LOCATION RESTRICTION DATE CONTRACTOR COST
PHILADELPHIA
PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between
Levick St. & Cottman Ave. 9 AM - 3 PM
10/15/17- 10/21/17 Walsh Construction
Company
$212,325,000.00
*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & 9th St. 9:30
AM - 2 PM.
10/16/17-10/19/17 Maintenance
*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -
2 PM.
10/16/17-10/19/17 Maintenance
*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between Phila. Int. Airport &
PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.
10/16/17-10/19/17 Maintenance
*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between US 1 (City Ave.) &
26th St. 9:30 AM - 2 PM.
10/16/17-10/19/17 Maintenance
*I-76 West Shielding: Right LANE CLOSURE & DETOUR
between South St. off Ramp & 676 Vine St.
Expressway. 9 PM - 5 AM. DETOUR POSTED
10/16/17-10/19/17 Buckley & Company,
Inc.
$103.5 million
*I-95 North Paving & Line Striping: INTERMITTENT RIGHT &
LEFT LANE CLOSURES between Allegheny Ave. &
Bridge St. 8 PM - 5 AM.
10/16/17-10/19/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
Company, Inc.
$160.2 million
DATE: 10-18-2017
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
TRAFFIC RESTRICTION BULLETIN
(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)
(All restrictions 24 hours/day, 7 days/week unless otherwise noted)
PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD
Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.
10/18/2017 Page 1 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 South Paving & Line Striping: INTERMITTENT RIGHT &
LEFT LANE CLOSURES between Bridge St. &
Allegheny Ave. 8 PM - 5 AM.
10/16/17-10/19/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
Company, Inc.
$160.2 million
Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between
Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.
10/16/17-10/20/17 James J. Anderson $869,700.00
Ridge Ave. Trench/Foundations: LANE CLOSURES between 16th
St. & Poplar St. 9 AM - 3 PM.
10/16/17-10/20/17 Armour and Sons
Electric
$1,698,438.00
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St & Schuylkill Ave. DETOUR
POSTED. 24 HOUR DETOUR
10/16/17-10/20/17 Abbonizio
Contractors, Inc.
$15.8 million
*US 1 N & S (Roosevelt Blvd.) Tree Removal: RIGHT LANE CLOUSRE between
Berkley St. & Ridge Ave 9 AM - 3 PM
10/16/17-10/20/17 Townscapes Inc.
*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks
County line & 9th St. 9 AM - 3 PM & 7 PM - 9 AM.
10/16/17-10/21/17 H&K Group, Inc. $7.6 million
PA 63 (Woodhaven Rd.) W Traffic Sign Testing: RIGHT SHOULDER CLOSURE
between Thorton Rd. & U.S. 1 (Roosevelt Blvd.). 9 AM
to 3 PM
10/17/17-10/18/17 Wampole-Miller, Inc. $15 million
*I-95 South Surveying: RIGHT SHOULDER CLOSED between
Cottman Ave./Rhawn St. & Betsy Ross
Bridge/Aramingo Ave. exits. 9 AM - 1 PM.
10/18/17 Pickering, Corts &
Summerson
*I-95 North Surveying: RIGHT SHOULDER CLOSED between
Bridge St./Harbison Ave. & Cottman Ave./Rhawn St.
exits. 11 AM - 3 PM.
10/18/17 Pickering, Corts &
Summerson
*I- 95 South ramp from Besty Ross
Bridge
Line Striping: INTERMITTEN RIGHT & LEFT LANE
CLOSURES on ramp. 8 PM- 5 AM
10/19/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
$160.2 million
10/18/2017 Page 2 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-76 West Ramp to 30th Street Bridge Inspection: RAMP CLOSURE between South
St & I-676. 9 AM - 3 PM.
10/21/17 SPECIALTY
Engineering, Inc.
*I-95 South Bridge Inspection: RIGHT LANE CLOSURE between
Girard Ave & I-676. 9 AM - 3 PM.
10/22/17 SPECIALTY
Engineering, Inc.
*I-95 South Bridge Inspection: LEFT LANE CLOSURE between
Girard Ave & I-676. 9 AM - 3 PM.
10/23/17 SPECIALTY
Engineering, Inc.
JFK Blvd. West Bridge Rehabilitation: CLOSED & DETOURED
between 20th St & Schuylkill Ave. DETOUR POSTED.
24 HOUR DETOUR
10/27/17-10/30/17 Abbonizio
Contractors, Inc.
$15.8 million
New State Rd. Roadway Construction: LANE CLOSURE between
Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8
PM - 5 AM.
10/8/17-10/14/17 Walsh Construction
Company
$212.3 million
*I-95 North Paving & Line Striping: INTERMITTENT RIGHT &
LEFT LANE CLOSURES between Allegheny Ave. &
Bridge St. 8 PM - 5 AM.
10/9/17-10/13/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
Company, Inc.
$160.2 million
*I-95 South Paving & Line Striping: INTERMITTENT RIGHT &
LEFT LANE CLOSURES between Bridge St. &
Allegheny Ave. 8 PM - 5 AM.
10/9/17-10/13/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
Company, Inc.
$160.2 million
*I-76 E & W Graffiti Removal: LANE & SHOULDER CLOSURES
between City Ave. & Green Lane exits. 10:30 PM - 5
AM.
10/9/17 & 10/11/17
& 10/13/17
SEPTA
Delaware Ave. Milling & Paving: LANE RESTRICTIONS between
Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM &
7 PM - 5 AM.
10/9/17-10/13/17 Tony DePaul & Son $550,000.00
10/18/2017 Page 3 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between
Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5
AM. Friday 7 PM - Saturday 9 AM.
10/9/17-10/14/17 H&K Group, Inc. $7.6 million
*I- 95 South ramp from Besty Ross
Bridge
Line Striping: INTERMITTEN RIGHT & LEFT LANE
CLOSURES on ramp. 8 PM- 5 AM
10/13/17 Driscoll Construction
Company,
Inc./Richard E.
Pierson Construction
$160.2 million
*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between
Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 9
AM.
10/13/17 H&K Group, Inc. $7.6 million
Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO
RIGHT TURN at Walnut onto Schuylkill. 24-HOUR
RESTRICTIONS.
8/28/17-12/31/17 Buckley & Company,
Inc.
$103 million
Cheltenham Ave. Utility Installation: LANE RESTRICTIONS between
Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.
8/30/17-11/2/17 PECO Energy
Holme Ave. Bridge Repair: LANE CLOSURE between Longford St.
& Arthur St. 24-HOUR RESTRICTIONS.
8/7/17-5/2018 Road-Con, Inc. $1.3 million
I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE
LANE 24-HOUR
7/21/17-10/31/17 Buckley & Company,
Inc.
$64.8 million
Roosevelt Blvd. Curb, Sidewalk, Bus Shelters & Pedestrian Lights:
LANE CLOSURES at Cottman Ave.; Rhawn St.;
Welsh Rd.; Grant Ave. & Red Lion Rd. 6 AM - 4:30
PM.
7/31/17-10/25/17 A.P. Construction,
Inc.
Aramingo Ave. Utility Installation: LANE CLOSURES between
Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.
7/20/17-4/1/18 A.P. Construction,
Inc.
$87 million
Palmer St. Overhead Bridge Construction: CLOSED &
DETOURED between Wildey St. & Delaware Ave. 24-
HOUR DETOUR. DETOUR POSTED.
6/15/16-5/1/18 James J. Anderson $211 million
Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between
Wildy St. & Delaware Ave. 24-HOUR DETOUR.
DETOUR POSTED.
6/15/17-5/1/18 James J. Anderson $211 million
10/18/2017 Page 4 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Richmond St. N & S Bridge Demolition: CLOSED & DETOURED between
Marlborough St. & Columbia Ave. 24-HOUR
DETOUR. DETOUR POSTED.
6/5/17-10/14/17 James J. Anderson $211 million
Columbia Ave. Bridge Demolition: CLOSED & DETOURED between
Wildey St. & Delaware Ave. 24-HOUR DETOUR.
DETOUR POSTED.
6/5/17-10/14/17 James J. Anderson $211 million
18th St. Roadwork: CLOSED & DETOURED between Vine St.
Local E/B & Vine St. Local W/B. 24-HOUR
CLOSURE. DETOUR POSTED.
5/15/17-10/27/17 Buckley & Company,
Inc.
$64.8 million
22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
21st St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.
(PA 611) & Rising Sun Ave. 9 AM - 3 PM.
12/2/15-11/2017 Armour and Sons
Electric
$4.7 million
Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Somerset St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Girard Ave. on-ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED
& DETOURED. 24-HOUR CLOSURE. DETOUR
POSTED.
12/16/15-10/20/17 James J. Anderson $211 million
Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between
Columbia Ave. & Aramingo Ave. 24-HOUR
RESTRICTIONS.
4/1/15-10/2018 James J. Anderson $211.7 million
BUCKS COUNTY
Fretz Valley Rd. Bedminster Twp. Tree Removal: LANE RESTRICTION at Deer Run Rd.
9 AM - 3 PM
10/16/17 Bustleton Services
10/18/2017 Page 5 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New
Rodger Rd. & New Falls Rd. 8 PM - 5 AM. DETOUR
POSTED.
10/16/17-10/17/17 Pennsylvania
Turnpike Commission
$142 million
Swamp Rd., Newtown Twp. Utility Installation: LANE RESTRICTIONS between
Sawmill Lane & Liberty Drive. 9 AM - 3 PM.
10/16/17-10/17/17 Newtown Artesian
Water Authority
*I-95 North, Bensalem, Middletown,
Lower Makefiel twps.
Guide Rail Repair: LANE CLOSURE between
Woodhaven Rd & New Hope exits. 10 AM - 2 PM.
10/16/17-10/18/17 Collinson, Inc. $2.6 million
Marienstein Rd., Nockamixon,
Bridgeton twps.
Patching, Milling & Overlay: LANE RESTRICTIONS
between PA 611 (Easton Rd.) & PA 32 (River Rd.). 9
AM - 3 PM.
10/16/17-10/20/17 James D. Morrissey $3.2 million
*I-95 North, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE
CLOSURES between New Falls Rd. & Newtown-
Yardley Interchange. 7 PM - 5 AM.
10/16/17-10/20/17 James J. Anderson $29,633,134
*I-95 South, Middletown Twp. Brdige Dam and Traffic Marking Installation:
INTERMITTENT LANE CLOSURES between
Newtown-Yardley Interchange and New Falls Rd. 7
PM - 6 AM.
10/16/17-10/20/17 James J. Anderson $29,633,134
Pennsylvania Ave., Morrisville Bor. Utility Installation: LANE CLOSURE between
Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays
10/16/17-10/23/17 PECO Energy
Kumry Rd., Milford Twp. Milling & Paving: LANE RESTRICTIONS between
Sleepy Hollow Rd. & Creamery Rd. 7 AM - 5 PM.
10/16/17-10/31/17 Blooming Glen
Contractors, Inc.
$3.7 million
*I-95 North, Bensalem Twp. Traffic Sign Testing: RIGHT SHOULDER CLOSURE
between Woodhaven Rd & Street Rd. exits. 9 AM to 3
PM
10/17/17-10/18/17 Wampole-Miller, Inc. $15 million
*I-95 North, Bensalem, Bristol twps. Reset Barrier: LANE RESTRICTION between PA 413
(Veterans Hwy.) & US 1 (Lincoln Hwy.). 8 PM - 5 AM.
10/17/17-10/19/17 Pennsylvania
Turnpike Commission
$118.8 million
PA 412 N (Durham Rd.),
Nockamixon Twp.
Tree Removal: LANE RESTRICTION at Traugers
Crossing Rd. 9 AM - 3 PM
10/18/17 Bustleton Services
10/18/2017 Page 6 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
U.S. 202 North, Buckingham Twp. Guide Rail Repair: LANE CLOSURE between Ash Mill
Rd. & U.S. 263. 9 AM to 3 PM
10/19/17 Collinson, Inc. $2.6 million
Bath Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between
Bayard St. & Lower Bucks Hospital Entrance.
Weekdays. 9 AM - 3 PM.
10/23/17-11/30/17 PECO Energy
Pennsylvania Ave.,Morrisville Boro Utility Installation: LANE CLOSURE between
Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays
10/25/17-11/1/17 PECO Energy
PA 611 South, Doylestown Twp.,
Doylestown Bor.
Line Painting: RIGHT LANE CLOSED between N.
Broad St. & W. State St. 9 AM - 3 PM.
10/9/17-10/20/17 Rohm and Haas
Chemicals, LLC
PA 611 (Easton Rd.), Warrington
Twp.
Curb Ramp Installation: LANE CLOSURES at
Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison
Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol
Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;
Doylestown Plaza. 9 AM - 3 PM.
10/9/17-10/20/17 James D. Morrissey $4.3 million
Radcliffe St., Bristol Boro. Utility Installation: LANE CLOSURE between Mulberry
St. & Walnut St. Weekdays. 9 AM - 3 PM.
10/12/17-10/19/17 PECO Energy
US 13 N & S (Bristol Pike), Bristol
Twp.
Storm Pipe Installation: LANE RESTRICTIONS
between Haunted Lane & Cedar Ave. Weekdays. 9
AM - 3 PM.
9/25/17-10/27/17 Bencardino
Excavating, Inc.
$634,265.00
Jacksonville Rd., Warminster,
Northampton twps., Ivyland Bor.
Milling & Paving: LANE RESTRICTIONS between
County Line Rd. & Almshouse Rd. Weeknights. 7 PM
- 5 AM.
9/25/17-10/31/17 Blooming Glen
Contractors, Inc.
$4.4 million
N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between
Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3
PM.
9/25/17-11/15/17 Bencardino
Excavating, Inc.
$155,000.00
Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED
between PA 152 & Constitution Ave. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-11/25/18 H&K Group, Inc.
10/18/2017 Page 7 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED
between Atkinson Rd. & Windy Bush Rd. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-11/30/17 Loftus Construction,
Inc.
$6.8 million
Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED
between Creamery Rd. & Paxson Rd. 24-HOUR
CLOSURE. DETOUR POSTED.
10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00
*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332
(Yardley-Newtown Rd.) & NJ state line. 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line &
PA 332 (Yardley-Newtown Rd.). 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
PA 32 (River Rd.), Lower Makefield
Twp.
Roadwork: LANE RESTRICTIONS between Woodside
Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Woodside Rd., Lower Makefield
Twp.
Roadwork: ALTERNATING TRAFFIC between River
Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Taylorsville Rd., Lower Makefield
Twp.
Roadwork: LANE CLOSURES between Woodside Rd.
& Highland Drive. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Brownsville Rd., Middletown Twp. Utility Installation: CLOSED & DETOURED between
Broadview Ave. & Old Lincoln Hwy. Weekdays. 9 AM
- 3 PM. DETOUR POSTED.
9/13/17-10/10/17 PECO Energy
Oxford Valley Rd., Falls Twp. Uitility Installation: LANE CLOSURE between Olds
Boulevard & Queen Anne Drive. Weekdays. 9 AM - 3
PM
10/4/17-10/12/17 Township of Falls
Authority
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between Plumbridge Drive & Bath Rd./Durham Rd. 8
PM - 5 AM. DETOUR POSTED.
8/20/17-11/10/17 Pennsylvania
Turnpike Commission
$142 million
10/18/2017 Page 8 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: LANE RESTRICTIONS & 15-
MINUTE STOPPAGES between Plumbridge Drive &
Bath Rd./Durham Rd. 7 AM - 3 PM.
8/20/17-11/10/17 Pennsylvania
Turnpike Commission
$142 million
Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413
& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.
8/20/17-11/10/17 Pennsylvania
Turnpike Commission
$142 million
PA 611 (Easton Rd.), Warrington
Twp.
Utility Installation: LANE CLOSURE between Street
Rd. & Paul Valley Drive. Weekdays. 9 AM - 3 PM.
8/22/17-10/13/17 Warrington Township
Authority
$29.13 million
Main St., Dublin Bor. ADA Ramp Installation: CURB LANE RESTRICTIONS
between High St. & Manor Drive. 7 AM - 3 PM.
8/24/17-10/19/17 Dublin Borough $29.19 million
PA 263 (York Rd.), Warminster Twp. Milling & Paving: LANE CLOSURE between County
Line Rd. & Tennyson Drive. Weeknights. 7 PM - 5
AM.
8/14/17-10/31/17 Blooming Glen
Contractors, Inc.
$4.4 million
Loux Covered Bridge over Cabin
Run on Carver-Wismer Road,
Bedminster Township
CLOSED & DETOURED INDEFINITELY: Due to
structural damage sustained from an oversized vehicle
DETOUR POSTED
8/1/17-Indef.
Lower State Rd., Doylestown Twp. Multi-Use Trail Installation: LANE RESTRICTIONS
between US 202 & Memorial Drive. Weekdays. 9 AM
- 3 PM.
5/30/17-10/17/17 James D. Morrissey,
Inc.
$29.17 million
Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED
between Hieter Rd. & Wentz Rd. 24-HOUR DETOUR.
DETOUR POSTED.
2/27/17-11/10/17 Pennsylvania
Turnpike Commission
$29.10 million
Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED
between Canary Rd. & Esten Rd. 24-HOUR
DETOUR. DETOUR POSTED.
2/27/17-11/10/17 Pennsylvania
Turnpike Commission
$29.10 million
PA 152 (Limekiln Pike), Warrington,
Twp.
Utility Installation & Paving: CLOSED & DETOURED
between Westminster Drive & County Line Rd. 24-
HOUR DETOUR. DETOUR POSTED.
12/13/16-10/12/17 James D. Morrissey,
Inc.
$14.8 million
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
East Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
10/18/2017 Page 9 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between
Bristol Rd. & Sugar Bottom Rd. 24-HOUR
RESTRICTIONS.
3/17/14-10/2017 J.D. Eckman, Inc. $31.6 million
Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between
Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.
3/2/11-Indef. $29.2 million
CHESTER COUNTY
Birmingham Rd. Birmingham, East
Bradford twps.
Paving: LANE RESTRICTIONS between Old
Wilmington Pike & Lenape Rd. 6 PM - 6 AM
10/15/17-10/18/17 Allan Myers $3.7 million
Kings Hwy, West Caln, West
Brandywine, Caln, Valley twps.
Milling: LANE RESTRICTIONS between Compass Rd.
& Lincoln Hwy. 7 PM - 5 AM & 9 AM - 3 PM
10/15/17-10/20/17 Allan Myers $6.3 million
PA 162 S (Embreeville Rd.), Newlin
Twp.
Tree Removal: LANE RESTRICTION between
Brandywine Creek Rd. & Scott Rd. 9 AM - 3 PM
10/16/17 Knight Brothers
Boot Rd., East Caln Twp. Soil Borings: LANE CLOSURE between Quarry Rd. &
Southwind Lane. 9 AM - 3 PM.
10/16/17-10/18/17 Navarro & Wright
Bulltown Rd., West Nantmeal Twp. Core Boring: LANE RESTRICTIONS between Yoder
Rd. & Hedge Rd. 9 AM - 3 PM.
10/16/17-10/20/17 Pennsylvania
Turnpike Commission
Strasburg Rd., West Sadsbury Twp. Milling: LANE RESTRICTION between Limestone Rd.
& Lancaster County Line 9 AM - 3 PM
10/16/17-10/20/17 Allan Meyers $5.5 million
PA 100 N (Pottstown Pike), West
Whiteland Twp.
Utility Installation: LANE RESTRICTIONS between
Warerloo Rd. & Town Center Mall 9 AM - 3 PM
10/16/17- 10/20/17 PECO Energy
U.S. 202 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between
Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM
10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million
U.S. 422 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between
U.S. 202 & PA 23 Valley Forge Rd). 8 PM - 5 AM
10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million
Business U.S. 30 W (Lincoln
Highway), Coatesville City
Utility Installation: LANE RESTRICTIONS between
First Ave & Church St. 9 AM - 3 PM
10/16/17-12/15/17 Pennslyvania
American Water Co.
10/18/2017 Page 10 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 422 West, Lower Pottsgrove
Twp.
Bridge Construction: LANE CLOSURES between
Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7
AM - 1 PM.
10/17/17-10/18/17 J.D. Eckman, Inc. $73.3 million
PA 724 (West Scuykill Rd.) North
Coventry Twp.
Tree Removal: LANE RESTRICTIONS between Berks
County Line & Catfish Ln. 9 AM - 3 PM
10/17/17-10/20/17 Knight Brothers
PA 724 (Sckuylkill Rd), North
Coventry Twp.
Utility Installation: LANE CLOSURE between Park Ave
& Vaughn Rd. 9 AM - 3 PM
10/17/17-10/24/17 PECO Energy
Lochwood Ln, East Goshen Twp Uitility Installation: LANE CLOSURE between
Lochwood Ln. & Strasburg Ln. Weekdays. 9 AM - 3
PM
10/19/17-10/26/17 PECO Energy
Leopard Rd. Easttown Twp. Utility Installation: LANE CLOSURE between Potter
Ave & Sheffield Dr. 9 AM - 3 PM
10/27/17-11/3/17 PECO Energy
Newtown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between
Sugartown Rd. & Waterloo Rd. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
10/26/17-11/16/17 PECO Energy
Newark Rd., New Garden Twp. Widening: LANE RESTRICTIONS between New
Garden Rd. & PA 41 (Gap Newport Pike). 9 AM - 3
PM.
9/25/17-10/30/17 Allan Myers, LP $1.4 million
Woodview Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED
between Ewing Rd. & W. Woodview Rd. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-12/2/17 Walsh Construction
Company
$29.2 million
Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot
Rd. & Kind Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday
7 AM - 5 PM.
10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million
Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between King
Rd. & Constitution Drive. Mon. thru Fri. 9 AM - 3 PM.
Saturday 7 AM - 5 PM.
10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million
Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURE between US
202 & Ship Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday
7 AM - 5 PM.
10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million
PA 29 (Morehall Rd.), East
Whiteland Twp.
Widening: LANE RESTRICTIONS at Great Valley
Parkway. Weekdays. 9 AM - 3 PM.
10/2/17-11/3/17 Liberty Property, LLC $29.3 million
10/18/2017 Page 11 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Conestoga Rd., West Pikeland Twp. Utility Installation: LANE CLOSURE between Byers
Rd. & Walnut Lane. Weekdays. 9 AM - 3 PM.
10/4/17-10/11/17 PECO Energy
PA 724 (Schuylkill Rd.), East
Pikeland Twp.
Utility Installation: LANE RESTRICTIONS at Ridge Rd.
Weekdays. 9 AM - 3 PM.
10/9/17-10/24/17 PECO Energy
East Nottingham, West Nottingham,
Upper Oxford, Lower Oxford, New
London, Londonderry twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 2:30 PM.
10/10/17-10/20/17 PennDOT $29.6 million
West Evergreen St., West Grove
Bor.
Sidewalk Replacement: LANE RESTRICTIONS
between Oakland Ave. & Prospect Ave. Weekdays 9
AM - 3 PM.
10/10/17-10/24/17 Flyway Excavating
Business US 30 West, City of
Coatesville
Utility Installation: LANE RESTRICTIONS between
First Ave. & Church St. Weekdays. 9 AM - 3 PM.
10/10/17-12/15/17 Pennsylvania
American Water
Company
PA 100 South (Pottstown Pike),
West Whiteland Twp.
Adjust Manhole Covers: LANE CLOSURES between
Commerce Drive & Lincoln Hwy. Weekdays. 9 AM -
3 PM.
10/11/17-10/19/17 Verizon
PA 282 (Wallace Ave.),
Downingtown Bor.
Sidewalk Installation: LANE SHIFT between
Pennsylvania Ave. & US 30 (Lancaster Ave.).
Weekdays. 9 AM - 3 PM.
9/11/17-11/30/17 Downingtown
Borough
US 1 North, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between PA
41 (Gap Newport Pike) & Newark Rd. 24-HOUR
RESTRICTIONS.
9/6/17-11/7/17 Loftus Construction,
Inc.
$5.5 million
US 1 South, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between
Newark Rd. & PA 41 (Gap Newport Pike). 24-HOUR
RESTRICTIONS.
8/7/17-11/7/17 Loftus Construction,
Inc.
$5.5 million
West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.50
10/18/2017 Page 12 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.50
Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4
PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.00
PA 23 (Ridge Rd.), East Pikeland
Twp.
Utility Installation: CLOSED & DETOURED between
Hares Hill Rd. & PA 724 (Schuylkill Rd.). 24-HOUR
DETOUR. DETOUR POSTED.
5/15/17-11/15/17 Toll Brothers $29.15 million
PA 352 (Chester Rd.), East Goshen
Twp.
Pipe Installation: TRUCK DETOUR at Boot Rd. 24-
HOUR CLOSURE. DETOUR POSTED.
5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million
Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green
Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.
3/3/17-Indef. Maintenance $29.3 million
*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES
between PA 724 (Schuylkill Rd.) & Sanatoga
interchanges. 9 AM - 2 PM & 5 PM - 5 AM.
12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million
*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES
between Sanatoga & PA 724 (Schuylkill Rd.)
interchanges. 7 PM - 1 PM.
12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million
Hollow Rd., West Vincent, East
Vincent twps.
Bridge Damage: CLOSED & DETOURED between
French Creek Rd. & Pughtown Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/20/16-Indef. PennDOT
Ross Fording Rd., West Fallowfield
Twp.
Bridge Damage: CLOSED & DETOURED between
Creek Rd. & Bryson Rd. 24-HOUR DETOUR.
DETOUR POSTED.
7/2/15-Indef. PennDOT $29.2 million
PA 724 ramp to US 422 East, East
Coventry Twp.
Ramp/Bridge Construction: RAMP CLOSED &
DETOURED. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, North Coventry
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
10/18/2017 Page 13 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 422 E & W, North Coventry
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
DELAWARE COUNTY
Springfield Rd., Upper Darby,
Springfield twps.; Collingdale, Aldan
Clifton Heights bors.
Milling & Paving: LANE RESTRICTIONS between
MacDade Blvd. & Netherwood Drive. 7 PM - 5 AM
and 9 AM - 3 PM
10/15/17-10/20/17 Highway Materials,
Inc.
$2.5 million
Upland Ave/22nd St. Upland Boro.
Chester City
Asphalt Paving Adjustments: LANE RESTRICTIONS
between Upland St. & Melrose St. 9 AM - 3 PM.
10/16/17-10/20/17 Allan Myers $7.2 million
*I-476 N & S, Radnor, Haverford,
twps.
ITS Fiber Installation & Splicing: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
10/16/17-10/20/17 Wampole-Miller, Inc. $15 million
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM
10/16/17-10/21/17 Neshaminy
Constructors, Inc.
$3.7 million
*I-95 N & S, Lower Chichester,
Upper Chichester, Chester, Upland,
Ridley, Tinicum twps. Chester City
Large Sign Maintenance: LANE CLOSURES between
PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5 AM
10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million
Sweetwater Rd., Thornbury,
Edgemont twps.
Mill & Base Repair: LANE RESTRICTIONS between
Valley Rd. & Creek Rd. 6 PM - 6 AM
10/19/17 Allan Myers $4,098,777.00
*I-95 S on ramp from Edgmont Ave Painting/Inspection: CLOSE I-95 SB ON RAMP
between Edgemont Ave & I-95 9 AM to 3 PM
10/23/17-10/27/17 South State, Inc. $16.6 million
Bryn Mawr Ave., Radnor Twp. Utility Installation: LANE RESTRICTIONS at Wootton
Rd. 9 AM - 3 PM.
10/25/17-10/27/17 Aqua Pennsylvania
*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER
CLOSURES between I-476 & PA 352/320. 10 PM - 5
AM.
10/9/17-10/20/17 South State, Inc. $16.6 million
10/18/2017 Page 14 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-476 N & S, Radnor, Haverford,
Marple twps.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
10/9/17-10/20/17 Wampole-Miller, Inc. $15 million
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM
10/9/17-10/13/17 Neshaminy
Constructors, Inc.
$3.7 million
PA 3 (West Chester Pike),
Haverford, Upper Darby twps.
Curb Ramp Reconstruction: LANE CLOSURE at Brief
Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal
Square & Pennock Ave. 9 AM - 3 PM.
10/9/17-10/20/17 L.C. Costa
Contractors, Inc.
$5.9 million
PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at
Chatham Rd.; Forge Rd.; Copley Rd.; Terminal
Square & Millbourne Ave. 9 AM - 3 PM.
10/9/17-10/20/17 L.C. Costa
Contractors, Inc.
$5.9 million
E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at
1st St.; 2nd St.; Baltimore St. & E. Baltimore St.;
Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose
Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave.
& Third St. 9 AM - 3 PM.
10/9/17-10/20/17 L.C. Costa
Contractors, Inc.
$7.2 million
Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at
Diamond St.; Madison St.; Woodlawn Ave.; Clifton
Ave. & Broadway Ave. 9 AM - 3 PM.
10/9/17-10/20/17 L.C. Costa
Contractors, Inc.
$4.1 million
US 1 (Baltimore Ave.), Clifton
Heights Bor.
Curb Ramp Reconstruction: LANE CLOSURES at
Church St.; Marple Ave.; Jackson Ave.; Springfield
Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.
10/9/17-10/20/17 L.C. Costa
Contractors, Inc.
$4.1 million
Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at
Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin
Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.
10/9/17-10/20/17 Lenni Electric $4.1 million
Baltimore Ave., Upper Darby Twp.,
Lansdowne Bor.
Traffic Signal Upgrade: LANE RESTRICTIONS
between Lansdowne Ave.; Penn Blvd./4th St.;
Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church
Lane. 9 AM - 3 PM.
10/9/17-10/20/17 Lenni Electric $4.1 million
10/18/2017 Page 15 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Baltimore Ave., Clifton Heights Bor.,
Upper Darby Twp.
Road Widening: LANE RESTRICTIONS at Springfield
Rd.; Church Lane; Delmar Drive; Diamond St. & Home
Depot Drive. 9 AM - 3 PM.
10/9/17-10/20/17 Lenni Electric $4.1 million
*US 322 E & W (Conchester Hwy.),
Concord Twp.
Reconstruction & Road Widening: PERIODIC LANE
RESTRICTIONS between US 1 (Baltimore Pike) & PA
261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM
Saturday
10/9/17-10/14/17 J.D. Eckman, Inc. $62.7 million
U.S. 1, Middletown, Upper
Providence, Marple twps.
Large Sign Maintenance: LANE CLOSURES between
PA 352 (Middletown Rd.) & PA 320 (Sproul Rd.). 8
PM - 5 AM
10/9/17-10/14/17 Carr & Duff, Inc. $2.1 million
Radnor, Haverford, Upper Darby,
Springfield, Marple, Newtown twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 2:30 PM.
10/10/17-10/20/17 PennDOT
County Line Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS at
Glenbrook Ave. Weekdays. 9 AM - 3 PM.
10/11/17-10/16/17 Aqua Pennsylvania
Barren Rd. Middletown Twp. Utility Installation: LANE CLOSURES between Devon
Lane & County Village Way. Weekdays. 9 AM - 3
PM.
10/11/17-10/20/17 PECO Energy
Naamans Creek Rd., Concord Twp. Utility Installation: LANE CLOSURES between Pyle
Rd. & Shavertown Rd. Weekdays. 9 AM - 3 PM.
10/13/17-10/20/17 PECO Energy
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: SIDEWALK CLOSED
between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour
Closure
10/2/17-12/6/17 Neshaminy
Constructors, Inc.
$3.7 million
Goshen Rd., Newton Twp. Utility Installation: ROAD CLOSURE WITH DETOUR
between Newton Street Rd. & Butler Dr. 9 AM - 3 PM.
DETOUR POSTED.
10/4/17-10/20/17 Aqua Pennsylvania
Bethel Rd., Concord Twp. Curb Installation: LANE RESTRICTIONS between
Smithbridge Rd. & Featherbed Lane. Weekdays. 9
AM - 3 PM.
10/5/17-11/17/17 Valley Point Church
10/18/2017 Page 16 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Sugartown Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS between
Poplar Ave. & Longwood Drive. Weekdays. 9 AM - 3
PM.
9/25/17-10/27/17 Aqua Pennsylvania $29.27 million
Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between S.
Devon Ave. & Lenoir Ave. 8:30 AM - 3 PM. DETOUR
POSTED.
9/25/17-10/31/17 PECO Energy $29.31 million
Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED
between 12th St. & 13th. DETOURED POSTED.
9/25/17-1/11/18 South State, Inc. $16.8 million
Baltimore Pike, Springfield Twp. Conduit Repair: LANE RESTRICTIONS between East
Woodland Ave. & Thomson Ave. Weekdays. 9 AM -
3 PM.
9/18/17-10/13/17 Verizon $29.13 million
Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest
Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9
AM - 3 PM.
9/5/17-10/13/17 Aqua Pennsylvania
Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between
Glendale Rd. & Township Line 9 AM - 3 PM
Weekdays
9/5/17-10/27/17 Aqua Pennsylvania
S. Oak Ave., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between
Baltimore Pike & Providence Rd. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
9/11/17-11/17/17 Aqua Pennsylvania
Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between
Lansdowne Ave. & PA 3 (West Chester Pike).
Weekdays. 9 AM - 3 PM. DETOUR POSTED.
9/11/17-11/17/17 Aqua Pennsylvania
Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between
MacDade Blvd. & PA 13 (Chester Pike). Weekdays.
9 AM - 3 PM. DETOUR POSTED.
8/22/17-11/24/17 Aqua Pennsylvania
Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between
13th St. & 12th St. 24-HOUR DETOUR. DETOUR
POSTED.
8/14/17-2/14/18 South State, Inc. $16.6 million
Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between
Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR
DETOUR. DETOUR POSTED.
8/7/17-10/20/18 Road-Con, Inc. $29.20 million
10/18/2017 Page 17 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Creek Rd., Middletown Twp. Pipe Installation: LANE CLOSURE between Duttons
Mill Rd. & W. Knowlton Rd. 24-HOUR
RESTRICTIONS.
8/1/17-10/15/17 Sunoco Pipeline L.P. $29.15 million
Chester Creek Rd., Middletown
Twp., Brookhaven Bor.
Utility Installation: CLOSED & DETOURED between
Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -
5 PM. DETOUR POSTED.
7/12/17-12/31/17 Middletown Township
Sewer Authority
$29.31 million
Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED
between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-
HOUR DETOUR. DETOUR POSTED.
6/20/17-10/20/17 South State, Inc. $16.6 million
Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between
Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.
6/12/17-11/3/17 Aqua Pennsylvania
S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED
between PA 320 (Sproul Rd.) & S. Ithan Ave.
5/30/17-12/15/17 Loftus Construction,
Inc.
$7.5 million
Creek Rd., Middletown Twp.,
Brookhaven Bor.
Pipe Installation: CLOSED & DETOURED between
Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -
5 PM. DETOUR POSTED.
5/15/17-12/31/17 Middletown Township
Sewer Authority
Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &
12th St.
3/27/17-11/29/17 South State, Inc. $16.6 million
*US 322 E & W (Conchester Hwy.),
Concord Twp.
Reconstruction & Road Widening: PERIODIC LANE
RESTRICTIONS between US 1 (Baltimore Pike) &
Clayton Park Drive. Weekdays. 9 AM - 3 PM & 7 PM -
6 AM.
3/20/17-10/20/17 J.D. Eckman, Inc. $62.7 million
College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED
between Spring Mill Rd. & Haverford Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/29/16-5/2018 Road-Con, Inc. $5.2 million
MONTGOMERY COUNTY
*I-76 E & W, West Conshohocken
Bor., Upper Merion, Lower Merion
twps.
Milling & Concrete Patching: LANE CLOSURES
between US 202 & US 1 (City Ave.) 9 PM - 9 AM.
10/13/17-10/14/17 J.D. Eckman, Inc. $21.1 million
*I-76 E & W, West Conshohocken
Bor., Upper Merion, Lower Merion
twps.
Milling & Concrete Patching: LANE CLOSURES
between US 202 & US 1 (City Ave.) 9 PM - 9 AM.
10/13/17-10/14/17 J.D. Eckman, Inc. $21.1 million
10/18/2017 Page 18 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Linfield Trappe Rd, Limerick Twp Base Repair: CLOSED between Township Line Rd &
Lewis Rd, Red Arrow Detour
8 PM to 5 AM
10/15/17 Maintenance
PA 611 (Old York Rd.), Abington
Twp.
Bridge Work: LANE RESTRICTIONS between Jericho
Rd. & Hamilton Ave. 9 AM - 3 PM. & 9 PM - 5 AM
10/15/17-10/20/17 J.D. Eckman, Inc. $3.6 million
US 422 East, Upper Merion, West
Norriton twps.
Bridge Steel Erection & Bridge Demolition: SINGLE
LEFT/RIGHT LANE CLOSURES & 15-MINUTE
STOPPAGES between US 202 & Trooper Rd.
Interchanges. 7 PM - 5 AM.
10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million
US 422 West, Upper Merion, West
Norriton twps.
Bridge Steel Erection & Bridge Demolition: SINGLE
LEFT/RIGHT LANE COSURES & 15-MINUTE
STOPPAGES between US 202 & Trooper Rd.
Interchanges. 9 PM - 6 AM.
10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Milling & Concrete Patching: LANE CLOSURES
between US 202 & US 1 (City Ave.) 9 PM - 5 AM & 9
PM - 9 AM (weekends)
10/15/17-10/21/17 J.D. Eckman, Inc. $21.1 million
*I-76 E & W, Lower Merion Twp. Surveying: RIGHT LANE AND SHOULDER
CLOSURE between Belmont Ave/Green Lane & City
Ave. exits 9 AM - 11 AM
10/16/17 Dawood Engineering
U.S. 422 W, Limerick Twp. Concrete Patching: RIGHT LANE CLOSURES
between Township Line Rd & Lewis Rd. 9 AM - 3 PM.
10/16/17-10/17/17 Maintenance
Eagleville Rd, Lower Providence Twp Base Repair: CLOSED between Ridge Pike & South
Park Ave, Red Arrow Detour
8 PM to 5 AM
10/16/17-10/17/17 Maintenance
Main St. Royersford Boro Curb, Sidewalk Installation: LANE CLOSURE between
3rd Ave & 4th Ave. 6 AM - 4 PM
10/16/17- 10/20/17 Borough of
Royersford
PA 73 (Skippack Pike), Whitpain
Twp.
Pavement Cores and Roadway Borings: LANE
CLOSURES between Crestline Drive & Cathcart Rd.
9 AM - 3 PM.
10/16/17-10/20/17 Applied Geoscience
& Engineering, Inc.
10/18/2017 Page 19 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Meyers Rd., Perkiomen Twp. Grading and Subbase: LANE RESTRICTIONS
between Seitz Rd. & Miller Rd. 9 AM - 3 PM.
10/16/17-10/20/17 H&K Group, Inc. $11.3 million
PA 29 (Gravel Pike), Perkiomen
Twp.
Pole Relocations: LANE RESTRICTIONS between
Miller Rd. & Harrison Ave. 9 AM - 3 PM.
10/16/17-10/20/17 H&K Group, Inc. $11.3 million
*I-476 N & S, West Conshohocken
Bor.
ITS Fiber Installation & Splicing: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
10/16/17-10/20/17 Wampole-Miller, Inc. $15 million
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams
St.;Franklin St.; Madison St.& Washington St. 9 AM -
3 PM.
10/16/17-10/20/17 Road-Con, Inc. $13.3 million
PA 320 S (Gulp Rd) Survey Operation: LANE CLOSURE between Trinity
Rd., I-76, Upper Gulph Rd. interchanges 9 AM - 3 PM
10/16/17- 10/20/17 Susquehanna Civil
Inc.
*I-76 E & W, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between
PA 320 (Swedeland Rd.) & PA Turnpike 8 PM - 5 AM
10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million
Layfayette Ave., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between
Layfayette Ave. Connector & PA 73 (Skippack Pike).
Weekdays. 9 AM - 3 PM.
10/16/17-11/30/17 Ambler Borough
Water Department
U.S. 202 N & S, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between
Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM
10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million
*I-76 W, Lower Merion Twp. Surveying: LANE CLOSURE between Belmont
Ave/Green Lane & City Ave. exits 9:45 AM - 2 PM
10/17/17 Dawood Engineering
*I-76 E & W, Lower Merion Twp. Surveying: RIGHT LANE AND SHOULDER
CLOSURE between Belmont Ave/Green Lane & City
Ave. exits 10 AM - 2 PM
10/18/17 Dawood Engineering
U.S. 422 E, Lower Providence Twp. Concrete Patching: LEFT LANE CLOSURES between
Egypt Rd. & Trooper Rd. 9 AM - 3 PM.
10/18/17-10/19/17 Maintenance
Gravel Pike (PA 29), Perkiomen Twp Base Repair: CLOSED between Skippack Pike (PA
73) & Bridge Rd, Red Arrow Detour
8 PM to 5 AM
10/18/17-10/19/17 Maintenance
10/18/2017 Page 20 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
S. Trooper Rd., West Norriton Twp. Trench Restoration: LANE RESTRICTIONS between
Blvd. of the Generals & William Penn Drive. 7 PM - 2
AM.
10/19/17 Sunesys, LLP
PA 663 (King St.), Pottstown Bor, Railroad Crossing Replacement: CLOSED AND
DETOURED between PA 100 (Pottstown Pike) &
Manatawny St. 24 HOUR CLOSURE
10/20/17-10/23/17 Colebrookdale
Railroad
PA 309 (Bethlehem Pike), Colmar
Twp.
Curb & Inlet Work: RIGHT LANE CLOSED between
Hilltown Pike & Triwigtown Rd. Weekdays. 9 AM - 3
PM.
10/20/17-10/27/17 A. Amsterdam
Conshocken State Rd., Lower
Merion Twp.
Bridge work: LANE RESTRICTION at Mill Creek Rd. 9
AM - 3 PM
10/23/17-10/25/17 Montgomery County
Evansburg Rd., Skippack Twp. Utility Installation: LANE RESTRICTIONS between
Township Line Rd. & Reagan Drive. 9 AM - 3 PM.
10/23/17-10/27/17 North Penn Water
Authority
PA 113 (Harleysville Pike), Lower
Salford Twp.
Utility Installation: LANE RESTRICTIONS between PA
63 (Sumneytown Pike) & Oak Drive. Weekdays. 9
AM - 3 PM.
10/23/17-11/30/17 PECO Energy
Old Forty Foot Rd., Lower Salford
Twp.
Bridge Rehabilitation: CLOSED AND DETOURED
between Township Line Road & Kober Road
WEEKDAYS 7 AM - 4 PM
10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million
Washington Lane, Lower Moreland
Twp.
Utility Installation: LANE CLOSURE between Welsh
Rd. & Holcomb Rd. 9 AM - 3 PM. Weekdays. 9 AM -
3 PM.
10/11/17-10/18/17 PECO Energy
Norristown, Upper Providence,
Lower Providence, Limerick,
Whitemarsh twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 3 PM.
10/10/17-10/20/17 PennDOT $29.6 million
Kepler Rd., Pottsgrove Twp. Utility Installation: LANE CLOSURE between Doe Run
Lane & Wooded Way. Weekdays. 9 AM - 3 PM.
10/10/17-10/17/17 PECO Energy
*I-476 N & S, Lower Merion Twp.,
West Conshohocken Bor.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
10/9/17-10/20/17 Wampole-Miller, Inc. $15 million
10/18/2017 Page 21 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams
St.;Franklin St.; Madison St.& Washington St. 9 AM -
3 PM.
10/9/17-10/20/17 Road-Con, Inc. $13.3 million
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at
Washington St. 9 AM - 3 PM.
10/9/17-10/20/17 Road-Con, Inc. $13.3 million
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at
Madison St. 9 AM - 3 PM.
10/9/17-10/20/17 Road-Con, Inc. $13.3 million
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin
St. 9 AM - 3 PM.
10/9/17-10/20/17 Road-Con, Inc. $13.3 million
Flint Hill Rd., Upper Merion Twp. Sidewalk Installation: LANE CLOSURE between
Brentwood Court & Hertzog Blvd. 9 AM - 3 PM.
10/9/017-10/20/17 GEI Enterprises Inc. $29.29 million
Bethlehem Pike, Springfield Twp. Utility & Sidewalk Installation: LANE RESTRICTIONS
between Windsor Rd. & Rich Ave. Weekdays. 9 AM -
3 PM.
10/9/17-10/20/17 Springfield Township
Authority
West Main St., West Norriton Twp. Curb Removal: LANE RESTRICTIONS at Schuylkill
Ave. Weekdays. 9 AM - 3 PM.
10/2/17-10/20/17 L.F.T. Realty $29.20 million
Sandy Hill Rd., Plymouth Twp. Milling and Paving: LANE RESTRICTIONS between
Fairfield Rd. & Rollin Hill Dr. Weekdays 7 PM - 5 AM
10/2/17- 10/27/17 Glasgow, Inc. $4.5 million
Edge Hill Rd., Upper Moreland Twp. Utility Installation: LANE CLSOURE between Quigley
Ave & Moreland Rd. 9 AM - 3 PM Weekdays
10/3/17-10/10/17 PECO Energy
Joshua Rd., White Marsh Twp. Pipeline Repair: LANE CLOSURE between Flower
Town Rd & Stenton Ave. 6 PM - 6 AM
10/3/17-10/14/17 Sunoco Pipeline L.P.
Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between
Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3
PM.
10/2/17-11/16/17 Pennsylvania
American Water
Company
10/18/2017 Page 22 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Gypsy Lane, Upper Merion Twp. Bridge Deck Reconstruction: CLOSED & DETOURED
between South Gulph Rd. & Hughes Rd. Weekdays.
24-HOUR DETOUR. DETOUR POSTED.
10/2/17-11/15/17 Loftus Construction,
Inc.
$5.5 million
Cowpath Rd., Telford Bor. Bridge Rehabilitation: CLOSED & DETOURED
between Hollow Rd. & Barndt Rd. 24-HOUR
CLOSURE. DETOUR POSTED.
10/4/17-11/3/17 Loftus Construction,
Inc.
$5.5 million
N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between
Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3
PM.
9/27/17-11/15/17 Bencardino
Excavating, Inc.
$155,000.00
Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between
Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3
PM.
9/26/17-11/30/17 Aqua Pennsylvania
PA-113 (3rd Ave./Rahns Rd), Trappe
Borough, Perkiomen Twp.
Milling and Paving: LANE RESTRICTIONS between
Boro Line Road and PA-29 (Gravel Pike). 7 PM - 5
AM.
9/18/17-10/13/17 Glasgow, Inc. ECMS 107861
Bleim Rd., Lower Pottsgrove Twp. Utility Installation: LANE RESTRICTIONS between
New Hanover Square Rd. & Pleasantview Rd. 9 AM -
3 PM. Saturdays. 7 AM - 7 PM.
9/22/17-10/20/17 Borough of Pottstown
Church Rd., Upper Merion Twp. Utility Installation: CLOSED & DETOURED between
Gulph Ridge Rd. & Henderson Rd. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
9/11/17-10/31/17 Aqua Pennsylvania
Cheltenham Ave., Cheltenham Twp. Utility Installation: LANE RESTRICTIONS between
Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.
8/30/17-11/2/17 PECO Energy
Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between
Washington Lane & York Rd. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
8/24/17-12/29/17 Aqua Pennsylvania
PA 363 (Trooper Rd.), Lower
Providence Twp.
Road Widening & Utility Installation: LANE
RESTRICTIONS between Eisenhower Ave. &
Shannondell Blvd. Weeknights. 7 PM - 5 AM.
7/17/17-11/30/17 Forge 20 LLC
10/18/2017 Page 23 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
Matsonford Rd., Upper Merion,
Lower Merion twps.
Bridge Repair: CLOSED & DETOURED between
Montgomery Ave. & Old Gulph Rd. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
7/10/17-10/27/17 SEPTA
PA 23 ramp to US 422 East, Upper
Merion, West Norriton twps.
Ramp Reconstruction: RAMP CLOSED &
DETOURED. 24-HOUR DETOUR. DETOUR
POSTED.
7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million
W. Wynnewood Rd, Lower Merion
Twp.
Utility Installation: LANE RESTRICTIONS between E.
County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3
PM.
6/5/17-10/27/17 Aqua Pennsylvania
Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at
Pleasantview Rd.; N. Washington St. & Mervine St. 9
AM - 3 PM.
5/30/17-10/20/17 Highway Materials,
Inc.
$4.8 million
Mervine St., Lower Pottsgrove Twp,
Pottstown Bor.
Curb Ramp Construction: LANE CLOSURE at N.
Franklin St. 9 AM - 3:30 PM.
5/30/1710/20/17 Highway Materials,
Inc.
$4.8 million
Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED
between PA 29 (Gravel Pike) & PA 73 (Skippack
Pike). 24-HOUR DETOUR. DETOUR POSTED.
5/2/17-10/2017 H&K Group, Inc. $11.3 million
Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED
between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR
DETOUR. DETOUR POSTED.
5/2/17-5/2019 H&K Group, Inc. $11.3 million
PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS
between PA 113 (Harleysville Pike) & Carrie Lane.
Weekdays. 9 AM - 3 PM.
3/15/17-11/1/17 Lower Salford
Township
$29.1 million
*US 422 East, Lower Pottsgrove
Twp.
Road & Bridge Construction: LANE CLOSURES
between PA 724 (Schuylkill Rd.) & Sanatoga
Interchanges. 5 PM - 5 AM.
1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million
*US 422 West, Lower Pottsgrove
Twp.
Road & Bridge Construction: WEEKEND LANE
CLOSURES between Sanatoga & PA 724 (Schuylkill
Rd.) Interchanges. 7 PM - 1 PM.
1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million
Edge Hill Rd., Abington Twp. Bridge Rehabilitation: CLOSED & DETOURED
between Ferndale Ave. & Hamilton Ave. 24-HOUR
DETOUR. DETOUR POSTED.
1/9/17-11/1/17 J.D. Eckman, Inc. $3.6 million
10/18/2017 Page 24 of 25
LOCATION RESTRICTION DATE CONTRACTOR COST
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
Baligomingo Rd., West
Conshohocken Bor.
Slope Stabilization: CLOSED & DETOURED between
PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.
DETOUR POSTED.
6/27/15-Indef. $29.27 million
PA 724 ramp to US 422 East, Lower
Pottsgrove Twp.
Roadwork: RAMP CLOSED & DETOURED. 24-
HOUR CLOSURE. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, Lower Pottsgrove
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
Interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, West Pottsgrove
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS
between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM
Fridays. 24-HOUR CLOSURE. DETOUR POSTED.
5/9/14-12/29/17 Valley Forge National
Historical Park
$29.29 million