A Strategic Plan for A Strategic Plan for Pavement Engineering Pavement Engineering NCHRP 20-7(223) NCHRP 20-7(223) AASHTO Joint Technical Committee on AASHTO Joint Technical Committee on Pavements Pavements Dan Dawood, P.E. Dan Dawood, P.E. Pennsylvania Department of Pennsylvania Department of Transportation Transportation July 15, 2008 July 15, 2008

description

 

Transcript of Dawood, Strategic Plan for Pavement Engineering II

Page 1: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement A Strategic Plan for Pavement EngineeringEngineering

NCHRP 20-7(223)NCHRP 20-7(223)

AASHTO Joint Technical Committee on AASHTO Joint Technical Committee on PavementsPavements

Dan Dawood, P.E.Dan Dawood, P.E.

Pennsylvania Department of TransportationPennsylvania Department of Transportation

July 15, 2008July 15, 2008

Page 2: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

The NCHRP 20-7(223) was initiated to identify major challenges and opportunities which would serve as the basis for a strategic plan for pavement engineering

These “grand challenges”, if overcome would result in significant advances in pavement engineering

Page 3: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

A panel was formed with the members from the following groups to identify the major challenges and opportunities:

• AASHTO JTCOP members• FHWA• Academia• Consulting Firms• ACPA & NAPA

Page 4: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

The Workshop’s purpose was to identify, evaluate, and prioritize research problems to ensure that the overall effort was aligned with a quality based research program.

Page 5: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 6: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Each grand challenge was defined by a brief statement of importance and our current preparedness in dealing with the specific challenge

A list of important research activities was generated with benchmarks set:

• Short term (2-3 years)• Mid term (4-5 years)• Long term ( > 5 years)

Page 7: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 8: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Managing the Network

Planning for implications of decisions throughout the pavement life cycle on overall quality , safety, and longevity of the network ( implications of preventive maintenance and rehabilitation) and integrating pavement management into asset management decisions

Page 9: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

• Extended pavement life through timely use of preservation & rehabilitation

• Optimizing allocation of funding through more accurate measures of funding needs

• Improved data integration and enhanced performance data to facilitate improved ME models and designs

Page 10: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 11: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Optimizing Functional Service

To address pavement functional characteristics and to develop guidelines for achieving acceptable safety, noise and smoothness characteristics

Page 12: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

Guidelines focused on functional characteristics of pavements and the design and construction of practices for achieving acceptable and optimum safety, noise, and smoothness levels

(implementation of noise reducing pavements, FHWA Traffic Noise Model, surface characteristics, methods to evaluate splash and spray, etc)

Page 13: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 14: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Ensuring Quality

To achieve better performing pavements by using performance specifications and construction quality assurance programs in which acceptance measures accurately characterize quality

Page 15: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

• Enhanced performance related specifications which consider relationships among key performance factors

• Improved quality control and assurance • Improved contracting and construction

Page 16: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 17: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Pursuing Sustainability

To provide long-lasting pavements that make optimal use of available materials and have minimal impact on the environment through understanding of the materials and their impact on performance

Page 18: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

A set of strategies to advance sustainable pavements that will incorporate the following:• Optimized use of available materials• Enhancement of the MEPDG• Longer life pavements• Cost effective pavements• Improve Overall Network condition

Page 19: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 20: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Managing Knowledge

Understanding the existing approaches to management and the dissemination of pavement engineering knowledge and to develop new and effective approaches to emerging technology

Page 21: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

Strategies to enhance and cultivate knowledge and dissemination of pavement engineering leading to:

• Well trained and qualified workforce in sufficient numbers to meet agency and industry needs

• Effective leaders in pavement engineering• Implementable best practices and technologies

Page 22: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 23: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Fostering Innovation

To foster innovations in pavement engineering practice that will lead to advancements in design, contracting, construction, maintenance, and rehabilitation techniques

Page 24: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

Innovations in all aspects of the pavement that would occur during its service life resulting in:

• Improved pavement performance• Improved service and safety for highway users• Reduced vehicle operating and delay costs • Reduced agency costs for maintenance and

rehabilitation

Page 25: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Through the consensus building process seven grand challenges were identified:

• Managing the Network• Optimizing Functional Service• Ensuring Quality• Pursuing Sustainability• Managing Knowledge• Fostering Innovation• Elevating Status and Outreach

Page 26: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Elevating Status and Outreach

To communicate to legislators and the public the importance of pavements to the nation’s infrastructure and to aid transportation officials and high level decision makers make informed decisions

Page 27: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

Anticipated Outcomes:

An effective outreach program that will:• Improve awareness of challenges in the

pavement area• Help transportation officials make better informed

decisions• Support adequate and consistent funding• Support establishing an AASHTO Highway

Subcommittee on Pavements

Page 28: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering

This list of business needs was developed to indicate the range of topics of interest to pavement engineers.

Details on this effort can be found in:

NCHRP Research Results Digest 276, Business Needs for Pavement Engineering

Page 29: Dawood, Strategic Plan for Pavement Engineering II

A Strategic Plan for Pavement EngineeringA Strategic Plan for Pavement Engineering