8/6/2019 Data Center Performance Report
1/8
Let's Build a Smarter Planet IBM08/09/11 1
Section-5Change Management Calls Summary June-2011
1. Scheduled PM to be performed
2. VM ware Installation.
Action
forNextMonth
1
Description Total calls Closedcalls
Calls inprogress
Pendingcalls
Infra 4 1 2 1
Database 1 1 0 0
Apps 11 1 6 4
Total 16 3 8 5
Changed Tickets
Tickets logged for Changes in New Server Installationand Network Modification
;Summary
0
1
2
3
4
5
6
C lo se In p r o gr
I n f r a
Databa
A p p
-
8/6/2019 Data Center Performance Report
2/8
Let's Build a Smarter Planet IBM
Server Uptime June 2011
K: Drive restructured successfully
PRD server was down for three hours due tohardware failure.
Summ
ary
Description May11 June11 July11
Average Uptimefor all Servers
with Redundancy
NIL NIL NIL
Average Uptimefor all Servers
without
Redundancy
100% 100 99.92
Monitoring Tool Testing for Datacenter and LinksAction
forNextMonth
2
0
10
0
10
0
99.9
020
40
60
80
100
May'11 J une'11 J ul y'11
W ith Redundancy W ithout Redunda
-
8/6/2019 Data Center Performance Report
3/8
Let's Build a Smarter Planet IBM
Critical Server Up-time ReportJune 2011
Microsoft Office
Excel 97-2003 Worksheet
HMSI 2F Server Uptime Report
S.No Planned AchievedApplication
1 PCPACK - F 99.5% 100%
2 PCPACK - S 99.5% 100%
3 MRO 99.5% 100%
4 Lotus 95% 100%
5 Internet 95% 100%
6 P2P Link 99.5% 92.94%
Total Uptime for Servers 98.80%
-
8/6/2019 Data Center Performance Report
4/8
Let's Build a Smarter Planet IBM
Network Uptime June-2011
Airtel MPLS link down due to Last mile problemfor 3.40 hours.
HCL P2P link down due to Manesar exchangefailure for 12.50 hours.
Tapukhera 2F Link Down Due to Frequent FiberCuts.
Summ
ary
Description May 11 June 11 July 11
Average uptimefor Routers
99.64% 99.26% 99.5%
Average uptimefor Firewalls
100% 100% 99.5%
Average uptimefor Switches
100% 100% 99.5%
Airtel Internet Link Up gradation from 2 Mbps to 6Mbps.
Redundant Link installation for Tapukhera Plant.
ActionforNextMonth
4
Network Uptime
95
96
97
98
99
100
M ay'11 June'11 July'11
Route rs Fire wall Switches Line
-
8/6/2019 Data Center Performance Report
5/8
Let's Build a Smarter Planet IBM
Internet Link Utilization ReportJune-2011
5
TATA
HCL
Airtel
-
8/6/2019 Data Center Performance Report
6/8
Let's Build a Smarter Planet IBM08/09/11 6
Backup Performance WINTEL June-2011
Backup Tr
05
10
1520
2530
35
1-M ay-
11
1-Jun-
11
1-Jul-11
Failed BackupSuccessful Ba
Description May 11 June11 July11
Failed Back-ups 00 00 1
Successful Back-ups
9 9 9
Successful Back-ups (%) 9 9 8
All Backup are Successful for this month, exceptthe backup for DHCP due to OS(VSS) file error.
Summary
Planning for 2F backup Strategy and Resources
CRF for OS reloading/repair has been shared withRohit San for aproval.
ActionforNextMonth
6Microsoft Office
Excel 97-2003 Worksheet
-
8/6/2019 Data Center Performance Report
7/8Let's Build a Smarter Planet IBM08/09/11 7
Section-8 CustomerAppreciations/Escalations
Escalations :-
Appreciation Details Date
For Physical diagram availability of Datacenter servers by Rohit San 13-04-2011
Kolkata Audit apreciation by Rupinder San 15-04-2011
Appreciation for bringing down daily pending calls to lowest (2) 21-04-2011
Escalation Details Root Cause Action Taken or To BeTaken
OwnerPlanned
Closure Date
NA
7
Appreciations:-
-
8/6/2019 Data Center Performance Report
8/8Let's Build a Smarter Planet IBM
Performance Report..June, 2011
Achievements
PM of IBM, HP Servers and Ironport-Websecurity. New Rack & Switch Installation for Punching Area and cabling through armed cable.
New Switch Addition in First Floor Rack and Purchase rack for new system.
Application level PM for Lotus and Mcafee is completed.
Done DNS Forwarder settings for Globle Web Portal on DNS Server.
Misses Airtel Internet Link Upgrade from 2 Mbps to 6 Mbps.
PM of Switches & Routers.
N: Drive Space merge with lotus Server space on NAS Server.