Dale Evans Director - @one Alliance January 2013
![Page 2: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/2.jpg)
Presentation covers ….
• Alliance Background
• Key Improvement Strategies
Product Development
Continuous Improvement
• Examples
![Page 3: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/3.jpg)
3
Need for a different approach!
2005 looking forward:
• Deliver a £ 1 bn five year programme
• Tough efficiency targets
• Operable solutions
• Health and Safety
Only achievable through a different model
![Page 4: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/4.jpg)
4
Developing an Alliance Model
ALIGNMENT
INTEGRATED TEAMS
VISIBLE PROGRAMMES
COLLABORATION
INCENTIVE BASED MODEL
CONTINUOUS IMPROVEMENT
![Page 5: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/5.jpg)
5
Alliance Organisation
engineering
![Page 6: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/6.jpg)
6
The Challenges!
• 25% affordability challenge (over 5 years)
• 50% reduction in embodied carbon
• 20% reduction in operational carbon
• All Capital Delivery targets
A constructive and innovative response to challenge
![Page 7: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/7.jpg)
7
OFF SITE CONSTRUCTION
PRODUCTION MANAGEMENT
CARBON REDUCTION
CONTINUOUS IMPROVEMENT
WASTE
PRODUCT DEVELOPMENT
![Page 8: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/8.jpg)
SMART Products
Minimum
Asset
Standard
3D Model
Drawings
Integrat ion
Guide
Health & Safety
Risk Assessment
Calculat ions
Specif icat ion
Procurement
Guide
Framework
Agreement
BOM
Cost data
Acceptance
CriteriaInstallat ion
Guide
Commissioning
Data
Funct ional
Design Spec
Sof tware Block
Maintenance
Schedule
Spares
Schedule
O&M
data
SAP ALM
data
JoECarbon
Footprint
Telemetry
Standards
Asset Monitoring
Frameworks (IRIS)
design the product once
get it right
use it many t imes…“design the product once
get it right
use it many t imes…“
![Page 9: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/9.jpg)
9
PRODUCT
DEVELOPMENT STANDARD WORK
CONTINUOUS
IMPROVEMENT
The Route to Continuous Improvement
Midi Submersible
Pumping Station
Product Installation
Guide
Rev 2.3 May 2012
![Page 10: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/10.jpg)
• Carbon and cost reduced to equivalent of refurbishing existing treatment plant
• Water Treatment Works developed from products
• Over 70% off-site construction
• Construction period of 6 months
• 60% reduction in embodied carbon (954 t CO2e from 2503 t)
Product Based WTW
![Page 11: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/11.jpg)
Product Example – Chlorination
Traditional
Component Sub Assembly Assembly
Product Based
![Page 12: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn](https://reader034.fdocuments.in/reader034/viewer/2022050100/5f3fdc9dc732f476262f56fa/html5/thumbnails/12.jpg)
12
Collaboration and Continuous Improvement
• Collaborative model provides:
- open view of performance
- opportunity for challenge
• Initiatives that collectively drive a different way of working
• Continuous Improvement (culture) as core strategy
OFF SITE CONSTRUCTION
PRODUCTION MANAGEMENT
CARBON REDUCTION
CONTINUOUS IMPROVEMENT
WASTE
PRODUCT DEVELOPMENT
OFF SITE CONSTRUCTION
PRODUCTION MANAGEMENT
CARBON REDUCTION
CONTINUOUS IMPROVEMENT
WASTE
PRODUCT DEVELOPMENT