Damage Prevention Virginia Pilot Project & Legislative Update.

22
Damage Prevention Virginia Pilot Project & Legislative Update

Transcript of Damage Prevention Virginia Pilot Project & Legislative Update.

Page 1: Damage Prevention Virginia Pilot Project & Legislative Update.

Damage PreventionVirginia Pilot Project &

Legislative Update

Page 2: Damage Prevention Virginia Pilot Project & Legislative Update.

EXCAVATOR requests locate for planned excavation

VUPS ONE-CALL CENTERidentifies and notifies affected operators

OPERATOR / LOCATORlocates facilities and provides positive response to VUPS

VUPS ONE-CALL CENTER provides positive response confirmation to excavator via E-mail or fax

EXCAVATOR OK to Dig With CARE

C.A.R.E.

Basic Notification Process in Virginia

Page 3: Damage Prevention Virginia Pilot Project & Legislative Update.

Problem

• The Common Ground Alliance One Call Systems International (OCSI) statistical data collected from 25 states across the country shows a total of over 15 million locate requests to one-call centers in 2004

• Depending on the location, one may assume that as many 5 outgoing locate ticket notifications might be sent to individual utility operators

• Depending on the nature of the individual utility operators’ facilities 40%-60% of those tickets may be over-notification

• The data also indicates that there were vague or incorrect excavation location descriptions on approximately 2% of the total outgoing tickets

Page 4: Damage Prevention Virginia Pilot Project & Legislative Update.

Phase I Metrics – Tickets

Type Control Area

Percentage

Test Area Percentage

Reduction

Total Requests

77,022 1,911

3Hour Notices 3,948 5.13% 42 2.20% 57.12%

Cancellations 502 0.65% 8 0.42% 35.77%

• Pilot study conducted with over 2,000 electronically white-lined tickets submitted

Page 5: Damage Prevention Virginia Pilot Project & Legislative Update.

Vettro 360 for Damage Prevention

• Vettro 360 application customized to leverage on-board GPS chip-set of handheld, Vettro ESRI mapping infrastructure, and support of peripheral GPS devices via Bluetooth

Page 6: Damage Prevention Virginia Pilot Project & Legislative Update.

Replace Address/Description with GPS Stamps

• End-user walks the area of planned excavation – Line, Polygon, Multi-line Segment, Bulls Eye – while recording GPS coordinates

• Coordinates and relevant descriptive data is submitted to One Call Centers for processing and notification of affected utilities

• Ticket can be suspended for completion at a later time

Page 7: Damage Prevention Virginia Pilot Project & Legislative Update.

Phase I: Electronic White Line

Page 8: Damage Prevention Virginia Pilot Project & Legislative Update.

Phase I Metrics - Responses

Type Control Area

Percentage

Test Area Percentage

Reduction

Code 60 20,849 27.07% 173 9.05% 66.56%

Code 91 3,836 4.98% 62 3.24% 34.86%

Code 93 31 0.04% 0 0.00% 100.00%

Code 94 464 0.60% 1 0.05% 91.31%

• Code 60: Locator and excavator agreed and documented marking schedule• Code 91: Incorrect address information• Code 93: Scope of work to large• Code 94: Marking instructions are unclear

Page 9: Damage Prevention Virginia Pilot Project & Legislative Update.

Phase I Metrics - Notification• Control Area averaged 7.96 members per locate request

• Test Area averaged 7.32 members per locate request—a 8.04% reduction

• Control Area averaged 768,527 square feet polygon size

• Test Area averaged 81,341 square feet polygon size—a 89.4% reduction

Page 10: Damage Prevention Virginia Pilot Project & Legislative Update.

Benefits• Improved safety and reliability of

underground utilities • Improved accuracy of locate ticket

information • Ability to see excavation area

mapped on handheld device • Fewer field visits to gather locate

ticket information • Fewer return calls from locator

asking for more specific information• Reduced time from submission of a

locate request to being cleared to work

• Reduced risk of downtime, enforcement actions and litigation resulting from damage incidents .

• Reduced risk of downtime, enforcement actions and litigation resulting from damage incidents

• Reduced time required to process locate requests

• Reduced ticket processing costs through automated ticket input/output

• Improved quality of service from one-call center

• Reduced over-notification • Reduced numbers of incorrect

tickets • Reduced footprint for locate areas

for grids and polygons

Page 11: Damage Prevention Virginia Pilot Project & Legislative Update.

In Summary…

Page 12: Damage Prevention Virginia Pilot Project & Legislative Update.

ONE CALL (IRTH software)

LOCATOR

Utilities are charged for each locate ticket generated

…and again for each request to mark their facilities

NOTIFICATIONAREA

Each time an excavator plans to dig…

EXCAVATOR

Current One Call Ticket Flow

Page 13: Damage Prevention Virginia Pilot Project & Legislative Update.

ONE CALL (IRTH software)

LOCATOR

NOTIFICATIONAREA

Each time an excavator plans to dig…

| VETTRO DP

Only necessary tickets are generated using GPS coordinates

…and only essential locate requests are generated

Savings of 39% per ticket

Utilities are charged for each locate ticket generated

…and again for each request to mark their facilities

Page 14: Damage Prevention Virginia Pilot Project & Legislative Update.

BENEFITS TO ONE CALL

The one call centers benefit in much the same way that they have been benefitting from Internet ticket entry. Every time an excavator uses electronic means to submit a ticket the cost of a person handling the call is eliminated. During this time of economic slowdown the impact isn’t felt as much as when volumes were increasing 7 to 15% per year. Centers were required to staff up to handle the call volumes coming in. Using this method of ticket creation speeds up the transaction and allows the flow to happen purely by machine, through machine, to machine.

Page 15: Damage Prevention Virginia Pilot Project & Legislative Update.

INCENTIVES TO EXCAVATORS

A new method of encouraging the excavators to participate may be coming from one of the partners with incentive to see this program succeed. A utility company that was cited for facility damage and faced with a stiff fine from the PHMSA is currently working to trade in the dollars they would pay for a donation of GPS enabled phones to excavators. This falls in line with several other unique methods of trading in financial penalties for educational opportunities. There have been cases where companies ran advertisements for 811, painted water towers or posted large billboards in lieu of paying a fine.

Page 16: Damage Prevention Virginia Pilot Project & Legislative Update.

BENEFITS TO OPERATORS

• Less “wasted” tickets• Less damages

BENEFITS TO ONE CALL

• More accurate tickets• Less CSR interaction

BENEFITS TO EXCAVATORS

• Speedier response from locators• Less locations to mark• Claims reduction

Page 17: Damage Prevention Virginia Pilot Project & Legislative Update.

PHASE TWO

Phase 2 involves the creation of an electronic manifest of the dig site that shows the utilities along with the dig site on an aerial map of the location. This document will greatly aid in the communication as “a picture tells a thousand words.” It will not eliminate the need for care in the digging process but it will provide an on-site reference for the excavator to use during the course of activity. As the results are being gathered from this phase right now they will be addressed in the future.

Page 18: Damage Prevention Virginia Pilot Project & Legislative Update.

LEGISLATIVE UPDATES

• Florida – Low Impact Marking…Public records exemption, No charging for locates, Call Center not responsible for locating:“ The system does not have a duty to mark or locate underground facilities and may not do so, and a right of recovery does not exist against the system for failing to mark or locate underground facilities. The system is not liable for the failure of a member operator to comply with the requirements of this chapter. “

Page 19: Damage Prevention Virginia Pilot Project & Legislative Update.

LEGISLATIVE UPDATES

• Kentucky

Page 20: Damage Prevention Virginia Pilot Project & Legislative Update.

LEGISLATIVE UPDATES

NevadaCalifornia

Only two ticket extensions

Page 21: Damage Prevention Virginia Pilot Project & Legislative Update.

• Many States Evaluating The 9 Elements from PIPES Act

• Enforcement Plays a Key Role In Determining How The Future Laws Will Look