D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1...

15
18-061 PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19 PROJECT ISSUE DATE AMENDMENT © THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THE WHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FOR DAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDER DESIGNSATM LIABLE. 7 aminya place orange nsw 2800 CLIENT TITLE DATE JOB No. SHEET REV [email protected] www.designsatm.com t.+612 6361 7461 m.0409 982 793 DA05 C IVAN ZHANG DEVELOPMENT APPLICATION A 23/05/19 AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION B 02/08/19 AMENDED TO SUIT NEW CIVIL DESIGN C 20/08/19 AMENDED TO SUIT TOWN PLANNER /Volumes/Shared/DAM2018/18061/plans/18061-DA(200818).pln ±0 0 FLOOR LEVEL +2,550 1 CEILING LEVEL SELECTED COLORBOND ROOF AT 25° PITCH SELECTED FACE BRICKWORK TO SUIT CLIENT SELECTED ALUMINIUM FRAMED DOORS AND WINDOWS FLOOR LEVEL 872.30 FGL 872.15 NGL 872.35 ±0 0 FLOOR LEVEL +2,550 1 CEILING LEVEL FLOOR LEVEL 872.30 FGL 872.15 NGL 872.50 PHOTOVOLTAIC PANELS AS PER BASIX ±0 0 FLOOR LEVEL +2,550 1 CEILING LEVEL SELECTED COLORBOND ROOF AT 25° PITCH SELECTED FACE BRICKWORK TO SUIT CLIENT SELECTED ALUMINIUM FRAMED DOORS AND WINDOWS SELECTED GARAGE DOOR VBE VBE FLOOR LEVEL 872.30 FGL&NGL 871.85 ±0 0 FLOOR LEVEL +2,550 1 CEILING LEVEL FLOOR LEVEL 872.30 FGL&NGL 871.85 N NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3

Transcript of D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1...

Page 1: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA05 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.30

FGL872.15

NGL872.35

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.30

FGL872.15

NGL872.50

PHOTOVOLTAIC PANELSAS PER BASIX

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS SELECTED GARAGE

DOOR

VBE

VBE

FLOOR LEVEL872.30

FGL&NGL871.85

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.30

FGL&NGL871.85

N

NORTH ELEVATION - D11:100 AT A3

EAST ELEVATION - D11:100 AT A3

WEST ELEVATION - D11:100 AT A3

SOUTH ELEVATION - D11:100 AT A3

Page 2: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA06 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.10

FGL871.93

NGL872.30

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.10

FGL871.93

NGL872.30

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED GARAGEDOOR

VBE

VBE

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.10

FGL&NGL871.30

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.10

FGL&NGL871.30

NORTH ELEVATION - D21:100 AT A3

EAST ELEVATION - D21:100 AT A3

WEST ELEVATION - D21:100 AT A3

SOUTH ELEVATION - D21:100 AT A3

Page 3: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA07 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED GARAGEDOOR

VBE

VBE

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL871.80

FGL&NGL871.00

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENTSELECTED ALUMINIUM FRAMED

DOORS AND WINDOWS

FLOOR LEVEL871.80

FGL871.60

NGL871.20

FGL&NGL871.60

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL871.80

FGL871.60

FGL&NGL871.30

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL871.80

FGL&NGL871.00

FGL&NGL871.30

NORTH ELEVATION - D31:100 AT A3

EAST ELEVATION - D31:100 AT A3

WEST ELEVATION - D31:100 AT A3

SOUTH ELEVATION - D31:100 AT A3

Page 4: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA08 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N±0

0 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

FLOOR LEVEL872.03

FGL&NGL871.78

FGL&NGL871.78

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.03

FGL&NGL871.78 FGL&NGL

871.43

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

SELECTED GARAGEDOOR

VBE

VBE

FLOOR LEVEL872.03

FGL&NGL871.43

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.03

FGL&NGL871.43

FGL&NGL871.58

NORTH ELEVATION - D41:100 AT A3

EAST ELEVATION - D41:100 AT A3

WEST ELEVATION - D41:100 AT A3

SOUTH ELEVATION - D41:100 AT A3

Page 5: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA09 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.30

FGL&NGL872.10

SKYLIGHTS TOBATHROOM & ENSUITE

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.30

FGL&NGL872.10 FGL&NGL

871.95±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

SELECTED GARAGEDOOR

VBE VBE

FLOOR LEVEL872.30

FGL&NGL872.10

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.30

FGL&NGL872.10

NORTH ELEVATION - D51:100 AT A3

EAST ELEVATION - D51:100 AT A3

WEST ELEVATION - D51:100 AT A3

SOUTH ELEVATION - D51:100 AT A3

Page 6: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA10 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

FLOOR LEVEL872.50

FGL872.30

NGL872.75

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.50

FGL872.30

NGL872.75

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED GARAGEDOOR

VBE VBE

FLOOR LEVEL872.50

FGL872.30

±00 FLOOR LEVEL

+2,5501 CEILING LEVEL

SELECTED COLORBONDROOF AT 25° PITCH

SELECTED FACE BRICKWORKTO SUIT CLIENT

SELECTED ALUMINIUM FRAMEDDOORS AND WINDOWS

FLOOR LEVEL872.50

FGL872.30

NORTH ELEVATION - D61:100 AT A3

EAST ELEVATION - D61:100 AT A3

WEST ELEVATION - D61:100 AT A3

SOUTH ELEVATION - D61:100 AT A3

Page 7: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA11 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

871.00

871.00

872.00

872.00

UNSDADEDAREA3.5m2

UNSDADEDAREA5.1m2

UNSDADEDAREA5.1m2

UNSDADEDAREA3.3m2

UNSDADEDAREA3.3m2

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 9:00am 21ST JUNE1:250 AT A3

Page 8: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA12 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

UNSDADEDAREA10.2m2

UNSDADEDAREA14.8m2

UNSDADEDAREA14.7m2

UNSDADEDAREA13.6m2

UNSDADEDAREA9.3m2

UNSDADEDAREA12.8m2

871.00

871.00

872.00

872.00

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 10:00am 21ST JUNE1:250 AT A3

Page 9: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA13 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

UNSDADEDAREA17.6m2

UNSDADEDAREA19.5m2

UNSDADEDAREA18.9m2

UNSDADEDAREA14.1m2

UNSDADEDAREA14.1m2

871.00

871.00

872.00

872.00

UNSDADEDAREA16.9m2

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 11:00am 21ST JUNE1:250 AT A3

Page 10: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA14 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

UNSDADEDAREA18.9m2

UNSDADEDAREA22.9m2

UNSDADEDAREA22.3m2

UNSDADEDAREA19.8m2

UNSDADEDAREA16.3m2

UNSDADEDAREA14.4m2

871.00

871.00

872.00

872.00

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 12:00pm 21ST JUNE1:250 AT A3

Page 11: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA15 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

UNSDADEDAREA19.1m2

UNSDADEDAREA21.5m2

UNSDADEDAREA20.4m2

UNSDADEDAREA18.5m2

UNSDADEDAREA15.1m2

UNSDADEDAREA12.3m2

871.00

871.00

872.00

872.00

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 1:00pm 21ST JUNE1:250 AT A3

Page 12: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA16 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

UNSDADEDAREA17.6m2

UNSDADEDAREA18.3m2

UNSDADEDAREA18.1m2

UNSDADEDAREA16.5m2

UNSDADEDAREA12.2m2

UNSDADEDAREA9.1m2

871.00

871.00

872.00

872.00

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 2:00pm 21ST JUNE1:250 AT A3

Page 13: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA17 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

N

GARDINER ROAD

871.00

871.00

872.00

872.00

UNSDADEDAREA13.9m2

UNSDADEDAREA13.8m2

UNSDADEDAREA13.1m2

UNSDADEDAREA11.7m2

UNSDADEDAREA7.9m2

UNSDADEDAREA4.9m2

DWELLING 1DWELLING 2DWELLING 3

DWELLING 4 DWELLING 5DWELLING 6

SHADOW DIAGRAM 3:00pm 21ST JUNE1:250 AT A3

Page 14: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE AUG 19

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA18 CIVAN ZHANG DEVELOPMENT APPLICATION

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8061

/pla

ns/1

8061

-DA

(200

818)

.pln

NORTHERN LIVING WINDOWS -UNSHADED AREA = 87.8%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 92.7% NORTHERN LIVING WINDOWS -

UNSHADED AREA = 97.6%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 93.3%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 98.1% NORTHERN LIVING WINDOWS -

UNSHADED AREA = 99.4%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 97.3%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 100.0% NORTHERN LIVING WINDOWS -

UNSHADED AREA = 100.0%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 99.3%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 100.0% NORTHERN LIVING WINDOWS -

UNSHADED AREA = 100.0%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 96.3%

NORTHERN LIVING WINDOWS -UNSHADED AREA = 97.9% NORTHERN LIVING WINDOWS -

UNSHADED AREA = 97.1%

NORTH WINDOW SHADOWING ELEVATIONS1:250 AT A3 - 10:00am 21ST JUNE

NORTH WINDOW SHADOWING ELEVATIONS1:250 AT A3 - 11:00am 21ST JUNE

NORTH WINDOW SHADOWING ELEVATIONS1:250 AT A3 - 12:00pm 21ST JUNE

NORTH WINDOW SHADOWING ELEVATIONS1:250 AT A3 - 1:00pm 21ST JUNE

NORTH WINDOW SHADOWING ELEVATIONS1:250 AT A3 - 2:00pm 21ST JUNE

DWELLING 5 DWELLING 4DWELLING 6

DWELLING 5 DWELLING 4DWELLING 6

DWELLING 5 DWELLING 4DWELLING 6

DWELLING 5 DWELLING 4DWELLING 6

DWELLING 5 DWELLING 4DWELLING 6

Page 15: D1 NORTH ELEVATION - D1 SOUTH ELEVATION - …...NORTH ELEVATION - D1 1:100 AT A3 EAST ELEVATION - D1 1:100 AT A3 WEST ELEVATION - D1 1:100 AT A3 SOUTH ELEVATION - D1 1:100 AT A3 PROPOSED

18-061PROPOSED MULTI RESIDENTIAL DEVELOPMENT, at no101, lot22 DP522405 GARDINER RD, ORANGE

PRO

JECT

ISSUE DATEAMENDMENT© THIS DRAWING AND THE CONCEPTS REMAIN THE PROPERTY OF

DESIGNSATM. ANY UNAUTHORISED USE OF THIS DRAWING, AS TO THEWHOLE OR PART MAY RENDER THE USER LIABLE TO AN ACTION FORDAMAGES. CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM

UNWARRENTED OR UNAUTHORISED USE SHALL NOT RENDERDESIGNSATM LIABLE.

7 aminya placeorange nsw 2800

CLI

ENT

TITL

E

DAT

E

JOB

No.

SHEE

T

REV

[email protected]

t.+612 6361 7461m.0409 982 793

DA19IVAN ZHANG DEVELOPMENT APPLICATION AUG 19 C

A 23/05/19AMENDED TO SUIT CURRENT DEVELOPMENT APPLICATION

B 02/08/19AMENDED TO SUIT NEW CIVIL DESIGN

C 20/08/19AMENDED TO SUIT TOWN PLANNER

/Vol

umes

/Sha

red/

DA

M20

18/1

8102

/pla

ns/1

8061

-CO

LOU

RS

(200

819)

.pln

ROOFCOLORBOND WINDSPRAY

GUTTERCOLORBOND WINDSPRAY

FACIACOLORBOND WHITE

GARAGE DOORCOLORBOND WHITE

FC SHEET GABLE INFILL - UNITS 2,3 & 5DULUX " LEXICON"

WINDOWSPEARL WHITE

FRONT DOORTIMBER STAIN

POSTSDULUX WHITE

PROPOSED EXTERNAL COLOUR SCHEME - ALL UNITS

FACE BRICKAUSTRAL - WHITSUNDAY - ORPHEUS