Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A...

11
armstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI

Transcript of Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A...

Page 1: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

Darmstadt Helmholtz Center for Heavy Ion Research

Facility for Antiproton and Ion Research

FAIR = A New International Facility next to GSI

Page 2: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

Facility for Antiproton and Ion Research14 Partner Countries so far:

Observers:

Austria

China

Finland

France Germany

Greece India Italy

Poland Romania

Russia Spain Sweden

UK

EU USA Hungary

Slovenia

Page 3: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

100 m

UNILACSIS 18

SIS 100/300

HESR

SuperFRS

NESR

CRRESR

ESR

• Construction in three phases until 2016• Total cost 1.2 B€• Scientific users: 2500 - 3000 per year

Construction Period, Cost, Users

• 65 % Federal Government of Germany• 10 % State of Hessen• 25 % Partner Countries FAIR GmbH with International Shareholders

Financing

Layout of the FAIR FacilityLayout of the FAIR Facility

GSI todayGSI today FAIR facilityFAIR facility• Beam intensities up by factors of 100 - 10000• Beam energies up by a factor 20• Production of antimatter beams• Factor 10 000 up in beam brilliance via cooling• Efficient parallel operation of programs

Gain Factors

Page 4: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

100 m

UNILACSIS 18

SIS 100/300

HESR

SuperFRS

NESR

CR

RESR

ESR

FLAIR

Rare-IsotopeProduction Target

AntiprotonProduction Target

CBM

PP / AP

Primary Beams

• 40Ar18+ 2x1012/s @ 1 – 2 AGeV• 238U28+: 5x1011/s @ 1 – 2 AGeV

• 40Ar18+ 2x1010/s @ 1 – 45 AGeV• 238U92+: 1x1010/s @ 1 – 35 AGeV 100 - 1000 times present intensity

• Protons: 2 – 5 x1013/s @ 30 GeV

Primary Beams

• 40Ar18+ 2x1012/s @ 1 – 2 AGeV• 238U28+: 5x1011/s @ 1 – 2 AGeV

• 40Ar18+ 2x1010/s @ 1 – 45 AGeV• 238U92+: 1x1010/s @ 1 – 35 AGeV 100 - 1000 times present intensity

• Protons: 2 – 5 x1013/s @ 30 GeV

Secondary Beams

• Broad range of radioactive beams up to 1 – 2 AGeV

• RI- Intensities up 10 000 - fold • Antiprotons

Secondary Beams

• Broad range of radioactive beams up to 1 – 2 AGeV

• RI- Intensities up 10 000 - fold • Antiprotons

Storage and Cooling of Beams

• Radioactive beams• anti-proton – A + e- – A collider • Antiprotons: > 1011 at 0.8 – 15 GeV/c• Future: Polarized antiprotons

Storage and Cooling of Beams

• Radioactive beams• anti-proton – A + e- – A collider • Antiprotons: > 1011 at 0.8 – 15 GeV/c• Future: Polarized antiprotons

Key Technical Features

• Phase-space optimization cooled beams, low-q ion beams • Rapidly-cycling super-conducting magnets• Efficient parallel operation of up to 4 programs

Key Technical Features

• Phase-space optimization cooled beams, low-q ion beams • Rapidly-cycling super-conducting magnets• Efficient parallel operation of up to 4 programs

A FAIR Performance !A FAIR Performance !

Page 5: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

100 m

UNILACSIS 18

SIS 100/300

HESR

SuperFRS

NESR

CR

RESR

GSI todayGSI todayFuture facilityFuture facility

ESR

FLAIR

Rare-IsotopeProduction Target

AntiprotonProduction Target

CBM

PP / AP

Hadron Structure, QCD-Vacuum and Medium Stored and cooled Anti-protons up to 15 GeV/c, 500 usersHadron Structure, QCD-Vacuum and Medium Stored and cooled Anti-protons up to 15 GeV/c, 500 users

Nuclear Structure & Nuclear AstrophysicsRI Beams from high-energy fragmentation; 600 usersNuclear Structure & Nuclear AstrophysicsRI Beams from high-energy fragmentation; 600 users

Physics of Dense Bulk Plasmas Ion-beam bunch compression + high-energy petawatt-laser; 250 users

Physics of Dense Bulk Plasmas Ion-beam bunch compression + high-energy petawatt-laser; 250 users

QCD-Phase Diagram: Nuclear & QGP Matter HI Beams 2 to 45 GeV/u; 400 users

QCD-Phase Diagram: Nuclear & QGP Matter HI Beams 2 to 45 GeV/u; 400 users

Materials Science, Radiation Biology (Ion & antiproton beams; 350 usersMaterials Science, Radiation Biology (Ion & antiproton beams; 350 users

Fundamental Symmetries & Ultra- High EM FieldsAntiprotons and highly stripped ions; 150 usersFundamental Symmetries & Ultra- High EM FieldsAntiprotons and highly stripped ions; 150 users

Accelerators: Linac, Double SC Synchrotrons, Storage Rings, Cooler RingsAccelerators: Linac, Double SC Synchrotrons, Storage Rings, Cooler Rings

Fields of Research at FAIRFields of Research at FAIR

Page 6: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

2000 2002 2004 2006

Wor

ksho

ps /

Whi

te P

aper

s: e

xplo

ratio

n of

sci

ence

opp

ortu

nitie

s

Wis

sen

sch

afts

rat-

Eva

luat

ion

& R

eco

mm

end

atio

n

BM

BF

Pre

ss R

elea

se:

'Gre

en L

igh

t' c

on

tin

gen

tu

po

n 2

5 %

inte

rn.

con

trib

.

CD

R S

ub

mis

sio

n

Preparation of the CDR (Concepual Design Report) in close collab. with intern. user community

Inte

rnat

ion

al S

teer

ing

C

om

mit

tees

es

tab

lish

edIn

tern

atio

nal

Mo

U

for

pre

par

ato

ry

ph

ase

7 N

ov

2007

: F

AIR

Sta

rt

Eve

nt

BT

R S

ub

mis

s. in

cl. C

ost

Bo

ok

Leg

al &

Go

vern

ance

Str

uct

ure

Co

nse

nt

by

Inte

rn. S

teer

ing

C.

Preparation of the BTR (Baseline Technical Report)

and of the

Legal & Governance Structure

2007

... Milestones ...

Brief History of the FAIR Project ...Brief History of the FAIR Project ...

Nu

PE

CC

LR

P:

'hig

hes

t p

rio

rity

'

On

ES

FR

I Lis

t fo

r n

ew r

esea

rch

in

fras

tru

ctu

res

Ger

man

Nat

ion

alK

Hu

K-C

om

mit

ee:

'hig

hes

t p

rio

rity

'

Page 7: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

PAC QCD E. Chiavassa

PAC NUSTAR R. Casten

PAC APPA D. Schwalm

TAC R. Garoby

FAIRH. Gutbrod, D. Kraemer

JCT

CORECost Review Groups

D. Plane, W. Bartel

FCIFull Cost Issues

B. Brandt

AFI Working GroupAdministrative + Funding Issues

Ö. Skeppstedt

LFILegal Framework Issues

U.B. Jahn

STI Working GroupScientific + Technical Issues

H. Wenninger

ISCInternational Steering Committee

H. Schunck / J. T. Gierlinsky

Mini-TACs• Cryogenics• Warm magnets •Cold magnets• Power Supplies• Beam Instrumentation• p-Linac

International Committee Structure during the FAIR Preparatory Phase

International Committee Structure during the FAIR Preparatory Phase

Page 8: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

Resolutions from the Recent ISC Meeting(October 17, 2007)

Resolutions from the Recent ISC Meeting(October 17, 2007)

... ISC approves the 7/11 FAIR start version recommended by STI…

... ISC urges all interested partners to provide further resources in due time in order to realize the full version according to the Baseline Technical Report as soon as possible ....

... ISC approves the modified convention and the final act. ISC urges its members to finalize the necessary legal steps regarding these documents...

... From the FAIR Start Event (Nov. 7, 2007) until the incorporation of the FAIR GmbH, the ISC will continue its work and will apply its Rules of Procedure according to the 'Rules of Procedure for the (future) FAIR Council'.

... The ISC authorizes the ISC Chair to set up Search Committees for the two Managing Directors of the future FAIR GmbH. ISC members are asked to make proposals for the members of the Search Committees by November 10, 2007.

Page 9: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

You are cordially invited to attend the ....You are cordially invited to attend the ....

Page 10: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

InvitationInvitation

Page 11: Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

Thank You!

FAIR in 2016 ...