1 Data Center Predictive Modeling How to minimize TCO through system level optimization Jim Rodriguez – GM Americas

Transcript of Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling...

Page 1: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

11

Data Center Predictive ModelingHow to minimize TCO through system level optimization

Jim Rodriguez – GM Americas

Page 2: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

22

What’s happening out there?...

• Increasingly dynamic environment

• Interdependency accelerates complexity

• Spiraling energy costs

• Regulatory compliance and governance

• CFO telling me cloud computing means zero capex and flexible right-sized opex

Page 3: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

33

What are others are saying?.... “Energy costs are the fastest-rising cost element in the data center portfolio, and yet data center managers are still not paying sufficient attention to the process of measuring, monitoring and modeling energy use in data centers.”

Rakesh Kumar, research vice president at Gartner.

“The lifecycles of data centers are getting shorter and shorter. The needs of today’s data centers are much more complex than they were twenty five or even five years ago.”

Lisa Richarde - Data Center Journal

Page 4: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

444

Data Center Predictive Modelling – A Solution?

•Modeling is not new!

•Modeling can help when things get complex

•Modeling can help create detailed future energy and data costs

•Modeling can provide advanced energy‐planning and accounting capabilities

•Enable thousands of man‐hour analyses to be run in minutes

•Avoid disruption of business operations

Page 5: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

55

How does it work?

Page 6: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

66

Simulation Modeling

6

Page 7: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

77

PUE is not a single number for a data center

Page 8: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

88

Financial outputs

8

Page 9: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

99

Page 10: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1010

An example simulation model

Base Scenario• 3.5 MW design IT capacity

• 2N+1 Infrastructure

• Running at 90% of rated capacity

• Using the old ASHRAE spec (45-55% RH)

• Poor airflow management

• No power management

• No virtualization

Page 11: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1111

An example simulation model

Base Scenario

• Located in Europe

• Chilled water / Dry cooler design

• Power cost of $0.08/kWh rising to $0.10/kWh

• Carbon intensity of 0.573kg / kWh

Page 12: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1212

Scenario 1 – Implement Best Practice

• Airflow management (aisle containment)

• Variable Frequency Drives in the CRAC units

• New ASHRAE spec

• Enable power management on servers

Page 13: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1313

Scenario 2 – Implement Economizer

• Airflow management (aisle containment)

• Variable Speed Drives in the CRAC units

• New ASHRAE spec

• Enable power management on servers

• Implement an indirect waterside economizer

Page 14: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1414

Results Comparison

4-Year Cost / Energy / Carbon Analysis

Scenario Energy (GWh)

Carbon (Tons) Energy Cost

Base 231 122,000 $43.4m

Implement Best Practices

168 89,000 $31.6m

Add Economizer 147 78,000 $30.2m

Savings 84 44,000 $12.7m

Page 15: Data Center Predictive Modeling - cfroundtable.orgData Center Predictive Modeling ... •CFO telling me cloud computing means zero capex and flexible right-sized opex. 3 What are others

1515

Thank youwww.romonet.com