  • Data Collection Survey on Renewable Energy Development in Pakistan Final Report

    January 2013 119 Nippon Koei Co., Ltd.

    Source: Prepared by JICA Study Team based on the Map by Irrigation and Power Department, Government of Punjab

    Figure 8.3.1-2 Location Map of Field Survey on Small Hydro Power Potential Sites

    1

    (7) #651 L.B.D.C. RD 285+454

    (6) #650 L.B.D.C. RD 258+654

    (5) #647 L.B.D.C. RD 161+732 (Renala Khurd)

    (2) #628 B.S. Link Main Line RD 0+000(3) #643 L.B.D.C. RD 0+000

    (1) #627 Balloki Hydropower

    (4) #602 (ADB-5) Q.B Link RD 304+985

    (9) #545 LCC Main LineJhang Branch Upper RD 68+830

    (8) #544 LCC Main LineJhang Branch Upper RD 37+025

    (10) #597 (ADB-3) Qaiderabad Barrage RD 0+000 (LCC)

    (13) #490 (ADB-1) LCC RD 0+000(14) #485 (ADB-2) New Khanki Barrage

    (11) #376 B.R.B.D. Link Canal RD 0+000(12) #392 (ADB-4) UCC RD 133+296

    (15) #2 Thal Main Line UpperRD 0+000

    (16) #5 Thal Main Line Lower RD 0+000(17) #11 Dullewala Branch RD 0+000(18) #3 Mahajir Branch RD 0+000(19) #13 Kundian Disty RD 0+000

  • Data Collection Survey on Renewable Energy Development in Pakistan Final Report

    January 2013 120 Nippon Koei Co., Ltd.

    Table 8.3.1-1 Summary of Field Survey of Small Hydro Power in Northern Punjab

    Day Date

    SiteNo.

    NaturalRiver /Canal

    Type ofP/NP *3)

    Sr. #of PPDB

    List

    Source ofRiver

    Barrage Canal System CanalR.D.1000

    FT.

    Latitude (N)Longitude (E)Measured by

    GPS

    Province DistrictName of City

    / TownDistance from

    CityList Data /Field Data

    Head(m)

    Discharge(m3/s)

    Power(InsalledCapacity)

    (MW)

    AverageAnnualEnergy(GWh)

    PlatFactor

    (%)

    Cost perMW

    (MillionUS$/MW)

    Stage ofStudy

    Notes JudgeRank by

    PPDB List

    31o 13.208' 83 km PPDB List 4.00 129.00 4.128

    73o 51.709' from Lahore Field Data 4.00 0.00 0.000 Not Perennial Flow to D/S X

    31o 13.208' 83 km PPDB List 0.74 523.86 3.101

    73o 51.709' from Lahore Field Data 2.52 240.00 4.838 New B.S. Link Barrage will be constructed O

    31o 13.208' 83 km PPDB List 0.67 278.00 1.490

    73o 51.709' from Lahore Field Data 0.95 193.00 1.467 Good condition, P/H will be in canal. O

    31o 32.007' 144 km PPDB List 2.08 450.00 7.48873o 56.483' from Lahore ADB F/S 2.04 450.00 7.684 Proposed P/H will be in canal O

    Field Data 1.92 320.00 4.915 Good site condition and design O

    30o 53.002' 123 km PPDB List 2.03 220.00 3.573Existing off-grid HPP 1.1 MW was operatedby WAPDA.

    73o 35.621' from Lahore Field Data - - -F/S for Upgradeing HPP (Total 4MW) willbe finished in Dec.2012 by WAPDA.

    O

    30o 45.556' 145 km PPDB List 1.98 195.00 3.08973o 19.742' from Lahore Field Data 2.09 116.35 1.945 Good site condition in Right Bank O30o 42.981' 155 km PPDB List 1.66 193.00 2.56373o 15.634' from Lahore Field Data 1.87 111.00 1.661 Good condition, P/H will be in canal. O

    31o 53.593' 124 km PPDB List 2.11 83.93 1.417

    73o 31.802' from Lahore Field Data 0.36 98.10 0.283 Low head (small potential) X

    31o 52.823' 270 km PPDB List 2.15 82.00 1.410 F/S by Alka Power (PVT) Limited

    73o 25.966' from Lahore Field Data 1.82 87.75 1.278 F/S by Alka Power (PVT) Limited O

    32o 19.785' 198 km PPDB List 3.83 700.00 21.44873o 40.925' from Lahore ADB F/S 3.68 700.00 23.000 Proposed P/H will be at right bank

    Field Data 5.04 0.00 0.000 Not Perennial Flow to D/S

    32o 21.689' 152 km PPDB List 1.76 203.76 2.869

    from Lahore Tarakai F/S 1.93 156.00 1.916

    74o 17.627' Field Data 0.61 83.50 0.407 Low head (small potential)

    32o 21.446' 139 km PPDB List 2.45 476.86 9.34674o 17.484' from Lahore ADB F/S 2.39 170.00 3.580 Proposed P/H will be in canal

    Field Data 3.23 10.00 0.258 Not Perennial Flow to D/S 32o 24.150' 128 km PPDB List 3.60 240.00 6.912

    73o 58.230' from Lahore ADB F/S 3.57 240.00 7.550Proposed P/H will be in New Lower ChenabCanal

    Field Data 2.42 159.42 3.086 (after construction of New Khanki Barrage) 32o 24.901' 128 km PPDB List 2.47 600.00 11.856

    73o 58.135' from Lahore ADB F/S 2.62 600.00 14.090Proposed P/H will be at right bank ofproposed New Khanki Barrage

    Field Data 2.29 0.00 0.000 Not Perennial Flow to D/S 32o 54.940' 278 km PPDB List 1.97 283.45 4.46771o 31.650' from Islamabad Field Data 0.64 147.67 0.756 Low head (small potential) X32o 30.615' 265 km PPDB List 1.52 144.13 1.75371o 33.248' from Islamabad Field Data 1.21 127.96 1.239 Good condition, P/H will be in canal. O32o 30.615' 265 km PPDB List 1.92 24.60 0.37871o 33.248' from Islamabad Field Data 2.05 19.20 0.315 Small discharge (Low Potential) X32o 30.615' 265 km PPDB List 2.11 41.42 0.69971o 33.248' from Islamabad Field Data 2.42 29.90 0.579 Small discharge (Low Potential) 32o 30.615' 265 km PPDB List 1.65 1.84 0.02471o 33.248' from Islamabad Field Data 1.15 1.70 0.016 Small discharge (Low Potential) X32o 30.615' 265 km PPDB List - - -71o 33.248' from Islamabad Field Data 3.41 0.00 0.000 Not Perennial Flow to D/S X

    Source : Prepared by JICA Study Team based on PPDB Hydro Power Potential List.*1) : Feasibility Studies of Hydel Power Stations in Punjab (Task 2), Asian Development Bank (ADB) for the Renewable Energy Development Sector Investment Program, Government of Punjab (GOP), National Engineering Service Pakistan (NESPAK), 2011.*2) : 2MW Hydropower Project on BRBD Canal RD0+000, Feasibility Report, Government of the Punjab Department of Energy, PPDB, Taraki Energy (PVT) Limited, July 2011.

    Note: *3) : P = Perennial, means the canal operates for 11 months a year., NP = Not Perennial.

    -Mianwali Mianwalli

    Identified -Mianwalli

    Identified

    20 Canal NP - Escape Channel 0+000 Punjab

    Punjab Mianwali19 Canal P 13 Kundian Disty 0+000

    Identified

    18 Canal P 3 Mahajir Branch 0+000 Punjab Mianwali Mianwalli

    11 Mianwalli

    Identified 18

    Thal Main LineUpper

    Main Line Lower 0+000 Punjab Mianwali Mianwalli

    Dullewala Branch 0+000 Punjab Mianwali

    Identified 20

    -

    7 16-Nov-2012 Fri.

    Thal Main.Lineupper

    0+000 Punjab MianwaliCanal P 2 INDUS JinnahThal Main LineUpper

    16 Canal P 5

    INDUS Jinnah

    17 Canal P

    F/S *1) 3

    6 15-Nov-2012 Thu. 15

    at Proposed NewKhanki Barrage

    Punjab Gujrat Maggowal 38.34

    Identified 8Mari Indus

    5

    F/S *1) 2

    14 NaturalRiver NP485

    ADB-2CHENAB Khanki

    New KhankiBarrage

    Lower ChenabCanal (LCC)

    Gujranwala Mansurwali 43.61 65.94 4.04CHENAB KhankiLower ChenabCanal (LCC) (RD0+000)

    Lower ChenabCanal (LCC)

    0+000 Punjab

    31.06 3.56

    4.26 F/S *1)KhankiUpper ChenabCanal (UCC) (RD133+296)

    Upper ChenabCanal (UCC)

    133+296 Punjab Sialkot

    4 13-Nov-2012

    14-Nov-2012 Wed.

    13 Canal P 490ADB-1

    12.39

    17.19

    50.60 4.94 F/S *2) 13

    12 Canal NP 392ADB-4 CHENAB

    B. R. B. D. LinkCanal

    0+000 Punjab Sialkot DaskaCanal P 376 CHENAB Marala

    Bombanwala RaviBedian Diapur (B.R. B. D.) LinkCanal

    4Daska 54.76

    10 NaturalRiver NP597

    ADB-3CHENAB Khanki

    Tue.

    11

    10Lower Chenab Cnal(L.C.C) MAINLINE

    Jhang BranchUpper

    68+830 Punjab Hafizabad Sukheke

    1Qaiderabad BarrageLower ChenabCanal (LCC)

    at QaiderabadBarrage 0+000

    PunjabMandi

    BahaddinPhalia 54.53 27.06 3.20 F/S *1)

    11

    9 Canal P 545 CHENAB Khanki

    37+025(37/38))

    Punjab Hafizabad KalekeP 544 CHENAB KhankiLower Chenab Cnal(L.C.C) MAINLINE

    Jhang BranchUpper

    Identified

    Identified 14

    3 12-Nov-2012 Mon.

    8 Canal

    Punjab Shahiwal Shahiwal

    2 11-Nov-2012 Sun.

    Identified

    Okara IdentifiedBallokiLower Bari DoabCanal

    L.B.D.C 258+654 Punjab Okara

    7 Canal P 651 RAVI Balloki Lower Bari DoabCanal L.B.D.C 285+454

    Identified 7

    6 Canal P 650 RAVI

    L.B.D.C(Renala Khurd)

    161+732 Punjab Okara Renala KhurdCanal P 647 RAVI BallokiLower Bari DoabCanal5

    9

    4.42 F/S *1) 6Qaiderabad BallokiLink Canal(304+985)

    Qaiderabad BallokiLink Canal

    304+985 Punjab Nankana Sahib Miranpur4 Canal P 602ADB-5 RAVI Balloki 52.59 78.17

    Identified -

    3 Canal P 643 RAVI Balloki

    0+000 Punjab KasurPjoolnaar(RadhaKishan)

    Identified -Lower Bari DoabCanal (L.B.D.C.)

    L.B.D.C 0+000 Punjab KasurPjoolnaar(RadhaKishan)

    RAVI BallokiBallokiHydropower

    Ravi Riverat Balloki Barrage0+000

    Punjab

    Field Survey Sites

    1 10-Nov-2012 Sat.

    1 NaturalRiver NP 627 IdentifiedX (Not

    Perennial)

    2 Canal P 628 RAVI Balloki B. S. Link MainLineB. S. Link MainLine

    Nankana SahibPjoolnaar(RadhaKishan)

  • Data Collection Survey on Renewable Energy Development in Pakistan Final Report

    January 2013 121 Nippon Koei Co., Ltd.

    8.3.2 Potential Project

    (1) ADB-F/S Sites

    In December 2009, the National Engineering Services Pakistan (NESPAK) was appointed as consultant by the Government of Punjab, Irrigation and Power Department (IPD) (now Energy Department) and entrusted with the task of completing a two stage study of ten potential hydro power sites. The first stage (Task 1), comprising of a ranking study of the sites on the basis of EIRR and unit generation cost of energy, was completed. The top five ranked schemes have been identified (Task 2) and detailed feasibility studies have been carried out. The details of the top five ranked small HPPs are shown in Table 8.3.2-1.

    Table 8.3.2-1 Summary of ADB-F/S Sites

    Among the five sites, ADB-F/S site Nos. 2, 3, and 4 were identified as not perennial river or canal whose flow is available one to four months a year. Also, ADB-F/