Daniela Bremmer WSDOT: Director, Strategic Assessment

19
Daniela Bremmer WSDOT: Director, Strategic Assessment Measuring and Communicating the Effectiveness of Systems Operation Strategies Subcommittee for Systems Operation and Management Annual Meeting April 9-10, 2013; Phoenix, Arizona 1

description

Measuring and Communicating the Effectiveness of Systems Operation Strategies. Subcommittee for Systems Operation and Management Annual Meeting April 9-10, 2013; Phoenix, Arizona. Daniela Bremmer WSDOT: Director, Strategic Assessment. 1. - PowerPoint PPT Presentation

Transcript of Daniela Bremmer WSDOT: Director, Strategic Assessment

Page 1: Daniela Bremmer WSDOT: Director, Strategic Assessment

Daniela BremmerWSDOT: Director, Strategic Assessment

Measuring and Communicating the Effectiveness of Systems Operation Strategies

Subcommittee for Systems Operation and Management Annual Meeting April 9-10, 2013; Phoenix, Arizona

1

Page 2: Daniela Bremmer WSDOT: Director, Strategic Assessment

Building of a Brand: Moving Washington- WSDOT’s strategy to address congestion

Improving the Performance of Our State’s Transportation Corridors by:

2

Page 3: Daniela Bremmer WSDOT: Director, Strategic Assessment

SR 167 HOT lanes

Incident Response Team

Traffic Management Center

• Intelligent Transportation Systems (ITS):

155 ramp meters, 106 real-time traveler information, 746 traffic cameras, 258 variable message boards, 7 traffic management centers.• Incident Response Teams: Statewide IR teams responded to 44,492 incidents in 2011. Average clearance time dropped from 33 minutes in 2001 to 12.6 minutes in 2011.• Signal Timing: Signal optimization program monitors and adjusts up to 1000 traffic signals to save drivers thousands of hours in yearly traffic delay.• High occupancy vehicle (HOV) lanes: WSDOT has completed 309 lane-miles of planned 320 lane-mile HOV system that is funded.• High occupancy toll (HOT) lanes:Making HOV lanes more efficient.

Operating Efficiently: OverviewGetting the most out of the infrastructure we have

SR 167 HOT lanes3

Page 4: Daniela Bremmer WSDOT: Director, Strategic Assessment

1. Communicate clear, relevant and easy-to-understand measures and results using Performance Journalism

2. Demonstrate how programs contribute to agency and state priorities 3. Monitor and analyze detailed program data 4. Evaluate effectiveness (Before and After) of deployed strategies 5. Hold regular problem-solving sessions –avoid silos 6. Allocate resources based on strategies that work-performance based

investment decisions 7. Indentify and target key audience groups 8. Regularly report to governor, legislature, media and public on performance -

seek and create opportunities to report

WSDOT’s Performance Management Philosophy for all Programs-including Operations

Ask yourself- What operational metrics and data would convince you that your tax payer dollars are well spent?

4

Page 5: Daniela Bremmer WSDOT: Director, Strategic Assessment

WSDOT Sample of System Performance Measures

5

Page 6: Daniela Bremmer WSDOT: Director, Strategic Assessment

Traffic Operations Performance Measurement Opportunities and Challenges-Examples

• The Challenge of Operational Strategies to fill the Productivity Gap

o Measuring System Productivity

• The Challenge of Quantifying Operational Benefits

o Traffic Incident Management (TIM) Example

6

Page 7: Daniela Bremmer WSDOT: Director, Strategic Assessment

Measuring and Communicating Lost Throughput Productivity

• WSDOT monitors vehicle throughput at strategic locations on the central Puget Sound freeway system using real-time data.

• Throughput productivity is measured by the difference between the highest average five minute flow rate observed during the year and the flow rate that occurs when vehicles travel below the maximum throughput speeds (50 mph).

Making a Case for Operational Strategies

7

Page 8: Daniela Bremmer WSDOT: Director, Strategic Assessment

Measuring and Communicating Lost Throughput Productivity

Making a Case for Operational Strategies

8

• Lost throughput productivity measures the percentage of a highway’s vehicle throughput capacity that is lost due to congestion in terms of vehicles per lane per hour.

Page 9: Daniela Bremmer WSDOT: Director, Strategic Assessment

New efforts for Operational Strategies:Traffic Incident Management (TIM) Example

Articulating Economic Benefits of Operational Strategies

9

WSDOT Incident Response Team arrive quickly to assist with traffic control and clean up. September 22, 2011.

Page 10: Daniela Bremmer WSDOT: Director, Strategic Assessment

“Clearing Roads - Helping Drivers” Washington’s Incident Response (TIM) Program

*WSDOT and WSP work together and track many more TIM measures, for details please see: Gray Notebook 48, pages 24-27, Gray Notebook 47, pages 17-19, Gray Notebook 46, pages 24-26 (http://wsdot.wa.gov/publications/fulltext/graynotebook/Dec12.pdf)

Key Performance Measures for Incident Response Teams*

Source: WSDOT Strategic Assessment Office (http://www.wsdot.wa.gov/accountability/)

10

Page 11: Daniela Bremmer WSDOT: Director, Strategic Assessment

A “roadway clearance time” based metric: Over-90-minute Incident Analysis (WSDOT & WSP- GMAP)

Based on WSDOT and WSP-Joint Operations Policy Statement (JOPS)”clear blocking traffic incidents in 90 minutes or less” http://www.wsdot.wa.gov/Operations/IncidentResponse/partnerships.htm

Source: WSDOT (http://www.wsdot.wa.gov/accountability/)

11

Page 12: Daniela Bremmer WSDOT: Director, Strategic Assessment

An “incident clearance time” based metric (WITS data only):

(January 2001 – December 2011)

33

25.6

18 17.1 17.6 17.316.1

13.4 13.4 12.6 12.6

0

5

10

15

20

25

30

35

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Annual average clearance time responded by the WSDOT IR program2001 - 2011

Time in minutes

Average Incident Clearance Time (Scene is Clear – no responders remaining)

Source: WSDOT Strategic Assessment Office (http://www.wsdot.wa.gov/accountability/)

12

Page 13: Daniela Bremmer WSDOT: Director, Strategic Assessment

Quantifying Benefits of the Incident Response Program

Safety

Traveler Experience

Delay /Congestion Reduction

Economic Benefits

13

Page 14: Daniela Bremmer WSDOT: Director, Strategic Assessment

Estimated Economic Benefits Delay Reduction - WITS data only

Baseline Assumptions: 1. Based on research performed by University of Maryland, Rice University, and

Texas Transportation Institute incident-induced delay was reduced by about 25% on average when incident response personnel assisted with incident clear-up.

2. WSDOT Incident Response research (TRAC 761.1) suggests an average incident

o with no lane closure costs $244 per minute of incident o with lane closure costs $345 per minute of lane closure

In 2012, Q2, WSDOT response teams helped clear 11,292 incidents statewide (This represents approximately 65% of all WSP-CAD records)

Economic benefits WSDOT’s Incident Response (IR) program responded to 11,292 incidents in the second quarter of 2012, saving travelers and businesses in Washington about $9.25 million by reducing the time and gas they would have wasted in travel delay due to congestion.

Source: WSDOT Strategic Assessment Office (http://www.wsdot.wa.gov/accountability/)

14

Page 15: Daniela Bremmer WSDOT: Director, Strategic Assessment

Quarterly Analysis of Economic Benefits* of the TIM Program

Source: WSDOT Strategic Assessment Office (http://www.wsdot.wa.gov/accountability/)

* The economic benefits for the TIM program are estimated as 25% of the cost of the incident induced delay. WSDOT’s program cost is $1.125 million per quarter.

15

Page 16: Daniela Bremmer WSDOT: Director, Strategic Assessment

Estimated Benefits of “Secondary Crashes” Avoided* (WSDOT assumptions)

Baseline Assumption: based on national case studies, the average secondary crash rate can be estimated at 20% (or more) of the primary number of incidents (FHWA)

In Q2 2012, WSDOT response teams helped clear 11,292 incidents statewide (Approximately 65% of all WSP-CAD records)

These proactive response actions helped avoid 2,258 secondary crashes (11,292*0.2 ) from occurring in Q2 2012

Economic benefits from secondary crashes avoided is $7.5 million (Assumptions include: Average clearance time for a secondary crash is 11.6 minutes and cost per minute of crash scene duration is $286; (2,258*11.6*$286 = $7.5M))

*Preliminary analysis in the 2012 Congestion Report;Source: WSDOT Strategic Assessment Office (http://www.wsdot.wa.gov/accountability/)

16

Page 17: Daniela Bremmer WSDOT: Director, Strategic Assessment

Combined Estimated Economic Benefits of the Incident Response Program

Quarterly Delay reductions: $9.25 million

Secondary Crashes avoided : $7.50 million

Total estimated quarterly economic savings/benefits: $16.75 million

Quarterly Cost of Incident Response Program (WSDOT): $1.13 million

Benefit Cost Ratio is approximately: 15 to 1

17

Page 18: Daniela Bremmer WSDOT: Director, Strategic Assessment

Source: San Diego Union-Tribune, Dec. 15, 2010

New Opportunities-Measuring Benefits of Active Traffic Management and Tolling Strategies……stay tuned!

18

Page 19: Daniela Bremmer WSDOT: Director, Strategic Assessment

19

Daniela Bremmer Washington State Department of TransportationDirector, Strategic Assessment Office360-705-7953 [email protected]

Resources Moving Washington Website: http://www.wsdot.wa.gov/movingwashington/

WSDOT’s Congestion Website: http://www.wsdot.wa.gov/Congestion/

WSDOT’s Accountability Website: http://www.wsdot.wa.gov/accountability/

Real Time Travel Times Website: http://www.wsdot.wa.gov/traffic/seattle/traveltimes/

Plan Your Commute– 95% Reliable Travel Times Website: http://www.wsdot.wa.gov/Traffic/Seattle/TravelTimes/reliability/

WSDOT’s quarterly performance report: the Gray Notebook: http://www.wsdot.wa.gov/Accountability/GrayNotebook/navigateGNB.htm

Performance Measurement at WSDOT, four page folio http://www.wsdot.wa.gov/NR/rdonlyres/91089378-E709-49EF-AE42-AE80BC44A91C/0/TRB_Performance_Folio.pdf

WSDOT’s Strategic Plan: http://www.wsdot.wa.gov/Accountability/PerformanceReporting/StrategicPlan.htm

Performance Journalism: http://www.wsdot.wa.gov/NR/rdonlyres/685F6B37-9082-47DE-81FC-676EE95C5EE9/0/Bridging_Gap_PJ_TRBprintedvsn.pdf

Making the Case for Funding: The WSDOT Experience (2008, Transportation Research Record) http://www.wsdot.wa.gov/NR/rdonlyres/E5D34B36-6662-4464-B4BA-1E858BBD710D/0/2007_TRB_Making_Case_Funding.pdf

Maximizing Highway System Capacity: Measuring and Communicating System Performance in an Evolving Field–(2008, Transportation Research Forum) http://www.wsdot.wa.gov/NR/rdonlyres/5FF329ED-A840-4F8A-A798-468948BEE80B/0/Maximizing_Highway_Capacity_PM_finalvsn.pdfContact Info: