Switchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental impact switchgear

Transcript of David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions...

Page 1: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

Switchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012

Low environmental impact switchgear

Page 2: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 2

Why reduce the SF6 volume to a minimum?...

Under the Australian Government’s 23 dollars/ton carbon tax, a 145 kV SF6 breaker will cost 16 000 dollar more.. …that is approximately 25%

Page 3: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

low

no

FunctionalIntegration

Encapsulation

partial full

med

ium

high

ABB Switchgear portfolioIntroduction of Switchgear Solutions

DTB Circuit BreakerCurrent Transformer

Hybrid ModulesCircuit BreakerCurrent TransformerVoltage TransformerDisconnectorEarthing Switch

GISCircuit BreakerCurrent TransformerVoltage TransformerDisconnectorEarthing SwitchBusbar / Busducts

LTB Circuit Breaker

DCB Circuit BreakerDisconnectorEarthing Switch

© ABB Group May 3, 2012 | Slide 3

Page 4: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 4

Breakers and Modules Outline

Why switchgear solutions?Disconnecting Circuit Breaker

Functionality and PortfolioLTA - Circuit Breaker with C02-gasHow will the DCB improve the network performanceImproved personnel safety – Maintenance exampleReferences

Summary

Outline

Page 5: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 5

Why switchgear solutions?Because it makes life E.A.S.Y!

Page 6: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 6

Why switchgear solutions?Because it makes life E.A.S.Y!

“Even if space is not a constraint, it is in

general a time consuming process

to apply for ”

Environment AVAILABILITY SAFETY YARD SIZE

“When we reduce maintenance to only once in 15 years, it

will definitely improve the safety “

“A high availability is our number one

priority”

“Minimizing the SF6 and substation

footprint will enable a lower environmental

impact”

Page 7: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 7

Why switchgear solutions? Evolution of single line configuration

Oil Minimum SF6 GasAir Blast

No extra contacts for disconnecting function

Encapsulation of disconnectors & current

transformers

Page 8: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

Why switchgear solutions? Lowest maintenance and failure rates

© ABB Group May 3, 2012 | Slide 8

Failu

re a

nd m

aint

enan

ce ra

te

1960 Today

Bulk oil CB

Air blast CB~1 yr

Minimum oil CB~5 yr

SF6 CB~15 yr

Open air disconnector, ~5 yr

Switchgear solutions reduce the maintenance interval from 5 to >15 years due to the removal of open air disconnectors

DCB, 15th year

Page 9: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 9

Double busbar introduced due to disconnector maintenance

Why switchgear solutions? Availability impact of open air disconnectors

Yesterdays standard solutions

Page 10: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

Why switchgear solutions? Availability impact without open air disconnectors

Today's standard solutions

Taking away the DS totally, there is no service and no risk for failure.

DCB

Page 11: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 11

Disconnecting Circuit BreakerFunctionality and product portfolio

Page 12: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 12

Failure of a disconnector in a major 400 kV S/S

Black-out of major part of Sweden

Main load centers

Historical grid development 1983 - a milestone for DCB

Main hydro generating

plants

20 000 MW load disconnected 5 million people affected

6 hours outage time

Page 13: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 13

LTB145 DCB Breaking function

Identical as conventional circuit breaker

The same breaking chamber and operating mechanism as a conventional circuit breaker

Same high reliability as for a standard circuit breaker

DCB fundamentalsOnly one set of moving contacts

Page 14: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 14

DCB fundamentalsOnly one set of moving contacts

LTB145 DCB Disconnecting function

The disconnection function for a DCB is obtained between the circuit breaker contact set.

“What we don’t have can not fail nor require maintenance”

Page 15: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 15

DCB fundamentalsMaximum security with motor operated earthing switch

Motor operated earthing switchRemote operated from control room

A very visible indication for the safety

Can be padlocked

Maximum safety for maintenance personnel

Page 16: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 16

Interlocking functionsIncreased safety with highly reliable interlocking

Closed position

Disconnected position- locked in open position

Earthing switch

ClosedOpen

Open position

Page 17: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 17

Interlocking functionsBlocking of circuit breaker function

DCB in open position

Remotely operated locking bar

Can only be operated when DCB is in open position

Can be padlocked

Unblocked

Blocked

Page 18: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 18

Interlocking functionsEarthing switch

Disconnected position- locked in open position

Earthing switch

ClosedOpen

Remote operated from control room

Can only be operated when DCB is blocked

Can be padlocked

LINK

Page 19: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 19

The DCB familyFor a simplified substation

Type DCB LTB 72.5D1/B

DCB LTB 145D1/B

DCBHPL 170-300B1

DCBHPL 362-550B2

Rated voltage 72.5 kV 145 kV 170 - 300 kV 362 -550 kV

Rated current 3150 A 3150 A 4000 A 4000 A

Breaking capacity 40 kA 40 kA 50 kA 63 kA

ABB provides DCB at all voltage levels and ratings

LINK

Page 20: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 20

IEC Standard for Disconnecting Circuit BreakersIEC 62271-108

DCB fulfils requirements for a circuit breaker and a disconnector

The standard describes how to test, interlock and block a Disconnecting Circuit Breaker

Page 21: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB High Voltage ProductsMay 3, 2012 | Slide 21

LTA – Circuit Breaker with CO2 gas Test installation and portfolio

Page 22: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

145 kV circuit breaker with CO2-gasPre-study

Field installation in Ulricehamn sinceMarch 2010 for a capacitor bank application

© ABB Group May 3, 2012 | Slide 22

Main characteristics

Rated voltage 145 kV

Rated short-circuit current 31.5 kA

Rated current 3150 A

Ambient temperature -50 C

Tested according to IEC

Composite insulators

Page 23: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 23

New LTB & DCB with CO2-gas LTA 72D1

ABB developing non-SF6 portfoliosLTB & DCB using CO2 instead of SF6

Developed from ABB’s highly efficient SF6interrupter technology

Common components with SF6 portfolioMSD1 mechanical spring driveInsulators, linkages, structure, castings

SF6 portfolios will remain for many years for the highest ratings

Page 24: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

LTA 72 Disconnecting Circuit Breaker with CO2-gas Technical data

Similar ratings as a conventional SF6 circuit breaker!

© ABB Group May 3, 2012 | Slide 24

Main characteristics

Rated voltage 72.5 kV

Breaking current 31.5 kA

Continuous current 2750 A

Ambient temperature -50 C to +50 C

Operation Three-pole

Page 25: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 25

DCB improving grid performance?Certainly!

Page 26: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 26

Substation Design ExampleConventional 145 kV single busbar

Busbar disconnector maintenance will cause outage of substation (> 8 hrs every 5th year)

2 line bays

2 transformer bays

24 m x 43 m = 1032 m2

6 disconnectors to maintain ~5th year

Page 27: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 27

Substation Design ExampleDCB 145 kV single busbar

Busbar only affected of DCB maintenance (2 hour outage every 15th year )

2 line bays

2 transformer bays

18 m x 22 m = 396 m2

4 Disconnecting links

Removal of 6 disconnectors

Page 28: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 28

Substation Design ExampleDCB 145 kV single busbar

DCB + CT on one support structure

Line Entrance Module, VT and SA on one support structure

Busbar motor operated earthing and VT on one support structure.

Disconnecting link

Page 29: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 29

Substation Design ExampleDCB 145 kV single busbar

Outage comparison due to maintenance

Single Object Single Transformer Parallel Objects

Page 30: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 30

Substation Design ExampleDCB 145 kV single busbar

Outage comparison due to maintenance

Single Object Single Transformer Parallel Objects

Space comparison

61 % Space reduction with same layout

Page 31: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

Dcbsubstations.comA tool to design and compare substations

© ABB Group May 3, 2012 | Slide 31

http://dcbsubstations.com

Page 32: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB High Voltage ProductsMay 3, 2012 | Slide 32

Maintenance exampleHow do we ensure the highest safetyand availability?

Page 33: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 33

A removable link, with bolted connection, prepared to be opened quickly

Highly reliable switching arrangementsDisconnecting Link – reconnection example 420 kV

In less than one hour the DCB can be disconnected from the system

1h to remove the link

Page 34: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 34

Conductor is brought in place

Surfaces are cleaned and greased

Tighten up the bolts

Highly reliable switching arrangementsDisconnecting Link – reconnection example 420 kV

1h to put it back

Page 35: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 35

Maintenance ExampleSingle bus

How to minimize the impact on availability during maintenance

Disconnecting Link

Single bus

Page 36: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 36

Maintenance ExampleSingle bus

Page 37: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 37

Maintenance ExampleSingle bus

Open line and busbar adjacent breakers

Page 38: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 38

Maintenance ExampleSingle bus

Lock the breakers and close the motor operate earthing switch

Page 39: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 39

Maintenance ExampleSingle bus

Earthing very visible indicator that it is safe to enter substation

Yes, it is earthed! Now it is safe to enter the substation

Page 40: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 40

Maintenance ExampleSingle bus

Apply portable earthing switches

Page 41: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 41

Maintenance ExampleSingle bus

Slack the link

Page 42: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 42

Maintenance ExampleSingle bus

Energize busbar

Page 43: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 43

Maintenance ExampleSingle bus

Same procedure to connect the links after DCB maintenance

Page 44: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 44

References

Page 45: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 45

Worldwide references DCBMore than 1100 units in 30 countries

Argentina AustraliaBelgium

BrazilCanada

DenmarkEstoniaFinland

GermanyHungaryIceland

IranKazakhstan

LithuaniaMexico

New ZealandNigeria

NicaraguaNorwayOman

RomaniaSudan

South AfricaSwedenUganda

UKSpainRussiaChina USA

Poland

Page 46: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 46

Swedish National GridDCB preference since 2000

“Same cost for a double breaker as a conventional double busbar”

Page 47: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 47

New ZealandABB preferred DCB supplier to Transpower

From Transpower TechnicalSpecification, 145 kV:

Transpowers main reason for putting in DCBs is to:(a) maximise circuit availability,(b) minimising components that need maintenance and(c) increase the maintenance intervals requiring outages from 4 years to 12 years.

Page 48: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 48

Rio Tinto DCB substations Why did Rio choose DCB as there preferred solution?

Benefits

Maintenance savings

Availability, Outage costs >1 MAUD/day

Reliability: Fewer apparatuses in substation

Safety: used hand operated disconnectors in the past.

IEC 61850 compliant substation

Page 49: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB High Voltage ProductsMay 3, 2012 | Slide 49

Indoor DCB SubstationA cost competitive solution for 72, 145 kV

Advantages

Cost competitive solution for urban areas

Alternative to GIS

Designed for harsh environmental conditions

Small total SF6 gas volume

132 kV DCB indoor substation,

Kiruna Sweden

LINK

Page 50: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 50

SummaryLow environmental impact switchgear

Page 51: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB High Voltage ProductsMay 3, 2012 | Slide 51

InterruptersSummary low environmental impact switchgear DCB will certainly improve personnel safety

Minimum need for maintenance will give fewer hours in the SS hence safer

Easy to understand the S/S layout

Fewer apparatus will make life easier

Less testing at site

Less time needed in the S/S makes it safer

Page 52: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 52

Direct Cost Savings

Land Acquisition

Land Preparation

Material savings

Busbar

Fence

Cabling

Support structures

Simplified layout

Less Engineering

Faster Delivery time

Faster Installation and Commissioning time

Summary low environmental impact switchgear DCB will certainly lower the direct costs

DCB gives a lower CAPEX

Page 53: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental

© ABB Group May 3, 2012 | Slide 53

Indirect Cost Savings

Increased availability:

Decreased cost for maintenance

Decreased cost and power outage

Increased revenues when the line can be in service

Reduced energy losses in the substation

Summary Switchgear SolutionsDCB will certainly lower the lifecycle costs

DCB gives a lower OPEX

Page 54: David Olofsson, Territory Marketing Manager, PG Breakers ... · PDF fileSwitchgear Solutions David Olofsson, Territory Marketing Manager, PG Breakers & Modules 2012 Low environmental