City Council Meeting April 16, 2013
STREETSCAPE PROJECTCONCEPT PLANS
DAVIS STREET
IMPROVEMENT PROJECT
City Council Meeting April 16, 20132
Davis Street Improvement Project
Limits of the Project• Hinman to Orrington
• Orrington to Ridge
• Ridge to Asbury
City Council Meeting April 16, 20133
Davis Street Improvement Project
Project Scope• Water Main Replacement (Benson to
Hinman)• Sewer Replacement (Orrington to Hinman)• Streetscape Upgrade (Hinman to Ridge)• Street Resurfacing (Hinman to Ridge)• Protected Bike Path (Hinman to Asbury)
City Council Meeting April 16, 20134
Davis Street Improvement Project
Hinman to Chicago
City Council Meeting April 16, 20135
Davis Street Improvement Project
Chicago to Orrington
City Council Meeting April 16, 20136
Davis Street Improvement Project
Sherman to Benson
City Council Meeting April 16, 20137
Davis Street Improvement Project
Parking Impacts Hinman Ave. to Chicago Ave.
• Number of parking stalls on the south side of the block
• Existing angle – 24
• Proposed parallel with sidewalk widening – 14
• Reduction – 10
Oak Ave. to Ridge Ave.
• Number of existing parking spaces – 14 on south side and 14 on north side
• Proposed parking spaces – 17 on south side and 14 on north side
• Increase - 3
Net Impact: -7
City Council Meeting April 16, 20138
Davis Street Improvement Project
Design Elements• Sidewalk Brick Replacement• Protected Bike Path• Bike Shelter• Sidewalk Furniture (Trash Cans & Benches)• Pedestrian Lighting
City Council Meeting April 16, 20139
Davis Street Improvement Project
Bike Racks & Trash Receptacles
Bike racks will be placed along Davis Street
City Council Meeting April 16, 201310
Davis Street Improvement Project
Bike Shelter Visual
Proposed Locations: Orrington @ Davis and Hinman @ Davis
City Council Meeting April 16, 201311
Church Street Project 2012
Bike Shelter Revised Location
Proposed Location: Orrington @ Library
City Council Meeting April 16, 201312
Davis Street Improvement Project
Green Elements
Porous Concrete Sidewalk and Parking Lanes
Rain Gardens
City Council Meeting April 16, 201313
Davis Street Improvement Project
Green Elements Continued
• LED Pedestrian Lighting
• Re-used Brick Materials
City Council Meeting April 16, 201314
Davis Street Improvement Project
Community Engagement• Presented to Downtown Evanston at Board
Meeting• Presented at the First Ward Meeting.• Presented to Fourth Ward Alderman.• Downtown Evanston sent out survey to
Davis Street Businesses
City Council Meeting April 16, 2013
• Questions– Are you in favor of losing 24 parking spaces?
Approx. 34 No, 1 Yes
Staff: Revised the plan to reduce only 7 spaces– Are you in favor of widening the sidewalks?
Approx. 34 No; 2 Yes
Staff: Revised the plan to eliminate widening.- How will project impact business/property negatively or
positively? Approx. 34 negatively, 1 positively
Staff: Construction project will temporarily impact businesses staff will work with each business to minimize the impact.
15
Downtown Evanston Survey
City Council Meeting April 16, 201316
Davis Street Improvement Project
Next Steps• Meet with Davis Street businesses/properties to finalize
schedule.• Water main and sewer project bid April 2013.• Street resurfacing and streetscape bid May 2013.• Conduct traffic analysis and meetings to design bike path
connections between Chicago Avenue and the Lakefront and between Asbury and Mason Park, Fall 2013
• Coordinate with ETHS and neighborhood to design bike path connection between Dodge and McCormick, Fall 2013.
City Council Meeting April 16, 201317
Davis Street Improvement Project
Proposed Construction Schedule
Dates of Work Streets/Property Effected
June— AugustWater Main & Sewer Replacement (Orrington to Hinman)
July-
August –
August-September
Sidewalk Widening & Streetscape
South side - Benson to Hinman
North side - Ridge to Benson
North side - Benson to Hinman
South side- Ridge to Benson
September 15 - October 10 Grinding & Street Resurfacing
October 14—28 Protected Bike Lane
October Pedestrian Lights, Bike Shelter & Bike Racks
City Council Meeting April 16, 201318
Davis Street Improvement Project
QUESTIONS