7/29/2019 Daily Record Summary-1
1/12
1
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.10.Reinforcement
1 31/12/2008 2 8 3 3 4/2
2 31/12/2008 2 8 8 4/7
3 31/12/2008 2 8 1 7/1 1
4 31/12/2008 2 8 5 36/1 2
5 31/12/2008 2 8 5 3 415/1 1,2
6 30/12/2008 2 8 35/1
7 30/12/2008 2 8 5 36/1 2
8 30/12/2008 2 8 3 37/1 1,2
9 30/12/2008 2 8 3 4/2 2
10 30/12/2008 2 8 3,5 415/1 1,211 30/12/2008 2 8 8 4/7
12 30/12/2008 2 8 4/1 1
13 29/12/2008 2 8 4/1 1
14 29/12/2008 2 8 3 4/2 2
15 29/12/2008 2 8 8 6/3 1
16 29/12/2008 2 8 36/1
17 29/12/2008 2 8 5 415/1 1
18 28/12/2008 2 8 3 37/1 2
19 27/12/2008 2 8 3 7/1 2
20 27/12/2008 2 8 8 2 8/2
21 27/12/2008 2 8 8 2 25/1
22 27/12/2008 2 8 36/1 2
23 27/12/2008 2 8 3 37/1
24 26/12/2008 2 8 9 4/825 26/12/2008 2 8 8 9/1 1
26 26/12/2008 2 8 23/1 2
27 26/12/2008 2 8 8 25/1
28 26/12/2008 2 8 2
29 26/12/2008 2 8 3 37/1 1
30 24/12/2008 2 8 4/8
31 24/12/2008 2 8 5 7/4 2
32 24/12/2008 2 8 3 25/1
33 24/12/2008 2 8 8 36/2
33a 24/12/2008 2 8 8 36/3
34 23/12/2008 2 8 3 23/1
35 23/12/2008 2 8 8 4/1
36 23/12/2008 2 8
37 23/12/2008 2 8 5 7/4
38 22/12/2008 2 8 1
39 22/12/2008 2 8 3 6/3
40 22/12/2008 2 8 3 7/1
41 22/12/2008 2 8 5 7/4
42 22/12/2008 2 8 8 9/1
43 22/12/2008 2 8 4 415/1
44 21/12/2008 2 8 5 4/7 2
45 21/12/2008 2 8 4/8
46 21/12/2008 2 8 5 7/4
47 21/12/2008 2 8 5 4/7 2
48 20/12/2008 2 8 4/8
49 20/12/2008 2 8 7/4 2
5020/12/2008 2
8 3 8/2
51 20/12/2008 2 8 8 9/1
52 20/12/2008 2 8 5 415/1
53 19/12/2008 2 8 5 4/7 2
54 19/12/2008 2 8 1
55 19/12/2008 2 8 3 419/1
56 19/12/2008 2 8 8 8/2
57 17/12/2008 2 8 9 4/7
58 17/12/2008 2 8
59 17/12/2008 2 8 9 8/2
60 17/12/2008 2 8 21/1
61 17/12/2008 2 8 2 23/1 2
62 17/12/2008 2 8 415/1
63 15/12/2008 2 8 8 4/8
64 15/12/2008 2 8 7/4 265 15/12/2008 2 8 5 8/1 2
66 15/12/2008 2 8 8 417/1
67 14/12/2008 2 8 5 8/1 2
68 13/12/2008 2 8 5 8/1 2
69 21/11/2008 2 8 5 6/3
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
-
7/29/2019 Daily Record Summary-1
2/12
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.
10.Reinforcement
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
70 20/11/2008 2 8 8,3 4/1 2
71 20/11/2008 2 8 5 6/3
72 19/11/2008 2 8 8 4/1
73 19/11/2008 2 8 5 6/3
74 19/11/2008 2 8 7/4 2
75 19/11/2008 2 8 5 8/1 2
76 19/11/2008 2 8 8/1 B
77 19/11/2008 2 8 3 419/1
78 18/11/2008 2 8 8 4/1
79 18/11/2008 2 8 4/7
80 18/11/2008 2 8 5 6/3 1
81 18/11/2008 2 8 7/4
82 18/11/2008 2 8 8/1
83 18/11/2008 2 8 3 28/1 2
84 18/11/2008 2 8 6 35/1
85 18/11/2008 2 8 3 415/1 1,2
86 17/11/2008 2 8 6 7/4
87 17/11/2008 2 8 5 8/2 1
88 17/11/2008 2 8 3 415/1 1,2
89 16/11/2008 2 8 5 8/2 1
90 16/11/2008 2 8 9 8/1
91 16/11/2008 2 8 5 8/2
92 15/11/2008 2 8 4/7 2
93 15/11/2008 2 8 8 4/8 2
94 15/11/2008 2 8 5 6/3 1
95 15/11/2008 2 8 8/1
96 15/11/2008 2 8 5 8/2
97 15/11/2008 2 8 5 28/1 2
98 15/11/2008 2 8 31/1 2
99 15/11/2008 2 8 3 32/1 2
100 15/11/2008 2 8 3 415/1 1,2
101 14/11/2008 2 8 3 415/1
102 14/11/2008 2 8 4/7
103 14/11/2008 2 8 8 4/8
104 14/11/2008 2 8 8/1 B
105 14/11/2008 2 8 5 8/2
106 14/11/2008 2 8 4 28/1 C 2
107 14/11/2008 2 8 6 31/1 1
108 14/11/2008 2 8 3 32/1 E 2
109 13/11/2008 2 8 5 6/3 1
110 13/11/2008 2 8 5 8/2 1111 13/11/2008 2 8 3 28/1 C
112 12/11/2008 2 8 2 8/1 B 1
113 11/11/2008 2 8 2 28/1 C 1,2
114 11/11/2008 2 8 7/4
115 9/11/2008 2 8 4 6/3
116 9/11/2008 2 8 4 6/3
117 9/11/2008 2 8 4 6/3
118 8/11/2008 2 8
119 8/11/2008 2 8 3 6/3 1,2
120 8/11/2008 2 8 8/2
121 8/11/2008 2 8 2 8/1 B
122 8/11/2008 2 8 1,3 28/1 C
123 8/11/2008 2 8 6 35/1
124 7/11/2008 2 8 2,3 4/7125 7/11/2008 2 8 2,3 6/3
126 7/11/2008 2 8 4/7
127 7/11/2008 2 8 3 6/3 1
128 7/11/2008 2 8 7/4
129 7/11/2008 2 8 8/1
130 7/11/2008 2 8 2 28/1
131 7/11/2008 2 8 6 35/1
132 6/11/2008 2 8 7/2
133 6/11/2008 2 8 7/5
134 6/11/2008 2 8 8/1
135 6/11/2008 2 8 2 28/1 2
136 6/11/2008 2 8 3 31/1 1,2
137 5/11/2008 2 8 4 6/1 2
138 5/11/2008 2 8 9 6/3
139 5/11/2008 2 8 2 7/1 1
140 5/11/2008 2 8 7/5
141 5/11/2008 2 8 8/1
142 5/11/2008 2 8 1 28/1 2
-
7/29/2019 Daily Record Summary-1
3/12
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.
10.Reinforcement
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
143 5/11/2008 2 8 5 31/1 1,2
144 5/11/2008 2 8 3 415/1 2
145 4/11/2008 2 8 5 31/1 1,2
146 4/11/2008 2 8 5 417/1 2
147 4/11/2008 2 8 5,6 418/1 2
148 4/11/2008 2 8 8/2 1,2
149 4/11/2008 2 8 7/1 1
150 4/11/2008 2 8 7/4
151 3/11/2008 2 8 7/4
152 3/11/2008 2 8 3 7/1 1,2
153 3/11/2008 2 8 9 8/2 1
154 3/11/2008 2 8 5 418/1 2
155 3/11/2008 2 8 7 28/1 2
156 3/11/2008 2 8 4 31/1 1,2
157 3/11/2008 2 8 8/1 B
158 2/11/2008 2 8 5 4/1
159 1/11/2008 2 8 5 4/1
160 1/11/2008 2 8 1,2 7/1
161 1/11/2008 2 8 8/2
162 1/11/2008 2 8 4 31/1 1,2
163 1/11/2008 2 8 2 27/1 1
164 1/11/2008 2 8 2 25/1 2
165 31/10/2008 2 8 5 35/2 1,2
166 31/10/2008 2 8 36/1
167 31/10/2008 2 8 36/2 1
168 31/10/2008 2 8 2 37/1 2
169 31/10/2008 2 8 7 27/1 2
170 31/10/2008 2 8 7 25/1 1
171 31/10/2008 2 8 5 4/1
172 31/10/2008 2 8 8/2
173 31/10/2008 2 8 2 7/1 2
174 31/10/2008 2 8 4 417/1 2
175 29/10/2008 2 8 5 4/1
176 29/10/2008 2 8 4 418/1 2
177 29/10/2008 2 8 4 417/1 2
178 29/10/2008 2 8 6 35/1
179 29/10/2008 2 8 2 4/2
180 29/10/2008 2 8 7/1
181 29/10/2008 2 8 7/2
182 29/10/2008 2 8 8/2
183 29/10/2008 2 8 8 8/1184 30/10/2008 2 8 8/2
185 30/10/2008 2 8 8/1
186 30/10/2008 2 8 1 7/1 2
187 30/10/2008 2 8 5 4/1
188 30/10/2008 2 8 4,8 418/1 2
189 30/10/2008 2 8 5 36/3 2
190 30/10/2008 2 8 5 35/2 2
191 30/10/2008 2 8 7 37/1 2
192 25/10/2008 2 8 9 4/1 2
193 25/10/2008 2 8 3 31/1 1
194 25/10/2008 2 8 2 32/1 2
195 25/10/2008 2 8 7 37/1
196 25/10/2008 2 8 1 415/1 1
197 25/10/2008 2 8 2 419/1 2198 26/10/2008 2 8 8/1 B
199 28/10/2008 2 8 4/1
200 28/10/2008 2 8 3 4/8
201 28/10/2008 2 8 6 35/1
202 28/10/2008 2 8 8/2
203 28/10/2008 2 8 2 415/1 1,2
204 28/10/2008 2 8 2 415/1
205 24/10/2008 2 8 3 31/1
206 24/10/2008 2 8 2 8/1 B
207 24/10/2008 2 8 3 7/4
208 24/10/2008 2 8 4 4/1
209 24/10/2008 2 8 3 8/1
210 24/10/2008 2 8 8/2
211 24/10/2008 2 8 2 417/2 2
212 25/10/2008 2 8 3 7/5
213 22/10/2008 2 8 1,2 31/1
214 22/10/2008 2 8 5 4/3
215 22/10/2008 2 8 4/1 2
-
7/29/2019 Daily Record Summary-1
4/12
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.
10.Reinforcement
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
216 22/10/2008 2 8 7 419/1
217 22/10/2008 2 8 7 417/2
218 22/10/2008 2 8 3 417/1 2
219 22/10/2008 2 8 3 418/1
220 23/10/2008 2 8 4 4/1 2
221 23/10/2008 2 8 5 4/3 2
222 23/10/2008 2 8 6 35/1
223 23/10/2008 2 8 2 31/1 1
224 23/10/2008 2 8 8/1 1
225 23/10/2008 2 8 8/1 B
226 23/10/2008 2 8 3 417/1
227 19/10/2008 2 8 3 418/1
228 21/10/2008 2 8 4/1
229 21/10/2008 2 8 5 4/3 2
230 21/10/2008 2 8 6/3
231 21/10/2008 2 8 1 31/1
232 21/10/2008 2 8 6 35/1
233 21/10/2008 2 8 2 37/1 1
234 21/10/2008 2 8 3 417/1
235 21/10/2008 2 8 3 418/1
236 18/10/2008 2 8 6/3
237 18/10/2008 2 8 2 417/1
238 18/10/2008 2 8 2 418/1
239 17/10/2008 2 8 5 4/8
240 17/10/2008 2 8 4,5 36/1 1
241 17/10/2008 2 8 6/3 1
242 16/10/2008 2 8 3 4/1 2
243 16/10/2008 2 8 5 4/8 2
244 16/10/2008 2 8 6/3
245 16/10/2008 2 8 8/1 B
246 16/10/2008 2 8 2 35/1
247 16/10/2008 2 8 2 418/1
248 15/10/2008 2 8 3 4/1
249 15/10/2008 2 8 5 4/8 2
250 15/10/2008 2 8 6/3
251 15/10/2008 2 8 8/1 B
252 15/10/2008 2 8 5 418/1
253 15/10/2008 2 8 5 36/1
254 13/10/2008 2 8 1 8/1 B
255 11/10/2008 2 8 3 4/1 2
256 11/10/2008 2 8 4 4/7 1,2257 11/10/2008 2 8 8/1 B 1
258 10/10/2008 2 8 3 4/1 2
259 10/10/2008 2 8 4/7
260 10/10/2008 2 8 5 4/8 2
261 10/10/2008 2 8 8/1 B 1
262 10/10/2008 2 8 1 417/1
263 10/10/2008 2 8 1 418/1
264 9/10/2008 2 8 3 4/1
265 9/10/2008 2 8 9 4/3 2
266 9/10/2008 2 8 4 4/7 2
267 9/10/2008 2 8 5 4/8
268 9/10/2008 2 8 6/2
269 9/10/2008 2 8 6/3
270 9/10/2008 2 8 7 8/1 B271 8/10/2008 2 8 3 4/1
272 8/10/2008 2 8 5 4/8 2
273 8/10/2008 2 8 6/2
274 8/10/2008 2 8 6/3 1
275 8/10/2008 2 8 5 7/4 1
276 7/10/2008 2 8 3 4/1 2
277 7/10/2008 2 8 5 4/8 2
278 7/10/2008 2 8 6/3 1
279 7/10/2008 2 8 5 7/4
280 7/10/2008 2 8 5 9/1
281 6/10/2008 2 8 2 4/1 2
282 6/10/2008 2 8 3 4/7 2
283 6/10/2008 2 8 6/3
284 6/10/2008 2 8 8/1 B
285 4/10/2008 2 8 4 4/3 2
286 4/10/2008 2 8 3 6/2 2
287 4/10/2008 2 8 6/3
288 4/10/2008 2 8 8/1 B
-
7/29/2019 Daily Record Summary-1
5/12
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.
10.Reinforcement
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
289 4/10/2008 2 8 4 8/2
290 3/10/2008 2 8 2 4/7
291 3/10/2008 2 8 5 4/8
292 3/10/2008 2 8 3 6/2 2
293 3/10/2008 2 8 8/1 B
294 3/10/2008 2 8 4 8/2
295 3/10/2008 2 8 9 9/1 1
296 2/10/2008 2 8 4 4/3 2
297 2/10/2008 2 8 1 4/7 2
298 2/10/2008 2 8 9 4/8
299 2/10/2008 2 8 5 7/4
300 2/10/2008 2 8 8/1 B
301 2/10/2008 2 8 4 8/2 1
302 1/10/2008 2 8 4/7 2
303 1/10/2008 2 8 3 6/1 2
304 1/10/2008 2 8 2 6/3 1
305 1/10/2008 2 8 7/4
306 1/10/2008 2 8 5 7/5
307 1/10/2008 2 8 9/1
308 30/9/2008 2 8 3 6/1 2
309 30/9/2008 2 8 5 7/5
310 29/9/2008 2 8 3 6/1 2
311 29/9/2008 2 8 5 7/4
312 28/9/2008 2 8
313 28/9/2008 2 8 1 6/3 1
314 27/9/2008 2 8 3 6/1 2
315 27/9/2008 2 8 9 7/4 1
316 27/9/2008 2 8 8/1 B
317 26/9/2008 2 8 5 7/5 1
318 26/9/2008 2 8 3 6/1 2
319 25/9/2008 2 8 5 8/1 1
320 23/9/2008 2 8 5 8/1 1
321 23/9/2008 2 8 3 6/3 1
322 22/9/2008 2 8 3 8/2 1
323 22/9/2008 2 8 2 6/3 1
324 20/9/2008 2 8 2 6/2 2
325 20/9/2008 2 8 2,3 8/2
326 20/9/2008 2 8 5 8/1
327 19/9/2008 2 8 1,3 8/2
328 19/9/2008 2 8 4 9/1
329 18/9/2008 2 8 3 4/7330 18/9/2008 2 8 2 8/2 1
331 18/9/2008 2 8 4 9/1
332 17/9/2008 2 8 2 6/1 1,2
333 17/9/2008 2 8 3 8/2 1
334 17/9/2008 2 8 3 9/1
335 16/9/2008 2 8 2 6/1 2
336 15/9/2008 2 8 4/8
337 15/9/2008 2 8 1,2 8/2 1
338 15/9/2008 2 8 4 7/4
339 15/9/2008 2 8 3 9/1
340 13/9/2008 2 8 4/8
341 13/9/2008 2 8 3,4 8/1
342 12/9/2008 2 8 4/8
343 12/9/2008 2 8 1 8/2344 11/9/2008 2 8 2 9/1
345 11/9/2008 2 8 4/8
346 10/9/2008 2 8 2 8/2
347 9/9/2008 2 8 1 8/2
348 8/9/2008 2 8 3 7/5
349 7/9/2008 2 8 1 8/2
350 6/9/2008 2 8 3 7/5
351 5/9/2008 2 8 3 4/7 1
352 5/9/2008 2 8 5 13/1 1,2
353 4/9/2008 2 8 3 4/7 1
354 4/9/2008 2 8 3 7/4 1
355 3/9/2008 2 8 6 35/2 2
356 3/9/2008 2 8 3 7/4
357 2/9/2008 2 8 3 4/7 2
358 2/9/2008 2 8 5 13/1
359 1/9/2008 2 8 3 4/7 2
360 1/9/2008 2 8 3 8/1
-
7/29/2019 Daily Record Summary-1
6/12
From To SIDE
1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling
9. Sill conc.
10.Reinforcement
2.STRUCTURES
LocationWork Decription
Culvert
No.
Page
No.
Date
schedulePortionItem of WorkWORK
1. ROAD
-
7/29/2019 Daily Record Summary-1
7/12
Culvert Cleaning
Demolishing Existing Deck
Demolishing Existing Deck
Cleaning Debris
Demolishing Existing Deck
Dewatering
Plastering HW
Demolishing Existing Deck
Demolishing Existing Deck
Plastering HW
Plastering HW
Demolishing Existing Deck
Demolishing Existing Deck
Deck Form Work
Demolishing Existing Deck
Deck Form Work
Deck Form Work
Demolishing Existing Deck
Dewatering
Drilling for Dowels
Demolishing Existing Deck
Demolishing Existing Deck
Dewatering
Debris Cleaning
Demolishing Existing Deck
Remarks
-
7/29/2019 Daily Record Summary-1
8/12
Remarks
Demolishing Existing Deck
Dewatering & Cleaning
Dewatering & Cleaning
Demolishing Existing Deck
Dewatering & Cleaning
Demolishing Existing Deck
Plastering
Demolishing Existing Deck
Dewatering & Cleaning
Plastering
Demolishing Existing Deck
By Pass Gravel Filling
Plastering
Collar Concrete
Form Work
Form Work
Form Work
Demolishing Existing Deck
Form Work
Concrete
Form Work & Concrete
Demolishing Existing Deck
Dewatering
Base Rebar Work
Rebar & Form Work
Demolishing Existing Deck
Dewatering
Surface Compaction
Demolishing Existing Parapet
Dewatering
Rebar & Form Work
Excavation & Dewatering
Surface Compaction
Demolishing Existing Deck
Abutment Formwork
Formwork & Concrete
Dewatering
Base Formwork
Surface Compaction
Demolishing Existing Deck
Excavation & Dewatering
-
7/29/2019 Daily Record Summary-1
9/12
Remarks
Rebar & Form Work
Plastering
Dewatering
Gravel Filling & Compaction
Gravel Filling & Compaction
Abutment & Headwall
Cleaning Debris
Rebar & Form Work
Abutment & Headwall
Dewatering
Rebar & Formwork
Dewatering
Demolishing Existing Deck
Rebar & Formwork
Parapet Wall Concrete
Parapet Wall Concrete
Parapet Wall Concrete
Excavation
Rebar work for Deck
Demolishing Existing Deck
Rebar & Formwork
Dowels Fixing
Form Work
Form Work
Rebar & Formwork
Excavation & Dewatering
Bending Rebar
Demolishing Existing Deck
Gravel Filling & ExcavationDemolishing Existing Deck
Gravel Filling & Compaction
Excavation
Form Work
Form Work
Form Work
Excavation
Dewatering & Sand Filling
Drilling Work to Old Cap.Beam
Excavation
Abutment & Head Wall
Drop Wall Formwork & Concrete
Plastering to HW
Head Wall
Demolishing Existing Deck
Formwork & Concrete
Rebar Fabrication
Demolishing Existing Deck
Demolishing Existing Deck
Rebar Work for Deck
Demolishing Existing Deck
-
7/29/2019 Daily Record Summary-1
10/12
Remarks
Demolishing Existing Deck
Formwork for side wall
Gravel Filling
Fabrication of Rebar
Demolishing Existing Deck
Formwork
Cleaning Debris
Rebar work for Side wall
Dewatering & Demolishing
Formwork & Concrete
Rebar work for Parapet
Dewatering & Demolishing
Plastering
Rebar work
Demolishing Existing Deck
Gravel Filling
Formwork & Rebar Work
Fabrication of Rebar
Demolishing Existing Deck
Shoring Work
Formwork & Rebar Work
Rebar Work
FormworkSand Filling
Abutment & Headwall
Formwork
Formwork
Excavation for Base
Formwork
Formwork
Demolishing Structure
Demolishing Existing Deck
ExcavationAbutment
Formwork
Dewatering & Demolishing
Demolishing Existing Deck
Rebar Work & Concrete
Formwork
Demolishing Existing Deck
Rebar Work
Rebar Work & Concrete
Formwork & Concrete
Demolishing Existing Deck
Excavation
Formwork & Concrete
Demolishing Existing Deck
Excavation
-
7/29/2019 Daily Record Summary-1
11/12
Remarks
Dowels Fixing
Formwork & Concrete
Formwork & Plastering to HW
Abutment & Headwall
Excavation
Rebar Work
Rebar Work
Formwork for Deck
Excavation
Formwork for Capping Beam
Excavation
Abutment & Headwall
Rebar Work & Concrete
Formwork
Gravel Filling & Compaction
Formwork & Plastering
Formwork & Plastering
Dewatering & Concrete
Excavation
Formwork
Rebar work
Dewatering & Concrete
Rebar work
Formwork
Sand Filling
Culvert 6/3 also RR Masonry
Formwork & Concrete
Dewatering
Formwork & Rebar
Dewatering
Demolishing Existing Deck
East & West Direction
Rebar Work
Abutment & Head Wall
Demolishing Existing Deck
Excavation
Demolishing Existing Deck
Dewatering
Dewatering
Rebar Work
-
7/29/2019 Daily Record Summary-1
12/12
Remarks