Dass Rasayanic Services

Company Profile 441 Sector 16 Sikandra Avas Yojna

Sikandra Agra www.wateronline.co.in

mail: [email protected] Phone +91-562-2641866,

Fax: +91-562-2641866 extn. 24)

An ISO 9001 & 140001 certified

design & development Organization

2

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

3

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Contents From the desk of CEO… .......................................................................................................... 4

Introduction ............................................................................................................................. 5

Activities.................................................................................................................................. 6

Environmental Planning ....................................................................................................... 6

Quantity Surveying .............................................................................................................. 6

Water Conservation and Auditing ......................................................................................... 6

Rain Water Harvesting ......................................................................................................... 6

Building Services Engineering ............................................................................................. 6

Water & Wastewater Treatment ........................................................................................... 7

Environmental Impact Assessment (E.I.A.) .......................................................................... 7

Established Infrastructure ..................................................................................................... 7

Research & Development ..................................................................................................... 7

India's First PVA Gel Based MBBR ..................................................................................... 8

Development of Unique storm water harvesting system ........................................................ 8

Modification of UASB reactors ............................................................................................ 8

Development of small footprint STP .................................................................................... 8

Key Personnel .......................................................................................................................... 9

Er. Dinkar Saxena ................................................................................................................ 9

Qualifications and Affiliations:............................................................................................. 9

Er. Anil Kumar Goyal ........................................................................................................ 12

Qualification & Affiliation: ................................................................................................ 12

Empanelment ..................................................................................................................... 12

Er. Vishal Solanki .............................................................................................................. 12

Qualification & Affiliations: ............................................................................................... 12

Staff and Associates ............................................................................................................... 13

Clientele Environment............................................................................................................ 14

Chronology of Projects Commissioned as Design and Built Contractor till Date .................... 16

Project Commissioned as Consultant ...................................................................................... 21

4

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

From the desk of CEO…

Dear Sir/ Madam,

It is a pleasure to introduce, Dass Rasayanic Services, a professionally managed organization and is an outcome of over 30 years of experience in implementation of various projects and design integration. Through our motivated and dedicated team of well qualified and experienced professionals we have come out to offer services which are completely and comprehensive in the field of Project Management. Our company has been involved in a very broad spectrum of projects and has successfully completed a number of assignments from conceiving to commissioning through all agencies and departments. It has successfully completed more than 500 projects mainly in, Sewage Treatment Plant (STP) Effluent Treatment Plant (ETP), Water Treatment Plant (WTP), Online Continuous Softener, Air Pollution Control System (APCS), Sound Pollution Control System (SPCS) and Reverse Osmosis System for Industrial, Commercial & Domestic application. It has the relevant experience, access to resources and technical knowhow to undertake successfully and complete any Project venture to the entire satisfaction of our valuable client and is equipped with state-of-art LAN based design & simulation workstation, Automated analytical Lab & workshops, in Agra to undertake all Turnkey Projects. Our areas of operation are as follows:

Environment Planning And Designing Environmental Management Plan (EMP) Water Conservation And Auditing Project Management Rain Water Harvesting Building Services Engineering Water Shed Management

Our client range includes individuals, M.N.C’s, Corporate, Industrial and Government bodies, leading Real Estate Developers and various institutional organizations of repute. Our priority is to supply best quality and prompt after sales services. We are thankful to all our clients / patrons for their overwhelming response and cooperation. Looking forwarded to continued support in future as well. Thanks and best regards. For Dass Rasayanic Services Dinkar Saxena

5

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Introduction Dass Rasayanic Services is professionally managed organization and is an outcome of over 30 years of experience in implementation of various projects and design integration. Through our motivated and dedicated team of well qualified and experienced professionals we have come out to offer services which are total and comprehensive in the field of Environmental Management. Our company has been involved in a very broad spectrum of projects and has successfully completed a number of assignments from conceiving to commissioning through all agencies and departments. Our client range includes individuals Indian Railways, IRCON International Ltd., M.N.C’s, USAID, Corporate, Industrial and Government bodies, leading Real Estate Developers and various institutional organizations of repute. It has the relevant experience, access to resources and technical knowhow to undertake successfully and complete any Project venture to the entire satisfaction of our valuable client.

6

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Activities Environmental Planning

Our design and planning address issues related to Social, environmental impact mitigation architectural history or design, city or regional planning, landscape architecture, construction science. Our design theme are based on followings Sustained & sustainable growth Peaceful co-existence of nature and human activities Minimum use of natural resources be it Energy or material Sustained biodiversity

Quantity Surveying

Comprehensive assessment of impact on environment, of would be or present or past action is EIA. Our in-house resources have all necessary equipment to measure real-time environmental parameter. In depth analysis employing simulation technique makes Environmental Impact Assessment (EIA) more authentic and meaningful

Water Conservation and Auditing

There is no doubt about the supremacy of water to our lives. This awareness crosses political and social boundaries. In many places people have difficult access to drinking water; often polluted, is available for human consumption. Dass Rasayanic Services, with its unique design concepts, often utilizing contours, hydraulic gradient, geological properties of site, conserve water and thus achieving Positive water balance. It has designed systems to handle more than 2000 M3 / hr runoff generated from residential area in Haryana. A project to conserve water from more than 500 ha watershed area of Bainpur reserve forest Agra is under planning stage this watershed is has both residential and forest area.

Rain Water Harvesting

The rapid expansion in development of ground water resources for varied usage has contributed in expansion of irrigated agriculture, overall economic development and in improving the quality of life in India. The speedy and uncontrolled usage of ground water has also created many problems. The intensive ground water development in many parts of the country has resulted in depletion of ground water levels and availability of the resource. The pristine ground water quality too became its victim. Mitigation: Water harvesting Rain water harvesting is the technique of collection and storage of rain water at surface or in sub-surface aquifers, before it is lost as surface run-off. The augmented resource can be harvested in the time of need. Artificial recharge to ground water is a process by which the ground water reservoir is augmented at rate exceeding that under natural conditions of replenishment.

Building Services Engineering

‘Every building has unique character thus require unique solution, thus Dass Rasayanic Services ‘practice the Science & Art in building services engineering, which produces unique cost effective yet green sustainable, system solutions.' It offers Design: designing layouts and requirements for building services for residential or commercial developments.

7

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Construction: supervising the construction of the building services, commissioning systems and ongoing maintenance and operation of services. Environmental: developing new energy saving methods for construction, designing new and improved energy conservation systems for buildings. Heating, ventilation and air conditioning (HVAC): specializing in the design, development, construction and operation of HVAC systems. Electrical technology: specializing in the design and development of electrical systems required for safe and energy sustaining operation of buildings.

Water & Wastewater Treatment

It has established more than 140 installations in water and wastewater treatment systems ranging from water for chromatography to dialysis, from supply to boilers to food industry and from packaged drinking water to wastewater treatment plant. We offer tailor made solutions to all water problems. Selection of treatment technology is based on need of site, energy and space. It offer system based on Membrane technology (R.O., Nano and Ultra) Anaerobic fixed film, suspended growth system (Up flow Anaerobic Blanket rectors) Floating media, suspended growth aerobic systems. Hybrid system based on anaerobic-aerobic systems Ion exchange based de-ionization units Wetland based Polishing treatment units

Environmental Impact Assessment (E.I.A.)

It offers studies related to environmental impacts of construction industry / industrial activities with mitigation for the same. This also includes detailing to the Govt. bodies for clearance of project. We have advance laboratory for water testing, monitoring of environment such as noise level etc. on site, This giving complete package to our client.

Established Infrastructure

Six desktop are connected via gigabyte LAN network, central storage device for flawless data transfer with State of the Art wireless support network. All systems have direct access to broad Band communication gateway. Around 1500 Sq-Ft of Furnished Carpet Space with Separate Sections for All Activities. Auto Level and Digital Cameras for Complete Tech. Detailing Of Sites. Ample Office, Site and Field Staff to Cater the Requirement of Each Site in Harmony. Total Station Instrument On Line Environment monitoring equipment’ besides conventional Water testing facility following on-site testing facility is available Water Soil Air Noise Biodiversity Survey equipment GIS Mapping

Research & Development

DRS in association with M/s. Ajanta Dairy, Agra, has successfully tested, model of milk concentrating unit based on membrane filtration. During test we were able to concentrate milk upto 55%. Quality of Fat recovery & other factors were found within satisfactory limits.

8

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Possible applications Reduction of cost in milk Transport. Energy saving in production of Milk powder & other milk preparations.

India's First PVA Gel Based MBBR

It is sheer Pleasure to announce another milestone in wastewater treatment, designing first PVA GEL based STP for TDI Mall at Kundli, Sonepat, Haryana. It is first reactor with installed capacity to treat 200 KLD of wastewater, reduces power consumption during low organic loading rate (Idle time of mall) without reducing the Active biomass or without affecting performance during peak hours.

Ideally suitable for Variable Hydraulic & organic loading applications. Development of Unique storm water harvesting system

DRS has developed unique high rate segregation & sedimentation systems for high flow rate

storm water system.

It is a matter of proud these systems are handling storm water up to 700 Cu m/hr., found

application in projects of national importance e.g Railway Coach factory Lalgunj, Raebareli.

EWS housing at HUDA, Haryana. More than 25 of such systems are operational.

It is applicable for storm water treatment & disposal of large catchment.

Modification of UASB reactors

Up flow Anaerobic Sludge Blanket reactor is modified, to have in built settling area thus

reducing space requirement & increase SRT. Resulting more reliable functioning.

More than 50 of such UASB are in operation since 1998.

Development of small footprint STP

First phase of 1.5 MLD of 4.5 MLD STP is completed at TDI City, Mohali, Punjab within 8m

x20m area with unique multi floor design having components, grit settler, equalization zone,

bio tower, PVA gel based MBBR followed by settling zone and control room .

9

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Key Personnel

Er. Dinkar Saxena

His career started with India’s leading Usha micro Processors and control Ltd. New Delhi in 1987. After one Year working as marketing executive, joined family owned Dass Rasayanic Carbo Udyog, as manager (product development).1999 started consultancy services under the Name & style of Dass Rasayanic Services for water treatment, Pollution Control, and Chemical Process control. Completed over 100 projects of wastewater treatment, STP, Air emission Control etc. Developed various ecofriendly self-sustaining models for water Pollution control. Clint list include, Pee Cee Soaps and Chemicals Ltd., Louis Berger group Inc, (U.S.A.)., Escort Kamayani Heart center, B.P. Oil Mills Ltd., Mc Donald restaurants, Country INN, Apollo clinics Agra and many more. At present listed on consulting penal of M/s. Agra Development Authority, Agra., M/s. C.P. Saluja and Associates, New Delhi M/s. Quality Bench Institute Pvt. Ltd. Mumbai, M/s. Project Management consortium, New Delhi, M/s. Arches associates, Agra M/s. Construction and Enviro- management group (CEMG) Agra M/s. Pushpanjali Construction Co Pvt. Ltd., Agra, M/s. Gambhir housing Pvt. Ltd. New Delhi M/s. Hardayal Milk Products Pvt. Ltd. Shikohabad, M/s. Shree Shyam Pulp & Board Mills, Kashipur, Uttarnchal M/s. Cooldeck Aqua Solutions Pvt.Ltd. Daman & Deu M/s. TDI Infrastructures Ltd. Kundli, Sonepat M/s. Tirubala Tri Environment Pvt. Ltd., Kanpur M/s. Felix Industries Pvt Ltd., Ahmedabad and many more.....

Qualifications and Affiliations:

S.N. Board / university Examination/ grade of membership

Year

1 Agra university B.Sc. 1982

2 Agra university M.Sc. Physics 1985

3 Agra university P.G.D.M. 1987

4 CII- IEMA (UK) EIMA APPROVED ADVANCED ENVIOMENT MANAGEMENT SYSTEMS AUDITORS COURSE

2004

5 SAI, New York, USA SAI Accredited Lead Auditors Course SA 8000

2006

6 Institute of engineers India M.I.E. 2004

7 Institute of engineers India Chartered Engineer [India], (C. Eng.)

2004

10

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

8 Institution of Public Health Engineers (India)

FIPHE 2007

Quality Improvement program

1 Indian Institute of Technology Bombay, Mumbai

Pollution Control Techniques for Distillery waste

June 2007

2 Indian Institute of Technology Guwahati, Assam

Advances in in membrane Separations Technology

Dec. 2007

3 National Institute of Disaster Management

NIDM-WBI Comprehensive Disaster Risk Management Framework

April 2008

Paper Presented

Presented at

1 Rain water harvesting at Puspanjali town in Agra city

Green summit 06 National Conference on Environmental Engineering organized by institution of Public health Engineers and Central pollution control board

March 2006

2 Watershed management and effective sanitation for an area of Agra city

Green summit 06 National Conference on Environmental Engineering organized by institution of Public health Engineers and Central pollution control board

March 2006

3 Wetland as tools for Bio remediation of river eco systems

Green summit 08 National Conference on Environmental Engineering organized by institution of Public health Engineers and Central pollution control board

April 08

4 Cascading of membrane – effect and uses

Green summit 08 National Conference on Environmental Engineering organized by institution of Public health Engineers and Central pollution control board

April 08

11

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

5 Restoration of River Yamuna Project proposal For Phase 1 Pilot plant at Buri Ka Nagla, Mauza Mau, Agra.

High powered Secretary meeting by Government of Uttar Pradesh for Development of drinking water at Agra chaired by Chief Secretary Uttar Pradesh.

May 08

6 A study of Bio-mass generation and bio remediation of river Yamuna

National workshop on emerging horizons in biofuel research and applications, NWEHBRA Agra organized by R.B.S. College & Department of Science Govt. of India

25-27 July 2009

7 Wetland a major tool for rural development and river pollution control

Natinal Seminar On Community Development & River Pollution Control " Critical issues & Concerns" at Kolkat India organised by Institution of public health Engineers India

4 & 5 th Feb 2013

8 Remediation of Arsenic affected areas of Gangetic Plains through rain water harvesting

28th National convention of Environmental Engineers and National Seminar on Hazardous waste management and healthcare in India

10 March 2013

9 Development of improved sanitation system for rural areas

28th National convention of Environmental Engineers and National Seminar on Hazardous waste management and healthcare in India organized by Institution of Engineers.

10 March 2013

Invited Lectures At

BMAS Engineering College, Agra

2010

Hindustan College of Science & Technology, Farah, Mathura

15 September 2012

Madhav Institute of Technology, Gwalior

Oct 2013

Session chaired At

Green Summit, 2008 April 2008

12

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

At NWEHBRA sponsored by Government of India, New Delhi.

July 2009

Green Summit, 2011 April 2011

TechFest, IIT Bombay (Mumbai)

2013

Er. Anil Kumar Goyal

The engineer in concern has passed the electrical graduation degree from HBTI., Kanpur’1989. His past work experience is with Hindalco Industries ltd., Global Boards Ltd., and Reliance Petroleum Ltd. Up-to 1999. There after practicing as Electrical consultant for various Industrial and Residential projects in Delhi, Agra and Noida.

Qualification & Affiliation:

B.Tech. [ELEC], F.I.V., M.I.E. Chartered Engineer Ref. M - 122058-0 Surveyor & Loss Assessor Ref. SLA-55561 Member of Institute Of Valuers Ref. F-11287. Empanelment Panel Surveyor & Loss Accessor For M/S The New India Assurance Co. Ltd.

Panel Surveyor & Loss Accessor For M/S The Oriental Insurance Co. Ltd.

Er. Vishal Solanki

The engineer in concern has passed the Civil graduation degree from Delhi College of Engineering, New Delhi in the year 1996. Worked with: M/S Pidilite Industries Ltd.. M/S Shalimar Tar Products [STP], Calcutta. M/S Cico Technologies Limited. M/S Sika India Pvt. Ltd. From April’2002 Onward Working as Valuer and Consultant for Water Proofing and Building Rehabilitation Works.

Qualification & Affiliations:

B.E. [CIVIL] M.I.P.H.E.

13

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Staff and Associates

S.No. Name Designation Qualification Experience Years with the Company

1. Ms. Nivedita Dinkar

Consultant professional, HR Training, Administration

M.B.A , MA English Litt, MA Sociology

22 Years 4 Years

2. Mr. Shivnandan Consultant Professional Legal

L.L.B. 22 Years 8 Years

3. Mr. Deepak Vyas Project Manager B.E.( Civil ) 14 Years 6 Years

4. Mr. Devesh Kulshrestha

Consultant Project management

M.B.A. 19 Years 8 Years

5. Mr. Shishupal Verma

Project Engineer (Civil)

B.Tech.( Civil ) 1.5 Year 1.5 Years

6. Mr. Vinay Gupta Accountant, Internal Auditor

M. Com 10 Years 9.0 Years

7. Vipul Gulati Assistant Design Engineer

B.Tech (Env) 1.9 1.9 Years

8. Ashish Sharma Assistant Engineer

B.Tech (Env) 1.8 1.8 years

9. Vivek Singh Junior Engineer B.Tech (Env) 1.5 1.5 Years

10. Anand Kumar Pandey

Trainee Engineer ( student)

B.Tech (Env) Fresher 4 Months

11. Technicians Plumbers Electrician

6 1 1

14

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Clientele Environment

Landmark Projects: 1. Design Consultant of design and

build contractor for EWS houses developed at various locations in Haryana. M/s Gahoi Buildwell Pvt. Ltd., M/s Marg ltd, M/s Jyoti Swaroop contractors Pvt. Ltd., New Delhi, Total number of dwelling units developed nearly 20,000.

Public health services design for following projects for economically weaker section

Detailed environmental planning of various services including watershed management, Rainwater harvesting, water supply, sewer line. For further details, please refer the following sections.

2. Rukmani Vihar, Vrindavan under Mathura Vrindavan Development Authority (MVDA) having area 186.52 acres

Public Health Engineering Services

Detailed environmental planning of various services including watershed management, water supply, and rain drain.

3. Developed environmental planning for various government schemes for slum development like Nandgaon, Mathura; Asifabad, Firozabad; Hastinapur, Meerut.

Public Health Engineering Services

Detailed environmental planning of various services including watershed management, water supply, and sewer line.

4. Design Consultant for Ircon International Limited for railway coach factory at Lalganj, Raebareli having area of about 250 hectares.

Public Health Engineering Services

Detailed environmental planning of various services including watershed management, re-alignment of natural storm water drain as per the client requirement, Rainwater harvesting, water supply, and sewer line.

5. Environment consultant for TDI Properties ltd., New Delhi for development of Secretariat & Sabha Bhawan for Gorkha Territorial Administration (GTA), Darjeeling, West Bengal.

Public Health Engineering Services

Detailed environmental planning including EMP, Fire Risk Assessment, Disaster Management Plan, building services (sewer , water supply, rain water harvesting) with a aim for zero discharge and self sustained building with use of renewable energy. Total Project layout estimated @ 600 crores.

15

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Development of Low Cost self-sustained Sanitation solutions for following projects: 1 Agra District Jail, Agra Water resource management of

1000000 Sq. m and wastewater treatment of 1000 inmates.

Anaerobic / aerobic digester based wastewater treatment system Collection of runoff generated at premises and recharge to dry bore well after settling through tube settlers.

Treatment of 60 KLD discharge with supply to irrigation area with only 1 hp pump requirement, using natural resources

2 Creative associates Public health services design for following projects under JNNURM

Bharatpur gate , Mathura Devnagar Gopal nagar, Mathura Laxmi nagar, Mathura Maholi road Navneet Nagar, Mathura

Sewer line & drinking water line completed

3 Gahoi Build well, Delhi Public health services design for following projects for economically weaker section

HUDA for following projects HUDA sector 33 & 34, Ambala HUDA Sector 47, 56,62-1 & Sec-2, Faridabad

Rainwater harvesting, drinking water supply, sewer line completed. Total no. of Houses 5000 under EWS category

4 Marg ltd. Delhi Public health services design for economically weaker section

Huda project at Rewari Rainwater harvesting, water supply, sewer line completed. Total no. houses 400

5 Ramway Food Ltd., Aligarh Low Cost Sanitation of Labour habitat

Food processing unit Rainwater harvesting, drinking water supply, sewer line STP completed

6 Wetland for Kakretha drain Low-cost water treatment facility for Village Kakretha by wetland

Under development

7. Mathura Vrindavan Development Authority (MVDA)

Public health services design for following projects under MVDA

Rukmani Vihar, Mathura Designing of water supply system & Rain drain planning

8.

Mathura Vrindavan Development Authority (MVDA)

Public health services design for following projects for economically weaker section under Manyawar shri kanshiram ji sahari garib awas yojana

Azizpur, Koshi Kalan, Mathura

Designing of Sewer Treatment Plant (STP) Capacity 600 kld

9. Mathura Virandavan Development Authority (MVDA)

Public health services design for following projects for economically weaker section under Manyawar shri kanshiram ji sahari garib awas yojana

Virandavan Mathura Designing of Sewer Treatment Plant (STP) Capacity 250 kld

16

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Chronology of Projects Commissioned as Design and Built Contractor till Date

S. No. DESCRIPTION OF PROJECT JOB ASSIGNED / COMPLETED TECHNOLOGY USED YEAR

1 M/s J.M.V. Water Park, Galena Road, Agra

Design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system.

Multi-grade sand filters system with insertion jets. Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage.

1995-96

2 M/s Krishna Chains India Ltd. Agra

Development effluent treatment plant with Zero discharge..

1. Ion exchange based recirculation technology for water treatment

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Optical transducer based sensing of sludge density in aeration OP-Amp based amplification and conversion of signal from Analog to digital for display and control.

4. Automation and Power control circuits for water levels and flow controls in various reactors.

1995-96

3 M/s. Hotel Taj Khema, Agra Deigns and development of ETP 1. Tricking filter based 20,000 lts per day wastewater recycling system with zero discharge option.

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display and control.

3. Automation and Power control circuits for water levels and flow controls in trickling filter.

1996-1997

4 M/s. Romsons Industries, Agra water re-circulation unit for mould cooling and cooling towers.

1. Water recirculation unit for cooling tower and mould cooling.

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display and control.

3. Automation and Power control circuits for water levels and fluid flow controls in various extruding machines.

1996

5 M/s. R. P. Milkmade Pvt. Ltd., Agra

ETP design 1. up flow Anaerobic reactors and air diffuser based aeration unit for waste water treatment.

1996

6 M/s Nutricia India Pvt. Ltd. Etah Design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system. Silver ion dosing system for water treatment.

Design of water recirculation for swimming pool, hydraulics of pool, Multi-grade sand filters system with insertion jets. Negative head of pump is used for Auto skimming of Pool. Converging of 220 V AC into 12 volt by transformer and,

1996

17

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

7 M/s. Bareilly College, Bareilly Design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Design of water recirculation for swimming pool, Hydraulics of pool Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1996-97

8 M/s. Jaiswal Beverages Pvt.Ltd. SPN

First Ion Exchange based Automatic mineral water plant

1. Activated carbon, ion exchange for treating water

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Automation and Power control circuits for water levels and flow controls in various sections of plant with PLC.

1997

9 M/s. Ramanlal Shorawala public School

Design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets. Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1997-8

10 M/s. Kaveri Resorts, Agra Design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets. Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1998

11 M/s. Triupati Swimming Pool, Agra

n of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, .in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1998

12 M/s. C.P. Vidya Niketan, Kaimganj.

design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, .in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1998-99

13 M/s. Asopa hospitals and research canter Ltd., Agra

Design and commissioning of wastewater treatment plant of 0.5 MLD

1. Trickling filter based wastewater treatment plant

2. Conductivity based sensing of electrical properties of

1997-1999

18

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Optical transducer based sensing of sludge density in aeration OP-Amp based amplification and conversion of signal from Analog to digital for display.

4. Automation and Power control circuits for water levels and flow controls in various reactors

14 M/s. Ram Raghu Hospital, Agra Ultra pure feed water for Dialysis unit Display and water properties display of De-ionized water for Dialysis.

1. Ion Exchange Based wastewater treatment plant for Low Conductivity water for Dialysis unit.

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Warning system for Higher Conductivity water

1998

M/s. Dhan Kumar Jain & Co., Agra

Ultra pure feed water for Silver electroplating. Automation and water properties display of De-ionized water for process water for silver electroplating.

1. Ion Exchange Based wastewater treatment plant for Low Conductivity water

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Warning system for Higher Conductivity water by switching the op amp based comparator.

1999

M/s. Ashish place, sultan Gunj Agra

Design of Fountains and rainwater harvesting. Total encashment is about 8000 SQM.

Runoff is passed through settling tank followed by hydro cyclone before entering the old abounded well.

1998-99

15 M/s. Kaveri Resorts Ltd, Agra design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1999

16 M/s. New Nandan Minerals, Mathura

Ultra-pure feed water for Plating units Automation and water properties display of De-ionized water for process water for de – ionized water

Ion Exchange Based wastewater treatment plant for Low Conductivity water 1. Conductivity based

sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

2. Warning system for Higher Conductivity water by switching the op amp

1998-99

19

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

based comparator.

17 M/s. City Convent, Balkesher, Agra

design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1999-2000

18 Col. Tayagi residence, Vibhav nagar, agra

Design of roof top garden along with rainwater harvesting of 400 SQM

Recharging through tube settler followed by injection well.

1999

19 M/s Kukrail Resorts, Kukrail, Lucknow

Design of water recirculation for swimming pool in Guitar Shaped pool, Hydraulics of pool Rainwater harvesting total en-catchments 25000 SQM Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Landscaping the Resort in such away that all the water is collected in recharging pond and a trench passing though the hideout area. Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions. Dimmer control for fountain lights.

1999-2000

20 M/s. DFS Park Ltd., Lucknow design of water recirculation for swimming pool, Hydraulics of pool Power control panel, shock prevention system. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

2001-2002

21 M/s. B.P. Oil mills Agra Rain water harvesting in Directors residence ‘Bagat villa’ nearly 9980 SQM plus run off from M.G. road total 12000 SQM

Use of Bar screen hydro cyclone followed by settling tank before recharging the ground water.

2001-02

22 M/s. P.C. Soaps and chemicals Ltd.

design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

1999-2002

23 M/S. Firozabad Club, Firozabad design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

2002-2003

20

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

24 M/s. Vinayak hospitals, Agra Ultra pure feed water for Dialysis unit Automation and water properties display of De-ionized water for Dialysis. Power back up for ICU and ICCU. Nurse address system in ICU, ICCU, NICU

1. Ion Exchange Based wastewater treatment plant for Low Conductivity water

2. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

3. Warning system for Higher Conductivity water by switching the op amp based comparator.

4. 12 Volt D.C. power backup lines for 24 hrs backup times.

5. array of re-settable Flip-flop circuit and warning display at Nurses room.

2003-2004

25 M/s Triveni development Constructions company Agra

design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system, in swimming pool. Silver ion dosing system for water treatment.

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

2003-04

26 Farm house of Mr. S. Mittal at Royal Farms, Artoni

Design of Landscaped rainwater harvesting system for en catchments area of 10000 SQM.

Lowering of Lawn and landscaping such away that all the runoff is collected at NE and overflow is sent to dry boring. Near pool.

2003-04

27 Kamyani hospital and research center. Agra

Designing of wastewater treatment & rain water harvesting of Nearly 600 SQM

Anaerobic digester based wastewater treatment system disposal of treated water through percolation trenches supported by evapotranspiration. Collection of runoff and discharge though bore well.

2003-04

28 Annant Apartments, Vibhav nagar

Designing of rain water harvesting for runoff generated from 2500 SQM

Project is divided into three area 1. Rooftop 2. Lawn 3.Offset Rooftop runoff is injected to aquifer though two injection wells and rest of the area by landscaping.

29 Kripa Dham Rain water harvesting En catchments 2500 SQM

Total rooftop is 1600 SQM but runoff generated from Road rush to the basement where it is treated with Tube settles and injected into Aquifer.

30 Ajanta dairy, Foundry Nagar Agra E.T.P. and Rain water harvesting of nearly 3000 SQM.

Anaerobic / aerobic digester based wastewater treatment system Collection of runoff generated at factory premises and recharge to dry bore well after settling through tube settlers.

2003-04

21

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

31 Agra District Jail, Agra Water resource management of

1000000 Sq. m and wastewater treatment of 1000 inmates.

Anaerobic / aerobic digester based wastewater treatment system Collection of runoff generated at premises and recharge to dry bore well after settling through tube settlers.

2004 Treatment of 60 KLD discharge with supply to irrigation area with only 1 hp pump requirement, using natural resources

32 Agra Development authority, Agra

Design of 5 Project rain water harvesting each exceeding 1,00,000 Sq m

Collection of runoff generated at premises and recharge to dry bore well after settling through tube settlers

2004

Project Commissioned as Consultant S. No. DESCRIPTION OF PROJECT JOB ASSIGNED / COMPLETED TECHNOLOGY USED REMARK

1 Agar Public school, Artoni Agra design of water recirculation for swimming pool, Hydraulics of pool Power control panel, low voltage under water lights, shock prevention system. Silver ion dosing system for water treatment. Project cost- 0.75 Cr

Multi-grade sand filters system with insertion jets Converging of 220 V AC into 12 volt by transformer and, tripping circuit for 10 mA leakage. 555 timer based Polarity changing circuit for production of Silver ions.

Completed

2. Pooja Glass Co. Firozabad, (A USAID assisted project) Contractor: M/s. Louise Berger Inc., New York, USA.

Design of Recirculation of wastewater generated from various units of Glass manufacturing plant. Rain water harvesting for 5000 Sqm of factory area. Power control system for wastewater recycle treatment plant

1. Cutting the generation of wastewater to 80% for cullet washing.

2. Zero discharge at Chrome plating

3. Rain water harvesting. 4. Disposal of treated

wastewater by Evapotranspiration Or water harvesting

5. operation Conductivity

based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

6. Warning system for Higher Conductivity water.

7. use of optical sensors and measuring the suspended solids, level controls and use of PLC for automatic working of wastewater treatment Plant.

First phase of installation is operative.

3 Hind Glass Co. Firozabad, (A USAIDS assisted project) Contractor: M/s. Louise Berger Inc., New York, USA.

Design of Recirculation of wastewater generated from various units of Glass manufacturing plant. Rain water harvesting for 5000 Sq. m of factory area. Power control system for wastewater recycle treatment plant

1. Cutting the generation of wastewater to 80% for cullet washing.

2. Zero discharge at Chrome plating

3. Rain water harvesting. 4. Disposal of treated

wastewater by Evapotranspiration Or water harvesting.

Completed

22

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

5. Conductivity based sensing of electrical properties of water and OP-Amp based amplification and conversion of signal from Analog to digital for display.

6. Warning system for Higher Conductivity water.

7. use of optical sensors and measuring the suspended solids, level controls and use of PLC for automatic working of wastewater treatment Plant.

4. Vimal Vatika, Agra Design of wastewater treatment plant for !34 houses Rainwater harvesting in 20000 SQM. Control of sludge profile in UASB reactor of Sewage plant Project cost- 0.75 Cr

1. UASB based water recycling system, with disposal of treated wastewater with evapotranspiration.

2. rain water harvesting with advance tube settler technology.

3. Use of array of optical sensors for displaying of sludge profile in UASB reactor.

Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

5. Al Shadeed slaughter house, Meerut

Design of Effluent treatment plant , capacity of 900 heads per day, Environment planning of entire area. Control of sludge profile in UASB reactor of Effluent treatment plant Project cost- 1.5 Cr

1. UASB based effluent treatment plant with capacity to 1000 KL per day.

2. Composting plant for more than 40 MT of Animal waste.

3. Use of array of optical sensors for displaying of sludge profile in UASB reactor.

4. Level sensors for automation of ETP.

Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

6 Nagar Palika Parishad, Firozabad

Controls for Fountain lights at various parks Project cost- 0.10 Cr

555 based switching circuit for relays connected to the under water lights.

Completed

7. Enkay Exports, EPIP Agra E.T.P. of new Production unit, with Dye and washing operations. Project cost- 0.20 Cr

Anaerobic/ aerobic based effluent treatment plant

UASB Complete, ETP yet to be commissioned.

8 Pushpanjali Construction Co. Agra

Design and development of water resource management of various upcoming projects in Agra and Mathura.

Total water recirculation and water harvesting project of 200 Acrs.

Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

9 Rangoli, M/s. Triveni Infrastructure development Co.

Environment impact assessment {E.I.A}, Environment planning, water resource management

Total water recirculation and water harvesting project of 30 Acrs.

Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

10 TDI City Agra, Environment impact assessment {E.I.A}, Environment planning, water resource management Project cost- 7.5 Cr

Total water recirculation and water harvesting project of 125 Acrs.

Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

11 Triveni Vatika , Mathura, M/s. Triveni Infrastructure development Co.

Environment impact assessment {E.I.A}, Environment planning, water resource management

Total water recirculation and water harvesting project of 120 Acrs.

Rainwater harvesting, drinking water supply, sewer

23

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

line ,STP under Construction

12 Baikunth Dham, Vrindavan Environment impact assessment {E.I.A}, Environment planning, water resource management Project cost- 37.5 Cr

Total water recirculation and water harvesting project of 120 Acrs.

Sewer line & drinking water line complete & STP Under construction

13 Shri Nikunj, Eldeco, Agra Environment planning, water resource management Project cost- 2 Cr

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

14 Bhawna Estate Environment management Plan {EMP}, Environment planning, water resource management Project cost- 12 Cr

housing project Phase-1 Rainwater harvesting, drinking water supply, sewer line completed STP under Construction Phase-ii in under construction

15 Hardayal Milk Products Pvt. Ltd. Shikohabad

Environment planning, water resource management Project cost- 1 Cr

Dairy Project Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

16 Ajanta Dairy Environment planning, water resource management Project cost- 0.5 Cr

Dairy Project Rainwater harvesting, drinking water supply, sewer line , ETP completed ETP for second phase under construction

17 M/s. Shree Shyam Pulp & Board Mills, Kashipur, Uttarnchal Unit-II

Environment planning, water resource management Project cost- 7 Cr.

Paper mills Rainwater harvesting, drinking water supply, sewer line, ETP completed

18 Khushhal Garden Environment planning, water resource management Project cost-0 .75 Cr

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

19 Pushpanjali Upvan, Mathura Environment planning, water resource management Project cost- 3.75 Cr

housing project Rain water , drinking water & sewer line completed STP under construction

20 Pushpanjali Orchid,Agra Environment planning, water resource management Project cost- 3.75 Cr

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

21 Pushpanjali Meadows, Chata, Mathura

Environment planning, water resource management

housing / resort project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction ntation

22 Shreeji Garden II, Mathura Environment planning, water resource management Project cost- 3.75 Cr

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

23 Shreeji Nagar, Agra Environment planning, water resource management

housing / resort project Rainwater harvesting, drinking water supply,

24

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Project cost- 0.5Cr sewer line ,STP completed STP

24 Anupam Estate , Vill. Baghda, Agra

Environment planning, water resource management

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

25 Arvind Vehicles Pvt. Ltd. Environment planning, water resource management Project cost- 50 lac.

Auto-mobile show room Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

26 MehndiPur Balaji Watershed management Project cost- 1.25 Cr

Ashram for MKP Charitable Trust

Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

27 C-impact institute of education Watershed management Project cost- 1.25 Cr

College/ institute Rainwater harvesting, drinking water supply, sewer line ,STP under Construction

28 Dabar shoes industries Watershed management Project cost- 20 lac.

Shoe Industry Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

29 Electro plating works, Agra Waste water management Electroplating industries Rainwater harvesting, drinking water supply, sewer line completed ETP completed

30 Ganga Pulp & Papers Pvt. Ltd., Varanasi

Environment planning, water resource management Project cost- 70 lac.

Paper Mills Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

31 GLA college of Technology & Management, Mathura

Watershed management of campus Project cost- 4 Cr

College/ institute Rainwater harvesting, drinking water supply, sewer line completed STP completed.

32 HRC Horizons, Agra Environment planning, water resource management of 700 dwelling units Project cost- 2.5 Cr

housing project Drinking water & sewer line completed Rain water harvesting & STP under construction

33 Hotel Leela venture, Mumbai Environment planning, water resource management

For the Project of 7 Star Hotel named Iskon Estate, Agra

Environment Clearance granted construction yet to be start

34 Jal Snasthan , Agra Consultant Improve Drinking water quality

Completed

35 Kamayani Hospital, Agra Watershed management Project cost- 20 lac.

Hospital Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

36 Kavisha Foods, Agra Watershed management Project cost-5 lac.

Food industry Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

37 Lotus Homes, Agra Environment planning, water resource management Project cost- 20 lac.

housing project Rainwater harvesting, drinking water supply, STP under Construction

38 Madhuban Plaza, Agra Environment planning, water resource management Project cost- 1 Cr.

Shopping Mall Still to be implement

39 Modern Slaughter House, Agra Environment planning, water resource management Project cost- 1 Cr.

Slaughter house Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

40 Nannumal Glass works , Firozabad

Watershed management Project cost- 10 lac.

Glass industry Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

41 Neel Padam Builders, Mathura Environment planning, water resource management Project cost- 25 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP completed

42 Neel Padam, Anand Lok Environment planning, water resource management

housing project Rainwater harvesting, drinking water supply,

25

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Project cost-25 lac. sewer line completed STP completed

43 Nri City Environment planning, water resource management Project cost- 2.5 Cr.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

44 Nichrome Industries Luster Egem Corp

EMP Nichrome industry Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

45 Om Apartments, Firozabad Environment planning, water resource management Project cost-50 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP completed

46 One Park Colony Environment planning, water resource management Project cost-50 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

47 P.P. Town , Farah, Mathura Environment planning, water resource management Project cost-1 Cr.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction with more than 45 acers

48 PEE CEE Cosma Soap Ltd. Dholpur

Study & mitigation Soap industry Completed

49 Radha Chain Co. Balkeshwar, Agra

Environment planning, water resource management Project cost- 40 lac.

Chain industry Unit-I Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction Unit-II complete by July 2010

50 Radhika Kunj, Patholi, Agra Environment planning, water resource management Project cost-70 lac

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

51 Ram Raghu, Agra Environment planning, water resource management Project cost-10 lac.

hospital Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

52 Rama city, Kanpur Environment planning, water resource management Project cost-4.5 Cr.

Integrated City Rainwater harvesting, drinking water supply, sewer line , STP under Construction

53 Rawat Medicare( P ) Ltd. Environment planning, water resource management

hospital Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

54 RCS Floor mill, Aligarh Environment planning, water resource management Project cost-10 lac.

Floor mill Unit-I Rainwater harvesting, drinking water supply, sewer line completed STP under Construction Unit-II Design Submitted

55 Shree Ram Ji Estate, Agra Environment planning, water resource management & Project management Project cost-3.5 Cr.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

56 TDI Moradabad Environment planning, water resource management & Project Management Project cost-2 Cr.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

57 TDI city , Kundali, HR Environment planning, water resource management & Project management Project cost-4.5 Cr

Shopping mall. Club house, Kingsbury

Under construction

58 UAL , Mathura Environment planning, water resource management Project cost-70 lac.

Rice Mill Rainwater harvesting, drinking water supply, sewer line completed ETP & STP under

26

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

Construction

59 Vasundhra Builders, Hathras

Environment planning, water resource management Project cost-70 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP completed

60 Vayu Vihar Phase-1 to IV Environment planning, water resource management Project cost-20 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP completed

61 Virola International Watershed management Project cost-40 lac.

Shoe industry Rainwater harvesting, drinking water supply, sewer line completed ETP under Construction

62 Vishkarma Multi story Environment planning, water resource management Project cost-1 Cr.

housing project Under construction

63 Vishkarma Shamshabad, Agra Environment planning, water resource management Project cost-20 lac.

housing project Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

64 Creative associates Public health services design for following projects under JNNURM Project cost-22 Cr.

Bharatpur gate , Mathura Devnagar Gopal nagar, Mathura Laxmi nagar, Mathura Maholi road Navneet Nagar, Mathura

Sewer line & drinking water line completed

65 Gahoi BUildwell, Delhi Public health services design for following projects for economically weaker section in consortium with M/S Techpro Engineers Pvt. Ltd. Project cost-12.5 Cr.

HUDA for following projects HUDA sector 33 & 34, Ambala HUDA Sector 47, 56,62-1 & Sec-2, Faridabad

Rainwater harvesting, drinking water supply, sewer line completed Total no. of Houses 5000 under EWS category

66 Techpro Engineers Pvt. Ltd., Delhi

Consultation regarding water shed management

Various projects of Techpro Engineers Pvt. Ltd.

67 Sri Raman Ji, member supreme court monitoring committee for environment in TTZ

To assist in impact assessment & technical evaluation for various projects

68 Marg Ltd. Delhi Public health services design for following projects Project cost-2.5 Cr.

Huda project at Rewari Rainwater harvesting, drinking water supply, sewer line completed STP under Construction Total no. houses 400

69 Shriji Shivasha Estate, Mathura Environment planning, water resource Project cost-5 Cr.

Housing Project Rainwater harvesting, drinking water supply, sewer line ,STP under Construction

70 Ramway Food Ltd., Aligarh Environment planning, water resource management Project cost-10 lac.

Food processing unit Rainwater harvesting, drinking water supply, sewer line completed STP under Construction

71 Creative associates Public health services design for for rukmani vihar,Mathura Project cost-7.5 Cr.

Housing Project A project by Mathura development authority in nearly 50Ha.

drinking water line completed

72 Deeksha Housing PVT.LTD Environment planning, water resource management of 400 dwelling units Project cost-5 Cr.

Housing Project Rainwater harvesting, drinking water supply, sewer line, STP ,under Construction

73 Hardayal Milk Products Environment planning, water resource management Project cost-1.0 Cr.

Rainwater harvesting, drinking water supply, sewer line, completed

74 TDI Kingsbury Environment planning, water resource management Of 1100 acre of township Project cost-100 Cr.

Housing Project Of 1100 acre of township

Rainwater harvesting, drinking water supply, sewer line STP under design

27

Dass Rasayanic Services An ISO 9001 & 140001 certified

Design & Development Organization

75 Nand Gailana Environment planning, water resource management Project cost-10 lac.

Banquet hall Rainwater harvesting, drinking water supply, sewer line STP under design

76 Hardayal Milk Products

Environment planning, water resource management Project cost-3.0 Cr.

Up gradation of plant Rainwater harvesting, drinking water supply, sewer line, completed

77 Railway coach factory Amethi

water resource management Project cost-10 Cr.

Railway coach factory In 550 Ha.

Rainwater harvesting, drinking water supply, sewer line completed,

78 Super House Sikandrabad Environment planning, water resource management Project cost-50 lac.

Housing Project

Rainwater harvesting, drinking water supply, sewer line STP under design

79 M/s. Pahlarai confectioneries Pvt. Ltd. Kanpur

Environment planning, water resource management Project cost-50 lac.

A Parle franchisee for Confectioneries.

Wetland based Water Shed management with zero discharge, under construction

80 M/s. Laxni Cotsyn Ltd., fathehpur, Riwari Bujurg

Environment planning, water resource management

Synthetic fabric unit (Technical Textile unit)

Under designing process

81 M/s. Lakshmi Cotsyn Ltd. Malwa unit

Environment planning, water resource management

Synthetic fabric unit (Technical Textile unit)

Under designing process

82 M/s. Food Junction, Indrapuram Gaziabad

Water resource management for food mall with optimization of HVAC

Food mall at Indrapuram

Under implementation.

83 M/s. Romsons Surgical Industries, Nunhai Agra

Watershed management with Value Engineering for optimization of Pneumatic power transition besides cut in power bill upto 20%

Industrial Unit for surgical items

About to commission

84 Nagar Nigam Agra Survey & projections of meat consumption in Agra Municipal Limits

Survey of nearly 10% population

Draft report is submitted and approved

85 Sahitya Bhawan Publication, Agra

Water resource management Unit of Publication Rainwater harvesting, drinking water supply, sewer line STP

86 A-IHM Institute of Hotel Management

Environment planning Institutional Building Rainwater harvesting, drinking water supply, sewer line STP

87 TDI Tuskan City, Kundali, Haryana

Sewer Treatment Plant (STP) housing project Under designing process

88 TDI International School Environment planning & Environment planning

Institutional Building Under designing process

Yet many more to come … For latest updates, visit our web site at www.wateronline.co.in Contact Us: 441 Sector 16 Sikandra, Avas Yojna Sikandra, Agra mail: [email protected] Phone +91-562-2641866, Fax: +91-562-2641866 extn. 24