Transcript of D8 ADVANCE Pre-Installation Guide (2)

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    1/13M88-E04046 18 February 2009

    1 of 9

    Bruker AXS

    D8 ADVANCEX-ray Diffractometer

    Pre-installation Guide(North America)

    Purpose

    This Pre-installation Guide will aid you and any requiredpersonnel in site preparation prior to installation of the

    D8 ADVANCE X-ray diffractometer.

    Read these instructions carefully and thoroughly to

    prepare for the installation of your D8 ADVANCE. Proper

    site planning will ensure optimum efficiency,

    maintenance access, proper instrument performance,

    and avoidance of unnecessary delays during installation.

    Responsibility

    The customer is responsible for making certain that thebasic site requirements for the D8 ADVANCE are

    fulfilled. These instructions are to be followed by the

    customer and by personally contracted tradespeople,

    except where otherwise noted.

    When the basic site requirements are fulfilled, it is the

    customer’s responsibility to complete the attached Pre-

    installation Checklist and return it to Bruker AXS via fax.

    System Requirements

    The following specifications are general system

    requirements. Use this information to make an initial

    decision on the suitability of your proposed site. Refer to

    later sections of this Pre-installation Guide for more

    details.

    Power (pages 4 - 5)

    System 208-240V, 60Hz, 1-phase, 40A

    Computer/peripherals 100-120V, 60Hz, 1-phase, 15A

    Haskris R100C water

    recirculator

    208-240V, 60Hz (isolated),

    1-phase, 15A

    Cooling Capacity 3850W (13125 btu/hr) or greater

    Temperature 50-68°F ±2°F (10-20°C ±1°C)

    Pressure 60-90 psi (4-6 bar)

    Quantity* 6 gal (23 L)

    *Quantity specified is for Haskris R100C. Use distilled water.

    Communications (Figure 2 and Table 5)

    Optional RJ-11 line near system for voice connection

    Ethernet network connection (Table 5)

    Table 1. Pre-installation Overview

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    2/13

    D8 ADVANCE Dimensions

    M88-E04046

    2

    D8 ADVANCE Dimensions Shipping Dimensions

    The D8 ADVANCE shipment includes two large boxes

    from Bruker AXS factories (Table 3). To account for

    variation in box size, maximum  dimensions are given in

    the Table. Additional small boxes may arrive with the

    shipment, given the configuration of the system.

     

    Figure 1. D8 ADVANCE dimensions

    D8 ADVANCE

    dimensions

    and weight

    Height 82.5” (209.5 cm)

    Width 55.1” (140.0 cm)

    Depth 49.4” (125.5 cm)

    Weightapprox. 1190 lbs

    (540 kg)

    Floor load

    capacity

    146.9 lbs/ft2 (717.0 kg/m2) minimum. The floor

    should be level and as rigid as possible to avoid

    vibration.

    Doorway

    clearance

    required

    Largest sub-assembly

    (unboxed/uncrated), if

    mounted parts are

    removed

    36.0” (91.4 cm)

    Wall-to rear ofinstrument

    clearance

    27.5” (70.0 cm)

    minimum

    Although the

    instrument has

    wheels, it should be

    accessible from all

    sides for proper

    servicing and airflow.

    Table 2. Actual instrument dimensions, weights, and clearances

    Base Box (on pallet) Top Box (on pallet)

    Height 58.3” (148 cm) 44.5” (113 cm)

    Width 57.1” (145 cm) 43.3” (110 cm)

    Depth 66.1” (168 cm) 55.1” (140 cm)

    Weight 1030 lbs (467 kg) 710 lbs (322 kg)

    Table 3. Maximum dimensions of instrument boxes from factory

    46.7" (118.7 cm)

    3.1"(8 cm)

    82.5"(209.5 cm)

    46.3" (117.7 cm)(side panels removed*)

    35.1"

    Dolly - 2.4"

    (6.0 cm)

    (89.2 cm)

    55.1" (140.0 cm)

    33.7" (85.6 cm)(front and rear panels removed*)

    46.0"(116.8 cm)

    33.3" (84.7 cm)

    Side View

    (enclosure rear removed*)

    Front View43.6"

    (111 cm)(light bar

      removed*)

     *NOTE: Dimensions with portions temporarily removed for transportation

    http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    3/13

    Environmental Considerations

    M88-E04046

    3

    Environmental Considerations

    Figure 2. Typical D8 ADVANCE floor plan

    Room/Instrument Requirements

    Optimal room temperature 75.2°F (24.0°C)

    Room operation-range temperature 57.2 - 93.2°F (14.0 - 34.0°C)

    Maximum temperature gradient 1.8°F (1°C) per hour for highest stabil ity of measuring values

    Relative humidity 20%-80%, non-condensing

    Heat dissipation to the air by the

    diffractometer (with temperature stabilizer,

    electronics measuring, X-ray generator, and

    vacuum pump).

    This configuration assumes that an external

    water recirculator is installed in a separate

    room.

    1.0 kW (3412 btu/hr) maximum

    Dissipated heat must be removed by a ventilation or air conditioning system. Cooling air

    should flow around the instrument without restriction. If possible, locate the air conditioning

    and heating ducts so that their airflow is not aimed directly at the instrument.

    NOTE: We recommend a clean, dust-free environment.

    Static electricity elimination (to avoid adverse

    effects on instrument electronics)

    Any carpeting in the area should be of a conductive variety. If the area is carpeted with non-

    conductive carpet, we recommend that you place anti-static mats over the conventional

    carpeting in the area around the instrument.

    Table 4. Environmental considerations

    Table (not factory-supplied)

    (70 cm)27.5"

    External water recirculator

    (Haskris R100C)

    (70 cm)

    27.5"Generator

    Electronics

    Minimumclearance

    28' (8.5 m) maximum

    cable distance between

    instrument and computer.

    Allow for routing of cables

    along baseboards.

    (70 cm)27.5"

    RJ-11 jack

    for voice

    connection

    (optional)

    RJ-45 jack

    for internet

    connection

    (optional)

    NOTE: For plumbing and electrical details,see the other Figures and Tables inthis Pre-installation Guide.

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    4/13

    Communications

    M88-E04046

    4

    Communications

    We strongly recommend that you install a telephone

    connection (for voice communications) near the

    instrument.

    NOTE: Bruker AXS’ Remote Diagnosis features are nowavailable over the internet (i.e., WebEx). Checkwith your IT administrator to find out howRemote Diagnosis may affect your IT policy.

    Electrical Power

    ■ See Table 6 for power requirements for the D8

    ADVANCE (including the computer and peripherals).

    Note the lengths of the various cables.

    ■ On the wall behind the instrument, connect powerfrom the building mains to a plug-type wall outlet or

    to a direct-wired circuit breaker/disconnect box, so

    that power to the instrument can be interrupted if

    necessary.

    NOTE: Outlet and plug not factory-supplied.

    NOTE: If the power line voltage at your site fluctuatesoutside the values in Table 6, a compatible linevoltage conditioner or regulator may benecessary. Check with your site’s electricalcoordinator.

    ■ Wire the room air conditioner and any external

    pumps to a different electrical circuit than that used

    for the instrument. High starting currents from their

    motors may adversely affect line voltage stability.

    Additionally, provide a separate electrical power cir-

    cuit for the Haskris water recirculator (if purchased).

    Figure 3. D8 ADVANCE electrical connections

    Connection Connector Purpose

    Telephone

    (optional)RJ-11

    Voice connection near

    instrument

    Internet

    connectionRJ-45 (Ethernet)

    Remote diagnosis over

    the internet

    Table 5. Communications: connections

    Generator

    Electronics

    Haskris

    R100C

    water

    recirculator

    Ground cable

    (factory-supplied)

    208 VAC, 40A

    Circuit breaker, disconnect box, or

    outlet for plug (not factory-supplied).

    Secure to wall.

    208 VAC, 15A

    (isolated from system)

    110 VAC, 15A

    six-outlet power strip

    (included)

    http://-/?-http://-/?-http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    5/13

    Electrical Power

    M88-E04046

    5

    Figure 4. D8 ADVANCE electrical connections (schematic)

    L1

    L2

    Fuse or

    breaker40 A (2)

    Electronics & Generator

    Cable to

    chassis ground

    (factory-supplied)

    3-conductor, 8-gauge

    power cable (factory-supplied).Cable is 20 feet (6.1 m) long,

    4 feet (1.5 m) of which areenclosed inside the instrument.

    Electrical Box

    House Power208 VAC

    Instrument(left side)

    Earth Ground

    Component Current rating Voltage and frequency Power cable lengths

    D8 ADVANCE diffractometer

    unit40A† 208-240V, 60Hz, 1-phase

    8-gauge, 3-conductor power cable

    (factory-supplied), about 15 ft (4.6 m)*

    Computer and peripherals 15A 100-120V, 60Hz, 1-phase6 ft (1.8 m)**

    Data cables: about 28 ft (8.5 m)

    External water recirculator,

    Haskris R100C

    15A 208-240V, 60Hz, 1-phase About 8 ft (2.4 m)***

    * Customer supplies plug to match wall receptacle (if used).

    ** Factory-supplied 6-position AC outlet strip (110V).

    *** For the recommended Haskris model (R100C), customer supplies plug to match wall receptacle (if used).

    † If fuses are used, use slow-blow fuses.

    Table 6. D8 ADVANCE electrical specifications

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    6/13

    Cooling Requirements

    M88-E04046

    6

    Cooling Requirements

    An external cooling-water system is required to

    dissipate heat produced by the D8 ADVANCE. The

    cooling-water system must be fed with a closed-circuit

    cooling system.

    To minimize difficulties with cooling water (e.g.,

    suspended solids, low pressure, and extreme water

    temperature variations), we recommend installing a

    Haskris R100C closed-circuit water recirculator as

    shown in Figures 5 and 6. Other cooling system

    arrangements are not recommended as they will

    inevitably fail to minimize the aforementioned difficulties

    and result in cooling problems.

    NOTE: If you do not wish to install a Haskris closed-circuit water recirculator, contact Bruker AXS for

    more information.

    CAUTION

    The X-ray tube’s warranty does not cover damageresulting from improper cooling water.

    Install two 3/4” copper lines, each maximum length of

    48 ft (15m), with a shut-off valve near each end of each

    pipe. Install 1/2” barbed fittings (not supplied) at each

    end of the pipes. These copper lines are intended for

    transporting the cooling water over long distances. The

    barbed fittings at the end of the pipes will connect to the

    short, factory-supplied hoses attached to the instrument.

    During installation, the Bruker AXS Field Service

    Engineer will connect factory-supplied 1/2” (12mm)

    inside diameter hoses between the Haskris R100C and

    piping, and then between the piping and instrument (the

    unit and instrument having customer-supplied barbed

    fittings). The Engineer will then fasten the water hoses

    to the barbed fittings with hose clamps.

    NOTE: The Haskris R100C needs supply water and adrain to remove heat that it emits. However, it

    keeps water consumption to a minimum using awater valve that opens and closes as required.

    NOTE: To protect the Haskris R100C, ensure that thewater is free of suspended matter. Also, ensurethat water hardness does not exceed 300 mg/ liter CaO, while remaining at neutral pH (7).

    Technical

    features

    Cooling capacity

    when water source

    is 65°F (18°C):

    3850W (13125 btu/hr)

    Water pump

    capacity3.7 gal/min (14.1 L/min)

    Water reservoir

    volume6 gal (23 L)

    Temperature

    stability±2°F (1.1°C)

    Refrigerant R134a

    Unit weight

    325 lbs (148 kg)

    (approximate shipping

    weight without water in

    the tank)

    Unit dimensions 31”H × 21”W × 29”D(79 cm × 53 cm × 74 cm)

    Coolant required

    Clean, potable, distilled

    water. Do not use

    deionized water.

    Condensercooling water

    requirements

    When temp. is:

    65°F (18°C)

    75°F (24°C)

    85°F (29°C)

    Flow rate required is:

    1.0 gal/min (3.8 L/min)

    1.5 gal/min (5.7 L/min)

    3.1 gal/min (11.8 L/min)

    Minimum required

    pressure differential

    from condenser

    water inlet to outlet:

    25 psi (1.7 bar)

    Maximum pressure

    differential from

    condenser water

    inlet to outlet:

    60 psi (4.1 bar)

    Maximum

    condenser water

    inlet pressure:

    125 psi (8.6 bar)

    Location

    Must be installed in

    a clean, indoor

    environment. Ifpossible, install the

    Haskris in a

    separate room to

    minimize noise and

    heat emission.

    We recommend access to

    the:

    TOP for routine

    maintenance, such aschanging water in the

    reservoir.

    FRONT for visibility of

    controls and readouts.

    ONE SIDE for convenient

    servicing should a spare

    part be required.

    Table 7. Haskris R100C recirculator specifications

    http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    7/13

    Cooling Requirements

    M88-E04046

    7

    Figure 5. Haskris R100C recirculator specifications

    Figure 6. Cooling water with the Haskris R100C closed-circuit water recirculator

    Haskris Model R100CTECHNICAL SPECIFICATIONS

    1. Power Requirements: 208/230V-1-60Hz

    2. F.L.A. Rating: 9.9A

    3. Recommended Fuse Size: 15A (time delay)

    REAR

    VIEWNOT DRAWN

    TO SCALE

    3"

    2.5"

    2.5"

    City Water "IN"3/8" FPT Brass

    City Water "OUT"

    3/8" FPT Brass

    SUPPLY

    RETURN

    21"24"

    2.25"

    18.5"

    POWER CORD (7 ft., no plug furnished)

    Note:

    Supply and return connections are

    1/2" Hand Valves with 1/2" Hose Barbs.

    DEPTH = 29.0"

    (73.7 cm)

    21.0"

    (53.3 cm)

    31.0"

    (78.7 cm)

    FRONT

    VIEWNOT DRAWN

    TO SCALE

    Unit ON/OFF

     Switch

    Power

    Indicator

    Water Level

     Indicator

    Flowmeter

    Leveling Legs

    (adjustable from 1/2" To 2")

    Ventilation grille

    Water Temp

    Control & Display

    65

    MENU

    FULL

    Generator Electronics

      Reinforced industrial water hose

      3/4" copper tubing

      Shut-off valves (wall-mounted)

      1/2" barbed fitting

    Water supply

    Supply to

    instrument

    Return from

    instrument

    R100C

    HaskrisDrain

    NOTE: 25’ (7.6 m) of water hose comeswith the Haskris R100C.

    65’ (20.0 m) of usable waterhose comes with the D8ADVANCE.

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    8/13

    Plumbing Requirements

    M88-E04046

    8

    Plumbing Requirements

    Gas Specifications

    Position-sensitive Detector Gas Supply(optional—for MBraun PSD only)

    ■ If an MBraun PSD (position-sensitive detector) is

    used with the D8 ADVANCE, install a P10 gas cylin-

    der and regulator as noted in Table 9.

    ■ Install a cylinder of gas with a two-stage regulator

    (for the flow counter) as noted in Table 9. We recom-

    mend indoor installation of the gas cylinder.

    ■ Ensure that the cylinder is securely mounted to avoid

    tipping. Observe all safety regulations for flammable

    gases. We recommend that you keep a reserve cylin-

    der.

    ■ Install as short a line as possible from the gas cylin-

    der to the instrument. Use factory-supplied Viton tub-

    ing (length as noted in Table 8). If your supply line

    must exceed the supplied length, use oxygen-free

    (high-purity) copper or stainless-steel piping. Ensure

    that the lines are clean and free of water, solvents,

    and particulate matter. Avoid exposing the gas linesto extreme temperatures (such as heating vents).

    ■ Operate the flow counters only with a commercial-

    grade mixture of P10 gas (i.e., 90% Argon, 10%

    methane, impurities less than 0.5% by volume).

    ■ Install a separate exhaust line leading to an outside

    discharge for the spent gas.

    Helium Supply (optional)

    ■ For equipment with a helium or nitrogen flush option

    (required for liquid or loose powder analysis), install a

    helium or nitrogen cylinder with a two-stage regula-

    tor as noted in Table 9.

    ■ Secure the cylinder with a mounting support to avoid

    accidental tipping.

    Material supplied with D8ADVANCE

    Tubing/hose ID sizes forbarbed fittings

    Tubing/hose lengths

    Counter tube gas

    (P10—for MBraun position-

    sensitive detector only)

    Inlet: Black Viton tubing 0.125” (0.32cm) 23 ft (7m)

    Outlet: Blue polymer tubing 0.25” (0.64cm) 23 ft (7m)

    Helium Blue Polymer tubing 0.125” (0.32cm) 23 ft (7m)

    Cooling water hoses Pressure water hose 0.5” (1.27cm) 65 ft (20.0m)

    Vacuum exhaust* Plastic hose 0.5” (1.27cm) 17 ft (5.2m)

    * Mist elimination is installed; exhausting vacuum is an option. You must provide an outlet for the vacuum exhaust (see Figure 2).

    Table 8. Tubing and hose sizes for supplied barbed fittings on D8 ADVANCE and Haskris R100C water recirculator

    GasCylinder/Regulator(not factory-supplied)

    P10

    Compressed-gas cylinder with T-size

    cylinder filling pressure, 2900 psi (180

    bar), with regulator such as AGA model

    SGVHPT272B-350 or equivalent.*

    Helium or nitrogen

    (optional; use if

    ordered)

    Compressed-gas cylinder with T-size

    cylinder filling pressure, 2900 psi (180

    bar), with regulator such as AGA model

    SGVHPT270B-580 or equivalent.*

    * Securely mount the cylinders to a wall or table. Observe safety

    regulations for all flammable gases.

    Table 9. Gas specifications

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    9/13

    Bruker AXS Inc.

    5465 East Cheryl Parkway

    Madison, WI 53711-5373 USA

    Phone +1 (800) 234-XRAY [9729]

    Fax +1 (608) 276-3006

    E-mail: [email protected]

    www.bruker-axs.com

    Bruker BioSciences

    40 Manning Road

    Billerica, MA USA

    Phone +1 (978) 663-3660

    Fax: +1 (978) 667-5993

    E-mail: [email protected]

    www.bruker-biosciences.com

    Final Check

    Final Check

    You, the customer, are responsible for meeting all

    applicable building and safety codes. Once the pre-

    installation utilities are connected, get certification (from

    an approved authority) that the installation meets all

    local building and safety codes.

    When all pre-installation work is finished, complete the

    attached D8 ADVANCE Pre-installation Checklist and fax

    it to Bruker AXS.

    Fax: 1 (608) 276-9162 or 1 (608) 276-3015

    Also, contact the Bruker AXS Service Department by

    telephone to confirm that your site is ready forinstallation.

    Tel: 1 (800) 234-XRAY [9729] or 1 (608) 276-3087

    Upon receiving confirmation that your site is ready,

    Bruker AXS personnel will schedule the instrument

    installation.

    When the System Arrives

    ■ When the system arrives, check it for damage with

    the delivery driver. Contact the carrier’s office and

    Bruker AXS immediately if you find any damage.

    ■Compare the packing list (i.e., the number of boxesreceived) with your order invoice and contact Bruker

    AXS if you find any discrepancies.

    ■ Move boxes or crates to the installation site (if possi-

    ble) to facilitate timely installation. Wait until a Bruker

    AXS Field Service Engineer opens the boxes to

    check their contents against your invoice. Do not

    open or uncrate any boxes.

    ■ If uncrating is required, call Bruker AXS for authoriza-

    tion at 1 (800) 234-XRAY [9729] extension 3087. If

    you are authorized to uncrate the shipment, save all

    packing material until the Bruker AXS Field Service

    Engineer completes the installation.

    ■ Installation must be performed by a Bruker AXS Field

    Service Engineer.

    ■ Save all packing materials for the system until the

    Bruker AXS Field Service Engineer has completed

    the installation.

    NOTE: Installation of the system typically requires threeto four working days. Optional attachmentsrequire additional time for installation andtesting.

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    10/13

    This page intentionally left blank

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    11/13

    D8 ADVANCE Pre-installation Checklist

    M88-E04046

    D8 ADVANCE Pre-installation Checklist

    Please complete the checklist below and fax it to the Bruker AXS Service Department:

    FAX

    FROM: TO:

     Bruker AXS,

     Attn: Service Dept.

     1 (608) 276-9162 or

    1 (608) 276-3015

    Contact Name Phone

    Company/Organization Fax

    Email

    Component YES/NO Value/remark Initial/date

    Room Location

    Floor load capacity exceeds 146.9 lbs/ft2 (717.0 kg/m2)(see Table 2)

    Room height exceeds 82.5” (209.5 cm) (see Table 2)

    Floor space for D8 ADVANCE free of equipment and clean (see

    Figures 1 and 2, Table 2)

    Doors and hallways from loading dock to location have adequate

    clearance for moving the D8 ADVANCE in its shipping crates;

    freight elevator available (see Table 3)

    Clearance on all sides of uncrated unit exceeds 27.5” (70.0 cm)

    (see Figure 2, Table 2)

    Computer table within 13.0’ (4.0 m) of instrument

    Environment (see Table 4)

    System is not exposed to direct sunlight

    Temperature between 57.2 - 93.2°F (14.0 - 34.0°C)

    Temperature gradient less than 1.8°F (1°C) per hour

    Heat removal capacity exceeds 1.0 kW (3412 btu/hr)

    Relative humidity between 20% - 80%, no condensation

    Carpeted rooms: anti-static carpeting or mats installed

    Communications (see page 4)

    Optional voice line (near instrument)

    Internet connection for remote diagnostics

    Electrical Power (see Figure 4, Table 6)

    208 VAC, 60 Hz ± 3 Hz, 40A (D8 ADVANCE)

    208 VAC, 60 Hz ± 3 Hz, 15A (Haskris R100C)

    110 VAC, 60 Hz ± 3 Hz, 15A (Computer and peripherals)

    1 of 3

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    12/13

    D8 ADVANCE Pre-installation Checklist

    M88-E04046

    All electrical power for the system must be isolated from circuits

    that have high starting currents (e.g., air conditioners, pumps,

    furnaces)

    Electrical connection of instrument to mains power supply is

    provided with automatic circuit breakers for all phases

    It is possible to disconnect the D8 ADVANCE completely from the

    mains power supply, using either a labeled switch or a circuit

    breaker located near the system

    Power cable connected directly to switchboard

    Socket outlet according to DIN49462, VDE 0623, IEC 309-1

    (Approved plug connector supplied by customer)

    Cooling Requirements (see page 6)

    Closed cooling system (Haskris R100C recommended)

    (see Figures 2 and 6)

    Plumbing/piping complete

    (for recommended Haskris unit)

    Customer-supplied cooling system (not recommended)

    The Haskris R100C water recirculator meets the cooling water requirements of the system. If you provide your own water supply, it must

    meet the following requirements.

    Flow rate greater than 1 gal/min (3.6 L/min). Recommended rate:

    1.1 gal/min (4.0 L/min)

    Pressure 60-110 psi (4-7.5 bar) and pressure-free drain

    Temperature 59-68°F (15-20°C). Room temperature must be high

    enough to avoid condensation.

    Bruker AXS recommends the use of distilled or reverse osmosis (RO) water for cooling the X-ray tube and generator. Use of deionized water

    is NOT recommended. If building water is used, it must meet the following requirements.

    Hardness less than:

    300mg/L CaO, or

    30° CaO (German scale), or

    53.7° CaO (French scale), or

    37.5° CaO (UK scale)

    pH of 7.0 ± 1

    Adequate filtering to remove suspended solids ( 50 m)

    Plumbing Requirements (see page 8)

    Distance to water supply less than 26’ (8 m), less than 48’ (15 m)

    if Haskris used

    Shutoff valves installed on both lines (not required if discharginginto drain)

    Elevation difference between Haskris and instrument less than 20’

    (6 m)

    NW ½” hose barb fittings for supply and return of cooling water

    Supply Gases (the optional helium mode requires helium gas cylinders and regulators, not factory-supplied) (see

    Tables 9 and 8, Figure 2)

    Component YES/NO Value/remark Initial/date

    2 of 3

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-

  • 8/19/2019 D8 ADVANCE Pre-Installation Guide (2)

    13/13

    Bruker AXS Inc.

    5465 East Cheryl Parkway

    Madison, WI 53711-5373 USA

    Phone +1 (800) 234-XRAY [9729]

    Fax +1 (608) 276-3006

    E-mail: [email protected]

    Bruker BioSciences

    40 Manning Road

    Billerica, MA USA

    Phone +1 (978) 663-3660

    Fax: +1 (978) 667-5993

    E-mail: [email protected]

    D8 ADVANCE Pre-installation Checklist

    P10 Gas (for MBraun PSD only):

    Commercial-grade P10 gas (90% Argon, 10% methane, less than

    0.5% impurities by volume) in T-size gas cylinder, e.g., 50 L, 200

    bar (2900 psi)

    Cylinder/regulator securely mounted to wall within 6’ (2 m) of theD8 ADVANCE

    If mounted further away than the supplied hose length, correct

    tubing/piping line installed (see Table 8)

    Local safety requirements for flammable gases fulfilled

    Exhaust gas vents to the outside, or a fume hood is present

    (if mandated by local safety requirements)

    Helium Gas (if applicable):

    Cylinder/regulator securely mounted to wall within 6’ (2 m) of the

    D8 ADVANCE

    If mounted farther away than the supplied hose length, correcttubing/piping line installed (see Table 8)

    Vacuum

    Exhaust to outside (optional)

    Final Check

    All local safety codes are met

    Fax a copy of this form to: Bruker AXS, Attention: Service

    Department 1 (608) 276-9162

    Call for installation: 1 (800) 234-XRAY [9729] extension 3087

    When system arrives: Check packing crates for shipping damage. If there is damage, contact your Carrier’s Office and Bruker AXS. Compare

    the packing list (the number of boxes) with your invoice. If possible, move boxes (crates) to installation site or storage area.

    Do not open crates or boxes. If uncrating is required, call Bruker AXS for authorization at 1 (800) 234-XRAY [9729] extension 3087.

    If authorized to uncrate, save all packing material until the Bruker AXS Field Service Engineer completes installation.

    Component YES/NO Value/remark Initial/date

    3 of 3