Pertemuan 11

SAMBUNGAN KELING

Matakuliah : D0164 /PERANCANGAN ELEMEN MESIN

Tahun : 2006

Page 2: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 2/21

2

LEARNING OUTCOMES

Pada akhir pertemuan ini, diharapkanmahasiswa akan dapat menggunakan

rumus dan menghitung rancangan

konstruksi sambungan keling

Page 3: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 3/21

3

OUTLINE MATERI

Pengertian

Metoda Pengelingan

Tipe Sambungan Keling

Desain Sambungan Keling

Page 4: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 4/21

4

PENGERTIAN

Definition:

Rivet is a short cylindrical bar with a head integral with it. Thecylindrical portion of the rivets is called shank or body and

lower portion of shank is known as tail.

Rivets are usually made from steel, brass, alluminum, copper 

Function:

The function of rivets in a joint is to make a connection that

has strength and tightness.

Page 5: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 5/21

5

CARA PENGELINGAN

Page 6: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 6/21

6

TIPE SAMBUNGAN KELING

Dua tipe sambungan

 ± Lap Joint

A lap joint is that in which one plate overlaps

the other and the two plates are then riveted

together.

 ± Butt Joint

A butt joint is that in which the main plates are

kept in allignment butting (touching) each other 

and a cover plate (strap) is placed either on

one side or in both sides of the main plates. ± Single strap butt joint.

 ± Double strap butt joint.

Page 7: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 7/21

7

TIPE SAMBUNGAN KELING

Jumlah Baris Pengelingan :

 ± Single riveted joint.

 ± Double riveted joint.

Page 8: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 8/21

8

TIPE SAMBUNGAN KELING

Page 9: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 9/21

9

MACAM PAKU KELING

Page 10: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 10/21

10

PitchJarak dari pusat satu keling ke pusat keling lainnya

yang sejajar, dinotasikan dengan p.

Diagonal Pitch

Jarak antara pusat keling pada baris berikutnya darisambungan keling zig-zag

Back PitchJarak tegak lurus diantara garis pusat dari baris

berikutnya, donotasikan dengan ps.

MarginMerupakan jarak antara pusat dari lubang kelingdengan tepi dari pelat, notasi m.

DISAIN TEKNIS KELING

Page 11: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 11/21

11

Sambungan keling dapat rusak denganbeberapa cara:

 ± Pinggiran pelat sobek. (m = 1.5 d)

PERHITUNGAN KEKUATAN

Page 12: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 12/21

12

Sobek melalui suatu baris keling

PERHITUNGAN KEKUATAN

Page 13: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 13/21

13

 Ar ea sobekan per panjang pitchAt = (p ± d).t

Ketahanan sobek per panjang pitch

Pt = f t. At

p = pitch dari keling

d = diameter keling

t = ketebalan platf t = tegangan tarik yg diijinkan dari bahan plat

PERHITUNGAN KEKUATAN

Page 14: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 14/21

14

PERGESERAN PADA KELING

2

4d  A

s

T!

nf d P ss

2

4

T

!Ketahanan geser keling per panjang pitch

 Ar ea geser per keling

Page 15: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 15/21

15

PATAH (CRUSH) PADA KELING.

 Ar ea patah per rivet Ac = d.t

Total ar ea patah

 Ac = n.d.t

Ketahanan patah keling per panjang pitch

Pc = n d t f c

n = jumlah keling per panjang pitch f c = tegangan patah yg diijinkan bahan keling

Page 16: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 16/21

16

EFISIENSI SAMBUNGAN KELING

Str ength of The Riveted Joint Pt, Ps, Pc

Str ength of Plate, P = p x t x f t 

Efisiensi sambungan;

c st 

 f  t  P  P  P  P 

..,,of Least!L

Page 17: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 17/21

17

EFISIENSI SAMBUNGAN

Lap Joint Effisiensi But joint(D strap)

Effisiensi

Single 45  ± 60 Single 55  ± 60

Double

63  ± 7

0 Double 7

0 ± 83

Triple 72 - 80 Triple 80  ± 90

Quadruple 85  ± 94

Page 18: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 18/21

18

SAMBUNGAN KELING TANGKI

1. Penentuan tebal shell (silinder):

t = (PD

) / (2

ft Ll) + 0,1 cmt = tebal silinder,

P = tekanan dalam silinder 

f t = tegangan tarik ijin

Ll = efisiensi sambungan las longitudinal (lihat tabel)

D = internal diameter silinder 

Desain Longitudinal

butt joint ( standard India)

Page 19: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 19/21

19

2. Diameter lubang dan paku keling

d = 6 t 0,5 berlaku untuk d > 8 mm

d = diameter lubang paku keling

t = tebal silinder 

Untuk d< 8 mm, perhitungan dari beban geser 

Diameter paku ditentukan dari diameter lubang (lihat tabel)

3. Perhitungan pitch (p)

pm

ax = C t + 4,128

cm

,C konstanta, tergantung jenis sambungan, lihat tabel

4. Perhitungan efisiensi sama dengan perhitungan efisiensisambungan keling plat

SAMBUNGAN KELING TANGKI

Page 20: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 20/21

20

Perhitungan lap joint circumferensial :

1. Perhitungan tebal silinder sama dengan untuk butt joint

longitudinal

2. Jumlah paku keling (n) :n = (D/d)2 (P/fs)

3. Perhitungan Pitch , ditentukan dari pers

h = (p-d)/ p

4. Jumlah baris

n/ {p (D +t)/ p}

SAMBUNGAN KELING TANGKI

Page 21: D016413797(2)

8/8/2019 D016413797(2)

http://slidepdf.com/reader/full/d0164137972 21/21

21

PENUTUP

Dalam mendisain keling, umumnyakekuatan keling masih dibawah harga

kekuatan bahan yang akan dikeling