Dallas, Texas / February 28, 2017
![Page 2: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/2.jpg)
Schedule
![Page 3: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/3.jpg)
Assistant Superintendent, District OperationsExecutive DirectorRISD FacilitiesRISD Project Manager
PrincipalAP, Support Staff/MinutesAP, Support Staff/MinutesKindergarten – First GradeSecond – Third GradeFourth GradeFifth – Sixth GradeSpecials504, Sped & DyslexiaLibrary/Lab
Roles + Responsibilities
Outgoing PTA President, parentIncoming PTA President, parentDads Club, parentDads Club, parentHOA, parentHOA, parentHOA, parentWRVNA, future parent
![Page 4: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/4.jpg)
Over 50 Years of Combined Project Experience and Client Leadership
![Page 5: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/5.jpg)
Norms and Roles
![Page 6: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/6.jpg)
Proven Five Step Process leads to Success
![Page 7: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/7.jpg)
![Page 8: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/8.jpg)
![Page 9: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/9.jpg)
![Page 10: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/10.jpg)
What culture, traditions, and values do you love about this campus?
![Page 11: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/11.jpg)
How will we define project success?
![Page 12: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/12.jpg)
![Page 13: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/13.jpg)
![Page 14: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/14.jpg)
Assistant Superintendent, District OperationsPrincipalFifth – Sixth GradeWRVNA, future parentHOA, parentDads Club, parentHOA, parent
Executive DirectorAP, Support Staff/Minutes504, Sped & DyslexiaSpecialsFourth GradeOutgoing PTA President, parentHOA, parent
Small Group Teams
RISD FacilitiesAP, Support Staff/MinutesKindergarten – First GradeSecond – Third GradeLibrary/LabIncoming PTA President, parentDads Club, parent
![Page 15: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/15.jpg)
Team A - What currently works on site?
Team B - What currently does not work on site?
Team C - What would you like to see on the site in the future?
![Page 16: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/16.jpg)
![Page 17: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/17.jpg)
Campus and Site Parking
EXISTING PARKING
REQUIRED ON SITE SPACES =
50 CLASSROOMS X 1.5 = 75 SPACES
NORTH LOT = 53 SPACES
SOUTH LOT = 26 SPACES
TOTAL ON SITE PARKING = 79 SPACES
FUTURE REQUIRED ON SITE SPACES =
62 CLASSROOMS X 1.5 = 93 SPACES (14 MORE SPACES)
STREET PARKING = 31 SPACES
![Page 18: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/18.jpg)
Campus Drop Off Traffic - Morning
Drop Off Time: 7:20am – 8:00am.
Multiple Drop Off Locations / Can Drop Off at the Main Entry.
Dad’s Club Manages Drop Off
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
![Page 19: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/19.jpg)
Campus Drop Off Traffic - Morning
Drop Off Time: 7:20am – 8:00am.
Multiple Drop Off Locations / Can Drop Off at the Main Entry.
Dad’s Club Manages Drop Off
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
![Page 20: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/20.jpg)
Campus Drop Off Traffic - Morning
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
Drop Off Time: 7:20am – 8:00am.
Multiple Drop Off Locations / Can Drop Off at the Main Entry.
Dad’s Club Manages Drop Off
![Page 21: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/21.jpg)
Campus Pick Up Traffic - Afternoon
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
DAY CARE BUS PICK UP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
DAY CARE BUS LOADING ZONE
DISMISSAL EXIT POINT
4th - 6th Exit to the North
![Page 22: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/22.jpg)
Campus Pick Up Traffic - Afternoon
4th - 6th Exit to the North
DP/PPCD Exit to the East
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
DAY CARE BUS PICK UP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
DAY CARE BUS LOADING ZONE
DISMISSAL EXIT POINT
![Page 23: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/23.jpg)
Campus Pick Up Traffic - Afternoon
4th - 6th Exit to the North
DP/PPCD Exit to the East
Day Care Exit to the Southeast
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
DAY CARE BUS PICK UP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
DAY CARE BUS LOADING ZONE
DISMISSAL EXIT POINT
![Page 24: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/24.jpg)
Campus Pick Up Traffic - Afternoon
4th - 6th Exit to the North
DP/PPCD Exit to the East
Day Care Exit to the Southeast
Kindergarten - 3rd Exit to the South
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
DAY CARE BUS PICK UP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
DAY CARE BUS LOADING ZONE
DISMISSAL EXIT POINT
![Page 25: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/25.jpg)
Campus Pick Up Traffic - Afternoon
4th - 6th Exit to the North
DP/PPCD Exit to the East
Day Care Exit to the Southeast
Kindergarten - 3rd Exit to the South
Walkers Exit to the North and West via the Playfields
NORTH CAR RIDER DROP OFF/PICKUP
DP/PPCD DROP OFF/PICKUP
DAY CARE BUS PICK UP
SOUTH CAR RIDER DROP OFF/PICK UP
ROAD BLOCK
DROP OFF / LOADING ZONE
HUG ZONE
DAY CARE BUS LOADING ZONE
DISMISSAL EXIT POINT
![Page 26: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/26.jpg)
![Page 27: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/27.jpg)
Site Constraints and Easements
Preliminary PD Research (PD 581)
Total Site: 10.0639 acres (438,383 SF)
Maximum Lot Coverage of 60%
• Above Ground Parking Structures Included in Lot Coverage
• Surface Parking Lots not Included
1 Story Maximum Above Grade
40 FT Maximum Structure Height
30 FT Front, Side & Rear Yard Setback
78,000 SF Maximum Floor Area
30 FT FRONT, SIDE & REAR YARD SETBACK
![Page 28: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/28.jpg)
Site Constraints and Easements
Lot Size: 438,383 SF (10.0639 acres)
Allowable Lot Coverage: 263,030 SF (6.038 acres)
• (438,383 x .60 = 263,030 SF)
• Actual Lot Coverage: 77,367 SF (1.776 acres)
• 185,663 SF of Additional Lot Coverage
Allowable Floor Area is 78,000 SF
• 78,000 SF - 77,367 SF = 633 SF
30 FT FRONT, SIDE & REAR YARD SETBACK
ALLOWABLE LOT COVERAGE
![Page 29: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/29.jpg)
Site Constraints and Easements
Lot Size: 438,383 SF (10.0639 acres)
Allowable Lot Coverage: 263,030 SF (6.038 acres)
• (438,383 x .60 = 263,030 SF)
• Actual Lot Coverage: 77,367 SF (1.776 acres)
• 185,663 SF of Additional Lot Coverage
Allowable Floor Area is 78,000 SF
• 78,000 SF - 77,367 SF = 633 SF
30 FT FRONT, SIDE & REAR YARD SETBACK
ALLOWABLE LOT COVERAGE
![Page 30: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/30.jpg)
Site Constraints and Easements
Lot Size: 438,383 SF (10.0639 acres)
Allowable Lot Coverage: 263,030 SF (6.038 acres)
• (438,383 x .60 = 263,030 SF)
• Actual Lot Coverage: 77,367 SF (1.776 acres)
• 185,663 SF of Additional Lot Coverage
Allowable Floor Area is 78,000 SF
• 78,000 SF - 77,367 SF = 633 SF
30 FT FRONT, SIDE & REAR YARD SETBACK
ALLOWABLE LOT COVERAGE
ADDITIONAL LOT COVERAGE
![Page 31: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/31.jpg)
Existing Site Utilities
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
![Page 32: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/32.jpg)
Existing Site Utilities
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
![Page 33: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/33.jpg)
Existing Site Utilities
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
EXISTING DOMESTIC WATER UTILITY
![Page 34: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/34.jpg)
Existing Site Utilities
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
EXISTING DOMESTIC WATER UTILITY
EXISTING SANITARY SEWER
![Page 35: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/35.jpg)
Existing Site Utilities
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
EXISTING DOMESTIC WATER UTILITY
EXISTING SANITARY SEWER
EXISTING STORM SEWER
![Page 36: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/36.jpg)
Site Constraints and Easements
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
EXISTING DOMESTIC WATER UTILITY
EXISTING SANITARY SEWER
EXISTING STORM SEWER
DRAINAGE EASEMENT
![Page 37: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/37.jpg)
Site Constraints and Easements
30 FT FRONT, SIDE & REAR YARD SETBACK
POWER UTILITY EASEMENT
EXISTING GAS UTILITY
EXISTING DOMESTIC WATER UTILITY
EXISTING SANITARY SEWER
EXISTING STORM SEWER
DRAINAGE EASEMENT
FLOODWAY EASEMENT
![Page 38: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/38.jpg)
Site Constraints and Easements
Lot Size: 438,383 SF (10.0639 acres)
Allowable Lot Coverage: 263,030 SF (6.038 acres)
• (438,383 x .60 = 263,030 SF)
• Actual Lot Coverage: 77,367 SF (1.776 acres)
• 185,663 SF of Additional Lot Coverage
Allowable Floor Area is 78,000 SF
• 78,000 SF - 77,367 SF = 633 SF
30 FT FRONT, SIDE & REAR YARD SETBACK
ALLOWABLE LOT COVERAGE
ADDITIONAL LOT COVERAGE
DRAINAGE EASEMENT
FLOODWAY EASEMENT
![Page 39: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/39.jpg)
Site Constraints and Easements
30 FT FRONT, SIDE & REAR YARD SETBACK
DRAINAGE EASEMENT
FLOODWAY EASEMENT
PROBABLE ZONES FOR ADDITIONS ZONE 1
ZONE 2
ZONE 3
ZONE 4
![Page 40: Dallas, Texas / February 28, 2017 · 50 classrooms x 1.5 = 75 spaces north lot = 53 spaces south lot = 26 spaces total on site parking = 79 spaces future required on site spaces =](https://reader034.fdocuments.in/reader034/viewer/2022050215/5f615ab9819a2946076a4cf9/html5/thumbnails/40.jpg)