or offset of the 3’’ dia. PVC piping if there is a demonstrated need by the Design Builder.

12. Elevation changes are discouraged due to the amount of horizontal spacing required to accommodate the vertical differential. This will generally only be possible in new utility sections of sufficient length where changes in elevation can be incorporated in the design of the new underground section.

13. Conduits do not need to be protected from water within the trench during construction.

14. The conduits should be protected from sparks or other damaging byproducts of welding that must take place nearby.

15. There are no seasonal restrictions assuming that the line is not shut down at any point during construction.

16. There are no set monitoring criteria.

17. It is preferred that no debris be left below the conduits that will decay, such as wood that would be used to support the line(s) during construction.

Page 60: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 3 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

18. When exposing the line(s), the existing coating will need to be protected and maintained. This coating is necessary to prevent corrosion of the cables. If the coating is damaged during construction, then the Design Builder s responsible for repairing the coating to the satisfaction of the Port Authority utilizing their coating repair criteria. Refer to the coating standards in the Reference Documents section of the RFP.

19. The backfill material shall meet the requirement provided by the owner and follow Con Edison Standards. See the requirements in the Reference Documents in the RFP.

20. The Design-Builder shall coordinate with Port Authority for the inspection of the existing 138kV Utility feature as well as the two existing PVC communication conduits prior to backfilling and post construction. The Design-Builder shall give Port Authority a notice 72 hours prior to backfilling the exposed utility features.

Queens At the Intersection of 94th Avenue/Atlantic Avenue and the Northbound Service Road Existing Facilities:

• 1-8” dia. HPP Steel pipe with 138k-V conductor (gas filled) and 2-3” dia. PVC conduits within the NB Service Road.

The Port Authority facility listed above shall be supported, protected and maintained within the proposed work area of 94th Avenue/Atlantic Avenue Bridge and the northbound service road intersection by the NYSDOT Design-Builder. The alignment of the Port Authority facilities shall remain unchanged. Northbound Service Road from Atlantic Avenue north to 91st Avenue under Long Island Railroad Bridges (I-678)) Existing Facilities:

• 1-8” dia. HPP Steel pipe with 138 kV conductor (gas filled) and 2-3” dia. PVC conduits run within the NB Service Road

The Port Authority facility listed above shall be supported, protected and maintained within the proposed work area under the existing Long Island Railroad Bridges by the NYSDOT Design-Builder. The alignment of the Port Authority facilities shall remain unchanged. The existing shallow cover protection which currently is installed over the existing Port Authority facility shall be maintained and protected. If the shallow cover protection needs to be removed and reinstalled under Contract 2, the Design Builder shall coordinate with representatives from Port Authority to determine the exact limits.

Page 61: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 4 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 62: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 5 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly

account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

Page 63: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #4A

Pg. 6 of 6 PRELIMINARY UTILITY WORK AGREEMENT – PORT AUTHORITY

DESIGN-BUILD CONTRACT

REV. 2 Date: 04/07/2020

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-01 to UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 64: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (9/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #5A

Pg. 1 of 5 PRELIMINARY UTILITY WORK AGREEMENT – MCI COMMUNICATIONS

DESIGN- BUILD CONTRACT

REV. 4 Date Modified: 04/09/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.: X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway (VWE) Capacity and Access Improvement to JFK Airport (Contract 2)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, MCI Communications of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this Utility Work Agreement (the Agreement) shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). I. Existing MCI Communications Facilities The existing MCI Communications facilities presently attached to the west abutment wall along the southbound service road in Queens County; New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows: Queens Southbound Service Road adjacent to the Van Wyck Expressway (I-678) – West Abutment of LIRR overhead bridge structures. Existing Facilities:

• A 216-pair fiber optic cable is active in the vicinity of LIRR Bridges. o This fiber optic line runs from utility pole ‘X’, located to the northwest of the LIRR Mainline

1/3 Bridge, down a riser and continues south along the west abutment wall of the LIRR Bridges, through a 4’’ EMT conduit and into a pull box just north of the existing Atlantic 6 LIRR Bridge.

The MCI Communications facilities listed above shall be supported, protected and maintained within the proposed work area of the Long Island Railroad Bridges by the NYSDOT Design-Builder.

Page 65: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (9/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #5A

Pg. 2 of 5 PRELIMINARY UTILITY WORK AGREEMENT – MCI COMMUNICATIONS

DESIGN- BUILD CONTRACT

REV. 4 Date Modified: 04/09/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall detach the existing MCI cable from existing Pole X, located in the LIRR property just south of the Staples store near the Southbound Service Road. The Design-Builder shall protect the MCI cable in a temporary trough or split duct in a temporary steel casing on the ground from the wingwall to Pole X; the full length of the exposed cable. The Design-Builder shall install a split duct riser pipe on Pole X and run the existing cable through. The type of temporary protection that is to be installed shall be coordinated with MCI Communications. NYSDOT Design-Builder shall be responsible for the materials required for the temporary protection.

b. Once the new LIRR Mainline 1/3 Bridge is installed, the Design-Builder shall remove the cable from the temporary steel casing and attach the cable back onto Pole X up a riser at an elevation where it was previously attached in existing conditions.

c. The NYSDOT Design-Builder shall notify MCI a minimum of three weeks in advance of the start of construction work.

Page 66: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (9/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #5A

Pg. 3 of 5 PRELIMINARY UTILITY WORK AGREEMENT – MCI COMMUNICATIONS

DESIGN- BUILD CONTRACT

REV. 4 Date Modified: 04/09/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 67: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (9/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #5A

Pg. 4 of 5 PRELIMINARY UTILITY WORK AGREEMENT – MCI COMMUNICATIONS

DESIGN- BUILD CONTRACT

REV. 4 Date Modified: 04/09/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly

account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

Page 68: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (9/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #5A

Pg. 5 of 5 PRELIMINARY UTILITY WORK AGREEMENT – MCI COMMUNICATIONS

DESIGN- BUILD CONTRACT

REV. 4 Date Modified: 04/09/2020

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-1 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 69: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 1 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Atlantic 6 Contract)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, Altice USA (Cablevision), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this Utility Work Agreement (the Agreement) shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). I. Existing Altice USA (Cablevision) Facilities The existing Altice USA (Cablevision) facilities presently attached to the west abutment wall along the southbound service road, and then aerial over the Van Wyck Expressway, just south of the existing LIRR Atlantic 6 Bridge in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows : Queens BIN 7076810 Atlantic 6 Long Island Railroad Bridge over Van Wyck Expressway (I-678)

Existing Facilities:

• A 288-count transatlantic fiber optic cable is active in the vicinity of Atlantic 6 Bridge. o This fiber optic cable runs from utility pole ‘X’, located to the northwest of the LIRR

Mainline 1/3 Bridge, down a riser and continues south along the west abutment wall of the LIRR Bridges, through a 4’’ EMT conduit and into a pull box just south of the Atlantic 6 LIRR Bridge.

o From the pull box the cable runs up a riser and into existing LIRR utility pole “B”. o From utility pole ‘B’ the Altice owned cable runs through a 4” dia. RGS steel conduit in the

vicinity of the north fascia of the Atlantic 6 Bridge (BIN 7076810) from (JB-2) to (JB-4) to Manhole 235 up a riser to utility pole ‘C’.

o From utility pole ‘C’ the aerial cable continues to run east of the project limits. The Altice USA (Cablevision) facilities listed above shall be supported, protected and maintained within the work area by the NYSDOT Design-Builder.

Page 70: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 2 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall detach the existing Altice cable from existing Pole X, located in the LIRR property just south of The Staples store near the Southbound Service Road. The Design-Builder shall protect the Altice cable in a temporary trough or split duct in a temporary steel casing on the ground from the top of the wingwall to Pole X; the full length of the exposed cable. The Design-Builder shall install a split duct riser pipe on Pole X and run the existing cable through. The type of temporary protection that is to be installed shall be coordinated with Altice USA. NYSDOT Design-Builder shall be responsible for the materials required for the temporary protection.

b. Once the new LIRR Mainline 1/3 Bridge is installed, the Design-Builder shall remove the cable from the temporary steel casing and attach the cable back onto Pole X up a riser at an elevation where it was previously attached in existing conditions.

c. The NYSDOT Design-Builder shall notify Altice a minimum of three weeks in advance of the start of construction work.

Page 71: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 3 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 72: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 4 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection, Relocation Work, Fiber Installation, and all Splicing, Energizing/De-energizing)

IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly

account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work.

Page 73: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 5 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

D. Such other agreement as approved by NYSDOT Office of Legal Affairs. VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-1 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 74: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 1 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Atlantic 6 Contract)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, Altice USA (Cablevision), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this Utility Work Agreement (the Agreement) shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). I. Existing Altice USA (Cablevision) Facilities The existing Altice USA (Cablevision) facilities presently attached to the west abutment wall along the southbound service road, and then aerial over the Van Wyck Expressway, just south of the existing LIRR Atlantic 6 Bridge in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows : Queens BIN 7076810 Atlantic 6 Long Island Railroad Bridge over Van Wyck Expressway (I-678)

Existing Facilities:

• A 288-count transatlantic fiber optic cable is active in the vicinity of Atlantic 6 Bridge. o This fiber optic cable runs from utility pole ‘X’, located to the northwest of the LIRR

Mainline 1/3 Bridge, down a riser and continues south along the west abutment wall of the LIRR Bridges, through a 4’’ EMT conduit and into a pull box just south of the Atlantic 6 LIRR Bridge.

o From the pull box the cable runs up a riser and into existing LIRR utility pole “B”. o From utility pole ‘B’ the Altice owned cable runs through a 4” dia. RGS steel conduit in the

vicinity of the north fascia of the Atlantic 6 Bridge (BIN 7076810) from (JB-2) to (JB-4) to Manhole 235 up a riser to utility pole ‘C’.

o From utility pole ‘C’ the aerial cable continues to run east of the project limits. The Altice USA (Cablevision) facilities listed above shall be supported, protected and maintained within the work area by the NYSDOT Design-Builder.

Page 75: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 2 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall detach the existing Altice cable from existing Pole X, located in the LIRR property just south of The Staples store near the Southbound Service Road. The Design-Builder shall protect the Altice cable in a temporary trough or split duct in a temporary steel casing on the ground from the top of the wingwall to Pole X; the full length of the exposed cable. The Design-Builder shall install a split duct riser pipe on Pole X and run the existing cable through. The type of temporary protection that is to be installed shall be coordinated with Altice USA. NYSDOT Design-Builder shall be responsible for the materials required for the temporary protection.

b. Once the new LIRR Mainline 1/3 Bridge is installed, the Design-Builder shall remove the cable from the temporary steel casing and attach the cable back onto Pole X up a riser at an elevation where it was previously attached in existing conditions.

c. The NYSDOT Design-Builder shall notify Altice a minimum of three weeks in advance of the start of construction work.

Page 76: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 3 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 77: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 4 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection, Relocation Work, Fiber Installation, and all Splicing, Energizing/De-energizing)

IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

The owner will not claim reimbursement for that betterment portion of the work but will duly

account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work. C. Reimbursement Agreement executed prior to performance of the work.

Page 78: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #6A

Pg. 5 of 5 PRELIMINARY UTILITY WORK AGREEMENT – ALTICE USA INC. (CABLEVISION)

DESIGN-BID-BUILD CONTRACT

REV. 5 Date Modified: 04/09/2020

D. Such other agreement as approved by NYSDOT Office of Legal Affairs. VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-1 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 79: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 1 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway (VWE) Capacity and Access Improvement to JFK Airport -Contract 2

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, Consolidated Edison Company of New York (“Con Ed” or “Owner”), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s design-builder. The said Design-Builder will coordinate with the owner in developing a Final Utility Work Agreement to be entered by the owner, the Design-Builder and New York State Department of Transportation. The existing Con Edison facilities are to be abandoned, removed, protected/supported or replaced as defined in this agreement. I. Existing Facilities The existing Con Edison Company facilities presently located in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows for a fixed price lump sum: $ XXXXXXXXX The following requirements are preliminary and shall apply to the NYSDOT Design-Builder scope of work for this contract;

1. Design–Builder shall maintain and provide 24/7 access to all existing and proposed Con Edison Manholes to Con Edison personnel.

2. Vibration levels shall not exceed 0.5 in/sec. If maximum levels are approached construction activities shall be halted and means and methods shall be reevaluated.

3. The Design–Builder shall conduct their operations in such a manner as not to damage any buried utilities. This includes but is not limited to crane placements, material handling and excavation. In developing and executing their work plan, the Design–Builder shall insure that the surface

Page 80: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 2 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

pressure within a lateral distance of 10 feet from the centerline of any buried utility does not exceed the limits specified:

a. Electric Ducts: 3.50ksf. b. 345Kv feeder and return lines: 3.50 ksf.

The following requirements are preliminary and shall apply to the NYSDOT Design-Builder scope of work at or near the existing Jamaica Substation located Archer Avenue, on the Northbound Service Road:

1. All Mobile Equipment used by the Design–Builder shall maintain a minimum 20’ clearance from the Jamaica Substation fence.

2. All other activities by Design–Builder shall maintain a minimum 15’ clearance from the Jamaica Substation fence.

3. No storage of Design–Builder’s materials or equipment is allowed within 5’ of the Jamaica Substation fence.

4. No picks or swings with large equipment should break the plane of the fence line, preferably should not break plane of curb line.

5. Design–Builder shall note that the existing fence has a security system, any vibration of fence will trip the alarm systems.

6. Design–Builder shall not block the existing rollup gate on Archer Ave between Van Wyck Expressway service road and 138th St, this gate requires 24/7 access.

7. Design-Builder shall maintain sidewalk access along Archer Ave in order to provide Con Edison personnel entry into Jamaica Substation building.

8. Design–Builder shall provide at least 2 weeks’ notice prior to Con Edison prior to any construction activities in the vicinity of the substation.

9. Design–Builder shall notify Con Edison and involve them in all meetings pertaining to work in the vicinity of the Jamaica Substation, including but not limited to meetings between different agencies, Mainline tracks roll-in and roll-out work, proposed Con Edison infrastructure.

10. Any excavation next to the substation property line will need PE stamped drawings to review methodology, design criteria and calculations. Design–Builder shall submit these to Con Edison minimum 20 days prior to the excavation.

11. Any installation of supporting equipment such as piles, sheeting and shoring in the vicinity of the substation, will need PE stamped drawings to review methodology, design criteria and calculations. Design–Builder shall submit these to Con Edison minimum 20 days prior to the excavation. If deemed necessary, accelerometers shall be set up in and around Con Edison’s sensitive equipment to monitor and ensure that allowable vibration standards are being met. Design–Builder shall obtain these standards directly from con Edison during three party negotiations.

Page 81: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 3 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

12. Any blasting in vicinity of substation property line will need PE stamped drawings to review methodology, design criteria and calculations. Design–Builder shall submit these to Con Edison minimum 20 days prior to the blasting. If deemed necessary, accelerometers shall be set up in and around Con Edison’s sensitive equipment to monitor and ensure that allowable vibration standards are being met. Design–Builder shall obtain these standards directly from con Edison during three party negotiations.

Queens BIN 1055699 94th Avenue & Atlantic Avenue over Van Wyck Expressway (I-678)

• 4-4” transite (on bridge) / concrete (underground) conduits run from MH #M-8292 towards the south fascia of the bridge to MH #M-11217. 2 empty conduits, 2 dead feeders.

• 4-4” transite (on bridge) / concrete (underground) conduits run from MH #M-8291 towards the north fascia of the bridge to MH #M-8262. All 4 conduits are empty.

• 2-4” concrete duct conduits run from MH #M-8292 to Box #52048 to the west bridge approach.

• On SB Service Road, 17-4” fiber conduits from MH #M-144 to MH #M-145.

• 6-4” concrete duct and 4-5” concrete duct conduits run from MH #M-14180 to MH #M-17273.

• 2-4” fiber conduits run from MH #M-145 to Box #52048 to Box #53712.

• 10-4” fiber conduits run from MH #M-145 to MH #M-146

• 2-4” concrete ducts run from MH #M-145 to MH #M-8292

• 2-4” fiber conduits run from MH #M-8292 to MH #M-14180

• 11-4” fiber conduits run from MH #M-8292 to MH #M-145

• 2-4” concrete ducts run from MH #M-8292 to MH #M-17273

• 2-4” fiber conduits run from MH #M-8291 to MH #M-17273.

• At the intersection of the NB Service Road and 94th Avenue, there are a couple service feed line to light poles from MH #M-8262, one to northwest corner of the intersection and the other in the southeast corner.

• 2-4” concrete duct conduits run from the east bridge approach to Box #51230 to MH #M-11217.

• 6-4” concrete conduits run from MH #M8261 to Transformer vault TM-4222.

• On the NB Service Road, 6-4” concrete duct conduits run from MH #M-12947 to MH #M-12948.

• 2-4” concrete duct conduits run from Box #51321 to Box #51320 to MH #M-8261 to Box #51319.

• 6-4” concrete duct conduits run from MH #M-8261 to MH #M-8263 All Con Edison facilities listed above shall be supported, protected and maintained within the proposed work area of Atlantic Avenue Bridge by the NYSDOT Design-Builder.

Con Edison Scope:

Con Edison shall be responsible for performing all work on all conductors (installation & removal, splicing, de-energizing & energizing). Con Edison will not take electric line outages during summer peak load period, which is June 1st to September 15th Con Edison will furnish conductors, conduits, manholes, shallow cover protection steel plates, etc. Con Edison will remove all cable and equipment from manholes/boxes/conduits prior to removal/abandoning facilities.

Page 82: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 4 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

NYSDOT Design-Builder Scope – Bridge Replacement:

a. The NYSDOT Design-Builder to relocate existing 2-4” fiber ducts from M-17273 to M-8291 by installing, rodding and roping 2-5” Precast Concrete ducts (PCD) between M-New5 and M-8291. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

b. The NYSDOT Design-Builder to relocate existing 6-4” concrete duct 4-5” concrete

duct conduits from MH #M-17273 to MH #M-14180 by installing, rodding and roping 6-5” Precast Concrete ducts (PCD) between M-New 5 and M-New 6. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole locations shall be coordinated with Con Edison and determined in the field.

c. The NYSDOT Design-Builder shall relocate existing M-14180 by installing new

manhole M-New6 and remove/abandon existing M-14180. New manhole shall be precast cable manhole – Type M 11-6, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

d. The NYSDOT Design-Builder to relocate existing 4-4” concrete ducts from M-8292

to M-14180 by installing, rodding and roping 4-5” Precast Concrete ducts (PCD) between M-8292 and M-New6. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

e. The NYSDOT Design-Builder to install, rod and rope 6-5” Precast Concrete ducts

(PCD) between M-8291 and M-New6. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field

f. The NYSDOT Design-Builder shall enlarge existing manhole M-8291. Existing

dimensions of manhole are 11’-6”X 4’-6”X 6’-6”. Enlarged manhole dimensions shall be 14’-0”X 4’-6”X6’-6” or as directed by Con Edison field representative in accordance to all applicable Con Edison standards and specifications.

g. The NYSDOT Design-Builder shall install, rod and rope 4-5” steel conduits on the

new 94th Ave. & Atlantic Ave. Superstructure towards the south fascia from MH #M-8292 to MH #M-11217. Steel conduits shall transition to precast concrete ducts (PCD) beyond the approach slab.

h. The NYSDOT Design-Builder shall install, rod and rope 6-5” steel conduits on the new 94th Ave. & Atlantic Ave. Superstructure towards the north fascia from MH #M-8291 to MH #M-8262. Steel conduits shall transition to precast concrete ducts (PCD) beyond the approach slab.

i. The NYSDOT Design-Builder shall permanently abate, remove and dispose of

existing 4-4” transite ducts located toward the north fascia and 4-4” transite ducts located toward the south fascia of the Atlantic Avenue Bridge Superstructure.

Page 83: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 5 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

Transite conduit removal shall be coordinated with Con Edison and performed in accordance Con Edison standards for handling and abatement of ACM.

j. The alignment of the Con Edison facilities shall be coordinated with Con Edison and other proposed utilities and constructed in accordance to all applicable Con Edison standards and specifications. NYSDOT Design-Builder shall submit as-built drawings for all new ducts installed to Con Edison Field Representative, provide survey of location against new curb alignment and provide exact dimensions for rodding report.

k. The NYSDOT Design-Builder shall supply utility supports and appurtenances

necessary to attach the conduits to the bridge in accordance to all applicable Con Edison standards and specifications.

l. The NYSDOT Design-Builder shall furnish all materials that are not being

provided by Con Edison. m. The NYSDOT Design-Builder shall notify Con Edison of installation schedule at

least 30 days before materials are required on site.

Anticipated Timeframe for NYSDOT Design-Builder Scope:

Based on historic data for similar scope, it is anticipated the proposed work shall require the following:

a. Once the conduit is installed, rodded and roped by the NYSDOT Contactor and accepted by Con Edison.

i. Con Edison would require 4 weeks to pull a section of cable. ii. A section of cable is from manhole to manhole.

iii. The section can have one cable pull or multiple cable pulls, the timeframe would still be 4 weeks per section.

b. Once all the cable is pulled Con Edison would then require 4 weeks for each primary feeder outage. Since the feeders are all part of the same network only one feeder outage can be taken at a time for reliability concerns.

i. 94th Avenue & Atlantic Avenue shall have 3 primary feeders in proposed condition, time for feeder splicing, de-energizing, re-energizing, and testing shall be 12 weeks.

c. Con Edison requires a total of 16 weeks to complete the cable work at these locations.

Northbound and Southbound Service Roads from Atlantic Avenue to 91st Avenue (Van Wyck Expressway under Long Island Railroad Bridges (I-678)) Existing Facilities:

• 13-4” fiber conduits (concrete encased) cross under VWE from MH #M-143 to MH #M-8085 approximately at STA. SB 172+25.

• 2-4” fiber conduits (concrete encased) cross under VWE from MH #M-143 to MH Box #51560.

• A 4” retired fiber conduit cross under VWE from MH #M-143 to Dead End “M”.

Page 84: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 6 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

• 5-4” retired fiber conduits cross under VWE from MH #M-143 to Dead End “N”.

• A 4” retired fiber conduits from MH #M-143 to Dead End “J”.

• A 2” iron conduit runs from MH #M-143 to NYC Lighting

• A 4” retired fiber conduits from MH #M-144 to Dead End “B”

• 4-4” concrete/steel conduits cross under VWE from MH #M-8036 to MH #M-8037 (manhole inside Jamaica Substation).

• On the SB Service Road and 91st Avenue intersection, 2-4” concrete ducts south run from Vaults VS-9104 & VS-8779 to MH #M-17006.

• 6-4” concrete and 4-5” concrete ducts run from MH #M-279 to MH #M-17006.

• 12-4” fiber conduits (concrete encased) run from MH #M-19461 to MH #M-646.

• 4-5” concrete ducts run from MH #M-19461 to MH #M-8036.

• 17-4” fiber conduits run south from MH #M-646 to MH #M-142 (10 retired).

• 15-4” fiber conduits run south from MH #M-142 to MH #M-8036 (5 retired).

• 13-4” fiber conduits run south from MH #M-8036 to MH #M-143 (5 retired).

• 17-4” fiber conduits run south from MH #M-143 to MH #M-144 (9 retired).

• 17-4” fiber conduits run south from MH #M-144 to MH #M-145 (9 retired).

• 7-4” concrete ducts run from MH #M-142 to Bus Compartment (1 retired).

• 4-4” concrete ducts run from MH #M-17006 to MH #M-14177.

• 6-4” concrete ducts run from MH #M-8036 to MH #M-14177.

• 2-8” HPP Con Ed critical facilities run south from MH #M-7075 to MH #M-7076.

• 2-8” HPP Con Ed critical facilities run from MH #M-7076 to Jamaica Substation.

• 4-5” high-density polyethylene (PVC) conduits run from MH #M-14177 to MH # M-14180.

• 6-4” concrete ducts run south from MH #M-14177 to MH # M-14180.

• 13-4” fiber conduits run from MH #M-646 to Dead End “B” (retired).

• 4-4” retired fiber conduits run from Dead End “A” to MH #M-646.

• 7-4” retired fiber conduits run from MH #M-279 to Dead End “C”.

• A 1” thermocouple runs from MH #M-7076 to Dead End.

• 6-4” retired fiber conduits run from Dead End “Y” to MH #M-142.

• 3-4” retired fiber conduits run from MH #M-142 to Dead End “K”.

• 12-4” retired fiber conduits run from MH #M-142 to Dead End “J”.

• 6-4” fiber conduits run from MH #M-143 to Dead End “E”.

• 2-4” fiber conduits run from MH #M-143 to Dead End “F”.

• A 4” fiber conduit runs from MH #M-146 to Dead End “A”.

• A 4” retired fiber conduit runs from Dead End “F” to MH #M-144

• On the NB Service Road, 6-4” concrete ducts run from MH #M-12948 to MH #M-12949.

• 2-4” concrete ducts run north from Box #51318 to MH #M-8327 to Box #51560.

• 2-5” concrete ducts run from MH #M-8327 to MH #M-12949.

• 6-4” concrete conduits run from MH #M-8327 to MH #M-8261.

• 2-4” concrete conduits run from MH #M-8327 to MH #M-8037.

• A 4” concrete conduit runs from MH #M-8261 to VS-1281.

• 4-4” concrete conduits run from MH #M-8327 to MH #M-8085.

• 2-4” concrete conduits run from MH #M-8327 to MH #M-19219.

• 4-4” concrete conduits run from MH #M-12949 to MH #M-20318.

• 4-4” concrete conduits run from MH #M-12949 to MH #M-8035.

• 4-5” HDPE conduits run from MH #M-72003 to MH #M-8085.

• 2-4” concrete conduits run from MH #M-72003 to MH #M-8327.

Page 85: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 7 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

• 4-5” HDPE conduit run from MH #M-72003 to MH #M-1427.

• 2-4” concrete conduits run from MH #M-72003 to MH #M-19219.

• A 8” HPP Con Ed critical facility runs from MH #M-12440 to MH #M-7103.

• A 8” HPP Con Ed critical facility runs from MH #M-7102(manhole inside Jamaica Substation) to MH #M-7103.

• 4-5” concrete conduits run from MH #M-19219 to MH #M-8197.

• 6-5” concrete conduits run from MH #M-8197 to MH #M-8035.

• 2-4” concrete conduits run from MH #M-19219 to Box #50928.

• 8-5” concrete conduits run from MH #M-19219 to MH #M-8197.

• 2-4” concrete conduits run from Box #50928 to MH #M-8197.

• 9-4” fiber conduits (concrete encased) run west crossing under VWE from MH #M-1427 to MH #M-652.

• 3-4” fiber conduits run from MH #M-652 to dead end “B”.

• 8-4” fiber conduits (concrete encased) run west crossing under VWE from MH #M-652 to MH #M-646.

• 4-4” fiber conduits (concrete encased) run west crossing under VWE from MH #M-652 to MH #M-279.

• 4-4” concrete conduits run from MH #M-1427 to MH #M-8197.

• 4-4” concrete conduits run from Dead End “H” to MH #M-8197.

• 2-5” concrete conduits run from Dead End “L” to MH #M-8197.

• 2-5” concrete conduits run from MH #M-8327 to MH #M-8037.

• 2-4” concrete conduits run from Dead End “D” to MH #M-19219.

• 2-4” concrete conduits run from MH #M-12949 to Dead End “I”.

• 4-5” concrete conduits run from MH #M-19219 to MH #M-8034.

• 2-4” concrete conduits run from Dead End “A” to MH #M-12948.

• 2-4” concrete conduits run from MH #M-11217 to MH #M-8261.

• 4-4” concrete conduits run from MH #M-8262 to MH #M-8261.

• 5-4” concrete conduits run from TM-4222 to MH #M-8261 (1 retired).

• 4-4” concrete conduits run from Box #51319 to MH #M-23431.

• 2-4” concrete conduits run from MH #M-8263 to Box #51321 to Box #51320 to MH #M-8261 to Box #51319 to Box #60890 to Box #51318.

• 6-4” concrete conduits run from MH #M-8263 to MH #M-8261 All Con Edison facilities listed above shall be supported, protected and maintained within the proposed work area by the NYSDOT Design-Builder.

Con Edison Scope:

Con Edison shall be responsible for performing all work on all conductors (installation & removal, splicing, de-energizing & energizing). Con Edison will not take electric line outages during summer peak load period, which is June 1st to September 15th Con Edison will furnish conductors, conduits, manholes, shallow cover protection steel plates, etc. Con Edison will remove all cable and equipment from manholes/boxes/conduits prior to removal/abandoning facilities.

Page 86: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 8 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

NYSDOT Design-Builder Scope:

a. The NYSDOT Design-Builder shall protect and then encase the existing 17-4” fiber conduits (concrete encased) from M-143 to M-144 in concrete and install 1” steel protection plate on top of the conduit in accordance to all applicable Con Edison standards and specifications.

b. The NYSDOT Design-Builder shall relocate existing M-14177 by installing new manhole M-New7 and remove/abandon existing M-14177. New manhole shall be precast cable manhole – Type M 11-6, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

c. The NYSDOT Design-Builder to relocate existing 6-4” Concrete ducts and 4-5” PVC ducts from M-14180 to M-14177 by installing, rodding and roping 10-5” Precast Concrete ducts (PCD) between M-New6 and M-New7. Existing conduits to be removed/ abandoned as necessary. Within the LIRR bridge area (approx. STA. SB 169+50 to SB 172+50) these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than 10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

d. The NYSDOT Design-Builder to relocate existing 6-4” Concrete ducts from M-

14177 to M-8036 by installing, rodding and roping 4-5” Precast Concrete ducts (PCD) between M-New7 and M-8036. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

e. The NYSDOT Design-Builder shall relocate existing M-17006 by installing new

manhole M-New8 south of the 91st Avenue and Southbound Service Road intersection and installing, rodding and roping 6-5” Precast Concrete Ducts (PCD) from M-279 to M-New 8 and remove/ abandon existing M-17006. New manhole shall be precast cable manhole – Type M 11-6, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

f. The NYSDOT Design-Builder to relocate existing 4-4” Concrete ducts from M-

14177 to M-17006 by installing, rodding and roping 6-5” Precast Concrete ducts (PCD) between M-New7 and M-New8. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

g. The NYSDOT Design-Builder to relocate existing 2-4” Concrete ducts from M-

17006 to VS-9104 and VS-8779 by installing, rodding and roping 2-5” Precast Concrete ducts (PCD) between M-New8 and VS-9104 and VS-8779 (1 conduit to each vault, common trench). Existing conduits to be removed/ abandoned as

Page 87: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 9 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

h. Due to reduction of sidewalk, The NYSDOT Design-Builder shall relocate existing

Bus Compartment by installing new field constructed manhole M-New12 and remove/ abandon existing bus compartment. New manhole location shall be coordinated with Con Edison and determined in field.

i. The NYSDOT Design-Builder to relocate existing 8-4” Concrete ducts from M-142

to Bus Compartment by installing, rodding and roping 8-4” Precast Concrete ducts (PCD) between M-142 and M-New12. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

j. The NYSDOT Design-Builder shall install new manhole M-New11. Manhole M-

New11 shall capture the conduit run from M-12947 to M-12948 to M-12949. The NYSDOT Design_Builder shall dig test pit to locate the existing 6-4” concrete conduit run from M-12948 to M-12947 and new manhole location shall capture these existing conduits. New manhole shall be field constructed cable manhole – Type M 11-6, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

k. The NYSDOT Design-Builder shall install new manhole M-New9. Manhole M-New 9 shall capture the conduit run from M-20318 to M-12949. The NYSDOT Design-Builder shall dig test pit to locate the existing 4-4” fiber conduit run from M-12949 to M-20318 and new manhole location shall capture these existing conduits. New manhole shall be field constructed cable manhole – Type M 11-6, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

l. The NYSDOT Design-Builder to relocate existing 6-4” Concrete ducts from M-12947 to M-12948 to M-12949 by installing, rodding and roping 8-5” Precast Concrete ducts (PCD) between M-New11 and M-New9. Existing conduits to be removed/ abandoned as necessary. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

m. The NYSDOT Design-Builder shall remove existing M-12948, due to proposed

retaining wall.

n. The NYSDOT Design-Builder shall relocate existing M-12949 by installing new manhole M-New10 and remove/ abandon existing M-12949. Manhole M-New10 shall capture the conduit run from M-8038. The NYSDOT Design-Builder shall dig test pit to locate the existing 4-4” fiber conduit run from M-12949 to M-8035 and new manhole location shall capture these existing conduits. New manhole shall be slotted precast cable manhole – Type M 11-6SL, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

Page 88: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 10 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

o. The NYSDOT Design-Builder shall install new manhole M-New14. New manhole shall be Precast cable manhole – Type M 11-6 with integral floor, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

p. The NYSDOT Design-Builder shall install, rod and rope 6-5” Precast Concrete

ducts (PCD) between M-8262 (on 94th Avenue) and M-New14. These conduits shall bypass existing M-8327. Within the LIRR bridge area (approx. STA. NB 169+50 to NB 172+25) these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than 10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

q. The NYSDOT Design-Builder to relocate existing 8-4” Concrete ducts from M-

12948 to M-12949 by installing, rodding and roping 8-5” Precast Concrete ducts (PCD) between M-New 11 and M-New9. Existing conduits to be removed/ abandoned as necessary. Within the LIRR bridge area (approx. STA. NB 169+50 to NB 172+25) these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than 10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane and manhole location shall be coordinated with Con Edison and determined in field.

r. The NYSDOT Design-Builder shall dig test pits to locate existing 6-4” concrete duct run from M-8261 to M-8327 and relocate it by installing, rodding and roping 8-5” Precast Concrete ducts (PCD) to the east of the existing conduit run between M-8261 and M-8327. These conduits shall bypass existing Box #51318. Existing conduits to be removed/ abandoned as necessary. Within the LIRR bridge area these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than 10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane shall be coordinated with Con Edison and determined in the field.

s. The NYSDOT Design-Builder to relocate existing 2-4” concrete duct run from Box

#51318 to M-8327 by installing, rodding and roping 2-4” Precast Concrete ducts (PCD) to the east of the existing conduit run between Box #51318 and M-8327. Existing conduits to be removed/ abandoned as necessary. Within the LIRR bridge area these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than

Page 89: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 11 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane shall be coordinated with Con Edison and determined in the field.

t. The NYSDOT Design-Builder to relocate existing 2-5” Concrete ducts from M-8327 to M-12949 by installing, rodding and roping 4-5” Precast Concrete ducts (PCD) between M-8327 and M-New10. Existing conduits to be removed/ abandoned as necessary. Within the LIRR bridge area (from M-8327 to approx. STA. NB 172+25) these PCD conduits shall have phenolic board and 3/8” steel plates installed between the proposed and existing conduit when separation is less than 10 feet. Phenolic board will be installed in 2 layers with a 3/8” steel plate in between and the phenolic board will be overlapped and staggered in order to minimize seams and shifting. The entire trench shall have horizontal steel plates installed in accordance to all applicable Con Edison standards and specifications. New conduit lane and manhole location shall be coordinated with Con Edison and determined in the field.

u. The NYSDOT Design-Builder shall install new manhole M-New13. Manhole M-New13 shall capture the conduit run from M-1427 to M-652. The NYSDOT Design-Builder shall dig test pit to locate the existing 9-4” fiber conduit run from M-652 to M-1427 and new manhole location shall capture these existing conduits. New manhole shall be field constructed cable manhole – Type M 11, with 11’-6” X 4’-6” X 6’-6” dimensions. New manhole location shall be coordinated with Con Edison and determined in field.

v. The NYSDOT Design-Builder shall install, rod and rope 6-5” Precast Concrete

ducts (PCD) between M-New14 and M-New13. New conduit lane and manhole locations shall be coordinated with Con Edison and determined in field.

w. The alignment of the Con Edison facilities shall be coordinated with Con Edison

and other proposed utilities and constructed in accordance to all applicable Con Edison standards and specifications. NYSDOT Design-Builder shall submit as-built drawings for all new ducts installed to Con Edison Field Representative, provide survey of location against new curb alignment and provide exact dimensions for rodding report.

x. The NYSDOT Design-Builder shall furnish all materials that are not being provided by Con Edison.

y. The NYSDOT Design-Builder shall notify Con Edison of installation schedule at least 30 days before materials are required on site.

Anticipated Timeframe for NYSDOT Design-Builder Scope:

Based on historic data for similar scope, it is anticipated the proposed work shall require the following:

Page 90: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 12 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

a. Once the conduit is installed, rodded and roped by the NYSDOT Contactor and accepted by Con Edison.

i. Con Edison would require 4 weeks to pull a section of cable. ii. A section of cable is from manhole to manhole.

iii. The section can have one cable pull or multiple cable pulls, the timeframe would still be 4 weeks per section.

b. Once all the cable is pulled Con Edison would then require 4 weeks for each primary feeder outage. Since the feeders are all part of the same network only one feeder outage can be taken at a time for reliability concerns.

i. Service road area mentioned above has 11 primary feeders, time for feeder splicing, de-energizing, re-energizing, and testing shall be 44 weeks.

c. Con Edison requires a total of 52 weeks to complete the cable work at these locations.

Page 91: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 13 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 92: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 14 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows:

NYSDOT Design-Builder to support, protect and maintain Con Edison Co of New York facilities, install new manhole, ducts, remove facilities and modify existing utilities for Con Edison Co of New York as mentioned in this utility agreement.

The owner will not claim reimbursement for that betterment portion of the work but will duly

account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of $ XXXXXXXXX to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work.

Page 93: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #2B

Pg. 15 of 15 PRELIMINARY UTILITY WORK AGREEMENT – CON EDISON ELECTRIC

DESIGN-BUILD CONTRACT

REV. 6 Date Modified: 04/13/2020

C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050_______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-01 TO UTL-17_

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 94: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 1 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

Since the construction, reconstruction, or maintenance of the transportation project described below, identified as:

Project Identification No.:X735.83 F.A. Project No.:

ROW Declaration No.: Map Nos.:

Parcel Nos.: County of: Queens

Contract No.: D900050

Project Description: Van Wyck Expressway Capacity and Access Improvement to JFK Airport (Contract 2)

necessitates the adjustment of utility facilities as hereinafter described (the “Project”), the owner, The Brooklyn Union Gas Company d/b/a National Grid NY (“National Grid” or “Owner”), of said facilities herewith agrees with the State of New York acting through the Commissioner of Transportation that this agreement shall apply to the accommodation of these utility facilities. Any adjustment of said facilities will be accomplished under the terms of this agreement, in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way and in accordance with the contract plans, specifications, proposal, amendment(s) or change order(s). The work described herein is subject to change pending the design details and schedule developed by New York State Department of Transportation’s design-builder. The said Design-Builder will coordinate with the owner in developing a Final Utility Work Agreement to be entered by the owner, the Design-Builder and New York State Department of Transportation. The existing National Grid facilities are to be abandoned, removed, protected/supported or replaced as defined in this agreement. I. Existing Facilities The existing National Grid Company facilities presently located in Queens County, New York within the New York State Right of Way as shown on the plans for the proposed transportation project are to be adjusted as follows for a fixed price lump sum: $ XXXXXXXXX

Page 95: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 2 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

Bridge Location National Grid Plate Showing Existing

Facilities **

National Grid Dwg Showing Proposed

Facilities

94th Avenue & Atlantic Avenue (BIN 1055699)

35A-19

Northbound and Southbound Service Roads from Atlantic Ave to 91st Ave (Long Island Railroad Bridges over Van Wyck Expressway (I-678))

34-185, 34-184 & 34-183

For Standard Details for Supports and Sleeves refer to National Grid DWG. ** For a Copy of the latest revision of National Grid Plates and National Grid Drawings please

call Mr. Justin Yip at (347) 633 5251 (or) email: [email protected]

Table 1: National Grid Reference ID Plates Showing Existing Facilities and Drawings Showing Proposed

Facilities The following requirements are preliminary and shall apply to the NYSDOT Design-Builder scope of work at all bridges

1. NYSDOT Design-Builder shall use extreme caution during its operation to avoid damaging any existing active gas facilities. The Design-Builder shall be financially responsible for any damage caused to National Grid facilities. National Grid retains the option to make repairs or to require the Design-Builder to make repairs to any damaged facility. All cost associated with such repairs shall be at the Design-Builder’s sole expense.

2. NYSDOT Design-Builder shall be responsible for the planning and provision of traffic control as required by National Grid to perform the gas installation until completion.

3. NYSDOT Design-Builder shall excavate and maintain main connection live gas openings (tie-in openings and cut & cap openings), and openings for welding at both ends of the bridge. The dimensions and locations for the openings shown in the attached drawings are approximate and shall be verified in the field by performing test holes as required by National Grid.

4. NYSDOT Design-Builder shall excavate and maintain main connection live gas openings (tie-in openings and cut & cap openings), and openings for welding for the proposed gas mains at the west service road under the LIRR bridges between 91st Avenue and Atlantic Avenue. The dimensions and locations for the openings shown in the attached sketch are approximate and shall be verified in the field by performing test holes as required by National Grid.

5. All excavated material shall become property of the NYSDOT Design-Builder and shall be disposed of in accordance with all applicable codes and standards.

6. NYSDOT Design-Builder shall sheet all excavations as per OSHA regulations. Design-Builder sheeting plans shall be approved and stamped by a P.E. licensed in the state of New York. Sheeting plans shall be submitted to National Grid for review and approval.

7. NYSDOT Design-Builder shall design, furnish and install all structural steel, including beams, channels, rods, hardware, etc. as required to support the new steel gas mains. Design drawings for structural steel

Page 96: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 3 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

supports shall be approved and stamped by a P.E. licensed in the state of New York. Design drawings shall be submitted to National Grid for review and approval.

8. NYSDOT Design-Builder shall design, furnish and install temporary timber flooring at bays where gas mains are being installed. NYSDOT Design-Builder shall adjust roller supports as directed by National Grid to facilitate pipe push/pull across the bridge.

9. NYSDOT Design-Builder shall move road traffic plates over live gas openings as required by National Grid.

10. National Grid shall perform all gas work: gas pipe assembly, pipe welding, pipe connections, pipe pressure testing, radiographic testing and purging of existing and new pipe. Refer to attached National Grid drawings for schedule for estimated time required to perform each operation at each bridge.

11. NYSDOT Design-Builder shall provide backfill material approved by National Grid for openings and

trenches in accordance with National Grid standard CNST01003.

12. NYSDOT Design-Builder shall be responsible for cuts and removal of retired gas pipe when needed. National Grid will take custody of abandoned gas pipe upon removal. When present and if necessary, National Grid shall remove coal tar coating at areas prior to pipe cuts for removal.

13. NYSDOT Design-Builder shall restore roadway pavement and sidewalks in accordance with NYSDOT and NYCDOT standards.

14. NYSDOT Design-Builder shall install all valve manholes, Boston boxes, test boxes and hardware required

for cathodic protection. NYSDOT Design-Builder is responsible to install and set the top of the hardware boxes at the same elevation as the final top of pavement contracted grades. National Grid shall furnish all valve manholes, Boston boxes, test boxes and cathodic protection material.

15. To facilitate installation of new gas pipes on all bridges, National Grid requires installation of gas pipes after girders have been erected but before the abutment backwall concrete is placed to top of girders. Also, NYSDOT Design-Builder shall install bridge diaphragms so that they will allow for the erection of the steel gas pipes on the bridges.

16. NYSDOT Design-Builder shall provide as needed temporary supports approved for National Grid for welding of gas pipes on each bridge.

17. NYSDOT Design-Builder shall submit a work schedule prior to the start of gas work. NYSDOT Design-Builder is responsible for the coordination of all gas work. National Grid requires weekly meetings on site during the gas work operation.

18. NYSDOT Design-Builder shall provide National Grid with a 2 week notice prior to installation of new gas main. NYSDOT Design-Builder shall provide National Grid with a 6 months notice prior to installation of new 30” gas mains on the Southbound Service Road.

19. During bridge construction NYSDOT Design-Builder shall provide access to gas mains as required by

National Grid.

Page 97: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 4 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

20. National Grid shall furnish all material required for the proposed gas main work i.e. pipes, fittings, and steel protection plates (if required) etc. NYSDOT Design-Builder shall provide material storage space for pipes, fittings, and steel protection plates (if required). The Design-Builder shall protect all material from damage and weather conditions.

21. Compensation to NYSDOT Design-Builder for all work performed under gas notes/provisions shall be

paid by the NYSDOT via a schedule of values requisition.

22. Any proposed modifications or deviations from the attached National Grid drawings, contract, and specifications shall be submitted in writing with appropriate details and back up to the resident engineer. All modifications must be reviewed and approved by National Grid.

23. NYSDOT Design-Builder shall supply National Grid with 3 copies of the final approved "as built" drawings in accordance with NYSDOT HDM Standards.

24. When cover on new gas main is less than 2 feet, NYSDOT Design-Builder shall install steel protection plates above the top of the main as required. National Grid shall supply steel protection plates.

25. NYSDOT Design-Builder shall obtain any required road use permits, disposal permits, storage permits, etc., as required for the performance of its work. National Grid shall obtain gas construction permits

26. All NYS, NYC, and Federal Codes pertaining to the work being performed by this specification, and on the drawings, are applicable.

27. Relevant National Grid plates showing all gas facilities near the bridges involved in this Project have been attached to this Agreement. Any conflicts with the gas facilities shown on the attached National Grid plates and NYSDOT drawings shall be brought to the attention of National Grid for resolution. NYSDOT Design-Builder shall be responsible for obtaining and using updated National Grid plates to locate all National Grid gas facilities before starting any excavation related with this project.

28. NYSDOT Design-Builder shall comply with New York State Code Rule 753. In addition, NYSDOT Design-Builder shall notify National Grid representative two weeks prior to digging.

29. National Grid representative shall have the right to inspect the NYSDOT Design-Builder’s work, material, and equipment when performing gas related work in accordance with this Agreement.

30. National Grid’s Inspection does not relieve the NYSDOT Design-Builder from the responsibility of performing work in accordance with the requirements of contract specifications and in accordance with the terms of this Agreement.

31. NYSDOT Design-Builder shall be responsible for the support and protection of all active National Grid facilities during the installation of other utilities. The associated cost for that work shall be funded by the utility whose facilities are being installed. If a utility or party other than National Grid requires work in connection with the Project and such work impacts National Grid’s facilities and requires work to be performed to National Grid’s facilities whether by National Grid or the NYSDOT Design-Builder, such utility or other party, not National Grid, shall be responsible and liable for any and all cost of the work to National Grid’s facilities.

Page 98: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 5 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

32. National Grid Loading Requirement: The NYSDOT Design-Builder shall install all new gas mains at a minimum of 4 feet of cover for any main under the roadway in the area within 100 feet north of the LIRR Mainline 1/3 Bridge.

33. The following National Grid standards, as amended to date, are applicable under this Agreement:

National Grid Document Number **

National Grid Standard Specification Description

CONT5010-LI-MA-NYC General Contract Conditions

FORM 00700 Terms and Conditions for Construction

Design-Builder Compliance Affidavit

SHW-101 Design-Builder Compliance to FMCSA and PHMSA Drug & Alcohol

Regulatory Requirements

N-1402 Design-Builder Safety Requirements

CNST5010-NYC General Construction Requirements and Pipe Handling

CNST01003 Backfilling and Restoration

MAIN6140-LI-NYC Single Stage Sheeting for Excavations to 20 ft. in depth

MAIN6141-LI-NYC Shoring for Typical Pit, Type C soil

030026-CS Installation of Test Stations for Cathodic Protection

VALV6130-LI-NYC Typical Ball Valve Installation for Gas Mains

DAM01003 Vibrational and Impact Forces in the Vicinity of Underground Gas

Facilities

CNST6010 Protective Shields for all Gas Lines NYC

CNST6030-LI-NYC Method of Protective Steel Plating for Gas Lines

** For a Copy of the latest revision of National Grid Standard Specifications please call Mr. Justin Yip at (347) 633 5251 (or) email: [email protected]

Table 2: National Grid Standards

Queens BIN 1055699 94th Avenue & Atlantic Avenue over Van Wyck Expressway (I-678)

• An 8” wrapped steel pipe that runs towards the north fascia of the 94th Avenue & Atlantic Avenue Bridge. This 8” gas main services LIRR Jamaica yard.

• A 12” wrapped steel pipe runs west near the north fascia of the 94th Avenue and Atlantic Avenue Bridge from a gas valve in the 94th Avenue and NB Service Road intersection.

Page 99: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 6 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

• At SB Service Road and Atlantic Avenue intersection, a 6” pipe runs E-W on Atlantic Avenue, to west of the west bridge approach

• On Atlantic Avenue an 8” plastic pipe runs along the south sidewalk and a 6” pipe runs along the north sidewalk.

• A 12” unknown medium density low pressure pipe runs N-S across the intersection of the SB Service Road and Atlantic Avenue.

• There are two set of gas mains running along the SB Service Road: o The first is a 30” cast iron pipe that connects to a 30” cast iron bell spigot (15 PSI) pipe. o The second is a 12” steel pipe which runs parallel to the 30” pipe, along the east side of

the SB Service Road.

• At the NB Service Road and 94th Avenue intersection, an 8” plastic gas pipe runs west on 94th Avenue on the north sidewalk to the northwest corner of the intersection.

• At the same intersection, on the south side of 94th Avenue, a retired 6” cast iron pipe running in the E-W direction connects to a retired 6” steel pipe which connects to a retired 6” cast iron pipe.

o This connects to a retired 12” steel pipe, which runs north from the intersection along the NB Service Road, which then connects to a retired 6” plastic pipe and then turns east into the entrance area of the train station platform and connects to a retired 6” PL pipe.

• Along NB Service road, an 8” steel pipe that runs north along the east sidewalk of the NB Service Road.

All National Grid facilities listed above which are not affected by the replacement of 94th Avenue & Atlantic Avenue bridge shall be supported, protected and maintained within work area by NYSDOT Design-Builder. National Grid Scope: National Grid shall perform all gas work: gas pipe assembly, pipe welding, pipe connections, pipe pressure testing, radiographic testing and purging of existing and new pipe. National Grid shall be responsible for checking the existing gas mains to be removed for ACM and perform abatement procedures if needed. National Grid shall cut and cap, flush, and clean the existing gas mains to be removed and be responsible for the hauling operations of these gas mains to the National Grid Greenpoint facility. National Grid will not take gas main outages during winter peak load period, which is a week after Thanksgiving, to April 1st. Any gas main outages during this period will need to be coordinated with National Grid on a case-by-case basis.

In case of an emergency, temporary gas stoppage for a few days may be allowed and shall be coordinated with National Grid. Anticipated Timeframe for National Grid Scope – Replacing Superstructure Steel: XX days.

NYSDOT Design-Builder Scope – Bridge Replacement:

a. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation of a 12” steel pipe on the west side of the 94th Avenue & Atlantic Avenue Bridge.

Page 100: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 7 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

b. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation of a 12” steel pipe on the east side of the 94th Avenue & Atlantic Avenue Bridge.

c. NYSDOT Design-Builder shall be responsible for assisting National Grid with the structural lifting and erection of the proposed 12” steel pipe on the proposed bridge. NYSDOT Design-Builder shall install new steel supports and insulating rollers. National Grid shall provide insulating rollers.

d. NYSDOT Design-Builder shall excavate weld pits and tie-in pits at locations. Locations and dimensions are approximate and shall be verified in the field.

e. NYSDOT Design-Builder shall install pipe sleeves at abutment walls, pipe sleeves to be provided by National Grid.

f. The NYSDOT Design-Builder shall permanently remove the existing 12” wrapped steel pipe running toward the north fascia of the 94th Avenue & Atlantic Avenue Bridge.

g. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation

of an 12” steel pipe on the west side of the 94th Avenue & Atlantic Avenue Bridge .

h. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation of an 12” steel pipe on the east side of the 94th Avenue & Atlantic Avenue Bridge .

i. NYSDOT Design-Builder shall be responsible for assisting National Grid with the structural lifting and erection of the proposed 12” steel pipe on the proposed bridge. NYSDOT Design-Builder shall install new steel supports and insulating rollers. National Grid shall provide insulating rollers.

j. NYSDOT Design-Builder shall excavate weld pits and tie-in pits at locations. Locations and dimensions are approximate and shall be verified in the field.

k. NYSDOT Design-Builder shall install pipe sleeves at abutment walls, pipe sleeves to be provided by National Grid.

l. The NYSDOT Design-Builder shall permanently remove the existing 8” wrapped steel pipe running toward the north fascia of the 94th Avenue & Atlantic Avenue Bridge.

m. For any existing gas main to be removed, the NYSDOT Design-Builder shall be responsible for removing the decommissioned gas mains from the field and dispose them in the National Grid provided containers.

Southbound Service Roads from Atlantic Avenue to 91st Avenue (Van Wyck Expressway under Long Island Railroad Bridges (I-678)) Existing Facilities:

Page 101: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 8 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

• On the west side of the SB Service Road a 30” steel (15 PSI) pipe runs NS between 91st Avenue and Atlantic Avenue.

• On the east side of the SB Service Road a 12” CI runs NS from 91st Avenue towards Atlantic Avenue and connects to a 12” steel pipe south of the LIRR bridges.

All National Grid facilities listed above shall be supported, protected and maintained within the proposed work area of LIRR Bridges by the NYSDOT Design-Builder. NYSDOT Design-Builder shall be responsible for obtaining and using updated National Grid plates to locate all National Grid gas facilities before starting any excavation related with this Project. NYSDOT Design-Builder shall perform test pits to verify existing facilities. Any existing cast iron gas mains which are exposed due to the proposed work will require replacement. National Grid Scope: National Grid shall perform all gas work: pipe installation, pipe welding, pipe connections, pipe pressure testing, radiographic testing and purging of existing and new pipe. National Grid shall be responsible for checking the existing gas mains to be removed for ACM and perform abatement procedures if needed. National Grid shall cut and cap, flush, and clean the existing gas mains to be removed and be responsible for the hauling operations of these gas mains to the National Grid Greenpoint facility. National Grid will not take gas main outages during winter peak load period, which is a week after Thanksgiving, to April 1st. Any gas main outages during this period will need to be coordinated with National Grid on a case-by-case basis. National Grid will not allow two consecutive or adjacent bridges to be taken offline simultaneously regardless of temperature. In case of an emergency, temporary gas stoppage for a few days may be allowed and shall be coordinated with National Grid.

NYSDOT Design-Builder Scope – Replacing Superstructure Steel:

Quantities shown below are based on preliminary NYSDOT scope of work and subject to change based on field conditions and final NYSDOT scope of work.

a. NYSDOT Design-Builder shall provide National Grid with a 4 month notice prior to the required installation of the new gas mains. National Grid will require special equipment and services that need to be scheduled in advance for the Installation of HP 30” steel gas mains.

b. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation of 30” steel pipe on the west side of the Southbound Service Road.

c. NYSDOT Design-Builder shall excavate and sheet as necessary for the installation of 12” steel pipe on the west side of the Southbound Service Road.

Page 102: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 9 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

d. NYSDOT Design-Builder shall excavate weld pits and tie-in pits at locations.

Locations and dimensions are approximate and shall be verified in the field.

e. For any existing gas main to be removed, NYSDOT Design-Builder shall be responsible for removing the decommissioned gas mains from the field and store them in the National Grid provided containers.

Page 103: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 10 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

II. Financial Responsibility (check appropriate boxes):

The facilities to be adjusted under the terms of this agreement are subject to Section 52 of the State Highway Law, and the cost of this adjustment is the sole responsibility of the owner.

Subdivision 24 of Section 10 of the State Highway Law enables the Commissioner of

Transportation to provide at the expense of the State, for adjustment to a municipally owned utility when such work is necessary as a result of State highway work. (Municipal Agreement required.)

Subdivision 24-b of Section 10 of the State Highway Law enables the Commissioner of

Transportation to participate in the necessary expenses incurred for adjustment of privately, publicly or cooperatively owned facilities, municipal utility facilities, or facilities of a corporation organized pursuant to the State Transportation Corporations Law. (Privately Owned Property Agreement or Reimbursement Agreement required.)

Subdivision 27 of Section 10 of the State Highway Law enables the Commissioner of

Transportation upon the request of a municipality, to perform for and at the expense of such municipality specified work to be included within a State-let contract. (Betterment Resolution required.)

Subdivision 33 of Section 10 of the State Highway Law enables the Commissioner of

Transportation, upon the request of a public utility corporation, to perform for and at the expense of such public utility corporation specified work to be included within a State-let contract.

Subdivision 13 of Section 30 of the State Highway Law enables the Commissioner of

Transportation to enter into an agreement to reimburse with public funds the owner for necessary expenses incurred as a result of this adjustment, or to replace the facilities in kind.

The owner will develop and keep a record of costs in accordance with the New York State

Department of Transportation (NYSDOT) Reimbursement Procedures, and when federal funds participate in the cost, the Federal Highway Administration (FHWA) Federal-Aid Policy Guide Part 645, or as indicated below:

________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 104: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 11 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

III. Physical Adjustment Method (check appropriate boxes): The actual adjustment or design engineering will be performed by the following method (s):

Contract let by the Commissioner.

Contract let by the Owner, (check applicable statement, i.e., a or b)

a. Best Interests of State.

b. Utility not sufficiently staffed or equipped.

By the Owner’s forces. (For Inspection and Relocation Work) IV. Betterment, Salvage, and Depreciation Credits Due the Project (check appropriate boxes):

There will be no extension of service life, improved capacity nor any other betterment of the facility (as defined by the NYSDOT Utility Reimbursement Procedures and by FHWA Federal-Aid Policy Guide Part 645) as a result of the adjustments made pursuant to this agreement.

There is betterment described as follows: NYSDOT Design-Builder to support, protect and maintain National Grid facilities, install new facilities, remove and modify existing utilities for National Grid as mentioned in this utility agreement.

The owner will not claim reimbursement for that betterment portion of the work but will duly account for it as required by applicable NYSDOT and FHWA procedures.

The owner hereby agrees to deposit with the Comptroller of the State of New York the amount of

$ xxxxx to cover the cost of the betterment as described above.

The owner agrees to comply with the requirements of the NYSDOT Utility Reimbursement

Procedure and FHWA Federal-Aid Policy Guide Part 645 with the respect to salvage and depreciation credits when applicable.

V. General Covenants

The owner hereby agrees to accept full title and responsibility for the adjusted facility in writing upon satisfactory completion of the work. Such acceptance will acknowledge the owner’s responsibility to maintain the facility in accordance with all applicable codes, standards and regulations, including his obligation, where applicable, to remove any or all of the facility from the highway at the order of the Commissioner of Transportation, all in accordance with the Rules and Regulations Governing the Accommodation of Utilities within the State Highway Right-of-Way. All compensable claims covered by this agreement will be included in one of the following:

A. Privately Owned Property Agreement executed prior to the performance of the work. B. Municipal Agreement executed prior to performance of the work.

Page 105: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

HC-140 (09/13) NEW YORK STATE DEPARTMENT OF TRANSPORTATION REF. #3B

Pg. 12 of 12 PRELIMINARY UTILITY WORK AGREEMENT – NATIONAL GRID GAS

DESIGN-BUILD CONTRACT

REV. 10 Date Modified: 04/07/2020

C. Reimbursement Agreement executed prior to performance of the work. D. Such other agreement as approved by NYSDOT Office of Legal Affairs.

VI. References

The following documents are herewith incorporated in this agreement be reference (check appropriate boxes)

Federal Highway Administration’s Federal-Aid Policy Guide Part 645.

Contract documents: Contract number _D900050 _______________

PIN __ X735.83__________________________ Plan sheets No. UTL-KEY, UTL-GN, UTL-01 TO UTL-17

Owner’s plan sheets _________________________________________________ Owner’s estimate sheets form No._____________________________________ Resolution dated ____________________, by ___________________________

Granting the State of New York authority to perform the adjustment for the owner. Agreeing to maintain facilities adjusted via State-let contract. Authorizing deposit of funds by the owner.

Certification by the owner or his agent that he has the legal authority to enter into this agreement.

_______________________________________________________________________________________ (Print/Type Name) Utility Owner or Agent (Signature) Title Date

_____________________________________________Main Office Utilities Engineer___________________ For NYSDOT Commissioner of Transportation Title Date

Page 106: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

X=10

35

761.57

11

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:16

X735.83_cph_utl_key.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

UTL-02

UTL-05

UTL-06

UTL-04

UTL-03

ATL

ANTIC

AVE

LIRR

95T

H

AVE

91ST

AVE

89ST

AVE

UTL-01UTL-08 UTL-10

UTL-09UTL-11

UTL-12

UTL-16

UTL-17

UTL-15

UTL-13

UTL-07

UTL-14

GRID

NO

RT

H

0 40 80 120 160'40

1" = 80'

UTILITY PLANS

KEY PLAN

1

UTL-KEY

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

Page 107: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

DG

N$U

SE

RN

AM

E

DG

N$S

YTIM

E

DG

N$SPE

C

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

0"0"

NO. H-1042A.

FOR TRENCHING DETAILS, REFER TO NYCDOT DWG. 5.

ADJACENT PAVEMENT.

COURSE THICKNESS SHALL MATCH THE EXISTING

NYSDOT STANDARD SPECIFICATIONS. PAVEMENT

COURSES, IN ACCORDANCE WITH THE LATEST

ALL UTILITY TRENCHES, INCLUDING PAVEMENT

THE DESIGN-BUILD CONTRACTOR SHALL RESTORE 4.

DOCUMENTS SECTION OF THE RFP.

REFER TO THE "ITS PLANS" IN THE REFERENCE

PROPOSED REPLACEMENT OF EXISTING FACILITIES

3. FOR ADDITIONAL ITS INFORMATION REGARDING

RFP.

IN THE REFERENCE DOCUMENTS SECTION OF THE

THE "LIGHTING PLANS" & TRAFFIC SIGNAL PLANS"

REPLACEMENT OF EXISTING FACILITIES REFER TO

SIGNAL INFORMATION REGARDING PROPOSED

2. FOR ADDITIONAL STREET LIGHTING AND TRAFFIC

UTILITY FACILITIES WITHIN THE PROJECT LIMITS.

UTILITY MAINTENANCE AND PROTECTION OF THE

ALL PROPOSED UTILITY RELOCATIONS AND/OR

WHICH IDENTIFY THE UTILITY SCOPE OF WORK FOR

THE NYSDOT HC-140 DB UTILITY AGREEMENTS

1. THE DESIGN-BUILD CONTRACTOR SHALL REFER TO

UTILITY PLAN NOTES (UTL-1 TO UTL-12):

CONSTRUCTION.

BE ACHIEVED, RELOCATION MUST BE PERFORMED PRIOR TO

AND PROPERLY PROTECTED DURING CONSTRUCTION. IF THIS CANNOT

SYSTEMS UNDERGROUND. THESE FACILITIES MUST BE SUPPORTED

20. FIRE DEPARTMENT CABLES RUN IN FIRE DEPARTMENT'S CONDUIT

INSPECTION REQUIREMENTS.

OWNERS DURING CONSTRUCTION FOR VIBRATION CRITERIA AND

19. THE DESIGN-BUILD CONTRACTOR SHALL COORDINATE WITH UTILITY

48'' FROM FDNY CONDUITS.

18. INSTALLATION OF ELECTRICAL CONDUITS MUST BE A MINIMUM OF

FACILITIES.

WILL RESULT IN THE EXPOSURE OF THE EXISTING CALPINE

INSPECTOR WILL BE PRESENT DURING ANY CONSTRUCTION THAT

CONDUIT TRENCH UNLESS COORDINATED WITH PORT AUTHORITY. AN

INSTALLATIONS MUST BE AT A MINIMUM OF 1'-4'' FROM THE

CABLES ARE TO BE MAINTAINED AND PROTECTED IN PLACE.

17. THE EXISTING CALPINE (PORT AUTHORITY OWNED) ELECTRICAL

A MINIMUM OF 12'' FROM OTHER UTILITIES.

INSTALLED WITHIN THE PROJECT LIMITS ARE TO BE INSTALLED AT

16. TELECOM SERVICES AND ELECTRICAL SERVICES THAT ARE

UTILITIES.

VERTICAL AND HORIZONTAL CLEARANCE OF 12'' FROM OTHER

15. NATIONAL GRID GAS MAINS ARE TO BE INSTALLED AT A MINIMUM

MAINTAINED DURING CONSTRUCTION.

14. NEW YORK CITY POLICE DEPARTMENT (NYPD) CALL BOXES SHALL BE

FDNY.

INTERIM LOCATIONS, IF NECESSARY, SHALL BE COORDINATED WITH

MAINTAINED DURING CONSTRUCTION UNLESS NOTED OTHERWISE.

13. NEW YORK CITY FIRE DEPARTMENT (FDNY) POSTS SHALL BE

BASELINE REPORT AND GEOTECHNICAL DATA REPORT.

12. FOR GROUND WATER AND SOIL PROPERTIES REFER TO GEOTECHNICAL

TIME OF CONSTRUCTION.

VERIFIED BY THE DESIGN-BUILD CONTRACTOR IN THE FIELD AT THE

11. ALL DIMENSIONS FOR EXISTING UTILITY STRUCTURES SHALL BE

COORDINATED WITH THE UTILITY OWNERS.

LIVE. ALL SHUTDOWNS OF EXISTING FACILITIES SHALL BE

GAS MAINS, AND WATER MAINS SHALL BE CONSIDERED ACTIVE OR

10. UNLESS NOTIFIED BY THE UTILITY OWNERS, ALL EXISTING CABLES,

MATCH THE GROUND ELEVATION DURING ALL CONSTRUCTION STAGES.

LIMITED TO MANHOLES, VAULTS, COVERS, AND VALVE BOXES TO

9. ADJUST ALL UTILITY SURFACE FEATURES INCLUDING BUT NOT

CONSIDERED APPROXIMATE AND MUST BE FIELD VERIFIED.

8. EXISTING ELEVATIONS SHOWN ON THE UTILITY PLANS SHALL BE

SHALL ALLOW FOR THE MITIGATION BY THE UTILITY OWNER.

OR HAZARDOUS MATERIALS ASSOCIATED WITH THEIR FACILITIES AND

DESIGN-BUILD CONTRACTOR TO THE DISCOVERY OF CONTAMINATED

7. AFFECTED UTILITY OWNERS SHALL BE ALERTED BY THE

CODE RULE 753 SHALL APPLY.

6. THE RULES AND REGULATIONS OF NEW YORK STATE INDUSTRIAL

SHALL BE MAINTAINED FREE OF DEBRIS.

5. STORM CATCH BASIN AND/OR DRAINS WITHIN THE CONTRACT LIMITS

CONSTRUCTION BY THE UTILITY OWNERS.

PROVIDE ACCESS FOR INSPECTION AND APPROVAL OF THE

ALL UTILITY OWNERS TO MAINTAIN THEIR FACILITIES. ALSO

4. PROVIDE ACCESS TO THE CONSTRUCTION AREA AT ALL TIMES FOR

NOTED.

(1'-0'') OF ALL EXISTING UTILITY SERVICES UNLESS OTHERWISE

3. ALL EXCAVATION SHALL BE PERFORMED BY HAND WITHIN ONE FOOT

NOT BE SHOWN.

UTILITY SYSTEMS. UTILITY SYSTEMS ABANDONED IN PLACE MAY

2. EXISTING UTILITY INFORMATION PROVIDED REPRESENTS ACTIVE

ACCURATE OR COMPLETE.

STREET SURFACE. THE LOCATIONS ARE NOT GUARANTEED TO BE

MAPS, SUE SURVEY, AND WHERE DATA IS AVAILABLE AT THE

1. EXISTING ACTIVE UTILITIES ARE SHOWN FROM RECORD UTILITY

GENERAL UTILITY NOTES:

jhGENERAL UTILITY NOTES

SHEET 1 OF 1

2

UTL-GN

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

NORTH OF THE LIRR BRIDGES.

ANY MAIN UNDER THE ROADWAY IN THE AREA WITHIN 100 FEET

INSTALL ALL NEW GAS MAINS AT A MINIMUM OF 4' OF COVER FOR

22. NATIONAL GRID LOADING REQUIREMENT: THE CONTRACTOR SHALL

B. 345KV FEEDER AND RETURN LINES: 3.50 KSF

A. ELECTRIC DUCTS: 3.50 KSF

LIMITS SPECIFIED:

CENTER LINE OF ANY BURIED UTILITY DOES NOT EXCEED THE

PRESSURE WITHIN A LATERAL DISTANCE OF 10 FEET FROM THE

WORK PLAN, THE CONTRACTOR SHALL ENSURE THAT THE SURFAVE

HANDLING, AND EXCAVATION. IN DEVELOPING AND EXECUTING HIS

INCLUDES BUT IS NOT LIMITED TO CRANE PLACEMENTS, MATERIAL

MANNER SO AS TO NOT DAMAGE ANY BURIED UTILITIES. THIS

21. THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN SUCH A

GENERAL UTILITY NOTES (CONT.):

MAIN WITH A COVER OF 2'-6'' AND LESS.

29. SHALLOW COVER PROTECTION MUST BE PROVIDED FOR THE WATER

THE BRIDGE IN AN EXPANSION JOINT CHAMBER.

BETWEEN THE STEEL AND DUTILE IRON WATER MAINS OUTSIDE

28. THE DESIGN-BUILDER SHALL INSTALL INSULATED FLANGE JOINTS

WATER MAIN.

BOTH ABUTMENTS WITH A HYDRANT BETWEEN THEM FOR THE

27. THE DESIGN-BUILDER SHALL INSTALL VALVES ON THE OUTSIDE OF

NEW WATER MAIN AS PER NYCDEP STANDARDS.

26. THE DESIGN-BUILDER SHALL PROVIDE EXPANSION JOINTS FOR THE

AND CORRUGATED ALUMINUM JACKETING.

MUST BE STEEL WELDED PIPES WITH 2'' THERMAL INSULATION

25. ALL PROPOSED WATER MAINS ON THE ATLANTIC AVENUE BRIDGE

STANDARDS AND SPECIFICATIONS WITH NO COST TO NYCDEP.

REQUIRED RESTRAINT LENGTH CRITERIA AS PER NYCDEP

PERFORMED WITHIN THE PROJECT LIMITS SHOULD MEET ALL

24. ALL PROPOSED WATER MAIN REPLACEMENT WORK TO BE

NYCDEP STANDARDS AND SPECIFICATIONS.

CONTRACTOR SHALL REMOVE ALL CASTING AND HYDRANTS AS PER

WATER MAINS ON 3-WAY TEE CONNECTIONS. THE DESIGN-BUILD

23. HYDRANT VALVES SHOULD BE INSTALLED CLOSE TO THE NEW

SPECIFICATIONS.

WATER MAIN IN ACCORDANCE WITH NYCDEP STANDARDS AND

BE REPLACED/RELOCATED SHOULD BE TRANSFERED TO THE NEW

22. ALL WATER SERVICE CONNECTIONS TO EXISTING WATER MAINS TO

FOR NYCDEP APPROVAL.

PIER AND PLATE DETAILS FOR THE WATER MAIN CONSTRUCTION

CONTRACTOR SHALL SUBMIT CUSTOMIZED SHOP DRAWINGS FOR

OF PIER AND PLATE AS PER NYCDEP STANDARD DRAWINGS, THE

ADJACENT UTILITY INTERFERENCES RESTRICT THE CONSTRUCTION

STANDARD DRAWING NUMBERS: 46464-Z, 42063-Y, AND 22785. IF

AND PLATE THE WATER MAIN IN ACCORDANCE WITH NYCDEP

OF COVER, BUT MORE THAN OR EQUAL TO 2 FEET OF COVER, PIER

TO FIELD CONDITIONS, IF WATER MAINS HAVE LESS THAN 3 FEET

MAINS AND THE COVER SHALL NOT BE LESS THAN 2 FEET. DUE

21. CONTRACTOR SHALL MAINTAIN 4 FEET OF COVER OVER ALL WATER

THE RESIDENT ENGINEER, FOR THE BUREAU'S FILES.

FIVE (5) COMPLETE SETS OF AS-BUILT DRAWINGS, APPROVED BY

SATISFACTORILY COMPLETED, THE CONTRACTOR SHALL SUBMIT

20. AFTER WATER MAIN WORK UNDER THE CONTRACT IS

REVISION.

AS SHOWN ON NYCDEP STANDARD DRAWINGS NO. 46104-W, LATEST

MAINS SHALL BE ACCOMPLISHED BY INSULATED FLANGED JOINTS,

19. THE CONNECTION BETWEEN STEEL AND DUCTILE IRON WATER

APPURTENANCES, LATEST REVISION.

FURNISHING DELIVERING AND LAYING STEEL PIPES AND

SEGMENTS AS PER NYCDEP STANDARD SPECIFICATIONS FOR

LONG-RADIUS ELBOWS OR SHALL BE SHOP FABRICATED FROM PIPE

18. ALL BENDS ON STEEL WATERMAINS SHALL BE STANDARD WEIGHT

LATEST REVISION.

CLASS E, AS PER NYCDEP STANDARD DRAWING NO. 38336-Y-A,

PLANS. JOINTS SHALL BE FORGED STEEL SLIP-ON FLANGES,

SHALL HAVE FLANGED JOINTS, UNLESS OTHERWISE NOTED ON THE

17. ALL STEEL WATER MAINS UP TO AND INCLUDING 24'' IN DIAMETER

FABRICATION.

STANDARDS, TO THE ENGINEER FOR APPROVAL PRIOR TO

GEOMETRY OF THE PIPE, AND ALL APPLICABLE NYCDEP

APPURTENANCES, ALL IN ACCORDANCE WITH APPROVED/ACCEPTED

SHOP DRAWINGS AND CATALOG CUTS FOR THE WATER MAIN(S) AND

16. CONTRACTOR SHALL SUBMIT ALL STEEL WATER MAIN FABRICATION

FOR APPROVAL PRIOR TO FABRICATION.

SUPPORTS AND SHALLOW COVER PROTECTION, TO THE ENGINEER

FABRICATION AND LAYING OF STEEL PIPE, INCLUDING PIPE

15. CONTRACTOR SHALL SUBMIT GEOMETRY DRAWINGS FOR

DRAWINGS, AND AS ORDERED BY THE ENGINEER.

APPURTENANCES", LATEST REVISION, ALL APPLICABLE NYCDEP STANDARD

SPECIFICATIONS FOR FURNISHING DELIVERING AND LAYING STEEL PIPES AND

LINED, COATED, AND INSTALLED IN ACCORDANCE WITH "NYCDEP STANDARD

ORDERED BY THE ENGINEER. THE STEEL MAINS SHALL BE FABRICATED, TESTED,

14. STEEL WATER MAINS SHALL BE USED WHERE SPECIFIED IN THE PLANS AND AS

PROTECTION SHALL BE AS SPECIFIED ON THE CONTRACT PLANS.

SHALLOW COVER PROTECTION. TYPE AND SIZE OF THE SHALLOW COVER

13. ALL WATER MAINS WITH A COVER LESS THAN 2'-6'' SHALL BE PROTECTED BY

CASE, HOWEVER, SHOULD THIS CLEARANCE BE LESS THAN SIX (6) INCHES.

MATERIAL TO AVOID EXCESSIVE BEARING PRESSURE ON THE SEWER PIPE. IN NO

THE CLEARANCE SPACE IS TO BE FILLED WITH LAYERS OF COMPRESSIBLE

(1) FOOT, THE WATER MAIN IS TO BE SUPPORTED BY A TRUSS ARRANGEMENT AND

BOTTOM OF THE PROPOSED WATER MAIN, AT THEIR CROSSING, IS LESS THAN ONE

WHEREVER THE CLEARANCE BETWEEN THE TOP OF AN EXISTING SEWER AND THE

12B. FOR WATER MAINS CROSSING SEWERS:

THEREOF.

EACH ADDITIONAL FIVE (5) FEET OF DEPTH OVER TEN (10) FEET, OR PORTION

CENTERLINE OF THE EXISTING SEWER SHALL BE INCREASED ONE (1) FOOT FOR

MORE, THE CLEARANCE BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE

WHERE THE DEPTH TO THE BOTTOM OF THE SEWER CRADLE IS TEN (10) FEET OR

PLUS ONE-HALF THE SEWER DIAMETER.

CENTERLINE OF THE EXISTING SEWER SHOULD NOT BE LESS THAN SIX (6) FEET

(10) FEET, THE CLEARANCE BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE

WHERE THE DEPTH TO THE BOTTOM OF THE SEWER CRADLE IS LESS THAN TEN

12A. FOR WATER MAINS INSTALLED PARALLEL TO SEWERS:

UTILITIES.

EXISTING WATER MAINS, SEWERS, HOUSE CONNECTIONS, DRAINS AND OTHER

11. ALL EXCAVATION SHALL BE DONE BY HAND WITHIN ONE FOOT (1'-0'') OF

HAVE HYDRANT FENDERS AS PER NYCDEP STANDARDS.

DEPARTMENT REQUIREMENTS. HYDRANTS SHALL BE "BREAKAWAY" TYPE, AND SHALL

10. ALL HYDRANTS SHALL BE MAINTAINED IN SERVICE AS PER NEW YORK CITY FIRE

PERPENDICULAR TO THE DISTRIBUTION MAIN.

TRANSFERED TO THE NEW MAIN, AND ALL SERVICES SHOULD BE INSTALLED

9. ALL TAPS AND WET CONNECTIONS ON THE EXISTING WATER MAIN SHOULD BE

AGAINST FREEZING DURING CONSTRUCTION.

8. ALL WATER AND SEWER HOUSE SERVICES SHOULD BE MAINTAINED AND PROTECTED

SEWER AND WATER HOUSE/SERVICE CONNECTIONS.

THE LOCATION, SIZE, AND TYPE OF ALL EXISTING UTILITIES, INCLUDING ALL

7. PRIOR TO BEGINNING ANY WATER MAIN WORK, THE CONTRACTOR MUST IDENTIFY

THROUGH 48'', LATEST REVISION.

PUSH-ON JOINTS AND DUCTILE-IRON FITTINGS WITH MECHANICAL JOINTS 6''

TABLE A8-2 IN ''STANDARD SPECIFICATIONS FOR DUCTILE IRON PIPE WITH

FOR TYPICAL MINIMUM LENGTHS OR REQUIRED REPLACEMENT/RESTRAINT, SEE

COMPLIANCE WITH THE REPLACEMENT/RESTRAINT REQUIREMENTS.

AND FOR PERSONNEL INJURY CAUSED BY NEGLIGENCE OR OMISSION REGARDING

THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO PROPERTY

REQUIREMENTS DUE TO NEWLY INSTALLED VALVES AND FITTINGS ARE FULLY MET.

MADE ABSOLUTELY CERTAIN THAT ALL THE REPLACEMENT/RESTRAINT

6. PRIOR TO CONNECTING THE NEW MAINS TO THE EXISTING ONES, IT MUST BE

SHALL BE MAINTAINED AT ALL TIMES.

DIAMETER, LATEST REVISION. ACCESS TO WATER VALVES WITHIN THE WORK AREA

WITH NYCDEP STANDARD SPECIFICATIONS FOR GATE VALVES 3'' THROUGH 20'' IN

5. ALL WATER MAIN VALVES SHALL BE DUCTILE IRON GATE VALVES IN ACCORDANCE

GRAY-IRON FITTINGS, 3'' THROUGH 48'' IN DIAMETER", LATEST REVISION.

REQUIREMENTS OF NYCDEP STANDARD SPECIFICATIONS FOR "DUCTILE-IRON AND

MECHANICAL JOINTS WITH RETAINER GLANDS AND SHALL CONFORM TO THE

DIAMETER", LATEST REVISION. ALL FITTINGS SHALL EMPLOY FULL BODY TYPE

DUCTILE IRON FITTINGS WITH MECHANICAL JOINTS 6'' THROUGH 48'' IN

STANDARD "SPECIFICATIONS FOR DUCTILE IRON PIPE WITH PUSH-ON JOINTS AND

HAVE RESTRAINED JOINTS AND SHALL BE CEMENT LINED AS PER NYCDEP

4. ALL DUCTILE IRON WATER MAINS UP TO AND INCLUDING 24'' DIAMETER SHALL

DETERMINED IN THE FIELD AS THE ENGINEER, AS WORK PROGRESSES.

HYDRANTS ARE SHOWN SCHEMATICALLY. THE EXACT ALIGNMENTS SHALL BE

3. THE ALIGNMENT OF THE WATER MAINS AND THE LOCATION OF THE VALVES AND

BEEN CLOSED BY THE NYCDEP PERSONNEL.

OFF VALVES. NO REMOVAL SHALL TAKE PLACE BEFORE SHUT-OFF VALVES HAVE

CONSTRUCTION AT LEAST 72 WORKING HOURS IN ADVANCE PRIOR TO SHUTTING

2. THE CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT (FDNY) AND NYCDEP OF

REQUIREMENTS.

SPECIFICATIONS; APPLICABLE STANDARD DRAWINGS, AND SPECIFIC CONTRACT

DEPARTMENT OF ENVIRONMENTAL PROTECTION (NYCDEP) STANDARD WATER MAIN

THE CONTRACT PLANS AND IN CONFORMANCE WITH THE NEW YORK CITY

1. ALL WATER MAIN WORK AND MATERIALS SHALL BE DONE IN ACCORDANCE WITH

WATERMAIN NOTES:

Page 108: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:17

X735.83_cph_utl_1.dgn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

NSR 11+00

SS

R 27+00

SS

R 28+00

SB 21+00

SB 22+00

NB 24+00

NB 25+00

NSR 10+00.0

0P

OB

EXISTING AIRTRAIN

LIMITS

ROADWAY

PROPOSED

VW

E

NB

OFF

RA

MP

VW

E

NB SE

RVIC

E

RD

95TH AVENUE

VW

E S

B SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VA

N

WY

CK E

XP

RESS

WA

Y

NB

GRIDNORTH

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-2

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

(TYPICAL ALL UTILITY PLANS)

HC-140 FOR ADDITIONAL INFORMATION.

NATIONAL GRID. REFER TO THE NYSDOT

ACCEPTED BY CON EDISON AND

UTL-11) WERE DESIGNED AND

THE CONTRACT PLANS (UTL-01 TO

3. PROPOSED UTILITY DESIGNS SHOWN IN

AND DETAILS.

DRAWINGS FOR FURTHER INFORMATION

AND OTHER PROPOSED UTILITY

2. REFER TO PROPOSED DRAINAGE PLANS

INFORMATION.

NOTES SHEET (UTL-GN) FOR MORE

1. REFER TO THE GENERAL UTILITY

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

3

UTL-01

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

19911

513

55

15794

M-701

M-8

263

M-14

184

15793

E

E

E

E

E

E

E

S

S

Page 109: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

NSR 12+00

SS

R 29+00

SS

R 30+00

SB 23+00

SB 24+00

NB 26+00

VW

E

NB SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E S

B SE

RVIC

E

RD

EXISTING AIRTRAIN

VA

N

WY

CK E

XP

RESS

WA

Y S

B

ROADWAY LIMITS

PROPOSED

(NATIONAL GRID)

STEEL GAS MAIN

TO EXISTING 12''

PROPOSED CONNECTION

(NATIONAL GRID)

STEEL GAS MAIN

TO EXISTING 30''

PROPOSED CONNECTION

MANHOLE (M-NEW5)

CONNECT TO EXISTING

(CON EDISON).

PROP. 2-5'' DUCTS

PROTECTED

MAINTAINED AND

CONDUITS TO BE

EXISTING CON EDISON

(CON EDISON)

MANHOLE M-NEW11

CONSTRUCTED

PROP. FIELD

BE REMOVED

(CON EDISON) TO

EXISTING 10-5'' PCD

D900048)

UNDER DB CONTRACT

REMAIN (INSTALLED

MANHOLE M-NEW5 TO

EXISTING CON EDISON

WATER MAIN

EXISTING 12'' DIP

PROP. CONNECTION TO

(NYCDEP)

SEWER MANHOLE

EXISTING

CONNECTION TO

PROPOSED

D900048)

UNDER DB CONTRACT

DUCTS (INSTALLED

EXISTING CON EDISON

(NYCDEP)

COMBINED SEWER

PROP. 36'' RCP

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:17

X735.83_cph_utl_2.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

GRIDNORTH

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-3

MATCHLINE: DWG. UTL-1

MATCHLINE: DWG. UTL-3

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

INFORMATION AND DETAILS.

UTILITY DRAWINGS FOR FURTHER

PLANS AND OTHER PROPOSED

2. REFER TO PROPOSED DRAINAGE

MORE INFORMATION.

NOTES SHEET (UTL-GN) FOR

1. REFER TO GENERAL UTILITY

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF UTILITY PLANS

VWE SERVICE ROADS

4

UTL-02

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED COMBINED/SANITARY

SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-146

53712

15795

513

21

"C"

E

EE

E

EE

SS

Page 110: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:17

X735.83_cph_utl_3.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

10+00

11+00

12+00

VW

E S

B SE

RVIC

E

RD

VWE

NB SER

VIC

E R

D

MANHOLE (M-8291)TO CON EDISON PROP. CONNECTION

(NATIONAL GRID)STEEL GAS MAINS PROP. 2-12''

(CON EDISON)STEEL CONDUITS PROP. 4-5''

CONDUIT (FDNY)PROP. 4'' STEEL

GRID)GAS MAIN (NATIONAL PROP. 12'' STEEL

(NATIONAL GRID)STEEL GAS MAIN PROP. 30''

MAINS (NYCDEP)PROP. 12'' DIP WATER

MAIN (NYCDEP)STEEL WATER PROP. 12''

(NYCDEP)JOINT CHAMBER PROP. EXPANSION

CONDUIT (FDNY)PROP. 4'' PVC

MANHOLE (M-8292)TO CON EDISON PROP. CONNECTION

GAS MAINNATIONAL GRID EXISTING 12'' CONNECTION TO PROP.

BE REMOVEDCONDUIT (FDNY) TO EX. DEAD 3''

(FDNY)COUPLING TO PVC PROP. STEEL

TO BE REMOVED(NATIONAL GRID) GAS MAINEX. 8'' STEEL

BE REMOVED(NATIONAL GAS) TO GAS MAIN EX. 12'' STEEL

(CON EDISON)STEEL CONDUITS PROP. 6-5''

REMOVEDTRANSITE DUCT TO BE EX. DEAD 4'' VERIZON

REMOVEDDUCTS TO BE CON EDISON EX. DEAD 4-4''

REMOVEDEDISON DUCTS TO BE EX. DEAD 4-4'' CON

REMOVEDMAIN TO BE EX. 12'' WATER

(NYCDEP) TO BE REMOVEDEX. 12'' DIP WATER MAIN

REMOVEDCONDUIT TO BE EX. 3'' FDNY

EXISTING (NATIONAL GRID)MAIN TO CONNECT TO PROP. 12'' STEEL GAS

WATER MAIN (NYCDEP)EXISTING 8'' DIP PROP. CONNECT TO

12'' STEEL GAS MAINPROP. TEMPORARY

CONDUIT (FDNY)PROP. 4'' PVC

(M-8261)EDISON MANHOLE TO EXISTING CON PROP. CONNECTION

WATER MAINTO EXISTING 12'' PROP. CONNECTION

CONDUIT (FDNY)PROP. 4'' PVC

(CON EDISON)STEEL CONDUITS PROP. 4-5''

(NATIONAL GRID)TO CONNECT TO EXISTING PROP. 12'' STEEL GAS MAIN

MANHOLE (M-8262)TO CON EDISON PROP. CONNECTION

EDISON)DUCTS (CON PROP. 6-5''

WATER MAIN EX. 12'' LCP

BE REMOVEDWATER MAIN TO EX. 12'' LCP

BE REMOVEDWATER MAIN TO EX. 12'' DIP

MAIN (NYCDEP) EX. 12'' DIP WATER

TO BE REMOVEDEDISON DUCTS EX. 6-4'' CON

DUCTS TO BE REMOVEDEX. 2-4'' CONC. CON EDISON

"TYPE A" (FDNY)PROP. MANHOLE

POST (FDNY)PROP. FIRE ALARM

EDISON)PCD (CON PROP. 8-5''

(CON EDISON)PROP. 2-5'' PCD

(CON EDISON)PROP. 4-5'' PCD

DUCTS TO REMAINCON EDISON EX. 2-4'' CONC.

REMOVEDDUCTS TO BE CON EDISON EX. 4-4'' CONC.

REMOVEDDUCTS TO BE CON EDISON EX. 6-4'' CONC. DUCTS (CON EDISON)

PROP. 8-5'' CONC.

TO BE REMOVEDMANHOLE (M-12948) EX. CON EDISON

CONDUITS TO REMAIN2-3'' PVC PORT AUTHORITY EX. 1-8'' GAS-FILLED STEEL &

(CON EDISON)PROP. 6-5'' PCD

LIMITSPROP. ROADWAY

TO BE REMOVEDEX. 12'' WATER MAIN

INFORMATION ON ITS.SHEET UTL-GN FOR MORE SEE GENERAL NOTES

MAIN (NYCDEP)PROP. 12'' DIP WATER

VALVE (NYCDEP)HYDRANT AND PROP. FIRE

VALVE (NYCDEP)PROP. WATER

TO REMAINSEWER PIPE (NYCDEP) EX. 12'' SANITARY

HIGH POINTSTOP AT WATER MAIN PROP. CORPORATION

ATLANTIC AVENUE

(NYCDEP)COMBINED SEWER PROP. 36'' RCP

COUPLING (FDNY)PROP. STEEL TO PVC

SEWER (NYCDEP)PROP. 36'' RCP COMBINED

REMOVED(M-17273) TO ME EX. CON ED MANHOLE

GRID

NORTH

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-2

MAT

CHLIN

E:

DW

G.

UTL-4

MATCHLINE: DWG. UTL-2

MATCHLINE:

DWG. UTL-5

MATCHLINE: DWG. UTL-5

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

94TH/ATLANTIC AVENUE BRIDGE

5

UTL-03

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED

AND DETAILS.

DRAWINGS FOR FURTHER INFORMATION

AND OTHER PROPOSED UTILITY

2. REFER TO PROPOSED DRAINAGE PLANS

INFORMATION.

SHEET (UTL-GN) FOR MORE

1. REFER TO GENERAL UTILITY NOTES

NOTES:

SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-146

51320

TM-4222

"A"

"A"

M-12

948

M-17273

M-8

261

M-8262

M-14

5

52048

M-8291

M-8292

"D"

"G"

"F"

E

E

E

E

E

E

EE

E

E

E

E

F

F

G

G

S

S

W

F

F

S

S

S

Page 111: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

A 11+00

94TH AVENUE

MANHOLE (M-11217)

EXISTING CON EDISON

PROP. CONNECTION TO

VAULT

EX. CON EDISON

DUCTS (CON EDISON)

EX. 2-4'' CONC.

(CON EDISON)

EX. 1-4'' CONC. DUCT

EXISTING FDNY MANHOLE

PROP. CONNECTION TO

CONDUIT (FDNY)

PROP. 4'' PVC

DUCTS (CON EDISON)

EX. 4-4'' CONC.

MAIN (NYCDEP)

EX. 12'' WATER

TO REMAIN

EX. HYDRANT REMAIN

(NATIONAL GRID) TO

EX. 12'' GAS MAIN

(CON EDISON)

PROP. 4-5'' PCD

ROADWAY LIMITS

PROPOSED

DUCTS TO BE REMOVED

EX. DEAD VERIZON PVC

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:18

X735.83_cph_utl_4.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

MAT

CHLIN

E:

DW

G.

UTL-3

GRID

NORTH

0 10 20 30 40'10

1" = 20'

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

FURTHER INFORMATION AND DETAILS.

OTHER PROPOSED UTILITY DRAWINGS FOR

2. REFER TO PROPOSED DRAINAGE PLANS AND

(UTL-GN) FOR MORE INFORMATION.

1. REFER TO GENERAL UTILITY NOTES SHEET

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

94TH AVENUE

6

UTL-04

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-8394

M-11217

M-8262

E

EF

G

S

T

Page 112: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:18

X735.83_cph_utl_5.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

NS

R 15+00

SS

R 32+00

SS

R 33+00

SB 26+00

SB 27+00

NB 29+00

NB 30+00

R=8162.0

R=8174.0

VW

E S

B SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E

NB SE

RVIC

E

RD

(NYCDEP)WATER MAIN

PROP. 12'' DIP

(NATIONAL GRID)

STEEL GAS MAIN

PROP. 30''

(NATIONAL GRID)

STEEL GAS MAIN

PROP. 12''

CONDUIT (FDNY)

PROP. 4'' PVC

(NYCDEP)WATER MAIN

PROP. 12'' DIP

EDISON BOX (51318)

TO EXISTING CON

PROP. CONNECTION

BE REMOVED

WATER MAIN TO

EX. 12'' DIP

BE REMOVED

CONDUIT TO

EX. 3'' FDNY TO BE REMOVED

EX. 12'' GAS MAIN

TO BE REMOVED

EX. 12'' GAS MAIN

TO BE REMOVED

EX. 30'' GAS MAIN

MANHOLE (M-NEW6)

NEW CON EDISON

PROP. CONNECTION TO

MANHOLE (M-NEW6)

NEW CON EDISON

PROP. CONNECTION TO

MAIN TO BE REMOVED

EX. 12'' LCP WATER

DUCTS (CON EDISON)

PROP. 16-5'' CONC.

MAIN INSTALLATION

REMOVED FOR WATER

STEEL GAS MAIN TO BE

EX. ABANDONED 6'' REMAINTRANSFORMER TO

EX. CON EDISON

TO REMAINDUCTS (CON EDISON)

EX. 2-4'' CONC.

BE REMOVED

HYDRANT TO

EX. FIRE

"TYPE A" (FDNY)

PROP. MANHOLE

MAIN TO REMAIN

GRID 8'' GAS

EX. NATIONAL

BE REMOVED

EDISON DUCTS TO

EX. 4-5'' CONC. CON

BE REMOVED

EDISON DUCTS TO

EX. 6-4'' CONC. CON

MANHOLE (M-NEW6)

CON EDISON

PROP. PRECAST

BE REMOVED

EDISON DUCTS TO

EX. 6-4'' CONC. CON

BE REMOVED

EDISON DUCTS TO

EX. 4-4'' CONC. CON

(CON EDISON)

PROP. 10-5'' PCD

REMAINEDISON DUCTS TO

EX. 17-4'' CONC. CON

TO BE REMOVED

EX. FIRE HYDRANT

BE REMOVED

EDISON DUCTS TO

EX. 6-4'' CONC. CON

TO REMAINDUCTS (CON EDISON)

EX. 2-4'' CONC.

TO REMAINDUCTS (CON EDISON)

EX. 2-4'' CONC. (CON EDISON)

PROP. 8-5'' PCD

(CON EDISON)

PROP. 14-5'' PCD

TO BE REMOVED

MANHOLE (M-14180)

EX. CON EDISON

TO REMAIN& 2-3'' PVC CONDUITS

1-8'' GAS-FILLED STEEL

EX. PORT AUTHORITY

AND VALVEHYDRANT PROP. FIRE

AND VALVEPROP. FIRE HYDRANT

(NYCDEP)COMBINED SEWER

PROP. 36'' RCP

GRIDNORTH

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-3

MATCHLINE: DWG. UTL-3

MATCHLINE: DWG. UTL-6

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

FURTHER INFORMATION AND DETAILS.

OTHER PROPOSED UTILITY DRAWINGS FOR

2. REFER TO PROPOSED DRAINAGE PLANS AND

(UTL-GN) FOR MORE INFORMATION.

1. REFER TO GENERAL UTILITY NOTES SHEET

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

7

UTL-05

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

513

18"F"

M-23431

VS-1281

M-14

180

60890

513

19

"E"

E

E

E

AB

OVE

GR

OUND (LIR

R JCI

PLA

NS)

4"

ELE

CTRIC

AL

COND

UIT

S

S

S

W

F

SS

Page 113: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

V18

+13.2

4V18

+00

C

C

C

C

NS

R 16+00

NS

R 17+00

SS

R 34+00

SB 28+00

NB 30+00

NB 31+00

VW

E S

B SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E

NB SE

RVIC

E

RD

(NYCDEP)WATER MAIN PROP. 12'' DIP

(NATIONAL GRID)STEEL GAS MAIN PROP. 30''

(NATIONAL GRID)STEEL GAS MAIN PROP. 12''

(CON EDISON)PROP. 10-5'' CD

(NYCDEP)WATER MAIN PROP. 12'' DIP

CONDUIT (FDNY)PROP. 4'' PVC

REMOVEDMAIN (NYCDEP) TO BE EX. 12'' DIP WATER

BE REMOVED(NATIONAL GRID) TO EX. 12'' GAS MAIN

REMOVEDMAIN (NYCDEP) TO BE EX. 12'' LCP WATER

REMOVEDCONDUIT TO BE EX. 3'' FDNY

LIRR DOUBLE DECK BRIDGE

LIRR ATLANTIC 6 BRIDGE

EXISTING DUCTS.PROTECTION OF PLATE FOR PROPOSED STEEL TO REMAIN. EDISON DUCTS EX. 17-4'' CON

TO BE REMOVEDMAIN (NATIONAL GRID) EX. 30'' STEEL GAS

REMOVEDDUCTS TO BE CON EDISON EX. 4-5'' CONC.

BE REMOVEDEDISON DUCTS TO EX. 6-4'' CONC. CON

BE REMOVEDEDISON DUCTS TO EX. 6-4'' CONC. CON

(CON EDISON)PROP. 24-5'' PCD

TO BE REMOVEDEX. FDNY MANHOLE

BE REMOVEDEDISON DUCTS TO EX. 2-4'' CONC. CON

CONDUITS TO REMAINSTEEL AND 2-3'' PVC 1-8'' GAS-FILLED EX. PORT AUTHORITY

DETAILS.(SC-5 & SC6) FOR MORE REFERENCE DOCUMENTS (SDD-10 & SML-12) AND STRUCTURAL DRAWINGS REFER TO PART 6

BE REMOVEDPIPE CONNECTION TO EX. FIRE HYDRANT AND

(NYCDEP)COMBINED SEWER PROP. 36'' RCP

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:18

X735.83_cph_utl_6.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

GRIDNORTH

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-5

MATCHLINE: DWG. UTL-7

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

DETAILS.

FOR FURTHER INFORMATION AND

AND OTHER PROPOSED UTILITY DRAWINGS

2. REFER TO PROPOSED DRAINAGE PLANS

SHEET (UTL-GN) FOR MORE INFORMATION.

1. REFER TO GENERAL UTILITY NOTES

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

8

UTL-06

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED

SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

T

"A"

"C"

"B"

EE

M-144

F

S

S

Page 114: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:18

X735.83_cph_utl_7.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

NS

R 18+00

NS

R 19+00

SS

R 35+00

SS

R 36+00

SB 29+00

SB 30+00

NB 32+00

NB 33+00

VW

E

NB SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VW

E S

B SE

RVIC

E

RD

ARCHER AVENUE

TUNNEL

SUBWAY

EXISTING

TUNNEL

SUBWAY

EXISTING

(NYCDEP)WATER MAIN PROP. 12'' DIP

(NATIONAL GRID)STEEL GAS MAIN PROP. 30''

(NATIONAL GRID)STEEL GAS MAIN PROP. 12''

(CON EDISON)CONC. DUCTS PROP. 10-5''

BE REMOVEDWATER MAIN TO EX. 12'' DIP

BE REMOVEDWATER MAIN TO EX. 12'' LCP

TO BE REMOVED(NATIONAL GRID) GAS MAIN EX. 30'' STEEL

REMOVEDCONDUIT TO BE EX. 3'' FDNY

REMOVED

MAIN TO BE

EX. 12'' GAS

LIRR DOUBLE DECK BRIDGE

LIRR MAINLINE 1/3 BRIDGE

TO BE REMOVED

EDISON DUCTS

EX. 4-5'' CON

TO BE REMOVED

EDISON DUCTS

EX. 6-5'' CON

(M-NEW9)EDISON MANHOLE CONSTRUCTED CON PROP. FIELD

(FDNY)ALARM POST PROP. FIRE

(FDNY)MANHOLE "TYPE A" PROP. SLOTTED

"TYPE A" (FDNY)PROP. MANHOLE

CONDUIT (FDNY)PROP. 4'' PVC

CONDUIT (FDNY)PROP. 4'' PVC

(NYCDEP)WATER MAIN PROP. 12'' DIP

INFORMATIONUTILITY RELOCATION APPLICABLE ALTICE AND MCI REFER TO UTL-12 FOR

(CON EDISON)PROP. 4-5'' PCD

(CON EDISON)PROP. 8-5'' PCD

PROTECTION.STEEL PLATE FOR REMAIN. PROPOSE EDISON DUCTS TO EX. 17-4'' CONC. CON

(CON EDISON)PROP. 24-5'' PCD

CONDUIT (FDNY)PROP. 4'' PVC

(CON EDISON)PROP. 6-5'' PCD

(M-8327)TO CON EDISON MH PROP. CONNECTION

DETAILS.(SC-5 & SC6) FOR MORE REFERENCE DOCUMENTS (SDD-10 & SML-12) AND STRUCTURAL DRAWINGS REFER TO PART 6

CONDUITS TO REMAINSTEEL & 2-3'' PVC 1-8'' GAS-FILLED EX. PORT AUTHORITY

REMOVEDDUCTS TO BE CON EDISON EX. 8-4'' CONC.

VALVES (NYCDEP)PROP. WATER

(NYCDEP)COMBINED SEWERPROP. 36'' RCP

(NYCDEP)COMBINED SEWER PROP. 24'' RCP

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-8

MATCHLINE: DWG. UTL-6

GRIDNORTH

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

UTILITY DRAWINGS FOR FURTHER INFORMATION AND DETAILS.

2. REFER TO PROPOSED DRAINAGE PLANS AND OTHER PROPOSED

INFORMATION.

1. REFER TO GENERAL UTILITY NOTES SHEET (UTL-GN) FOR MORE

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

9

UTL-07

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-8

327

M-14

3

515

60

E

M-20318

M-12

949

M-8085

E

E

E

E F

F

S S

S

F

F

F

S

Page 115: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

NS

R 19+00

NS

R 20+00

SS

R 37+00

SS

R 38+00

SB 31+00

SB 32+00

R=18511.5

NB 34+00

VW

E

NB SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VW

E S

B SE

RVIC

E

RD

(NYCDEP)

WATER MAIN

PROP. 12'' DIP

(NATIONAL GRID)

STEEL GAS MAIN

PROP. 12''

(NATIONAL GRID)

GAS MAIN

PROP. 30'' STEEL

SYSTEM (NYCDEP)

TO EXISTING

MAIN CONNECTION

PROP. 12'' WATER

TUNNEL

SUBWAY

EXISTING

(CON EDISON)

CONC. DUCTS

PROP. 10-5''

TO BE REMOVED

(NATIONAL GRID)

GAS MAIN

EX. 12'' STEEL

(CON EDISON) TO REMAIN

EX. 17-4'' CONC. DUCTS

BE REMOVED

MAIN (NYCDEP) TO

EX. 12'' DIP WATER

LIMITS

ROADWAY

PROP.

(M-NEW14)

EDISON MANHOLE

PROP. PRECAST CON

MANHOLE (M-NEW10)

PRECAST CON EDISON

PROP. SLOTTED

(M-NEW7)

MANHOLE

CON EDISON

PROP. PRECAST

TO BE REMOVED

(NATIONAL GRID)

GAS MAIN

EX. 30'' STEEL

(CON EDISON)

PROP. 4-5'' PCD

(M-8036)

EDISON MANHOLE

TO EXISTING CON

PROP. CONNECTION

(CON EDISON)

PROP. 6-5'' PCD

BE REMOVED

EDISON DUCTS TO

EX. 6-4'' CONC. CON

REMOVED

(M-14177) TO BE

MANHOLE

EX. CON EDISON

TO BE REMOVED

EDISON DUCTS

6-4'' CONC. CON

EX. 4-5'' PVC &

(CON EDISON)

PROP. 6-5'' PCD

REMAIN

EDISON DUCTS TO

EX. 4-4'' CONC. CON

(CON EDISON)

PROP. 6-5'' PCD

(CON EDISON)

PROP. 4-5'' PCD

BE REMOVED

EDISON DUCTS TO

EX. 4-4'' CONC. CON

VALVE (NYCDEP)

HYDRANT AND

PROP. FIRE

(NYCDEP)

COMBINED SEWER

PROP. 24'' RCP

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:19

X735.83_cph_utl_8.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-9

MATCHLINE: DWG. UTL-7

GRIDNORTH

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

UTILITY DRAWINGS FOR FURTHER INFORMATION AND DETAILS.

2. REFER TO PROPOSED DRAINAGE PLANS AND OTHER PROPOSED

INFORMATION.

1. REFER TO GENERAL UTILITY NOTES SHEET (UTL-GN) FOR MORE

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

10

UTL-08

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

E

E

M-8037

M12440

M-14177

M-19

219

M72003

FACILITY F-18001

CON ED. CRITICAL

FACILITY F-701 & F-702

CON ED. CRITICAL

M-8

036

E

E

E

G

S

T

S

Page 116: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:19

X735.83_cph_utl_9.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

NS

R 21+00

NS

R 22+00

NSR 21+98.72

PI

SS

R 38+00

SS

R 39+00

SB 32+00

SB 33+00

SB 32+35.7

3

PCC

NB 35+00

NB 36+00

VW

E S

B SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E

NB SE

RVIC

E

RD

VW

E

NB

ON

RA

MP

91ST AVENUE

(NYCDEP)

WATER MAIN

PROP. 12'' DIP

SYSTEM

TO EXISTING

CONNECTION

GAS MAIN

PROP. 12''

12'' MAIN (NYCDEP)

PIPE CONNECTION TO

PROP. FIRE HYDRANT &

DUCTS (CON EDISON)

PROP. 6-5'' CONC.

FIRE HYDRANT

REMOVE EXISTING

MH-1

AUTHORITY

EX. PORT

TO REMAIN

(NATIONAL GRID)

EX. 30'' GAS MAIN

TO BE REMOVED

(NATIONAL GRID)

EX. 30'' GAS MAIN

BE REMOVED

(NATIONAL GRID) TO

EX. 12'' GAS MAIN

REMAIN

CONDUITS TO

EX. CON EDISON

GRID) TO REMAIN

MAIN (NATIONAL

EX. 12'' GAS

(M-NEW12)

CON EDISON MANHOLE

PROP. FIELD CONSTRUCTED

EXISTING SYSTEM

CONNECTION TO

PROP. 30'' GAS MAIN

REMOVED

EDISON DUCTS TO BE

EX. 8-4'' CONC. CON

TO BE REMOVED

COMPARTMENT

EX. BUS

REMOVED

EDISON) TO BE

DUCTS (CON

EX. 4-4'' CONC.

(CON EDISON)

PROP. 6-5'' PCD

EXISTING MANHOLE (M-142)

EDISON). CONNECT TO

PROP. 8-4'' PCD (CON

12'' DIP (NYCDEP)

CONNECTION TO EXISTING

PROP. WATER MAIN

MAIN TO BE REMOVED

EX. 12'' DIP WATER

(NYCDEP)

SEWER

COMBINED

RCP

PROP. 24''

REMAIN

2-3'' PVC CONDUITS TO

GAS-FILLED STEEL &

EX. PORT AUTHORITY 1-8''

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-10

MATCHLINE: DWG. UTL-8

GRIDNORTH

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

DRAWINGS FOR FURTHER INFORMATION AND DETAILS.

2. REFER TO PROPOSED DRAINAGE PLANS AND OTHER PROPOSED UTILITY

1. REFER TO GENERAL UTILITY NOTES (UTL-GN) FOR MORE INFORMATION.

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

11

UTL-09

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

MH-1

E

E

M-7

076

M-17

006

50928

E

M-7101

BUS COMPT.

M-19874

M-14

2

E

E

E

E

E

E

EF

S

S

S

S

S

Page 117: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

NS

R 23+00

SS

R 40+00

SS

R 41+00

SB 34+00

SB 35+00

NB 37+00

R=14983.5

VW

E S

B SE

RVIC

E

RD

VA

N

WY

CK E

XP

RESS

WA

Y S

B

VA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E

NB SE

RVIC

E

RD

VW

E

NB

ON

RA

MP

91ST AVENUE

LIMITS

PROP. ROADWAY

VAULTS

TO CON EDISON

PROP. CONNECTION

MH (M-279)

TO CON EDISON

PROP. CONNECTION

(M-NEW8)

CON EDISON MANHOLE

PROP. FIELD CONSTRUCTED

(M-NEW13)

EDISON MANHOLE

CONSTRUCTED CON

PROP. FIELD

(CON EDISON)

PROP. 12-5'' PCD

(CON EDISON)

PROP. 6-5'' PCD

91ST AVENUE

REMOVED

EDISON DUCTS TO BE

EX. 2-4'' CONC. CON

(CON EDISON)

PROP. 2-5'' PCD

LIMITS

PROP. ROADWAY

PLACE

BE ABANDONED IN

EDISON DUCTS TO

EX. 12-4'' CON

THE ROADWAY LIMITS

ABANDONED PAST

EDISON DUCTS TO BE

EX. 2-4'' CONC. CON

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:19

X735.83_cph_utl_10.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-11

MATCHLINE: DWG. UTL-9

GRIDNORTH

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

INFORMATION AND DETAILS.

UTILITY DRAWINGS FOR FURTHER

PLANS AND OTHER PROPOSED

2. REFER TO PROPOSED DRAINAGE

FOR MORE INFORMATION.

1. REFER TO UTILITY NOTES SHEET

NOTES:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

12

UTL-10

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-279

STL. PLATE

ST

L.

PLAT

E

M-19464

M-8

197

50940

M-1427

M-19

461

M-646

VS-9104

VS-8779

E

E

E

E

M-652

E

E

E

S

SS

W

TT

Page 118: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:19

X735.83_cph_utl_11.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

NS

R 24+00

NS

R 25+00

SS

R 42+00

SB 35+00

SB 36+00

R=18511.0

NB 38+00

NB 39+00

SB

SE

RVIC

E

RO

AD

NB SE

RVIC

E

RO

AD

vVA

N

WY

CK E

XP

RESS

WA

Y S

B

vVA

N

WY

CK E

XP

RESS

WA

Y

NB

VW

E S

B

ON-R

AMP

VW

E

NB

OFF-R

AMP

0 10 20 30 40'10

1" = 20'

MATCHLINE: DWG. UTL-10

GRIDNORTH

STORM SEWER

NYCDEP WATER

SANITARY SEWER

CALPINE

CON EDISON &

NATIONAL GRID GAS

PROPOSED STORM SEWER

PROPOSED CON EDISON

PROPOSED CHARTER

PROPOSED FDNY

PROPOSED NYCDEP WATER

LIGHTING CONDUITS

TRAFFIC SIGNAL &

NYSDOT ITS

VERIZON

CHARTER

FDNY

LEGEND:

STORM SEWER

PROPOSED REMOVAL OF

GRID GAS

PROPOSED NATIONAL

INFORMATION AND DETAILS.

UTILITY DRAWINGS FOR FURTHER

PLANS AND OTHER PROPOSED

2. REFER TO PROPOSED DRAINAGE

INFORMATION.

NOTES SHEET (UTL-GN) FOR MORE

1. REFER TO GENERAL UTILITY

NOTE:

EXISTING UTILITIES

PROPOSED REMOVAL OF

UTILITY PLANS

VWE SERVICE ROADS

13

UTL-11

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

SEWER

PROPOSED SANITARY/COMBINED SANITARY/COMBINED SEWER

PROPOSED REMOVAL OF

M-19464

VS-8587

50941

52451

EE

S

Page 119: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

GRID

NO

RT

H

C12

SCALE: „" = 1'-0"

B12 A12

3'-3"

9'-•"

8'-2‚" 14'-5‚" 14'-5‚" 10'-ƒ"

21'-0"47'-1•"

SCALE: „" = 1'-0"

21'-4"24'-2"24'-2"

EXIST GROUND

APPROX.

SCALE: „" = 1'-0"

SECTION A-A

A

A10'-7"

8'-7"

4'-6"

TOP OF LOW RAIL

1'-6"

1'-6‡"

1'-8‚"

TOP OF EXISTING DECK

TOP OF EXISTING DECK

TOP OF LOW RAIL

ABUTMENT BEARING

EXISTING WESTc

BOX TO REMAIN

EXISTING LIGHTING CONDUIT TO REMAIN

EXISTING LIGHTING

CONDUIT TO REMAIN

EXISTING LIGHTING

CONDUIT TO REMAIN

EXISTING LIGHTING

TO REMAIN

EX. UTILITY POLE A

PROPOSED PLAN

PROPOSED ELEVATION

ATLANTIC 6 CONTRACT

PROPOSED CABLE PULLING IN

RECONFIGURED DURING

CABLES TO BE

EXISTING SPLICE CANS AND

(MCI & ALTICE) TO REMAIN

EX. 2 - 4'' DIA. RGS CONDUITS

TO REMAIN

CONDUITS (MCI & ALTICE)

EX. 2 - 4'' DIA. RGS

BOX TO REMAIN

EXISTING LIGHTING

ALTICE)

CONDUITS (MCI &

EX. 2 - 4'' DIA. RGS

EX. POLE AEX. POLE X

TO REMAIN

EX. UTILITY POLE X

INSTALLATION

MAINLINE BRIDGE

CABLES DURING

AND ALTICE

RISER FOR MCI

PROP. TEMPORARY

OPTIC CABLES. SEE NOTE 2.

EXISTING MCI/ALTICE FIBER

FIBER OPTIC CABLES

EX. MCI/ALTICE

SEE NOTE 3.

PROTECTIVE ENCASEMENT.

PROP. TEMPORARY

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

DG

N$U

SE

RN

AM

E

DG

N$S

YTIM

E

DG

N$SPE

C

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

7076800

UTL-12

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

UTILITY PLAN

WEST ABUTMENT WALL

LIRR MAINLINE 1/3 BRIDGE

INFORMATION.

4. REFER TO GENERAL UTILITY NOTES SHEET (UTL-GN) FOR MORE

UTILITY OWNERS.

SHALL BE COORDINATED BETWEEN THE DESIGN-BUILDER AND THE

3. INSTALLATION OF TEMPORARY PROTECTION FOR EXISTING CABLES

FOR THE INSTALLATION OF THE NEW LIRR MAINLINE 1/3 BRIDGE.

PROTECTED AND MAINTAINED DURING THE ROLL OUT/IN PROCESS

2. EXISTING MCI AND ALTICE CABLES SHALL BE LOWERED

CABLES SHALL BE COORDINATED WITH LIRR.

1. TEMPORARY RELOCATION OF THE EXISTING ALTICE AND MCI

NOTES:

14

Page 120: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

C

C

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:2

0

X735.83_cph_utl_13.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

VAN

WYC

K E

XPRESS

WAY

SB

SB SERVIC

E ROAD

MAINLINE TRACK 3c

MAINLINE TRACK 1c

SB SER

VIC

E R

OA

D

vVA

N

WYC

K E

XPRESS

WA

Y SB

vVA

N

WYC

K E

XPRESS

WA

Y

NB

NB SER

VIC

E R

OA

D

ARCHER AVE

COMMUNICATIONS PRE-CONTRACT

AND PROTECTED BY LIRR

RAISED 10 FEET, MAINTAINED,

COMMUNICATION CABLES TO BE

EX. 2 AERIAL LIRR

SIGNALS CABINET B

PROPOSED LIRR

CABINETS TO REMAIN

EX. LIRR SIGNALS

REMOVED (TYP.)

LIGHTING TO BE

EX. UNDER DECK

BE REMOVED (TYP.)

LIGHTING CONDUITS TO

EX. UNDER DECK

SEE NOTE 6.

MORE DETAILS)

WALL (SEE UTL-17 FOR

ON EXISTING RETAINING

COMMUNICATION CONDUITS

PROPOSED SIGNAL AND

LIRR MAINLINE 1/3 BRIDGE

LIRR DOUBLE DECK B

RIDGE

MANHOLE

SIGNALS

EX. LIRR

BRIDGE TO PROPOSED CABINET

RUNNING UNDERGROUND FROM

PROP. LIRR SIGNAL CABLES

EX. LIRR POLE X

POLE A

LIRR

EX.

PRE-CONTRACT

INSTALLED BY LIRR

PROP. POLE "A-1"

PRE-CONTRACT

INSTALLED BY LIRR

PROP. POLE "B-1"

EX. LIRR POLE B

REMAIN

CABINET TO

EX. LIRR SIGNALS

MAINLINE BRIDGE IS INSTALLED

INSTALLED BACK ONCE NEW

TEMPORARILY RELOCATED AND

EX. TRAIN SIGNAL CABLES TO BE

PROPOSED SIGNAL CABLES

CABLE TRAY CARRYING

PROPOSED UTILITY STEEL

RETURN TO LIRR.

CONSTRUCTION. CABLES TO BE

BE REMOVED DURING BRIDGE

EX. 6-4'' SIGNAL CONDUITS TO

SIGNALS CABINET A

PROP. LIRR

BE REMOVED

ALONG ABUTMENT WALL TO

COMMUNICATION CABLES

EXISTING SIGNAL &

RECEIVING YARD CONSTRUCTION.

REMOVED TEMPORARILY DURING

EX. 2'' SIGNAL AIR PIPE TO BE

NOTE 7.

1/3 CONSTRUCTION. SEE

DURING LIRR MAINLINE

EXISTING LIRR GAS MAIN

PROP. CUT AND CAP SIGNALS GROUP

BRIDGE DONE BY LIRR

ONTO PROPOSED MAINLINE

PROTECTED. RELOCATION

OFF BRIDGE, MAINTAINED AND

IN BALLAST TO BE PULLED

EX. SIGNAL CABLE

7076800

UTL-13

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

LIRR MAINLINE 1/3 BRIDGE

0 10 20 30 40'10

1" = 20'

GRID

NORTH

LIRR UTILITY PLANS

DEPARTMENT.

FOR EXISTING GAS MAINS AND AIR PIPES WITH LIRR SIGNALS

7. NYSDOT CONTRACTOR SHALL COORDINATE CUT AND CAP LOCATIONS

INSTALLED.

1/3 BRIDGE. GAS SERVICE TO BE RESTORED ONCE NEW BRIDGE IS

EXISTING GAS MAIN ON THE EAST APPROACH OF THE LIRR MAINLINE

6. NYSDOT CONTRACTOR SHALL COORDINATE WITH LIRR TO CUT AND CAP

NECESSARY APPROVAL FOR PROPOSED RELOCATION SCHEME.

5. NYSDOT DESIGN-BUILDER SHALL COORDINATE WITH LIRR TO GAIN

SHALL BE PERFORMED BY LIRR COMMUNICATION GROUP.

4. ALL CUTOVERS, PULLING, AND SPLICING OF COMMUNICATION CABLES

COORDINATED WITH LIRR COMMUNICATIONS GROUP.

3. ALL LIRR COMMUNICATION CABLE UTILITY RELOCATION SHALL BE

CABLES SHALL BE PERFORMED BY LIRR SIGNALS GROUP.

2. ALL CUTOVERS, DEENERGIZING, PULLING, AND SPLICING OF SIGNAL

COORDINATED WITH LIRR SIGNALS GROUP.

1. ALL LIRR SIGNAL CABLE UTILITY RELOCATION SHALL BE

NOTES:

15

FF

S

E

E

E

E

F

F

G

S

S

S

PREVIOUSLY UNMARKED AND UNIDENTIFIED

SIGNAL AIR LINE ON DOUBLE DECK LOWER LEVEL:

E

E

E

Page 121: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

V18+

13.2

4

V18+

00

N52°0

4'0

7.4

4"

W

94.0

7'

EOP 18

+13.24

N-43

673.4

8

E 54

806.5

7

V18+

13.2

4

V18+

00

N52°0

4'0

7.4

4"

W

94.0

7'

EOP 18

+13.24

N-43

673.4

8

E 54

806.5

7

C

CC

C

C

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

nla

mbros

20-A

PR-2

020 20:2

0

X735.83_cph_utl_14.d

gn

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

MAINLINE TRACK 1c

YARD TRACK 1

RECEIVING c

MONTAUK TRACK

WESTBOUND c

TRACK 3

ATLANTIC AVE.

WESTBOUND c

MAINLINE TRACK 2

EASTBOUNDc

10 WEST TRACKc

TRACK 1

ATLANTIC AVE.

WESTBOUND c

TRACK 2

ATLANTIC AVE.

WESTBOUND c

MAINLINE TRACK 4

EASTBOUNDc

TRACK 4

ATLANTIC AVE.

WESTBOUND c

MAINLINE TRACK 4

EASTBOUNDc

MAINLINE TRACK 2

EASTBOUNDc

RETAINING WALL

EX. LIRR CONDUITS ON EAST

LIRR MAINLINE 1/3 BRIDGE

LIRR DOUBLE DECK B

RIDGE

UTL-16)

EAST RETAINING WALL (SEE

LIRR SIGNAL CABLE ON

MAINTAIN AND PROTECT

LIRR DOUBLE DECK B

RIDGE

SIGNALS CABINET A

PROPOED LIRR

SEE UTL-13

RETURN TO LIRR.

CONSTRUCTION. CABLES TO BE

BE REMOVED DURING BRIDGE

EX. 6-4'' SIGNAL CONDUITS TO

REMOVED (UTL-16)

CONDUITS TO BE

EX. LIRR POWER

SEE NOTE 7.

RECEIVING YARD CONSTRUCTION.

REMOVED TEMPORARILY DURING

EX. 2'' SIGNAL AIR PIPE TO BE

CONSTRUCTION. SEE NOTE 7.

DURING RECEIVING YARD

AIR PIPE TO BE MAINTAINED

PROP. TEMPORARY 2'' SIGNAL

UTL-15 & UTL-17)

RETAINING WALL (SEE

CONDUITS ON EAST

AND COMMUNICATION

PROPOSED LIRR SIGNAL

UTL-14

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

LIRR DOUBLE DECK BRIDGE

7066687

7066688

GRID

NORTH

0 10 20 30 40'10

1" = 20'

LIRR UTILITY PLANS

THE PROPOSED AIR PIPE.

LIRR SIGNALS DEPARTMENT FOR TEMPORARY AND FINAL LOCATION OF

YARD CONSTRUCTION. NYSDOT CONTRACTOR SHALL COORDINATE WITH

TEMPORARILY RELOCATED TO SOUTHSIDE OF TRACK DURING RECEIVING

7. THE EXISTING 2'' AIR PIPE ON THE DOUBLE DECK BRIDGE SHALL BE

INSTALLED.

1/3 BRIDGE. GAS SERVICE TO BE RESTORED ONCE NEW BRIDGE IS

EXISTING GAS MAIN ON THE EAST APPROACH OF THE LIRR MAINLINE

6. NYSDOT CONTRACTOR SHALL COORDINATE WITH LIRR TO CUT AND CAP

NECESSARY APPROVAL FOR PROPOSED RELOCATION SCHEME.

5. NYSDOT DESIGN-BUILDER SHALL COORDINATE WITH LIRR TO GAIN

SHALL BE PERFORMED BY LIRR COMMUNICATION GROUP.

4. ALL CUTOVERS, PULLING, AND SPLICING OF COMMUNICATION CABLES

COORDINATED WITH LIRR COMMUNICATIONS GROUP.

3. ALL LIRR COMMUNICATION CABLE UTILITY RELOCATION SHALL BE

CABLES SHALL BE PERFORMED BY LIRR SIGNALS GROUP.

2. ALL CUTOVERS, DEENERGIZING, PULLING, AND SPLICING OF SIGNAL

COORDINATED WITH LIRR SIGNALS GROUP.

1. ALL LIRR SIGNAL CABLE UTILITY RELOCATION SHALL BE

NOTES:

16

S

S

S

THE FACE OF THE ABUTMENT WALLTHE WALL RUN TO SIGNAL MANHOLE AND BOTTOM SEVEN CONDUITS RUN TO

THE UPPER DECK AND LOWER DECK TOP FOUR CONDUITS RUNNING ALONG

ELEVEN UTILITY CONDUITS RUN FROM THE END OF THE ABUTMENT BETWEEN

EE

E

PREVIOUSLY UNMARKED AND UNIDENTIFIED

SIGNAL AIR LINE ON DOUBLE DECK LOWER LEVEL:

EE

E

E

E

E

E

HANGING SIGNAL CONDUIT

EE

E

E

E

E

E

E

E

E E

E

EE

E

Page 122: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

DG

N$U

SE

RN

AM

E

DG

N$S

YTIM

E

DG

N$SPE

C

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

24'-0"

6'-0"

16'-0" 7'-6"

4'-0"

15'-6"

4'-0"C W X H SK M N NX T R P

c BR

G.

83'-‡" 75'-5"

14'-5™"7'-2‚" 20'-6†" 15'-‚" 17'-5‚" 15'-10…" 3'-1‡" 15'-3" 17'-6‚" 17'-5" 14'-4‰" 5'-1ƒ"

9'-11"

1'-10"

1'-10ƒ"

GRID

NO

RT

H

DECK, AND TRACK NOT SHOWN

UPPER LEVEL FLOORBEAMS,

ELEVATION 65.90

BRIDGE SEAT

EL. 53.01EL. 53.80

EL. 71.75

EL. 65.90

EL. 36.5

SERVICE ROAD

TOP OF NORTHBOUND

EL. 36.50

EL. 53.80

EL. 36.50

SERVICE ROAD

TOP OF NORTHBOUND

EXISTING WALL FOOTING

EXISTING WALL FOOTING

EL. 36.50

SEE UTL-17

CONTAINING SIGNAL CABLES

PROPOSED 5-4'' LIRR CONDUITS

TO REMAIN

SIGNAL CONDUITS

EXISTING LIRR

LIRR PROPERTY

CONTINUE EAST IN

SIGNAL CABLES

EXISTING LIRR

TO BE MAINTAINED AND PROTECTED

CONTAINING COMMUNICATION CABLES

EXISTING LIRR CONDUIT

REMOVED. SEE NOTE 4.

CONDUITS (DEAD) TO BE

EX. 2 LIRR EL&P

REMAIN (TYP.)

LIGHTING CONDUITS TO

EXISTING EMBEDDED

REMAIN (TYP.)

LIGHTING CABINETS TO

EXISTING EMBEDDED

MAINLINE 1/3 BRIDGE. SEE UTL-13.

PROPOSED CABLES ACROSS THE NEW

PROP. UTILITY TRAY CARRYING

REMOVED. SEE NOTE 4.

CONDUITS (DEAD) TO BE

EX. 2 LIRR EL&P

PROTECTED

TO BE MAINTAINED AND

COMMUNICATION CABLES

CONTAINING

EXISTING LIRR CONDUIT

TO BE MAINTAINED AND PROTECTED

CONTAINING COMMUNICATION CABLES

EXISTING LIRR CONDUIT

CABLES

COMMUNICATION

SIGNAL &

CONTAINING

LIRR CONDUITS

PROPOSED 5-4''

COMMUNICATION CABLES

CONTAINING SIGNAL &

PROPOSED 5-4'' LIRR CONDUITS

PROPERTY

CONTINUE EAST IN LIRR

EXISTING LIRR SIGNAL CABLES

TO BE REMOVED. SEE NOTE 4.

EX. LIRR EL&P PULLBOX (DEAD)

INSTALLED, ENERGIZED, AND TESTED.

CABLES TO BE REMOVED ONCE PROPOSED CABLES ARE

BE LOWERED DURING DOUBLE DECK BRIDGE CONSTRUCTION.

EX. LIRR SIGNAL & COMMUNICATION CABLES/CONDUITS TO

SCALE: ˆ = 1'-0"

SCALE: ˆ = 1'-0"

SCALE: ˆ = 1'-0"

SECTION B-B

A

A B

SCALE: ˆ = 1'-0"

SECTION A-A

B

UTL-15

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

EXISTING PLAN

EXISTING ELEVATION

EAST ABUTMENT WALL - DOUBLE DECK BRIDGE

LIRR UTILITY PLAN

BY THE LIRR COMMUNICATIONS DEPARTMENT.

6. ALL COMMUNICATION CABLE SPLICING OPERATIONS SHALL BE DONE

LIRR SIGNALS DEPARTMENT.

5. ALL SIGNAL CABLE SPLICING OPERATIONS SHALL BE DONE BY THE

DEPARTMENT.

CONDUIT RELOCATION OR REMOVAL WORK WITH THE LIRR POWER

4. THE DESIGN-BUILDER SHALL COORDINATE ALL POWER CABLE AND

DEPARTMENT.

AND CONDUIT RELOCATION WORK WITH THE LIRR COMMUNICATION

3. THE DESIGN-BUILDER SHALL COORDINATE ALL COMMUNICATION CABLE

CONDUIT RELOCATION WORK WITH THE LIRR SIGNALS DEPARTMENT.

2. THE DESIGN-BUILDER SHALL COORDINATE ALL SIGNAL CABLES AND

PLANS.

REFER TO DWG. UTL-13 THROUGH UTL-17 FOR ALL LIRR UTILITY 1.

NOTES:

17

Page 123: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

DG

N$U

SE

RN

AM

E

DG

N$S

YTIM

E

DG

N$SPE

C

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

DURING CONSTRUCTION.

MAINTAINED AND PROTECTED

CONATAINING CABLE TO BE

EX. LIRR SIGNAL CONDUIT

EX. SB SERVICE ROADWALL FOOTING

EX. WEST RETAINING

CONSTRUCTION.

PROTECTED DURING

MAINTAINED AND

CABLE TO BE

CONDUIT CONATAINING

EX. LIRR SIGNAL

CONTRACT) TO REMAIN

(INSTALLED IN ALT. 6

EXISTING MCI & ALTICE

SHOWN FOR CLARITY

COREDRILL HOLES NOT

BE REMOVED. SEE NOTE 4.

EX. LIRR EL&P BOXES TO

REMOVED. SEE NOTE 4.

EX. LIRR EL&P CONDUIT TO BE

FOR MORE DETAILS.

SEE STRUCTURAL PLANS

10'-0"

2'-0"

3'-2•"

4'-9"

DURING CONSTRUCTION.

MAINTAINED AND PROTECTED

CONATAINING CABLE TO BE

EX. LIRR SIGNAL CONDUIT

CONTRACT)

(INSTALLED IN ALT. 6

EXISTING MCI & ALTICE

REMOVED. SEE NOTE 4.

EX. LIRR EL&P CONDUIT TO BE

UTL-16

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

A

A

N11 M11 K11 H11 G11 E11 D11 C11

SECTION A-A

GRID

NO

RT

H

SCALE 3/32" = 1'-0"

SCALE 3/32" = 1'-0"

SCALE 3/32" = 1'-0"

PROPOSED PLAN

PROPOSED ELEVATION

WEST ABUTMENT WALL - DOUBLE DECK BRIDGE

LIRR UTILITY PLANS

BY THE LIRR COMMUNICATIONS DEPARTMENT.

6. ALL COMMUNICATION CABLE SPLICING OPERATIONS SHALL BE DONE

LIRR SIGNALS DEPARTMENT.

5. ALL SIGNAL CABLE SPLICING OPERATIONS SHALL BE DONE BY THE

REMOVAL WORK WITH THE LIRR POWER DEPARTMENT.

COORDINATE ALL POWER CABLE AND CONDUIT RELOCATION OR

CONDUITS TO FACILITATE REMOVAL. THE DESIGN-BUILDER SHALL

4. LIRR POWER (EL&P) DEPARTMENT TO CUT POWER IN EXISTING

DEPARTMENT.

AND CONDUIT RELOCATION WORK WITH THE LIRR COMMUNICATION

3. THE DESIGN-BUILDER SHALL COORDINATE ALL COMMUNICATION CABLE

CONDUIT RELOCATION WORK WITH THE LIRR SIGNALS DEPARTMENT.

2. THE DESIGN-BUILDER SHALL COORDINATE ALL SIGNAL CABLES AND

PLANS.

REFER TO DWG. UTL-13 THROUGH UTL-17 FOR ALL LIRR UTILITY 1.

NOTES:

18

Page 124: DB CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 4 … · 4/21/2020  · AIRPORT – CONTRACT 2 1 Part 4 - Utility Requirements PIN X735.83, Contract D900050 Final April 21, 2020

GRID

NO

RT

H

A16

SCALE: „" = 1'-0"

B16

SCALE: „" = 1'-0"

PROPOSED ELEVATIONSCALE: „" = 1'-0"

SECTION A-A

15'-7•"

EXIST GROUND

APPROX.

58'-3„"

A

A

TOP OF LOW RAIL

SEAT (TYP.)

TO EXPAND BRIDGE

EXISTING PILASTER

PARTIALLY REMOVE

16'-4"

TOP OF LOW RAIL

C16

4'-4" 19'-0" 14'-5‚" 4'-10‚"

BEARING (TYP.)

FLOORBEAM

TOP OF EXISTING DECK

ABUTMENT BEARING

EXISTING EASTc

TOP OF EXISTING DECK

WALL. SEE NOTE 1.

PARTIALLY REMOVE

uEL. 62.54

uEL. 60.46

uEL. 59.00

uEL. 58.13

uEL 39.13

uEL. 35.13

uEL 39.13

uEL. 35.13

uEL. 63.86

uEL. 58.13

uEL. 67.44

uEL. 62.54

PROPOSED PLAN

WALL. SEE NOTE 1.

PARTIALLY REMOVE

REMAIN

CABINET TO

EX. SIGNAL

INSTALLED

ONCE PROPOSED CABLES ARE

DECK BRIDGE TO BE REMOVED

EX. SIGNAL CABLES ACROSS DOUBLE

(SEE UTL-13)

COMMUNICATION CABLES

EX. AERIAL LIRR

EXISTING SIGNAL CABINET

UNDER THE BALLAST TO

EX. SIGNAL CABLES RUN

UTILITIES

RETAINING WALL

REMAINDER OF EAST

SEE UTL-15 FOR

(UTL-13 & UTL-14)

LIRR MAINLINE 1-3 BRIDGE

SOUTH FASCIA OF NEW

PROP. UTILITY TRAY ALONG

TRACK CONSTRUCTION

AS NECESSARY DURING RECEIVING YARD

DOUBLE DECK BRIDGE TO BE RELOCATED

EX. LIRR SIGNAL CONDUIT RUNNING ACROSS

EX. LIRR UTILITY POLE B

CABINET (SEE UTL-13)

TO PROPOSED SIGNAL

UNDER EXISTING BALLAST

PROPOSED CONDUITS RUN

ARE INSTALLED

PROPOSED CABLES

REMOVED ONCE

CABLES TO BE

COMMUNICATION

EX. LIRR SIGNAL &

INSTALLED. SEE NOTE 2.

NEW CONDUITS ON WALL

TO BE PULLED ONCE

COMMUNICATION CABLES

PROP. LIRR SIGNAL &

RELOCATION

COMMUNICATION CABLE

FACILITATE SIGNAL &

EXISTING RETAINING WALL TO

INSTALL 7-4'' CONDUITS ONCONDUITS

& COMMUNICATION

PROP. 5-4'' LIRR SIGNAL

CUTOVER

SIGNAL & COMMUNICATION CABLE

NEW CONDUIT INSTALLATION FOR

DURING CONSTRUCTION TO FACILITATE

TEMPORARILY LOWERED AND SUPPORTED

EX. 7 LIRR CONDUITS TO BE

CABLES

COMMUNICATION

PROP. SIGNAL &

& SIGNAL DEPARTMENTS.

BY LIRR COMMUNICATIONS

ENERGIZED, AND TESTED

ARE INSTALLED,

ONCE PROPOSED CABLES

CABLES TO BE REMOVED

1/3 BRIDGE (SEE UTL-13 & 14)

FASCIA OF THE NEW MAINLINE

CONDUITS ALONG THE SOUTH

INSTALLED THROUGH PROPOSED

PROP. SIGNAL CABLES TO BE

RELOCATION

TO FACILITATE CABLE

EXISTING RETAINING WALL

INSTALL 7-4'' CONDUITS ON

CUTOVER.

CONDUITS FOR CABLE

TO FACILITATE NEW

DURING CONSTRUCTION

TO BE LOWERED

EX. 7 LIRR CONDUITS

C

FIL

E

NA

ME

=

US

ER

=

DA

TE/

TI

ME

=

JO

B

MA

NA

GE

RD

ESIG

N

SU

PE

RVIS

OR

DE

SIG

NC

HE

CK

DR

AF

TIN

GC

HE

CK

PR

OJ

EC

T

MA

NA

GE

R

DG

N$U

SE

RN

AM

E

DG

N$S

YTIM

E

DG

N$SPE

C

VAN WYCK EXPRESSWAY CAPACITY & ACCESS

QUEENS 11

BRIDGES CULVERTSPIN

COUNTY:

DESCRIPTION OF ALTERATIONS:

AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED

CONTRACT NUMBER

DRAWING NO.

SHEET NO. REGION:

X735.83

D900050IMPROVEMENTS TO JFK AIRPORT PROJECT

CONTRACT 2

7076800

UTL-17

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

LIRR MAINLINE 1/3 BRIDGE

LIRR UTILITY PLANS

PROTECTED.

OUT OPERATION. EXISTING UTILITIES TO BE MAINTAINED AND

ACCOMODATE SUPERSTRUCTURE REMOVAL DURING ROLL IN/ROLL

PORTION OF EXISTING WALL NEEDS TO BE REMOVED TO 3.

S-ML9.

FOR EAST ABUTMENT FOUNDATION DETAILS, SEE DWG. NO. 2.

S-ML7.

UNDER MAINLINE 1/3 BRIDGE. REFER TO STRUCTURAL DRAWING

WALL TO BE REMOVED TO LOWER EXISTING SIGNAL CABLES 1.

GENERAL NOTES:

LIRR COMMUNICATIONS DEPARTMENT.

6. ALL COMMUNICATION CABLE SPLICING OPERATIONS SHALL BE DONE BY THE

SIGNALS DEPARTMENT.

5. ALL SIGNAL CABLE SPLICING OPERATIONS SHALL BE DONE BY THE LIRR

RELOCATION OR REMOVAL WORK WITH THE LIRR POWER DEPARTMENT.

4. THE DESIGN-BUILDER SHALL COORDINATE ALL POWER CABLE AND CONDUIT

CONDUIT RELOCATION WORK WITH THE LIRR COMMUNICATION DEPARTMENT.

3. THE DESIGN-BUILDER SHALL COORDINATE ALL COMMUNICATION CABLE AND

RELOCATION WORK WITH THE LIRR SIGNALS DEPARTMENT.

2. THE DESIGN-BUILDER SHALL COORDINATE ALL SIGNAL CABLES AND CONDUIT

REFER TO DWG. UTL-13 THROUGH UTL-17 FOR ALL LIRR UTILITY PLANS.1.

NOTES:

19