  • PRODUCTION PLANNING & PROCESSING SUMMARY 2-Jan-14

    No. Order No. Item Code Type Of Order PI No. Date Rec

    36 SKS 2014005 GE/27/M6222G Master Stock 1/6/2014

    37 SKS 2014006 Film Blowing Stock 1/6/2014

    38 SKS 2014007 BBF 1080(80MM) PE BLACK Injection Stock 1/6/2014

    39 SKS 2013001 BB50 Master Stock 1/7/2014

    40 SKS 2013003 KBUW14 Master Stock 1/7/2014

    41 SKS 2014001 MPD5695 Master Stock 1/7/2014

    42 SKS 2014002 MPD5697 Master Stock 1/7/2014

    43 SKS 2014003 MODERN Film Blowing Stock 1/7/2014

    44 SKS 2014004 C55 90MM PE BLACK Injection Stock 1/7/2014

    45 DPN(LK) 2014001 DUNNES BAG - SML Master PF99039832 1/8/2014

    0.06MM PPE*9.75'' (Single side electron)

  • PRODUCTION PLANNING & PROCESSING SUMMARY

    Issued By Team Brand Lanka PC

    20-Jan Luminjuan Cathy Katherine TESCO Darshani 50,000

    13-Jan Luminjuan Cathy Katherine Darshani 459 lbs

    13-Jan Luminjuan Cathy Katherine Darshani 50,130

    14-Nov Luminjuan Karen Karen GDP Darshani 30,000

    31-Oct Luminjuan Karen Karen GDP Darshani 20,000

    20-Jan Luminjuan Cathy Judy DUNNES Darshani 50,000

    20-Jan Luminjuan Cathy Judy DUNNES 50,000

    13-Jan Luminjuan Cathy Judy Darshani 1222 lbs

    13-Jan Luminjuan Cathy Judy Darshani 100,260

    20-Jan Luminjuan Cathy Judy Darshani 15,300 15,300 Stock from SKS2013008

    Planning Shipout

    DayCustomer Service

    Total Order Qty

    Completed Qty (pcs)

    Current Status

  • Film Blowing Department Printing Department

    Stock from SKS2013008

    Target Starting

    Date

    Actual Starting

    Date

    Target Ending

    Date

    Actual Ending

    DateDone Qty

    (lbs)Balance

    Qty (lbs)

    Transfer Qty (lbs)

    Receiving Qty

    Target Starting

    Date

    Actual Starting

    Date

    Target Ending

    Date

  • Printing Department Zip Loc Department

    Done Qty Done Qty Actual

    Ending Date

    Balance Qty

    Transfer Qty

    Receiving Qty

    Target Starting

    Date

    Actual Starting

    Date

    Target Ending

    Date

    Actual Ending

    Date

  • Zip Loc Department Bag Cutting Department

    Done Qty Balance QtyTransfer

    QtyReceiving Qty (film)

    pcs

    Receiving Qty (zip Loc) m

    Target Starting

    Date

    Actual Starting

    Date

    Target Ending

    Date

    Actual Ending

    DateBalance

    Qty

  • Bag Cutting Department Injection Molding Department Hanger Attaching Department

    Done Qty Transfer QtyTarget

    Starting Date

    Actual Starting

    Date

    Target Ending

    Date

    Actual Ending

    DateBalance

    QtyTransfer

    QtyReceiving Qty

    (bags)Receiving

    Qty (Hangers)

  • Hanger Attaching Department

    Done Qty

    Actual Shipout DateTarget

    Starting Date

    Actual Starting

    Date

    Target Ending

    Date

    Actual Ending

    DateBalance

    QtyTransfer

    Qty

  • Remarks

    All Production Summary