    Converted tankers into FPSO:Life extensions structural challenges

    Damien THIERYOffshore Project Engineer

    Bureau Veritas HO [email protected]

  • 8/10/2019 Damien Thiery

    2/14

    2MCE Deepwater Development 2014 - Madrid

    Introduction: converted tankers into FPSO

    In 2014: Conversions represent approximately 70%of the F(P)SO units

    Forecast of F(P)SO orders over the next period (2014-2018):

    Conversion 55% New built 25%

    Redeployment 20 %

    2 phases should be taken into account:

    Life extension: when the asset exceeds its design life

    Tanker Service

    FP(S)O Service

  • 8/10/2019 Damien Thiery

    3/14

    3MCE Deepwater Development 2014 - Madrid

    Contents

    1. Hull structure challenges

    2. Structural analysis

    Strength assessment

    Fatigue assessment

    3. Integrity management System

    4. Conclusion

  • 8/10/2019 Damien Thiery

    4/14

    4MCE Deepwater Development 2014 - Madrid

    Hull structural challenges

    Previous history: as trading services and during the transit

    RAO Roll RAO Pitch

    RAO Roll

    RAO Pitch

  • 8/10/2019 Damien Thiery

    5/14

    5MCE Deepwater Development 2014 - Madrid

    Hull structural challenges: Tanker service

    What are the main hull degradation processes of a tanker ?

    Corrosion

    Fatigue cracks / fatigue accumulated damage

    What is the current hull condition ?

    Is the operating history (log book) fully known ?

    Are previous inspection / repair reports available ?

    Which is the outcome from the condition assessment survey (corrosion) ?

    How site environmental conditions compare with tanker class notation ?

  • 8/10/2019 Damien Thiery

    6/14

    6MCE Deepwater Development 2014 - Madrid

    Hull structural challenges: FPSO Service

    How to ensure the hull is eligible to be converted ?

    Which are the results of feasibility study and in terms of strength and fatigue ?

    Design conversion verification by structural assessment: forecast futurecondition and expected end of life.

    What are the necessary repairs to face the FPSO service life ? IMR strategy to be defined in order to ensure the operational continuity

    Is there an Asset Integrity Management System planed ?

  • 8/10/2019 Damien Thiery

    7/14

    7MCE Deepwater Development 2014 - Madrid

    Structural Analysis

  • 8/10/2019 Damien Thiery

    8/14

    8MCE Deepwater Development 2014 - Madrid

    Structural Analysis

    Input for the structural analyses :

    Key structure drawings

    Capacity plan

    Trim & stability booklet

    Weight distribution

    Tanker speed and trading routes history

    Towing/transit speed and route

    Repair history, detected failures, damages, particular findings:cracks, indents, impacts, pitting,

    Corrosion as is condition or reassessed scantlings

    FPSO operational Loading conditions, Loading/Unloading

    sequence Site metocean conditions

    Hydrodynamics & heading analysis results

    Mooring analysis results (mooring loads at hull interface)

  • 8/10/2019 Damien Thiery

    9/14

    9MCE Deepwater Development 2014 - Madrid

    Structural Analysis: Strength analysis

    FINDINGS

    Strength analysis

    Design waves applied on the model to maximize loadparameters.

    Yielding verification Buckling verification

  • 8/10/2019 Damien Thiery

    10/14

    10MCE Deepwater Development 2014 - Madrid

    Structural Analysis: Fatigue analysis

    Fatigue analysis

    Operational loading condition + transit condition

    Assessment of typical locations (determined by experience & fatigue scan)

    Analysis of previously detected cracks on board Assessment of repair solutions

  • 8/10/2019 Damien Thiery

    11/14

    11MCE Deepwater Development 2014 - Madrid

    Structural Analysis: Particular areas

    Turret-Hull Interface

    Crane Pedestals

    Topsides stools

    Hopper knuckle

  • 8/10/2019 Damien Thiery

    12/14

    12MCE Deepwater Development 2014 - Madrid

    Structural Analysis

    Outputs of structural analysis

    Remaining life assessment

    Inspection plan definition based on hot spot maps

    Determination of repair/modification solution To avoid further cracking

    To insure sufficient corrosion margin

    To avoid integrity issues resulting in production down time

    To avoid hot work or dry dock

    Area 1

    Area 3Area 2

    Area 4

  • 8/10/2019 Damien Thiery

    13/14

    13MCE Deepwater Development 2014 - Madrid

    Integrity management System

    Operator & Partners

    ensuring that FPSO inspection plan is carried out and updated with documents

    (modifications, inspection findings, corrective actions )

    Marine operation

    department

    Project TeamInspection Plan

    Production

    department

    Contractor

    Site inspectors

    Safety

    department

    Maintenance

    department

    Classification Society

  • 8/10/2019 Damien Thiery

    14/14

    14MCE Deepwater Development 2014 - Madrid

    Conclusion

    Corrosion and structural integrity are the main challenges

    Finite Elements Analyses and Asset Integrity Systemprovide answers regarding :

    The status of the hull structure = condition assessment If the unit is suitable for intended = life extension

    How to anticipate / minimize / avoid offshore structural work beforegoing offshore

    Follow-up in service (Class surveys, operator inspections)

    Tanker service

    Trading routes Damages and repairs

    Surveys

    Structural analysis

    FPSO service

    Sites conditions Expected service life

    Structural analysis

    Inspection & Maintenance

    CONVERSION