D1 - City of Wanneroo€¦ · d.ensure a permit & reinstatement specifications are obtained from...

1
DRAWING TITLE PROJECT DETAILS DWG NO REVISION SCALE PAPER SIZE REVISION HISTORY REV DATE DESCRIPTION DSG CHK DRW PROJECT NO DRAWING DESIGN CHECK J. CUBONG AS NOTED A1 B ISSUE FOR REVIEW PROPOSED UNITED SERVICE STATION WANNEROO ROAD, NEERABU, WESTERN AUSTRALIA TBC J. ABADINAS J. ABADINAS A 09-DEC-2019 ISSUE FOR REVIEW JA JC JA B 14-FEB-2020 ISSUE FOR REVIEW JA JC JA STORMWATER DRAINAGE PLAN SCALE 1:200 SITE DATA: SITE CLASSIFICATION = TO BE CONFIRMED GROUND WATER TABLE = OVER 2.5m BELOW EXISTING GROUND LEVEL SOIL PERMEABILITY = 2 m/day (TO BE CONFIRMED) GENERAL NOTES: 1. DATUM IS LOCAL AND TO BE VERIFIED ON SITE. 2. CHECK ALL DIMENSIONS ON SITE. READ ALL ENGINEERING DRAWINGS IN CONJUNCTION WITH ARCHITECTURAL & SURVEY DRAWINGS. ANY DISCREPANCIES BETWEEN ENGINEERING DRAWINGS AND ARCHITECTURAL DRAWINGS SHALL BE CONFIRMED PRIOR TO COMMENCING CONSTRUCTION. DO NOT SCALE FROM THESE DRAWINGS. 3. ALL WORK TO BE IN ACCORDANCE WITH "AS3500-2003 PLUMBING & DRAINAGE", THE "BUILDING CODE OF AUSTRALIA" AND THE LOCAL AUTHORITY'S STANDARD SPECIFICATIONS. 4. LOT CONNECTION PIT (WHEN APPLICABLE) TO LOCAL AUTHORITY SPECIFICATIONS. 5. WHERE MANHOLES ARE LOCATED IN THE AREAS SUBJECT TO VEHICULAR LOADING, STANDARD TRAFFICABLE LIDS ARE TO BE INSTALLED & BASED TO BUILDER'S DETAIL. 6. ALL DRAINAGE PIPEWORK SHALL BE PVC CLASS HD STORMWATER, UNLESS WHERE LOCATED UNDERNEATH ANY STRUCTURES PIPEWORK SHALL BE PVC SEWER CLASS SN8. 7. ALIGNMENT OF PIPES SHALL BE AS SHOWN ON THE PLAN & SHALL BE TO THE PIPE OR MANHOLE CENTRELINE. 8. BEFORE CONSTRUCTION COMMENCES, THE CONTRACTOR SHALL: A. CHECK ON SITE THE LOCATION OF THE EXISTING SERVICES WITH THE APPROPRIATE AUTHORITY. ENSURE PROPOSED STORMWATER PIPE DOES NOT CLASH WITH ANY EXISTING SERVICES. B. ARRANGE FOR THE LOCATION AND THE LEVEL OF THE CONNECTION POINT TO EXISTING STORMWATER MANHOLE TO BE VERIFIED BY A SURVEYOR. C. CONFIRM THAT BOUNDARY PEGS OR OTHER SURVEY REFERENCE POINTS TO BE USED IN SETTING OUT OF THE PROJECT ARE LOCATED IN THE CORRECT POSITIONS. D. ENSURE A PERMIT & REINSTATEMENT SPECIFICATIONS ARE OBTAINED FROM THE LOCAL AUTHORITY IF EXCAVATION WILL BE IN A ROAD RESERVE OR RIGHT OF WAY. E. ENSURE ALL DETAILS HAVE BEEN CHECKED AND THAT NO DISCREPANCIES EXIST. ALL QUERIES AND DISCREPANCIES ARE TO BE RESOLVED PRIOR TO COMMENCING WORKS. 11. ALL EXCAVATIONS SHALL BE SECURED & MADE SAFE IN ACCORDANCE WITH REQUIREMENTS OF THE OCCUPATIONAL SAFETY & HEALTH ACT OF 1984, THE OCCUPATIONAL SAFETY & HEALTH REGULATION 1996 & OF ANY RELEVANT REGULATORY BODY. 12. PROPERTIES WHICH HAVE BEEN EXCAVATED SHALL BE RETURNED TO AT LEAST A SIMILAR CONDITION TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. 13. TRENCH BACKFILL SHALL BE CLEAN GRANULAR MATERIAL, COMPACTED TO A LEVEL NOT LESS THAN THAT OF THE SURROUNDING UNDISTURBED GROUND, FOR THE FULL DEPTH OF EXCAVATION. BACKFILL UNDER ROADS SHALL BE COMPACTED TO THE REQUIREMENTS OF THE LOCAL AUTHORITY. 14. ALL CONNECTION INTO EXISTING LOCAL AUTHORITY STORMWATER ARE TO BE CARRIED OUT BY THE CONTRACTOR TO LOCAL AUTHORITY SPECIFICATIONS. 15. THIS STORM WATER DESIGN IS TO BE READ IN CONJUNCTION WITH THE BUILDER'S ARCHITECTURAL DRAWINGS (PARTIALLY REPRODUCED HERE). 16. CLIENT IS TO ENSURE LOCAL AUTHORITY HAVE APPROVED THESE DRAWINGS BEFORE BEING ISSUED FOR PRICING, TENDER & CONSTRUCTION. LEGEND: 150Ø PIPE 100Ø PIPE FROM BUILDING DOWNSPOUT TRAFFICABLE STORMWATER TANK WITH GRATE COVER TRAFFICABLE STORMWATER TANK WITH CONCRETE COVER NON-TRAFFICABLE STORMWATER TANK WITH CONCRETE COVER TRAFFICABLE PRECAST SUMP PIT WITH GRATE COVER FALL DIRECTION IL+10.00 PIPE INVERT LEVEL TT+10.00 TOP OF TANK LEVEL RL+10.00 PAVEMENT LEVEL HP+10.00 PAVEMENT HIGH POINT LP+10.00 PAVEMENT LOW POINT BK+10.00 BOTTOM OF KERB TK+10.00 TOP OF KERB EXISTING GROUND LEVEL D1 STORMWATER DRAINAGE PLAN AND DETAILS EXISTING SLIP ROAD SITE BOUNDARY 64.95M SITE BOUNDARY 62.31M SITE BOUNDARY 64.95M SITE BOUNDARY 62.31M 4.5m x 1.755m AEROBIC TREATMENT UNIT TO HYD. ENG'S DETAILS WITH REQUIRED CLEARANCES AS INDICATED. PAINTED LINE MARKINGS RUBBER WHEEL STOPS TO CAR BAYS ACROD BAY TO COMPLY WITH AS 2890.6 16mm RECESSED MAT WELL TO CIVIL DWGS & TO AS 1428 10m PYLON SIGN AS PER UNITED STD DWGS. FOOTING TO ENG'S DWGS (CONFIRM SAFE DISTANCE FROM POWERLINES) 2.0M x 2.0m POTABLE WATER SYSTEM 2.5M DIA. FIRE WATER TANK 14m x 0.66m LEACH DRAIN TO HYD. ENG'S DETAILS WITH REQUIRED CLEARANCES AS INDICATED. 14m x 0.66m LEACH DRAIN TO HYD. ENG'S DETAILS WITH REQUIRED CLEARANCES AS INDICATED. SWALE 1 ABOVE GROUND STORAGE 1 (AREA = 412sqm) ABOVE GROUND STORAGE 2 (AREA = 535sqm) HEAVY DUTY GRATED DRAIN (DETAILS TO BE CONFIRMED) ALL SURFACE RUN-OFF UNDER CAR AND TRUCK CANOPY AREAS WILL BE DIRECTED TO OIL AND WATER SEPARATOR TO HYDRAULIC CONSULTANTS DESIGN DRAINWELL 2 DRAINWELL 1 DRAINWELL 3 LP + 46.60 LP + 46.60 LP + 46.60 LP + 46.60 RL + 46.70 RL + 46.70 RL + 46.70 RL+46.70 RL + 46.70 RL + 46.70 LP + 46.60 HP+46.70 HP+46.55 HP+46.40 HP+46.25 RL+46.40 HP+46.40 HP+46.25 RL+46.20 HP+46.70 RL+46.75 RL+46.75 RL+45.75 RL+45.75 RL+45.75 RL+46.25 RL+46.25 RL + 46.70 TYPICAL STORMWATER TANK DETAILS SCALE 1:20 INLET PIPE PIPE INVERT LEVEL DEPTH AS PER PLAN THIS PAGE DIAMETER AS PER PLAN THIS PAGE 150 MORTAR FILLET AND BEDDING TANK BASE TO BUILDER'S DETAILS 100 COMPACTED SUBGRADE TO 90% MDD OUTLET PIPE TANK LID TO BUILDER'S DETAILS PRE-CAST CONCRETE TANK WRAPPED IN "BIDIM A14" GEOFABRIC ALL AROUND AS SHOWN SOAKAGE HOLE FILLED WITH 20-25mm SIZED AGGREGATE GROUND LEVEL SEE TANK SCHEDULE

Transcript of D1 - City of Wanneroo€¦ · d.ensure a permit & reinstatement specifications are obtained from...

Page 1: D1 - City of Wanneroo€¦ · d.ensure a permit & reinstatement specifications are obtained from the local authority if excavation will be in a road reserve or right of way. e.ensure

DRAWING TITLE

PROJECT DETAILS

DWG NO REVISION

SCALE PAPER SIZE

REVISION HISTORYREV DATE DESCRIPTION DSG CHKDRW

PROJECT NODRAWING

DESIGN

CHECKJ. CUBONG

AS NOTED A1

BISSUE FOR REVIEW

PROPOSED UNITEDSERVICE STATIONWANNEROO ROAD, NEERABU,

WESTERN AUSTRALIA

TBC

J. ABADINAS

J. ABADINAS

A 09-DEC-2019 ISSUE FOR REVIEW JA JCJAB 14-FEB-2020 ISSUE FOR REVIEW JA JCJA

STORMWATER DRAINAGE PLANSCALE 1:200

SITE DATA:

SITE CLASSIFICATION = TO BE CONFIRMEDGROUND WATER TABLE = OVER 2.5m BELOW EXISTING GROUND LEVELSOIL PERMEABILITY = 2 m/day (TO BE CONFIRMED)

GENERAL NOTES:1. DATUM IS LOCAL AND TO BE VERIFIED ON SITE.2. CHECK ALL DIMENSIONS ON SITE. READ ALL ENGINEERING DRAWINGS IN

CONJUNCTION WITH ARCHITECTURAL & SURVEY DRAWINGS. ANY DISCREPANCIESBETWEEN ENGINEERING DRAWINGS AND ARCHITECTURAL DRAWINGS SHALL BECONFIRMED PRIOR TO COMMENCING CONSTRUCTION. DO NOT SCALE FROM THESEDRAWINGS.

3. ALL WORK TO BE IN ACCORDANCE WITH "AS3500-2003 PLUMBING & DRAINAGE", THE"BUILDING CODE OF AUSTRALIA" AND THE LOCAL AUTHORITY'S STANDARDSPECIFICATIONS.

4. LOT CONNECTION PIT (WHEN APPLICABLE) TO LOCAL AUTHORITY SPECIFICATIONS.5. WHERE MANHOLES ARE LOCATED IN THE AREAS SUBJECT TO VEHICULAR LOADING,

STANDARD TRAFFICABLE LIDS ARE TO BE INSTALLED & BASED TO BUILDER'S DETAIL.6. ALL DRAINAGE PIPEWORK SHALL BE PVC CLASS HD STORMWATER, UNLESS WHERE

LOCATED UNDERNEATH ANY STRUCTURES PIPEWORK SHALL BE PVC SEWER CLASS SN8.7. ALIGNMENT OF PIPES SHALL BE AS SHOWN ON THE PLAN & SHALL BE TO THE PIPE OR

MANHOLE CENTRELINE.8. BEFORE CONSTRUCTION COMMENCES, THE CONTRACTOR SHALL:

A. CHECK ON SITE THE LOCATION OF THE EXISTING SERVICES WITH THEAPPROPRIATE AUTHORITY. ENSURE PROPOSED STORMWATER PIPE DOES NOTCLASH WITH ANY EXISTING SERVICES.

B. ARRANGE FOR THE LOCATION AND THE LEVEL OF THE CONNECTION POINT TOEXISTING STORMWATER MANHOLE TO BE VERIFIED BY A SURVEYOR.

C. CONFIRM THAT BOUNDARY PEGS OR OTHER SURVEY REFERENCE POINTS TO BEUSED IN SETTING OUT OF THE PROJECT ARE LOCATED IN THE CORRECTPOSITIONS.

D. ENSURE A PERMIT & REINSTATEMENT SPECIFICATIONS ARE OBTAINED FROM THELOCAL AUTHORITY IF EXCAVATION WILL BE IN A ROAD RESERVE OR RIGHT OFWAY.

E. ENSURE ALL DETAILS HAVE BEEN CHECKED AND THAT NO DISCREPANCIES EXIST.ALL QUERIES AND DISCREPANCIES ARE TO BE RESOLVED PRIOR TOCOMMENCING WORKS.

11. ALL EXCAVATIONS SHALL BE SECURED & MADE SAFE IN ACCORDANCE WITHREQUIREMENTS OF THE OCCUPATIONAL SAFETY & HEALTH ACT OF 1984, THEOCCUPATIONAL SAFETY & HEALTH REGULATION 1996 & OF ANY RELEVANTREGULATORY BODY.

12. PROPERTIES WHICH HAVE BEEN EXCAVATED SHALL BE RETURNED TO AT LEAST ASIMILAR CONDITION TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION.

13. TRENCH BACKFILL SHALL BE CLEAN GRANULAR MATERIAL, COMPACTED TO A LEVELNOT LESS THAN THAT OF THE SURROUNDING UNDISTURBED GROUND, FOR THE FULLDEPTH OF EXCAVATION. BACKFILL UNDER ROADS SHALL BE COMPACTED TO THEREQUIREMENTS OF THE LOCAL AUTHORITY.

14. ALL CONNECTION INTO EXISTING LOCAL AUTHORITY STORMWATER ARE TO BECARRIED OUT BY THE CONTRACTOR TO LOCAL AUTHORITY SPECIFICATIONS.

15. THIS STORM WATER DESIGN IS TO BE READ IN CONJUNCTION WITH THE BUILDER'SARCHITECTURAL DRAWINGS (PARTIALLY REPRODUCED HERE).

16. CLIENT IS TO ENSURE LOCAL AUTHORITY HAVE APPROVED THESE DRAWINGS BEFOREBEING ISSUED FOR PRICING, TENDER & CONSTRUCTION.

LEGEND:

150Ø PIPE

100Ø PIPE FROM BUILDING DOWNSPOUT

TRAFFICABLE STORMWATER TANK WITH GRATE COVER

TRAFFICABLE STORMWATER TANK WITH CONCRETE COVER

NON-TRAFFICABLE STORMWATER TANK WITH CONCRETE COVER

TRAFFICABLE PRECAST SUMP PIT WITH GRATE COVER

FALL DIRECTION

IL+10.00 PIPE INVERT LEVEL

TT+10.00 TOP OF TANK LEVEL

RL+10.00 PAVEMENT LEVEL

HP+10.00 PAVEMENT HIGH POINT

LP+10.00 PAVEMENT LOW POINT

BK+10.00 BOTTOM OF KERB

TK+10.00 TOP OF KERB

EXISTING GROUND LEVEL

D1STORMWATER DRAINAGEPLAN AND DETAILS

EXISTING SLIP ROAD

SIT

E B

OU

ND

AR

Y 6

4.9

5M

SITE BOUNDARY 62.31M

SIT

E B

OU

ND

AR

Y 6

4.9

5M

SITE BOUNDARY 62.31M

4.5m x 1.755m AEROBIC

TREATMENT UNIT TO HYD. ENG'S

DETAILS WITH REQUIRED

CLEARANCES AS INDICATED.

PAINTED LINE

MARKINGS

RUBBER

WHEEL STOPS

TO CAR BAYS

ACROD BAY TO

COMPLY WITH

AS 2890.6

16mm RECESSED

MAT WELL TO

CIVIL DWGS & TO

AS 1428

10m PYLON SIGN AS PER

UNITED STD DWGS.

FOOTING TO ENG'S DWGS

(CONFIRM SAFE DISTANCE

FROM POWERLINES)

2.0M x 2.0m

POTABLE WATER

SYSTEM

2.5M DIA. FIRE

WATER TANK

14m x 0.66m LEACH

DRAIN TO HYD. ENG'S

DETAILS WITH

REQUIRED CLEARANCES

AS INDICATED.

14m x 0.66m LEACH

DRAIN TO HYD. ENG'S

DETAILS WITH REQUIRED

CLEARANCES AS

INDICATED.

SWA

LE 1

ABOVE GROUND STORAGE 1(AREA = 412sqm)

ABOVE GROUND STORAGE 2(AREA = 535sqm)

HEAVY DUTY GRATED DRAIN(DETAILS TO BE CONFIRMED)

ALL SURFACE RUN-OFF UNDER CAR AND TRUCKCANOPY AREAS WILL BE DIRECTED TO OIL AND WATER

SEPARATOR TO HYDRAULIC CONSULTANTS DESIGN

DRA

INW

ELL

2

DRAINWELL 1

DRA

INW

ELL

3

LP + 46.60

LP + 46.60LP + 46.60 LP + 46.60

RL + 46.70

RL + 46.70

RL + 46.70

RL+46.70

RL + 46.70

RL + 46.70

LP + 46.60

HP+46.70

HP+46.55

HP+46.40

HP+46.25

RL+46.40

HP+46.40

HP+46.25

RL+46.20

HP+46.70

RL+46.75RL+46.75

RL+45.75RL+45.75RL+45.75

RL+46.25RL+46.25

RL + 46.70

TYPICAL STORMWATER TANK DETAILSSCALE 1:20

INLET PIPE

PIPE INVERT LEVEL

DEP

TH A

S PE

RPL

AN

THI

S PA

GE

DIAMETER AS PER PLAN THIS PAGE

150

MORTAR FILLETAND BEDDING

TANK BASE TOBUILDER'S DETAILS

100

COMPACTED SUBGRADE TO 90% MDD

OUTLET PIPE

TANK LID TOBUILDER'S DETAILS

PRE-CASTCONCRETE TANKWRAPPED IN"BIDIM A14"GEOFABRIC ALLAROUND ASSHOWN

SOAKAGE HOLEFILLED WITH20-25mm SIZEDAGGREGATE

GROUND LEVEL

SEE

TAN

KSC

HED

ULE

AutoCAD SHX Text
8.16
AutoCAD SHX Text
8.16