8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
1/13M88-E04046 18 February 2009
1 of 9
Bruker AXS
D8 ADVANCEX-ray Diffractometer
Pre-installation Guide(North America)
Purpose
This Pre-installation Guide will aid you and any requiredpersonnel in site preparation prior to installation of the
D8 ADVANCE X-ray diffractometer.
Read these instructions carefully and thoroughly to
prepare for the installation of your D8 ADVANCE. Proper
site planning will ensure optimum efficiency,
maintenance access, proper instrument performance,
and avoidance of unnecessary delays during installation.
Responsibility
The customer is responsible for making certain that thebasic site requirements for the D8 ADVANCE are
fulfilled. These instructions are to be followed by the
customer and by personally contracted tradespeople,
except where otherwise noted.
When the basic site requirements are fulfilled, it is the
customer’s responsibility to complete the attached Pre-
installation Checklist and return it to Bruker AXS via fax.
System Requirements
The following specifications are general system
requirements. Use this information to make an initial
decision on the suitability of your proposed site. Refer to
later sections of this Pre-installation Guide for more
details.
Power (pages 4 - 5)
System 208-240V, 60Hz, 1-phase, 40A
Computer/peripherals 100-120V, 60Hz, 1-phase, 15A
Haskris R100C water
recirculator
208-240V, 60Hz (isolated),
1-phase, 15A
Cooling Capacity 3850W (13125 btu/hr) or greater
Temperature 50-68°F ±2°F (10-20°C ±1°C)
Pressure 60-90 psi (4-6 bar)
Quantity* 6 gal (23 L)
*Quantity specified is for Haskris R100C. Use distilled water.
Communications (Figure 2 and Table 5)
Optional RJ-11 line near system for voice connection
Ethernet network connection (Table 5)
Table 1. Pre-installation Overview
http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
2/13
D8 ADVANCE Dimensions
M88-E04046
2
D8 ADVANCE Dimensions Shipping Dimensions
The D8 ADVANCE shipment includes two large boxes
from Bruker AXS factories (Table 3). To account for
variation in box size, maximum dimensions are given in
the Table. Additional small boxes may arrive with the
shipment, given the configuration of the system.
Figure 1. D8 ADVANCE dimensions
D8 ADVANCE
dimensions
and weight
Height 82.5” (209.5 cm)
Width 55.1” (140.0 cm)
Depth 49.4” (125.5 cm)
Weightapprox. 1190 lbs
(540 kg)
Floor load
capacity
146.9 lbs/ft2 (717.0 kg/m2) minimum. The floor
should be level and as rigid as possible to avoid
vibration.
Doorway
clearance
required
Largest sub-assembly
(unboxed/uncrated), if
mounted parts are
removed
36.0” (91.4 cm)
Wall-to rear ofinstrument
clearance
27.5” (70.0 cm)
minimum
Although the
instrument has
wheels, it should be
accessible from all
sides for proper
servicing and airflow.
Table 2. Actual instrument dimensions, weights, and clearances
Base Box (on pallet) Top Box (on pallet)
Height 58.3” (148 cm) 44.5” (113 cm)
Width 57.1” (145 cm) 43.3” (110 cm)
Depth 66.1” (168 cm) 55.1” (140 cm)
Weight 1030 lbs (467 kg) 710 lbs (322 kg)
Table 3. Maximum dimensions of instrument boxes from factory
46.7" (118.7 cm)
3.1"(8 cm)
82.5"(209.5 cm)
46.3" (117.7 cm)(side panels removed*)
35.1"
Dolly - 2.4"
(6.0 cm)
(89.2 cm)
55.1" (140.0 cm)
33.7" (85.6 cm)(front and rear panels removed*)
46.0"(116.8 cm)
33.3" (84.7 cm)
Side View
(enclosure rear removed*)
Front View43.6"
(111 cm)(light bar
removed*)
*NOTE: Dimensions with portions temporarily removed for transportation
http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
3/13
Environmental Considerations
M88-E04046
3
Environmental Considerations
Figure 2. Typical D8 ADVANCE floor plan
Room/Instrument Requirements
Optimal room temperature 75.2°F (24.0°C)
Room operation-range temperature 57.2 - 93.2°F (14.0 - 34.0°C)
Maximum temperature gradient 1.8°F (1°C) per hour for highest stabil ity of measuring values
Relative humidity 20%-80%, non-condensing
Heat dissipation to the air by the
diffractometer (with temperature stabilizer,
electronics measuring, X-ray generator, and
vacuum pump).
This configuration assumes that an external
water recirculator is installed in a separate
room.
1.0 kW (3412 btu/hr) maximum
Dissipated heat must be removed by a ventilation or air conditioning system. Cooling air
should flow around the instrument without restriction. If possible, locate the air conditioning
and heating ducts so that their airflow is not aimed directly at the instrument.
NOTE: We recommend a clean, dust-free environment.
Static electricity elimination (to avoid adverse
effects on instrument electronics)
Any carpeting in the area should be of a conductive variety. If the area is carpeted with non-
conductive carpet, we recommend that you place anti-static mats over the conventional
carpeting in the area around the instrument.
Table 4. Environmental considerations
Table (not factory-supplied)
(70 cm)27.5"
External water recirculator
(Haskris R100C)
(70 cm)
27.5"Generator
Electronics
Minimumclearance
28' (8.5 m) maximum
cable distance between
instrument and computer.
Allow for routing of cables
along baseboards.
(70 cm)27.5"
RJ-11 jack
for voice
connection
(optional)
RJ-45 jack
for internet
connection
(optional)
NOTE: For plumbing and electrical details,see the other Figures and Tables inthis Pre-installation Guide.
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
4/13
Communications
M88-E04046
4
Communications
We strongly recommend that you install a telephone
connection (for voice communications) near the
instrument.
NOTE: Bruker AXS’ Remote Diagnosis features are nowavailable over the internet (i.e., WebEx). Checkwith your IT administrator to find out howRemote Diagnosis may affect your IT policy.
Electrical Power
■ See Table 6 for power requirements for the D8
ADVANCE (including the computer and peripherals).
Note the lengths of the various cables.
■ On the wall behind the instrument, connect powerfrom the building mains to a plug-type wall outlet or
to a direct-wired circuit breaker/disconnect box, so
that power to the instrument can be interrupted if
necessary.
NOTE: Outlet and plug not factory-supplied.
NOTE: If the power line voltage at your site fluctuatesoutside the values in Table 6, a compatible linevoltage conditioner or regulator may benecessary. Check with your site’s electricalcoordinator.
■ Wire the room air conditioner and any external
pumps to a different electrical circuit than that used
for the instrument. High starting currents from their
motors may adversely affect line voltage stability.
Additionally, provide a separate electrical power cir-
cuit for the Haskris water recirculator (if purchased).
Figure 3. D8 ADVANCE electrical connections
Connection Connector Purpose
Telephone
(optional)RJ-11
Voice connection near
instrument
Internet
connectionRJ-45 (Ethernet)
Remote diagnosis over
the internet
Table 5. Communications: connections
Generator
Electronics
Haskris
R100C
water
recirculator
Ground cable
(factory-supplied)
208 VAC, 40A
Circuit breaker, disconnect box, or
outlet for plug (not factory-supplied).
Secure to wall.
208 VAC, 15A
(isolated from system)
110 VAC, 15A
six-outlet power strip
(included)
http://-/?-http://-/?-http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
5/13
Electrical Power
M88-E04046
5
Figure 4. D8 ADVANCE electrical connections (schematic)
L1
L2
Fuse or
breaker40 A (2)
Electronics & Generator
Cable to
chassis ground
(factory-supplied)
3-conductor, 8-gauge
power cable (factory-supplied).Cable is 20 feet (6.1 m) long,
4 feet (1.5 m) of which areenclosed inside the instrument.
Electrical Box
House Power208 VAC
Instrument(left side)
Earth Ground
Component Current rating Voltage and frequency Power cable lengths
D8 ADVANCE diffractometer
unit40A† 208-240V, 60Hz, 1-phase
8-gauge, 3-conductor power cable
(factory-supplied), about 15 ft (4.6 m)*
Computer and peripherals 15A 100-120V, 60Hz, 1-phase6 ft (1.8 m)**
Data cables: about 28 ft (8.5 m)
External water recirculator,
Haskris R100C
15A 208-240V, 60Hz, 1-phase About 8 ft (2.4 m)***
* Customer supplies plug to match wall receptacle (if used).
** Factory-supplied 6-position AC outlet strip (110V).
*** For the recommended Haskris model (R100C), customer supplies plug to match wall receptacle (if used).
† If fuses are used, use slow-blow fuses.
Table 6. D8 ADVANCE electrical specifications
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
6/13
Cooling Requirements
M88-E04046
6
Cooling Requirements
An external cooling-water system is required to
dissipate heat produced by the D8 ADVANCE. The
cooling-water system must be fed with a closed-circuit
cooling system.
To minimize difficulties with cooling water (e.g.,
suspended solids, low pressure, and extreme water
temperature variations), we recommend installing a
Haskris R100C closed-circuit water recirculator as
shown in Figures 5 and 6. Other cooling system
arrangements are not recommended as they will
inevitably fail to minimize the aforementioned difficulties
and result in cooling problems.
NOTE: If you do not wish to install a Haskris closed-circuit water recirculator, contact Bruker AXS for
more information.
CAUTION
The X-ray tube’s warranty does not cover damageresulting from improper cooling water.
Install two 3/4” copper lines, each maximum length of
48 ft (15m), with a shut-off valve near each end of each
pipe. Install 1/2” barbed fittings (not supplied) at each
end of the pipes. These copper lines are intended for
transporting the cooling water over long distances. The
barbed fittings at the end of the pipes will connect to the
short, factory-supplied hoses attached to the instrument.
During installation, the Bruker AXS Field Service
Engineer will connect factory-supplied 1/2” (12mm)
inside diameter hoses between the Haskris R100C and
piping, and then between the piping and instrument (the
unit and instrument having customer-supplied barbed
fittings). The Engineer will then fasten the water hoses
to the barbed fittings with hose clamps.
NOTE: The Haskris R100C needs supply water and adrain to remove heat that it emits. However, it
keeps water consumption to a minimum using awater valve that opens and closes as required.
NOTE: To protect the Haskris R100C, ensure that thewater is free of suspended matter. Also, ensurethat water hardness does not exceed 300 mg/ liter CaO, while remaining at neutral pH (7).
Technical
features
Cooling capacity
when water source
is 65°F (18°C):
3850W (13125 btu/hr)
Water pump
capacity3.7 gal/min (14.1 L/min)
Water reservoir
volume6 gal (23 L)
Temperature
stability±2°F (1.1°C)
Refrigerant R134a
Unit weight
325 lbs (148 kg)
(approximate shipping
weight without water in
the tank)
Unit dimensions 31”H × 21”W × 29”D(79 cm × 53 cm × 74 cm)
Coolant required
Clean, potable, distilled
water. Do not use
deionized water.
Condensercooling water
requirements
When temp. is:
65°F (18°C)
75°F (24°C)
85°F (29°C)
Flow rate required is:
1.0 gal/min (3.8 L/min)
1.5 gal/min (5.7 L/min)
3.1 gal/min (11.8 L/min)
Minimum required
pressure differential
from condenser
water inlet to outlet:
25 psi (1.7 bar)
Maximum pressure
differential from
condenser water
inlet to outlet:
60 psi (4.1 bar)
Maximum
condenser water
inlet pressure:
125 psi (8.6 bar)
Location
Must be installed in
a clean, indoor
environment. Ifpossible, install the
Haskris in a
separate room to
minimize noise and
heat emission.
We recommend access to
the:
TOP for routine
maintenance, such aschanging water in the
reservoir.
FRONT for visibility of
controls and readouts.
ONE SIDE for convenient
servicing should a spare
part be required.
Table 7. Haskris R100C recirculator specifications
http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
7/13
Cooling Requirements
M88-E04046
7
Figure 5. Haskris R100C recirculator specifications
Figure 6. Cooling water with the Haskris R100C closed-circuit water recirculator
Haskris Model R100CTECHNICAL SPECIFICATIONS
1. Power Requirements: 208/230V-1-60Hz
2. F.L.A. Rating: 9.9A
3. Recommended Fuse Size: 15A (time delay)
REAR
VIEWNOT DRAWN
TO SCALE
3"
2.5"
2.5"
City Water "IN"3/8" FPT Brass
City Water "OUT"
3/8" FPT Brass
SUPPLY
RETURN
21"24"
2.25"
18.5"
POWER CORD (7 ft., no plug furnished)
Note:
Supply and return connections are
1/2" Hand Valves with 1/2" Hose Barbs.
DEPTH = 29.0"
(73.7 cm)
21.0"
(53.3 cm)
31.0"
(78.7 cm)
FRONT
VIEWNOT DRAWN
TO SCALE
Unit ON/OFF
Switch
Power
Indicator
Water Level
Indicator
Flowmeter
Leveling Legs
(adjustable from 1/2" To 2")
Ventilation grille
Water Temp
Control & Display
65
MENU
FULL
Generator Electronics
Reinforced industrial water hose
3/4" copper tubing
Shut-off valves (wall-mounted)
1/2" barbed fitting
Water supply
Supply to
instrument
Return from
instrument
R100C
HaskrisDrain
NOTE: 25’ (7.6 m) of water hose comeswith the Haskris R100C.
65’ (20.0 m) of usable waterhose comes with the D8ADVANCE.
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
8/13
Plumbing Requirements
M88-E04046
8
Plumbing Requirements
Gas Specifications
Position-sensitive Detector Gas Supply(optional—for MBraun PSD only)
■ If an MBraun PSD (position-sensitive detector) is
used with the D8 ADVANCE, install a P10 gas cylin-
der and regulator as noted in Table 9.
■ Install a cylinder of gas with a two-stage regulator
(for the flow counter) as noted in Table 9. We recom-
mend indoor installation of the gas cylinder.
■ Ensure that the cylinder is securely mounted to avoid
tipping. Observe all safety regulations for flammable
gases. We recommend that you keep a reserve cylin-
der.
■ Install as short a line as possible from the gas cylin-
der to the instrument. Use factory-supplied Viton tub-
ing (length as noted in Table 8). If your supply line
must exceed the supplied length, use oxygen-free
(high-purity) copper or stainless-steel piping. Ensure
that the lines are clean and free of water, solvents,
and particulate matter. Avoid exposing the gas linesto extreme temperatures (such as heating vents).
■ Operate the flow counters only with a commercial-
grade mixture of P10 gas (i.e., 90% Argon, 10%
methane, impurities less than 0.5% by volume).
■ Install a separate exhaust line leading to an outside
discharge for the spent gas.
Helium Supply (optional)
■ For equipment with a helium or nitrogen flush option
(required for liquid or loose powder analysis), install a
helium or nitrogen cylinder with a two-stage regula-
tor as noted in Table 9.
■ Secure the cylinder with a mounting support to avoid
accidental tipping.
Material supplied with D8ADVANCE
Tubing/hose ID sizes forbarbed fittings
Tubing/hose lengths
Counter tube gas
(P10—for MBraun position-
sensitive detector only)
Inlet: Black Viton tubing 0.125” (0.32cm) 23 ft (7m)
Outlet: Blue polymer tubing 0.25” (0.64cm) 23 ft (7m)
Helium Blue Polymer tubing 0.125” (0.32cm) 23 ft (7m)
Cooling water hoses Pressure water hose 0.5” (1.27cm) 65 ft (20.0m)
Vacuum exhaust* Plastic hose 0.5” (1.27cm) 17 ft (5.2m)
* Mist elimination is installed; exhausting vacuum is an option. You must provide an outlet for the vacuum exhaust (see Figure 2).
Table 8. Tubing and hose sizes for supplied barbed fittings on D8 ADVANCE and Haskris R100C water recirculator
GasCylinder/Regulator(not factory-supplied)
P10
Compressed-gas cylinder with T-size
cylinder filling pressure, 2900 psi (180
bar), with regulator such as AGA model
SGVHPT272B-350 or equivalent.*
Helium or nitrogen
(optional; use if
ordered)
Compressed-gas cylinder with T-size
cylinder filling pressure, 2900 psi (180
bar), with regulator such as AGA model
SGVHPT270B-580 or equivalent.*
* Securely mount the cylinders to a wall or table. Observe safety
regulations for all flammable gases.
Table 9. Gas specifications
http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
9/13
Bruker AXS Inc.
5465 East Cheryl Parkway
Madison, WI 53711-5373 USA
Phone +1 (800) 234-XRAY [9729]
Fax +1 (608) 276-3006
E-mail: [email protected]
www.bruker-axs.com
Bruker BioSciences
40 Manning Road
Billerica, MA USA
Phone +1 (978) 663-3660
Fax: +1 (978) 667-5993
E-mail: [email protected]
www.bruker-biosciences.com
Final Check
Final Check
You, the customer, are responsible for meeting all
applicable building and safety codes. Once the pre-
installation utilities are connected, get certification (from
an approved authority) that the installation meets all
local building and safety codes.
When all pre-installation work is finished, complete the
attached D8 ADVANCE Pre-installation Checklist and fax
it to Bruker AXS.
Fax: 1 (608) 276-9162 or 1 (608) 276-3015
Also, contact the Bruker AXS Service Department by
telephone to confirm that your site is ready forinstallation.
Tel: 1 (800) 234-XRAY [9729] or 1 (608) 276-3087
Upon receiving confirmation that your site is ready,
Bruker AXS personnel will schedule the instrument
installation.
When the System Arrives
■ When the system arrives, check it for damage with
the delivery driver. Contact the carrier’s office and
Bruker AXS immediately if you find any damage.
■Compare the packing list (i.e., the number of boxesreceived) with your order invoice and contact Bruker
AXS if you find any discrepancies.
■ Move boxes or crates to the installation site (if possi-
ble) to facilitate timely installation. Wait until a Bruker
AXS Field Service Engineer opens the boxes to
check their contents against your invoice. Do not
open or uncrate any boxes.
■ If uncrating is required, call Bruker AXS for authoriza-
tion at 1 (800) 234-XRAY [9729] extension 3087. If
you are authorized to uncrate the shipment, save all
packing material until the Bruker AXS Field Service
Engineer completes the installation.
■ Installation must be performed by a Bruker AXS Field
Service Engineer.
■ Save all packing materials for the system until the
Bruker AXS Field Service Engineer has completed
the installation.
NOTE: Installation of the system typically requires threeto four working days. Optional attachmentsrequire additional time for installation andtesting.
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
10/13
This page intentionally left blank
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
11/13
D8 ADVANCE Pre-installation Checklist
M88-E04046
D8 ADVANCE Pre-installation Checklist
Please complete the checklist below and fax it to the Bruker AXS Service Department:
FAX
FROM: TO:
Bruker AXS,
Attn: Service Dept.
1 (608) 276-9162 or
1 (608) 276-3015
Contact Name Phone
Company/Organization Fax
Email
Component YES/NO Value/remark Initial/date
Room Location
Floor load capacity exceeds 146.9 lbs/ft2 (717.0 kg/m2)(see Table 2)
Room height exceeds 82.5” (209.5 cm) (see Table 2)
Floor space for D8 ADVANCE free of equipment and clean (see
Figures 1 and 2, Table 2)
Doors and hallways from loading dock to location have adequate
clearance for moving the D8 ADVANCE in its shipping crates;
freight elevator available (see Table 3)
Clearance on all sides of uncrated unit exceeds 27.5” (70.0 cm)
(see Figure 2, Table 2)
Computer table within 13.0’ (4.0 m) of instrument
Environment (see Table 4)
System is not exposed to direct sunlight
Temperature between 57.2 - 93.2°F (14.0 - 34.0°C)
Temperature gradient less than 1.8°F (1°C) per hour
Heat removal capacity exceeds 1.0 kW (3412 btu/hr)
Relative humidity between 20% - 80%, no condensation
Carpeted rooms: anti-static carpeting or mats installed
Communications (see page 4)
Optional voice line (near instrument)
Internet connection for remote diagnostics
Electrical Power (see Figure 4, Table 6)
208 VAC, 60 Hz ± 3 Hz, 40A (D8 ADVANCE)
208 VAC, 60 Hz ± 3 Hz, 15A (Haskris R100C)
110 VAC, 60 Hz ± 3 Hz, 15A (Computer and peripherals)
1 of 3
http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
12/13
D8 ADVANCE Pre-installation Checklist
M88-E04046
All electrical power for the system must be isolated from circuits
that have high starting currents (e.g., air conditioners, pumps,
furnaces)
Electrical connection of instrument to mains power supply is
provided with automatic circuit breakers for all phases
It is possible to disconnect the D8 ADVANCE completely from the
mains power supply, using either a labeled switch or a circuit
breaker located near the system
Power cable connected directly to switchboard
Socket outlet according to DIN49462, VDE 0623, IEC 309-1
(Approved plug connector supplied by customer)
Cooling Requirements (see page 6)
Closed cooling system (Haskris R100C recommended)
(see Figures 2 and 6)
Plumbing/piping complete
(for recommended Haskris unit)
Customer-supplied cooling system (not recommended)
The Haskris R100C water recirculator meets the cooling water requirements of the system. If you provide your own water supply, it must
meet the following requirements.
Flow rate greater than 1 gal/min (3.6 L/min). Recommended rate:
1.1 gal/min (4.0 L/min)
Pressure 60-110 psi (4-7.5 bar) and pressure-free drain
Temperature 59-68°F (15-20°C). Room temperature must be high
enough to avoid condensation.
Bruker AXS recommends the use of distilled or reverse osmosis (RO) water for cooling the X-ray tube and generator. Use of deionized water
is NOT recommended. If building water is used, it must meet the following requirements.
Hardness less than:
300mg/L CaO, or
30° CaO (German scale), or
53.7° CaO (French scale), or
37.5° CaO (UK scale)
pH of 7.0 ± 1
Adequate filtering to remove suspended solids ( 50 m)
Plumbing Requirements (see page 8)
Distance to water supply less than 26’ (8 m), less than 48’ (15 m)
if Haskris used
Shutoff valves installed on both lines (not required if discharginginto drain)
Elevation difference between Haskris and instrument less than 20’
(6 m)
NW ½” hose barb fittings for supply and return of cooling water
Supply Gases (the optional helium mode requires helium gas cylinders and regulators, not factory-supplied) (see
Tables 9 and 8, Figure 2)
Component YES/NO Value/remark Initial/date
2 of 3
http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
-
8/19/2019 D8 ADVANCE Pre-Installation Guide (2)
13/13
Bruker AXS Inc.
5465 East Cheryl Parkway
Madison, WI 53711-5373 USA
Phone +1 (800) 234-XRAY [9729]
Fax +1 (608) 276-3006
E-mail: [email protected]
Bruker BioSciences
40 Manning Road
Billerica, MA USA
Phone +1 (978) 663-3660
Fax: +1 (978) 667-5993
E-mail: [email protected]
D8 ADVANCE Pre-installation Checklist
P10 Gas (for MBraun PSD only):
Commercial-grade P10 gas (90% Argon, 10% methane, less than
0.5% impurities by volume) in T-size gas cylinder, e.g., 50 L, 200
bar (2900 psi)
Cylinder/regulator securely mounted to wall within 6’ (2 m) of theD8 ADVANCE
If mounted further away than the supplied hose length, correct
tubing/piping line installed (see Table 8)
Local safety requirements for flammable gases fulfilled
Exhaust gas vents to the outside, or a fume hood is present
(if mandated by local safety requirements)
Helium Gas (if applicable):
Cylinder/regulator securely mounted to wall within 6’ (2 m) of the
D8 ADVANCE
If mounted farther away than the supplied hose length, correcttubing/piping line installed (see Table 8)
Vacuum
Exhaust to outside (optional)
Final Check
All local safety codes are met
Fax a copy of this form to: Bruker AXS, Attention: Service
Department 1 (608) 276-9162
Call for installation: 1 (800) 234-XRAY [9729] extension 3087
When system arrives: Check packing crates for shipping damage. If there is damage, contact your Carrier’s Office and Bruker AXS. Compare
the packing list (the number of boxes) with your invoice. If possible, move boxes (crates) to installation site or storage area.
Do not open crates or boxes. If uncrating is required, call Bruker AXS for authorization at 1 (800) 234-XRAY [9729] extension 3087.
If authorized to uncrate, save all packing material until the Bruker AXS Field Service Engineer completes installation.
Component YES/NO Value/remark Initial/date