D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of...

122
D-Ri43 783 NATIONAL PROGRAM FOR INSPECTION OF NON-FEDERAL DAMS / BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS WALTHAMI MA NEW ENGLAND DIV APR 80 UCLASSIFIEE G 1/1 N U~EmomhEEEohEI smmhhEEmhhmhh EhhmhEEEEEmhI mhmmhhhhhhhus mohhohhohEI- ---efI'llmmn

Transcript of D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of...

Page 1: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

D-Ri43 783 NATIONAL PROGRAM FOR INSPECTION OF NON-FEDERAL DAMS /BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS WALTHAMI MANEW ENGLAND DIV APR 80

UCLASSIFIEE G 1/1 N

U~EmomhEEEohEIsmmhhEEmhhmhhEhhmhEEEEEmhImhmmhhhhhhhusmohhohhohEI-

---efI'llmmn

Page 2: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

7~~~.J -.a-TI-

-,'

0.

I IHII'm' * 2 fi.2

11111'25 111.4 1.6

MICROCOPY RESOLUTION TEST CHART

NATIONAL BJRtAUJ MU MANLAR[> RU ,A

Page 3: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-1 -2 -. 7 -

GLASTONBURY ,CONNECTICUT I 0

BUCKINGHAM RESERVOIR DAMCT 00244 -

PHASE I INSPECTION REPORT

* NATIONAL DAM INSPECTION PROGRAM

CV)

\/\/ALTHAM. MAS.025-l

LiJAPRIL 1980

k 7J 17

Page 4: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

'0 IINCI ASTTEDMSECURITY C.LASSIFICATION OF TIS PAGE (When bee. knfr.d)

REPOT DCUMNTATON AGEREAD INSTRUCTIONS

TITL REPOR S.CUMETATI.) PAGE t~ON B.TYEOREPCOTMPETIOD COVERE

1, REPORT NUMBER 2 TA.LSO ACIPIENT S CATALOG NUMBER

NATIONAL PROGRAM FOR INSPECTION OF NON-FEDERAL .PRRMNO.RPRTUMR

DAMS________________7. AuTIHOR(s. 8 CONTRACT OR GRANT NUMBER(@)

NEW ENGLAND DIVISION

9 PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASKAREA II WORK UNIT N6UMBERS

I CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE

DEPT. OF THE ARMY, CORPS OF ENGINEERS April 1980NEW ENGLAND DIVISION, NEDED 13. NUMBER OFPAGES

424 TRAPELO ROAD, WALTHAM, MA. 0225414. MONITORING AGENCY NAME &AOORESS(It different $row ConauiinUd Office) 15. SECURITY CLASS. (01 title tePeeS)

UNCLASSIFIEDliOECLASSIPICATION/DOWNGRADING

SCHEIDULE

16. DISTRIBUTION STATEMENT (at this e port)

APPROVAL FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED

17. DIST RISUTION ST ATIEMENT (of the &vbetted enteed in Bieck 20, it different Itat RPP*)

It. SUPPLEMENTARY NOTES

Cover program reads: Phase I Inspection Report, National Dam Inspection Program;however, the official title of the program is: National Program for Inspection of

* Non-Federal Dams; use cover date for date of report.

19. KEY WORDS (Continue en reverse side Ioneceosw and idenifIl &Jablck "untbet)

DAMS, INSPECTION, DAM SAFETY,

Conn. River Basin

Glastonbury, Conn. T 7

20 AIIISTRPACT (Contine. en peyOtOO Old* It MoCOe4MY ed Identify by 610ck 0 list)

The Buckingham Reservoir Darm is an earth embankment 400 ft. in length and 30 ft.J. in maximum height. The width of the dam crest is about 15 ft. As a result of

visual inspection and the review of limited availhble data regarding this projectp *the dam, spillw.' and dike appear to be in poor condition. For the combinationof dam size (small) and downstream hazard (significant), a range in the magnitudeof the test flood of 100-year frequency flood to the PMF is given.

* DD I~S1473 LDITION0 0P. NOV539 IS OBSOLETE P

.,~~NL % .

Page 5: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

DEPARTMENT OF THE ARMY

NEW ENGLAND D' 'ISION CORPS OF ENGINEERS

Jun424 TRAPELO ROAD-WALTHAM MASSACHUSETTS 02154

REDLI T-

NEDED

II SEF 1J~

Honorable Ella T. GrassoGovernor of the State of ConnecticutState Capitol

ka Hartford, Connecticut 06115

Dear Governor Grasso:

Inclosed is a copy of the Buckingham Reservoir Dam Phase I InspectionReport, which was prepared under the National Program for Inspection ofNon-Federal Dams. This report is presented for your use and is basedupon a visual inspection, a review of the past performance and a briefhydrological study of the dam. A brief assessment is included at thebeginning of the report. I have approved the report and support thefindings and recommendations described in Section 7 and ask that youkeep me informed of the actions taken to implement them. This follow-upaction is a vitally important part of this program.

A copy of this report has been forwarded to the Department of Environ-mental Protection, the cooperating agency for the State of Connecticut.In addition, a copy of the report has also been furnished the owner,City of Manchester, c/o Mr. Frank J. Jodaitis, Water & SewerAdministrator, 494 Main Street, Manchester, Connecticut 06040.

Copies of this report will be made available to the public, upon" request, by this office under the Freedom of Information Act. In the

case of this report the release date will be thirty days from the dateof this letter.

* .. I wish to take. this opportunity to thank you and the Department ofEnvironmental Protection for your cooperation in carrying out thisprogram.

Sincerely,

Incl SCH EIDERAs stated Colonel, Corps of Engineers

1j I

Page 6: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-- - - - -.•-.. - - .- -.-.-

BUCKINGHAM RESERVOIR DAM

CT 00244

3'

CONNECTICUT RIVER BASIN

GLASTONBURY, CONN.CTICUT--Accession ForNTIS GRA&I

DTIC TAB

Unannounced f"Jus3tification

~By__.5

Di tribution/• itv Codes

L !nd/or

Ie

PHASE I INSPECTION REPORT

NATIONAL DAM INSPECTION PROGRAM

I,7

i":

.- .... .'...-...'.-.. ..-.. . .. - .. , .. -. -.- . .. .. . - ,.. ..-- -.-..... .--.. . 4....-.-.. --.-..

Page 7: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.. - -.. .. % '- - ..' J , . . - .- uJ , . . ... ". * . .- - . -- + -- . . . . " : " " +

" " .. ... . .

NATIONAL DAM INSPECTION PROGRAMPHASE I INSPECTION REPORT

I,

Identification No.: CT 00244Name of Dam: Buckingham Reservoir DamTown: GlastonburyCounty and State: Hartford, ConnecticutStream: Roaring BrookDate of Inspection: 7 November, 1979

BRIEF ASSESSMENT

The Buckingham Reservoir Dam is an earth embankment 400 feet inlength and 30 feet in maximum height. The width of the dam

U& crest is about 15 feet. The upstream face of the dam varies inslope from 1 on 2 to 1 on 3 (vertical to horizontal). The down-stream slope is 1 on 24. A dike and spillway section islocated to the left of the dam. The spillway is 50 feet long,constructed of concrete. The upstream dike embankment slopes at1 on 2 (vertical to horizontal). The downstream embankment also

i slopes at 1 on 2. A 16" diameter supply main (to Manchester) anda 24" diameter blow-off pipe pass through the gatehouse and dam.

Buckingham Reservoir is used for public water supply. It has astorage of 380 acre-feet and a dam height of 30 feet. The damis thus classified as "small" in size. The probable dam failureimpact area is largely undeveloped woodland. However, twofactories located in the village of East Glastonbury would beflooded to a depth of about 2 feet above first floor levels. Withthe possibility of the loss of a few lives and the probability ofappreciable economic losses in the event of the dam failure, thedam has been classified as having a "significant" hazard potential.

As a result of the visual inspection and the review of limitedavailable data regarding this project, the dam, spillway and dikeappear to be in poor condition. The vertical and horizontalalignment of the dam is good. The downstream slope has severaltrees and high brush, especially at the abutments. Erosiongullies up to 8 inches deep on the downstream slope, due tovehicular traffic, were noted. The riprap on the upstream slopeis in good condition with a few unprotected areas. Considerableseepage as evidenced by wet area downstream from the toe of dam

" :and at the toe of the natural slope at the left abutment was- + noted. Several springs were observed, although these springs

did not appear to carry fine material. The concrete spillway anddike are in fair condition. The concrete spillway had areas of

. - .-o.

Page 8: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

erosion, spalling and deterioration. Seepage was noted at thebase of the left training wall. The dike was overgrown withbrush; however, no seepage was observed. Apparent settlement orslumping was observed at upstream edge of dike's crest immediatelyto the right of the spillway. Apparent movement has occurred at

m the downstream toe adjacent to the left spillway training wall.The vertical and horizontal alignment was good. A few minorerosion gullies were noted on the downstream slope.

For the combination of dam size (small) and downstream hazard(significant), a range in the magnitude of the test

Tflood of 100-year frequency flood to the PMF is given. Atest flood of 100-year frequency flood was selected for thisproject. The maximum spillway capacity is 2,040 CFS at a stageof 5.7 feet above the spillway crest (equal to the top of dam).The capacity of the spillway is adequate to pass the 100-yeartest flood outflow of 1,260 CFS without overtopping the dam anddike.

Within one year of receipt of this Phase I Inspection Report, theowner should retain a qualified registered engineer to accomplishthe following: 1) Investigate the seepage occurring downstreamfrom the toe of the dam and at the toe of the natural slope at theleft abutment. The investigation should include an evaluation ofthe ability of the existing seepage collection system to ade-

* quately control and monitor the seepage. The need for additionaldrainage and collection systems, especially at the toe of thenatural slope at the left abutment, should be considered; 2)SInvestigate the seepage occurring at the base of the left silway training wall to determine whether there is any danger of

internal erosion of the spillway dike behind the wall and 3) repair-: all spalled and deteriorated concrete.

The owner should also carry out the following operational andmaintenance procedures: 1) Monitor on a regular basis the seepageoccurring downstream from the toe of the dam and downstream fromthe toe of the natural slope at the left abutment. 2) Inititateregular readings of the quantity of seepage being collected by", --,the underdrain system. 3) Remove the trees growing on thedownstream slope at the abutments of the main dam. 4) The erosion

gullies on the downstream slope of the dam at Sta 2+30 should befilled and protected by planting with grass. Vehicular trafficshould not be allowed on the slope. 5) Replace missing riprapon upstream slope of dam. 6) Monitor on a regular basis theseepage occurring downstream at the base of the left spillwaytraining wall. 7) Remove trees growing at the downstream toe of

, the spillway dike and in the downstream spillway channel. 8) Thebrush growing on the spillway dike should be cleared. 9) Back-fill erosion gullies and 1 ft. deep hole on the downstream slopeof the dike. 10) Monitor on a regular basis the two locationson the spillway dike slopes which show indications of pastmovement, i.e., the upstream edge of the crest immediately to the

4 right of the spillway and the downstream toe immediately to theleft of the spillway. 11) Engage a qualified reqistered engi-neer to make a comprehensive technical inspection of the dam and

4.' ,p

Page 9: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

,.Le

dike once every year. 12) Establish a surveillance program foruse during and immediately after he2avy rainfall, and also a warningprogram to follow in case of emergency conditions. 13) Sedi-

M. ment should be removed from the outlet of the 24" diameter blow-offand the channel cleared of brush. The 16" diameter blow-off

- should be located and inspected and 14) Blow-off valves should be

* working condition.operated on a scheduled basis to ensure that they are in good

Registered CT. 7634

.

""0 . "-6

.*.i,4

p . .~ .°" . * f. . **.*~ * . . .

.-.- .. { % i . "-

Page 10: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

This Phase I Inspection Report onBuckingham Reservoir Damhas been revieved by the undersigned Review Board members. In ouropinion, the reported findings, conclusions, and recommendations areconstent vith the Recommended Guidelines for Safety Inspection ofDam_@. and with good engineering Judgment and practice, ad to hereby

-, submitted for approval.CN . od

I =

CARNEY H. TERZIAN, MMBERDae Contesign Branch

I' Engineering Division

IARS DATI~, MEIMA N

oater Control BranchEngineering Division

l o* __

640" S. o°Y

:1 Geotechnical Enqineering BranchEngineering DDvision

u - i.7,

,. . *..-* .

Page 11: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PREFACE

This report is prepared under guidance contained in theRecommended Guidelines for Safety Inspection of Dams, for Phase IInvestigations. Copies of these guidelines may be obtained fromthe Office of Chief of Engineers, Washington, D.C. 20314. Thepurpose of a Phase I Investigation is to identify expeditiouslythose dams which may pose hazards to human life or property. Theassessment of the general condition of the dam is based upon avail-able data and visual inspections. Detailed investigation, andanalyses involving topographic mapping, subsurface investigations,testing, and detailed computational evaluations are beyond thescope of a Phase I investigation: however, the investigation isintended to identify any need for such studies.

In reviewing this report, it should be realized that the re-ported condition of the dam is based on observations of field con-ditions at the time of inspection along with data available to theinspection team. In cases where the reservoir was lowered ordrained prior to inspection, such action, while improving thestability and safety of the dam, removes the normal load ,n thestructure and may obscure certain conditions which m other-

" wise be detectable if inspected under the normal ope ng environ-ment of the structure.

It is important to note that the condition of a dam dependson numerous and constantly changing internal and external condi-tions, and is evolutionary in nature. It would be incorrect toassume that the present condition of the dam will continue torepresent the condition of the dam at some point in the future.Only through continued care and inspection can there be any chancethat unsafe conditions be detected.

Phase I inspections are not intended to provide detailed hydro-logic and hydraulic analyses. In accordance with the establishedGuidelines, the Spillway Test flood is based on the estimated"Probable Maximum Flood" for the region (greatest reasonably pos-sible storm runoff), or fractions thereof. Because of the magni-

- tude and rarity of such a storm event, a finding that a spillwaywill not pass the test flood should not be interpreted as neces-sarily posing a highly inadequate condition. The test flood pro-vides a measure of relative spillway capacity and serves as an aide

* in determining the need for more detailed hydrologic and hydraulicstudies, considering the size of the dam, its general conditionand the downstream damage potential.

The Phase I Investigation does not include an assessment of* the need for fences, gates, no-trespassing signs, repairs to exist-

Sing fences and railings and other items which may be needed tominimize trespass and provide greater security for the facility

.' and safety to the public. An evaluation of the project for com-pliance with OSHA rules and regulations is also excluded.

Page 12: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

TABLE OF CONTENTS

Section Page

Letter of Transmittal

Brief Assessment

Review Board Page

Preface i

Table of Contents ii -iv

Overview Photo v - vi

Location Map vii

REPORT

1. PROJECT INFORMATION

1.1 General

a. Authority 11. b. Purpose of Inspection 1

1.2 Description of Project

a. Location 1b. Description of Dam and Appurtenances 1-2c. Size Classification 2d. Hazard Classification 2e. Ownership 2

- -" f. Operator 3g. Purpose of Dam 3h. Design and Construction History 3i. Normal Operational Procedure 3

1.3 Pertinent Data 3-6

2. ENGINEERING DATA

2.1 Design Data 7

2.2 Construction Data 7-8

2.3 Operation Data 8

2.4 Evaluation of Data 8

." I

o o" " ". ., " " % " -.. " " . / . a " " " " " " " " . .....' .'° = , " " , % " ." " ." ." . " " " " , .," " " ". . , ' .. '. , ..' ' ' .J " . '"i. .i. • . .

Page 13: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

. .. U .

. Section Page

, 3. VISUAL INSPECTION

3.1 Findings

- a. General 9b. Dam 9-10C. Appurtenant Structures 10-11d. Reservoir Area 12e. Downstream Channel 12

3.2 Evaluation

4. OPERATIONAL AND MAINTENANCE PROCEDURES

4.1 Operational Procedures

a. General 13b. Description of any Warning System in Effect 13

4.2 Maintenance Procedures

a. General 13b. Operating Facilities 13

4.3 Evaluation 13

5. EVALUATION OF HYDRAULIC/HYDROLOGIC FEATURES

5.1 General 14

5.2 Design Data 14

5.3 Experience Data 14

* 5.4 Test Flood Analysis 14-15

5.5 Dam Failure Analysis 15

6. EVALUATION OF STRUCTURAL STABILITY

6.1 Visual Observation 16

6.2 Design and Construction Data 16

6.3 Post-Construction Changes 16

6.4 Seismic Stability 16

U'-

. U- -- - *i . *-2. .. . .. . ... .. . . .- .. . . .. . . . . --.. . . . .--. . . . . . * . .... ..,U .

: .° : .: . . uu:. n.. . 5 : .- . .- : . ..A * . U * ; * *... . 4..... U . .... .-

Page 14: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

Iq

Section Page

* I 7. ASSESSMENT, RECOMMENDATIONS AND REMEDIAL MEASURES

7.1 Dam Assessment

a. Condition 17b. Adequacy of Information 17

• .c. Urgency 17

7.2 Recommendations 17

... 7.3 Remedial Measures

a. Operation and Maintenance Procedures 17-18

7.4 Alternatives 18

i APPENDIXES

Appendix Description

A INSPECTION CHECKLIST

B ENGINEERING DATA

C PHOTOGRAPHS

D HYDROLOGIC AND HYDRAULIC COMPUTATIONS

E INFORMATION AS CONTAINED IN THE NATIONALINVENTORY OF DAMS

iv

*' . • . *. * - ~ - . . .

* * * . . -.*..

Page 15: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

OVERVIEW PHOTOBuckingham Reservoir Dam

0v

Page 16: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

OVEVIE PHT

BuknhmReeviLa

I.at

Splla an0Dk

vi0

Page 17: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.7,,

I kt (y-h

o .

IT* I .j ~L..

.- '-... ITO.-

-. ./ j (.s' (77VICINITY MAP

L~~~~/~7ji/>* 10*~ MILES-

f1 C- *..s

* / 2

ISIT

7~ dy 3f-'

r. /

g

GLSOBR COPROJETTICUT

FLHET . 1.V ASCATS C

Page 18: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

NATIONAL DAM INSPECTION PROGRAMPHASE I INSPECTION REPORT

°BUCKINGHAM RESERVOIR DAM - CT 00244

SECTION 1 - PROJECT INFORMATION

1.1 GENERAL:

a. Authority. Public Law 92-367, August 8, 1972, author-ized the Secretary of the Army, through the Corps of Engineers,to initiate a national program of dam inspection through theUnited States. The New England Division of the Corps of Engi-neers has been assigned the responsibility of supervising theinspection of dams within the New England Region. FlahertyGiavara Associates, P.C. has been retained by the New EnglandDivision to inspect and report on selected dams in the State ofConnecticut. Authorization and notice to proceed was issued toFlaherty Giavara Associates, P.C. under a letter of 19 October1979 from William E. Hodgson, Jr., Colonel, Corps of Engineers.

iContract No. DACW33-80-C-0001 has been assigned by the Corps ofEngineers for this work.

b. Purpose.

1) Perform technical inspection and evaluation of non-federal dams to identify conditions which threaten the publicsafety and thus permit correction in a timely manner by non-

federal interests.

2) Encourage and assist the States to initiate quicklyeffective dam safety programs for non-federal dams.

-. 3) To update, verify and complete the National Inven-tory of Dams.

1.2 DESCRIPTION OF THE PROJECT:

a. Location. Buckingham Reservoir Dam (AKA Roaring BrookDam No. 1) is located in Glastonbury, Connecticut on Roaring

-. - Brook. Access to the reservoir is from Old Coop Road and Route94. The reservoir is located about 1 miles east of Buckingham.The reservoir is shown on the U.S.G.S. Topographic Map "Marl-borough, Connecticut" at a latitude of 41043'02" and a longi-tude of 72029'56". The Location Map on page vii shows thelocation of the structure.

b. Description of Dam and Appurtenances. The BuckinghamReservoir Dam is an earth embankment 400 feet in length and 30

* feet in maximum height. The width of the dam crest is about 15feet at an elevation of 458.7 NGVD. (Note: All elevations fromplans have been converted to NGVD.)

,. -1-

Page 19: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

The upstream face of the dam varies in slope from 1 on 2 to 1on 3 (vertical to horizontal). The face of the dam is protectedwith riprap from 4l. 455 NGVD to El. 442 NGVD and with about 18inches of stone and gravel to El. 432 NGVD. The downstream slopeis 1 on 2k, and the surface is loamed. A heavy stone fill isin place at the downstream toe. An impervious blanket was placedbeneath the upstream slope and an impervious core material (loam)was rolled in layers or puddled just upstream of a concrete corewall at the centerline of the embankment. Steel sheet piling wasdriven beneath the core wall and embankment section.

LA downstream drainage collection system consisting of underdrainsand drainage chambers (equipped with weirs) has been constructeddownstream of the dam (subsequent to original dam construction).

A 16" diameter supply main (to Manchester) and a 24" diameterblow-off pipe pass through the gatehouse and dam.

A dike and spillway section is located approximately 200 feetto the left of the dam. The spillway is 50 feet long with amaximum height of 27 feet, constructed of concrete, with a top

ft- elevation of El. 452 NGVD (flash boards in place at elevation453 NGVD). The top of the dike is at elevation 458.7 NGVD(field measured). The upstream embankment slopes at 1 on 2(vertical to horizontal). The downstream embankment also slopesat 1 on 2.

The upstream slope consists of impervious material covered withgravel and stone; the downstream slope is constructed of coarsematerial. A concrete core wall is located in the center of thedike.

The spillway discharge enters Roaring Brook about 2,000 feetdownstream of the spillway.

c. Size Classification. Buckingham Reservoir Dam has astorage volume of 380 acre-feet and a dam height of 30 feet.Storage of less than 1,000 acre-feet and a height of less than 40feet classify this structure in the "small" category accordingto guidelines published by the Corps of Engineers.

. -d. Hazard Classification. The dam is classified as having*° a "significant" hazard potential. The probable dam failure

* impact area is largely undeveloped woodland. However, twofactories located in the village of East Glastonbury would be

O 'flooded to a depth of about 2 feet above first floor levels.With the possibility of some loss of life and the probability ofappreciable economic losses in the event of dam failure, the damhas been classified as having a significant hazard potential.

e. Ownership. City of Manchester, c/o Mr. Frank J.O ,, Jodaitis, Water and Sewer Administrator, 494 Main Street,

Manchester, Connecticut, Phone: 203-647-3111.

-2--6'

• . -. -. - . -. * •. .-, .* ...

Page 20: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-. w " . , v - ; _. - ,," - - . 7 - . . . -- . . > " .'

- t. "

f. Operator. The dam is operated by the Manchester Water

Department. Mr. Robert Young (203-647-3111) is responsible for

the operation of this dam.

g. Purpose of Dam. The purpose of this dam is to impound

the reservoir for use as a public water supply.

F h. Design and Construction History. Design information

consists of plans for construction of the dam and spillway

dated February 1924. The dam was designed by C. Saviles,

Consulting Engineer. The dam was visited by the design engineer

frequently during construction. Work began about September 1,

1923 and was completed about August 1, 1924. A downstream

seepage collection system was added after construction of the

dam. The date of this post construction change is unknown.

i. Normal Operational Procedure. The Buckingham ReservoirDam is a surface water storage facility for the Manchester WaterDepartment. Water can be taken off through the upper gatehouse ina 16" diameter water supply main. A 24" diameter blow-off can beoperated to lower the water level in the reservoir. The blow-off

*was not operated during the inspection. It is not known whether*the flashboards on the spillway are ever removed for maintenance.

1.3 PERTINENT DATA:

a. Drainage Area. The drainage area is 4.5 square miles. - of upland terrain that is generally well wooded and undeveloped.

The drainage area forms the headwaters of Roaring Brook.

b. Discharge at Dam Site.

1) A 24-inch diameter cast iron pipe passes throughthe dam and was observed at the toe of downstream slope. A 16-inch conduit is indicated on the plans but could not be locatedin the field. Assuming both outlet conduits are operational, themaximum outlet works discharge would be approximately 120 CFS.

2) There are no known records of past floods or floodstage heights at the dam.

3) The ungated spillway capacity at the top of dam -2040 cfs @ El. 458.7 without flashboards and 1530cfs @ El. 458.7with flashboards in place.

4) The ungated spillway capacity at the test floodelevation - 1257 cfs @ El. 457.1.

5) The gated spillway capacity at normal pool elevationO "is not applicable at this dam.

6) The gated spillway capacity at test flood elevationis not applicable at this dam.

7) The total spillway capacity at test flood elevation -

1257 cfs @ El. 457.1.

" "'" 8) The total project discharge at the top of dam is 2040cfs at El. 458.7 without flashboards and 1530cfs at El. 458.7 withflashboards in place.

- 3 -

Page 21: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

9) The total project discharge at test flood eleva-tion -1257 cfs @ El. 457.1.

U c. Elevations. (Feet above National Geodetic VerticalDatum: NV

1) Streambed at toe of dam ....................... 429+

2) Bottom of cut-off ..............................407+

3) Maximum tailwater .............................. N/A

4) Recreation pool .................................N/A

5) Full flood control pool ........................ N/A

6) Spillway crest ......... 452+, with flashboards 453+

7) Design surcharge ........................... Unknown

8) Top of dam and dike ......................... 458.7+

9) Test flood surcharge ................... 457.1+

d. Reservoir. (Length in Feet)

p1) Normal pool (Spillway crest)................. 3,000+

2) Flood control pool ....................... N/A

3) Spillway crest pool.....................3,000+

4) Top of dam ............................ 4,000+

5) Test floodpool ..............................3,800+

e. Storage. (acre-feet)

1) Normal pool (Spillway crest)................... 110

2) Flood control pool ............................. N/A

3) Spillway crest pool .................. 110

04) Top of d am........%................... 380

5) Test flood pool ............................. 300

f. Reservoir Surface. (acres)

1) Normal pool (Spillway crest)............... 35

2) Flood control pool ...... .......... .. .. .. . ... ... .N/A

C...

Page 22: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

3) Spillway crest .................................. 35

4) Test flood pool ................................... 53

S5) Top of dam........................................60

g. Dam.

Dam Dike

1 1) Type: Earth embankment Earth embankmentconcrete spillway

2) Length: 400+ feet w/spillway: 175± ft.

3) Height: 30 feet 27 feet

4) Top Width: 15 feet 15 feet

5) Side Slopes: U/S 3-2 horizon- U/S & D/S 2 hori-tal to 1 verti- zontal to 1 verti-

I cal; D/S 2 cal.horizontal to 1vertical

6) Zoning: Riprap; gravel;sand and gravel,p' impervious material

7) Impervious Core: Concrete core Concrete core

8) Cut-off: Steel sheet piling Nonebelow core wall

9) Grout Curtain: None None

h. Diversion and Regulating Tunnel.

1) Type: N/A

2) Length: N/A

3) Closure: N/A

4) Access: N/A

* 5) Regulating N/AFacilities:

i. Spillway.

0 1) Type: Concrete gravity sectionwith stepped D/S face

2) Length of Weir: 50 feet

6. .. .-.. .. . .. . . . .

Page 23: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

3) Crest Elevation: 452+ feet; 453+ feet with

flashboards -

?O 4) Gates: None

5) U/S Channel: Concrete training wallsfrom reservoir, rock andgravel bed

6) D/S Channel: Concrete training walls,riprap bed

j. Regulating Outlets.

1) Invert: 429.5+

2) Size: 16 and 24 inch diameter

3) Description: 24-inch blow-off and 16-inchsupply with blow-off

4) Control Mechanism: Manually operated gatevalves

.2

So -6

Page 24: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

SECTION 2- ENGINEERING DATA

2.1 DESIGN:

The following documents which contain the principal informationregarding this dam and its appurtenances were reviewed in the

* preparation of this report.

* a. Drawings. Roaring Brook Reservoir Glastonbury Conn.Drawing of Dam for the South Manchester Water Company, scale1" = 10', Feb. 1924. Dam No. 1, Drawing No. 1 through No. 3

* .(see Appendix B).

Additionally, several items of correspondence pertaining to the jproject, including the results of periodic inspections conductedby the State were reviewed (see Appendix B).

2.2 CONSTRUCTION: I

No information is available concerning the foundation prepara-tion or embankment construction. However, the design engineercertified the following relative to construction of the dam.

"...this dam, to the best of my knowledge and beliefwas actually constructed as shown on the three sheetsof drawings Nos. 1, 2, 3, entitled 'Roaring BrookReservoir, Glastonbury, Conn. Drawings of Dam for

-* the South Manchester Water Company. Dam No. 1, dated. February 1924, approved 3/31/24.

"This dam was visited by me frequently during construc-tion. Work commenced about 9/1/23 and completed about8/1/24.

"The material used in the soil core on the upstreamside of the dam and in the impervious blanket extend-ing upstream was constructed essentially as shown onthe plans. The loam was excellent quality, free fromlarge stones, roots and vegetable matter and care-fully placed and consolidated. The concrete, althoughoccupying a somewhat minor place as regards the sta-bility of the structure, was of excellent quality,carefully placed and of first rate appearance afterthe forms were removed. It was composed of one partVulcanite cement and six parts of clean bank gravel

* from a pit near the site of the work. The cementappeared to be of excellent quality and was care-

-' fully housed before use. The concrete set well andwas very hard at all times after the forms were re-moved. Practical tests were made on the ground withlarge size blocks of concrete mixed in different

-7 0

..................................................... .** * .. . log~

Page 25: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

proportions and the 1:6 mix chosen as giving the bestresults for practical purposes. This mix seemed theequivalent of a proportioned 1:2:4 mix."

Apparently subsurface drains of various sizes were added tothe original design drawings. The date of construction of

. "'. .. these drains is unknown. Details shown on the drawings are ingood agreement with field observations.

2.3 OPERATION:

Formal operational records are not available for this dam.Operation of the dam is by the Town of Manchester Water Depart-ment.

2.4 EVALUATION:

a. Availability. Only limited engineering information isLA &available for this dam.

b. Adequacy. The lack of in-depth engineering data didnot allow for a definitive review. Therefore, the adequacy ofthis dam could not be assessed from the standpoint of reviewingdesign and construction data, but is based primarily on visualp inspection, past performance history and sound engineeringjudgement.

c. Validity. Only minor conflicts have been noted be-tween the available data and the observations made during theinspection. In general, there is no reason to question thevalidity of the available data.

08

"-8-

*.%** . . . . . . . . . . . . .

Page 26: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

V., SECTION 3 - VISUAL INSPECTION

E ,3.1 FINDINGS:

a. General. Based on the visual inspection, the dam andits appurtenances, Buckingham Reservoir Dam, spillway and dike,appear to be in poor condition. The dam is an earth embankmentwith a riprap protection on the upstream face, an upstream im-pervious blanket, a concrete core wall and loamed downstreamslope, with heavy stone fill at the toe. A concrete spillwaysection 50 feet long is located to the left of the main dam

" . embankment. The spillway section is constructed in the center.' of a dike (embankment) with a concrete core wall.

The vertical and horizontal alignment of the dam is good. Thedownstream slope has several trees and high brush, especiallyat the abutments. Erosion gullies up to 8 inches deep on thedownstream slope, due to vehicular traffic, were noted. Theriprap on the upstream slope is in good condition with a fewunprotected areas. Considerable seepage as evidenced by wetarea downstream from the toe of dam and at the toe of the naturalslope at the left abutment was noted. Several springs wereobserved, although these springs did not appear to carry finematerial.

_The concrete spillway and dike are in poor condition. Theconcrete spillway had areas of erosion, spalling and deteriora-tion. Seepage was noted at the base of the left training wall.

*' - The dike was overgrown with brush; however, no seepage was ob-served. Apparent settlement or slumping was observed at up-stream edge of dike's crest immediately to the right of the

q spillway. Apparent movement has occurred at the downstream toeadjacent to the left spillway training wall. The vertical andhorizontal alignment was good. A few minor erosion gullieswere noted on the downstream slope. It was difficult to deter-mine continuity of riprap coverage due to brush and vegetativedebris.

b. Dam.

1) Upstream Face - The upstream slope of the dam hasriprap protection up to about 3 ft. below the crest, as shownin Photo No. 1. An occasional opening was observed in the rip-

.r 'rap, but the overall condition is generally good. No signifi-cant erosion was observed on the slope.

2) Crest - The crest of the dam is covered with grassand some low Ur-uh, and is in generally good condition, as shownin Photos No. 2 and No. 3. The gatehouse for the outlet works

0 *4 is located on the crest, as can be seen in Photos No. 1 and No. 3.

* 6

Page 27: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

. .o

3) Downstream Slope - Photos No. 4, No. 5, No. 8 and-"- No. 9 show the general condition of the downstream slope. The

slope is covered with grass and some brush. Several trees (upto 1-ft.-diameter) are growing on the downstream slope near theright abutment, as shown in Photo No. 6. Trees are also growingat the left abutment, as shown in Photo No. 9. Vehicular trafficon the slope at Sta 2+30 has created gullies up to 8-in.-deep, asshown in Photo No. 6. Several animal holes up to 6-in.-diameterwere observed on the slope, and several large animal holes upto 1 -ft.-diameter were observed near the downstream toe.

Much of the area downstream from the toe of the dam is saturatedand spongy, and a large area between Sta 4+00 and 5+00 is coveredwith standing water (Photo No. 11). The wet area is about 80feet long by 20 feet wide, located 10 to 30 feet downstream of thetoe. A small spring was observed at about Sta 4+30, approximately30 ft. downstream from the toe. The seepage from the spring hadno visible turbidity.

Seepage was also observed at the toe of the natural slope at theleft abutment (approximately Sta 6+00). Several small springswere observed at the toe of the slope in this area. The seepagefrom the springs had no visible turbidity.

The dam has an extensive downstream seepage collection system.The seepage collection system is not shown on the original con-struction drawings, indicating that the system was installedsubsequent to the original construction of the dam. One of theavailable drawings shows a sketch of the seepage collection system

". superimposed on a copy of the original construction drawing. Thisdrawing shows two seepage collection chambers,both of which wereobserved in the field. These are visible in Photo No. 7.

A third seepage collection chamber, which is not shown on thedrawing, was observed about 50 to 60 ft. downstream from the damat approximately Sta 1+75. Considerable flow was observed in theseepage collection system at the time of inspection. Thecollection chambers are equipped with weirs for measuring the

* . volume of flow (see Photo No. 10). A representative of theowner, present during the inspection, indicated that the volumeof seepage is not being monitored.

4) Blow-off - The outlet of a 24" diameter cast ironpipe was located and found to be full of sediment, as shown inPhoto No. 12. The end of the pipe had a hairline crack in it.

0. The pipe discharges into a four foot wide channel that is heavilyovergrown with brush. A second blow-off, 16 inches in diameter,

*is shown on the plans but could not be located in the field. Thegatehouse control valves for the blow-offs were not inspected oroperated during the site visit.

c. Appurtenant Structures. The spillway is located in anearth dike to the left of the main dam, as shown in Photos No.13 and No. 14. The general configuration of the spillway and

-10-

Page 28: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

spillway dike is shown in the overview photo. Water was over-- •flowing the spillway at the time of inspection.

*~ 1) Spillway Dike - The available construction drawingsindicate that the spillway dike has a concrete core wall and thatthe left section of the dike embankment and left half of the spill-way are founded on rock.

The upstream slope of the dike has riprap up to about 3 ft.below the crest. The riprap is covered with brush and vegetativedebris above the water line, as shown in Photo No. 14, makingit difficult to evaluate the continuity of the riprap coverage.

The crest of the dike is grass covered (see Photo No. 15). Ascan be seen in the photo, the upstream portion of the crestimmediately to the right of the spillway appears to have settledor slumped toward the reservoir.

The downstream slope of the dike is covered with grass and lowbrush. Several small trees are growing at the downstream toeof the slope. A few erosion gullies were observed on the down-stream slope. A hole, about 1 foot deep and 1 foot in diameter,was observed on the slope about 8 feet to the left of the spill-way and about 8 feet downslope from the crest.

2) Spillway - The spillway weir and training wallsare concrete (see Photo No. 16). The spillway training wall isin fair condition, with some spalling noted (Photo No. 17).There are short sections of stone masonry wall at the downstreamends of the spillway training walls, as shown in Photo No. 18.The downstream end of the stone masonry wall on the left sideof the spillway has been displaced about 4-5 inches downslope.12" high, wooden flashboards were in place on the spillway crestand are in good condition.

Considerable seepage was observed at several locations alongthe base of the left spillway training wall. Seepage was ob-served at the base of both the concrete training wall (PhotoNo. 18) and the stone masonry wall section. The seepage had no

* visible turbidity. The available construction drawings indicatethat the concrete training wall on this side of the spillway isfounded on rock.

The downstream spillway channel is a natural stream bed, asshown in Photo No. 19. There are a number of small trees growing

'O in and overhanging the channel, as shown in the photo.

3) Spillway Apron - The spillway discharges onto ariprap apron located between the retaining walls. The rocksrange up to 3 feet in diameter, and there appears to have beensome movement of the rock in the past. There is no evidence ofdegradation.

1-%%". -A

Page 29: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

~w7

d. Reservoir Area. The land around the reservoir's peri-Smeter has-mild to moderate slopes and is well wooded. There is

no evidence of slides or unstable slopes (see Photo No. 20).

* a e. Downstream Channel. The spillway apron discharges intoa natural channel that is 15 to 25 feet wide and 2 to 3 feetdeep (Photo No. 19). The channel has a natural bed of sand and

*" gravel, with some cobbles and boulders. Minor erosion of thebanks is occurring for the first 200+ feet downstream of thespillway dike, and sand bars with some vegetation have formedin the center. The channel banks and floodplain are heavilywooded.

3.2 EVALUATION:

On the basis of the results of the visual inspection, the damappears to be in poor condition. The inspection disclosed thefollowing items which require attention:

a. A considerable amount of seepage is occurring down-r stream from the toe of the dam and at the toe of the naturalslope at the left abutment. Several small springs were notedin these areas. Although no evidence of sediment transport wasobserved, this seepage warrants further investigation.

b. Trees are growing on the downstream slope at both abut-ments of the main dam.

c. Vehicular traffic on the downstream slope at Sta 2+30has resulted in formation of erosion gullies on the slope.

d. Considerable seepage is occurring along the base of the- left spillway training wall.

e. There is some indication of past movement at two loca-tions on the spillway dike slopes; the upstream edge of the crestimmediately to the right of the spillway appears to have settledor slumped toward the reservoir and the downstream end of the

- stone masonry wall on the left side of the spillway has beendisplaced downslope.

-. of f. Several small trees are growing at the downstream toe

-. of the spillway dike, and the dike slopes are partially coveredwith brush.

g. Trees are growing in the downstream spillway channel.

h. The outlet for the 24" diameter blow-off conduit ishalf full of sediment and the channel is heavily overgrown with

• brush. The outlet for the 16" diameter blow-off could not belocated.

-12-

Page 30: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

i. Animal holes were noted on the downstream slope ofthe dam.

j. Riprap is missing at some locations on the upstreamU slope.

k. A 1-foot deep hole on the downstream slope of the dike.

K 1. Erosion gullies on the downstream slope of the dike.

-13-

* ** ** . . . ..'.

Page 31: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

SECTION 4 - OPERATIONAL AND MAINTENANCE PROCEDURES

4.1 OPERATIONAL PROCEDURES:

a. General. The Buckingham Reservoir Dam is a surfacewater storage facility for the Manchester Water Department.Water can be taken off through the upper gatehouse in a 16-inchdiameter water supply main. A 24" diameter blow-off can beoperated to lower the water level in the reservoir. The blow-off

F- was not operated during the inspection. It is not known whetherthe flashboards on the spillway are ever removed for maintenance.

S."b. Description of any Warning System in Effect. There is* no formal warning system in effect in the event of a failure or

partial failure of the structure.

4.2 MAINTENANCE PROCEDURES:

a. General. It does not appear that any formal maintenanceprocedures are practiced at the dam. Numerous trees and brush

. have overgrown the downstream slope.

b. Operating Facilities. There are no formal maintenanceprocedures followed for the operating facilities.

4.3 EVALUATION:

- Regular operation maintenance procedures for this dam and itsappurtenances have not been developed or implemented.

I An emergency action plan should be prepared to prevent or mini-mize the impact of failure. This plan should list the expedient

,- action to be taken and authorities to be contacted in emergencysituations.

4 14

,°- 14 "

• " 1-S

............................................................,.

Page 32: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

SECTION 5 - EVALUATION OF HYDRAULIC/HYDROLOGIC FEATURES

5.1 GENERAL DATA:

The Buckingham Reservoir Dam is an earth structure with a con-crete spillway. The crest length of the dam is 400 feet; itsheight is 30 feet. The spillway is separated from the dam bynatural high ground; therefore the spillway is constructed inconjunction with an earth dike. The 50-foot-long centrallylocated spillway discharges onto a series of stone steps andthence directly into a natural channel.

- The watershed area is 4.5 square miles of upland terrain thatis well wooded. The majority of the land within the watershedis presently undeveloped. Approximately 5 percent of the land

*- within the watershed drains into ponds or lakes upstream of thedam.

r 5.2 DESIGN DATA:

No specific design data is available for this watershed or thestructures of Buckingham Reservoir Dam. In lieu of existingdesign information, U.S.G.S. Topographic Maps (Scale 1" = 2,000')were utilized to develop hydrologic parameters. Some of thepertinent hydraulic design data was obtained and/or confirmed

* N by actual field measurements at the time of the visual fieldinspection.

5.3 EXPERIENCE DATA:

S,Historical data for recorded discharges is not available for thisdam.

5.4 TEST FLOOD ANALYSIS:

* .The test flood for determining the spillway adequacy is basedupon Corps of Engineers guidelines. The size classification ofthe dam is "small" based upon a height of 30 feet and storagevolume of 380 acre-feet. The hazard potential is "significant"due to the land use downstream of the dam. The test

O - flood required by Corps of Engineers guidelines for this sizedam and hazard potential can range from the 100-year return fre-quency flood to the probable maximum flood (PMF).

* The test flood selected for this project is the 100-year flood,due to the possibility of the loss of a few lives and the

, probability of appreciable economic loss due to dam failure.The relative size of the dam and reservoir storage volume was

. taken into account when selecting the test flood at the lowerend of the range.

15

Page 33: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

'0

C .The magnitude of the test flood was determined by using a

S ... hydrograph method developed by the U.S. Department of Agricul-ture, Soil Conservation Service, and described in the publication"Design of Small Dams," by the U.S. Bureau of Reclamation.

The test flood was developed based on a runoff rate for a storm

with a 6 hour duration. The test flood for this duration storm. was computed to be 1634 CFS. Triangular hydrographs were

developed based on the computed spillway test flood inflow rates.

The hydrograph was routed through the reservoir using a computerprogram based on stage-storage and stage-discharge data. Thereservoir was assumed to be full and level with the spillwaycrest prior to the storm event. The flashboards were assumed tobe in place during routing of the test flood. In addition, itwas assumed that the outlet conduits were closed throughout thetest flood duration. The computations indicate that the testflood peak inflow rate of 1634 CFS is reduced to a peak outflowrate of 1257 CFS, which represents a reservoir attenuation effectof 23 percent.

The peak flood stage at the spillway is at elevation 457.1 NGVD,which is 1.6 feet below the crest of the dam. The spillway cantherefore pass 100 percent of the test flood outflow. Themaximum spillway capacity is 2040 CFS, without overtopping thedam (a stage of 5.7 above the spillway crest El. 453.0 NGVD).

5.5 DAM FAILURE ANALYSIS:

The downstream impact of a dam failure was analyzed using theCorps of Engineers "Rule of Thumb Guidance for Estimating Down-stream Dam Failure Hydrographs" dated April 1978.

Based upon an assumed breach width of 80 feet, which is equalto 40% of the dam's width at mid-height, the peak flood flowI.. due to failure would be 22,087 CFS with an initial depth of 30feet just downstream of the dam. The total flow (base flow plusfailure outflow) is 24,128 CFS.

The probable impact area is largely undeveloped woodland. How-ever, two active factories located about 2 miles downstream ofthe dam would be flooded with about 2± feet of water above theirfirst floors. They are the Peerless Woodworking Company andQuality Name Plate Company located in the village of East Glas-tonbury, Connecticut. The economic loss is anticipated to beappreciable if dam failure were to occur. The depth of waterat the downstream impact area prior to and just after assumedfailure is 5 and 8 feet respectively.

-16

* - .-.. . . . .

Page 34: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

SECTION 6 - EVALUATION OF STRUCTURAL STABILITY

6.1 VISUAL OBSERVATIONS:

The visual inspection did not disclose any immediate stabilityproblems.

. Features indicating slope movement were observed at two locationson the spillway dike. The appearance of these features suggestslimited surficial movement rather than large deep-seated move-ment.

• -The discharge observed near the downstream toe of the main dam*I showed no evidence of sediment transport; however, they warrant

further investigation. The source of the flows should be in-- -" vestigated and appropriate recommendations developed.

6.2 DESIGN AND CONSTRUCTION DATA:

1The available data consists of three construction drawings en-titled "Roaring Brook Reservoir, Drawings of Dam for the SouthManchester Water Company, Dam No. 1," dated February 1924 andan undated sketch of a seepage collection system superimposedon a copy of one of the construction drawings.

0 The available data is not sufficient to permit a formal sta-bility analysis. The present evaluation is based primarily

*upon the visual inspection.

6.3 POST-CONSTRUCTION CHANGES:

The existing seepage collection system was apparently installedsubsequent to the original construction of the dam, since it isnot shown on the original construction drawings. No informa-tion was available on the design and construction details ofthe collection and monitoring system.

6.4 SEISMIC STABILITY:

Buckingham Reservoir Dam is located in Seismic Zone 1 and, in-O accordance with the recommended Phase I guidelines, does not

warrant seismic analysis.

- 1.7 -

~~~~~................................. .. .•..... ...... " ..... ' ,,*,.

Page 35: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

'0

SECTION 7 - ASSESSMENT, RECOMMENDATIONS AND REMEDIAL MEASURES

(i 7.1 DAM ASSESSMENT:

a. Condition. The visual inspection indicates that thedam is in poor condition. The major concerns with respect tothe long-term performance of the dam are:

1) Seepage is occurring downstream from the toe ofthe dam and at the toe of the natural slope at the left abut-ment. Several small springs were noted in these areas.

2) Considerable seepage is occurring along the baseof the left spillway training wall.

3) There is some indication of past movement at twolocations on the spillway dike slopes.

b. Adequacy. The engineering information available was

limited and thus assessment of the condition of the dam was

based primarily on the results of the visual inspection, pastoperational performance of the structure and sound engineeringjudgement.

c. Urgency. The recommendations and remedial measurespresented in Sections 7.2 and 7.3 should be implemented by theowner within one year of receipt of this Phase I inspection re-port.

7.2 RECOMMENDATIONS:

The owner should retain a qualified registered engineer toaccomplish the following:

a. Investigate the seepage occurring downstream from thetoe of the dam and at the toe of the natural slope at the leftabutment. The investigation should include an evaluation of theability of the existing seepage collection system to adequatelycontrol and monitor the seepage. The need for additional drain-age and collection systems, especially at the toe of the naturalslope at the left abutment, should be considered.

- b. Investigate the seepage occurring at the base of theleft spillway training wall to determine whether there is any

*danger of internal erosion of the spillway dike behind the wall.

", c. Repair all spalled and deteriorated concrete.

0. 7.3 REMEDIAL MEASURES:

a. Operation and Maintenance Procedures. The owner should:

- 18 -

0 -

Page 36: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

") Monitor on a regular basis the seepage occurringdownstream from the toe of the dam, downstream from the toe ofthe natural slope at the left abutment, and at the base of the

P left spillway training wall.

2) Initiate regular readings of the quantity of seep-age being collected by the underdrain system.

3) Remove the trees growing on the downstream slopeat the abutments of the main dam, at the downstream toe of thespillway dike, and in the downstream spillway channel. Theroots should be removed and backfilled. The brush growing onthe dam and spillway dike slopes should be cleared.

4) The erosion gullies on the downstream slope of thedam at Sta 2+30 should be filled and protected by planting withgrass. Vehicular traffic should not be allowed on the slope.

- "5) All animal holes on the downstream slope of the dam- should be backfilled.

6) Replace missing riprap on upstream slope of dam.

7) Backfill erosion gullies and 1 ft. deep hole on thedownstream slope of the dike.

8) Monitor on a regular basis the two locations on thespillway dike slopes which show indications of past movement,i.e., the upstream edge of the crest immediately to the rightof the spillway and the downstream toe immediately to the leftof the spillway.

9) Engage a qualified registered engineer to make acomprehensive technical inspection of the dam and dike/spillwayonce every year.

10) Establish a surveillance program for use during and• immediately after heavy rainfall, and also a warning program to

follow in case of emergency conditions.

11) Sediment should be removed from the outlet of the24" diameter blow-off and the channel cleared of brush. The 16"diameter blow-off should be located and inspected.

12) Blow-off valves should be operated on a scheduled" basis to ensure that they are in good working condition.

7.4 ALTERNATIVES:

There are no practical alternatives to the recommendations con-S'tained in Sections 7.2 and 7.3.

* -19-

Page 37: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

* .* * . .

Je

F

Ia APPENDIX A

INSPECTION CHECK LIST

pS

IC.

.J.

0

S

Page 38: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

INSPECTION CHECK LIST

PARTY ORGANIZATION

PROJECT BUCKINGHAM RESERVOIR DAM DATE Nov. 7. 1979

L TIME 0900

WEATHER Cloudy - 45OF

W.S. ELEV. U.S. DN.S.

PARTY:

1. R. Smith. FGA. Project Manager

! 2. J. MacBroom, FGA, Hydraulics/Hydroloqy

3. R. Murdock, GEI, Geotechnical11

6

4. D. Shields, GEI, Geotechnical

5. R. Young, Manchester Water Department

S PROJECT FEATURE INSPECTED BY REMARKS

- 6.

9.

- 'A

• "o-'----"o , -'-..... .... .. . ...- -.-.. . ........ .... o.. ... .. .. ..... .....-- - : '...-.44 . . ': .' . ... .. . . .. ,. .-

Page 39: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LISTO ,NATIONAL DAM INSPECTION PROGRAM

DAM: BUCKINGHAM RESERVOIR DAM DATE: Nov- 7 1 9q

*AREA EVALUATED CONDITIONS

DAM EMBANKMENT

- iCrest Elevation

Current Pool Elevation

Maximum Impoundment toDate

Surface Cracks None observed.

Pavement Condition No pavement, grass covered.

Movement or Settlement None observed.of Crest

Lateral Movement None observed.

Vertical Alignment No misalignment observed.

Horizontal Alignment No misalignrent observed.

Condition at Abutment and Trees growing on downstream slope atat Concrete Structures abutments.

Indications of Movement None observed.of Structural Items onSlopes

Trespassing on Slopes Vehicular traffic on downstream slopeat Sta 2+30.

Sloughing or Erosion of Erosion gullies on downstream slopeSlopes or Abutments at Sta 2+30, due to vehicular traffic.

Rock Slope Protection Riprap on upstream slope - good condi-Riprap Failures tion.

Unusual Movement or None observed.Cracking at or near Toes

Unusual Embankment or Considerable seepage downstream from toe ofDownstream Seepage dam and at toe of natural slope at left

abutment. Several springs observed.Piping or Boils None observed.

* Foundation Drainage Extensive downstream seepage collection system.-. Features

Toe Drains Plans show stone fill toe-drain - not visablein the field.

Instrumentation System Weirs in seepage collection chambers.

SCrest and downstream slope are grass covered with-Vegetation sae low brush. Trees growing on downstream slope"'a+- ah~itmnnts. A-2

Page 40: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LIST* NATIONAL DAM INSPECTION PROGRAM

DAM: BUCKINGHAMI RESERVOIR DM DATE: Nov. 7. 1979

AREA EVALUATED CONDITIONS

DIKE EMBANKMENT

Crest Elevation Spillway Dike.

Current Pool Elevation

Maximum Impoundment toDate

Surface Cracks None observed.

Pavement Condition No pavement, grass covered.

Movement or Settlement Apparent settlenent or slumping at upstream edgeof Crest of crest inriediately to the right of the spillway.

Lateral Movement Apparent movent at downstream toe at left

spillway training wall.Vertical Alignment No misalignment observed.

Horizontal Alignment No misaligmnnt observed.

Condition at Abutment and Good, except for apparent movement adjacent toat Concrete Structures spillway (see above).

Indications of Movement Downstream end of stone masonry training wall onof Structural Items on left side of spillway is 'displaced about 4 to

u Slopes 5 in. downslope.

Trespassing on Slopes No evidence of trespassing.

Sloughing or Erosion of Few minor erosion gullies on downstream slope.Slopes or Abutments

Rock Slope Protection - Riprap on upstream slope - difficult to determineRiprap Failures continuity of coverage due to brush and

vegetative debris.Unusual Movement or Apparent movement at downstream toe at leftCracking at or near Toes spillway training wall.

Unusual Embankment or Seepage at base of left spillway training wall.Downstream Seepage

Piping or Boils None observed.

Foundation DrainageFeatures None.

Toe Drains None.

Instrumentation System Crest and slopes are grass covered.

Brush on slopes and several small trees atVegetation downstream toe. A

Page 41: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LIST

NATIONAL DAM INSPECTION PROGRAM

DAM: BUCKINGHAM RESERVOIR DAM DATE: .Nov. 7, 1979

AREA EVALUATED CONDITIONS

OUTLET WORKS - INTAKECHANNEL AND INTAKESTRUCTURE

a. Approach Channel Not visable, underwater.

Slope Conditions

" .Bottom Conditions

Rock Slides or Falls

Log Boom

Debris

Condition of ConcreteLining

Drains or Weep Holes

b. Intake Structure

Condition of Concrete

Stop Logs and Slots

A-4

t~

Page 42: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LIST-NATIONAL DAM INSPECTION PROGRAM

* I DAM: R[TC"TNGHAM RzaR\7RlTP hAM DATE: Lionv 7 1Cq7q

.-. -- AREA EVALUATED CONDITIONS

OUTLET WORKS - CONTROL TOWER

a. Concrete and Structural Control tower in good condition. Theoutlet works could not be inspected

General Condition during the site visit.

Condition of Joints

Spalling

Visible Reinforcing

... Rusting or Staining ofConcrete

Any Seepage orEfflorescence

Joint Alignment

' Unusual Seepage or Leaksin Gate Chamber

Cracks

Rusting or Corrosion ofSteel

* b. Mechanical and E'ectrical

Air Vents

Float Wells

-* Crane Hoist

Elevator

Hydraulic System

Service Gates

Emergency Gates

Lightning Protection*• System

. "Emergency Power System

S""Wiring and Lighting- System in Gate Chamber

* .A-5

......................................--.-. ,*.-*....b ",.-._*-..

Page 43: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LISTNATIONAL DAM INSPECTION PROGRAM

DAM: BUCKInM RESERVOIR DAM DATE: Nov. 7, 1979

AREA EVALUATED CONDITIONS

OUTLET WORKS - TRANSITIONAND CONDUIT

General Condition ofConcrete

Rust or Staining onConcrete

Spalling

Erosion or Cavitation

Cracking

Alignment of Monoliths

Alignment of Joints

Numbering of Monoliths

6- ..

I

A-

____"" ___"_" ____" __-"_ ""_-___'_,______-"_____-__ A-,S . """, -''" -. '''-.-; ;," --. '--i' -' "- '") ."-"..- . "-

Page 44: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-PERIODIC INSPECTION CHECK LIST

NATIONAL DAM INSPECTION PROGRAM

- " DAM: Buckingham Reservoir Dam DATE: -7 1 q7q

AREA EVALUATED CONDITIONS

OUTLET WORKS - OUTLETSTRUCTURE AND OUTLETCHANNEL

General Condition of

Concrete

Rust or Staining

Spalling

. ,Erosion or Cavitation

Visible Reinforcing

Any Seepage orEfflorescence

Condition at Joints

Drain Holes Not applicable

Channel Not applicable

Loose Rock or Trees Not applicableOverhanging Channel

Condition of Discharge Not applicableChannel

.A-

__ _ _ _ __O._ _ _ _ __ _ _ _ -

Page 45: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LISTNATIONAL DAM INSPECTION PROGRAM

DAM: BUCKINGHAM RESERVOIR DAM DATE: Nov. 7, 1979

AREA EVALUATED CONDITIONS

OUTLET WORKS - SPILLWAY WEIR-. APPROACH AND DISCHARGE

CHANNELS

a. Approach Channel Not applicable.

General Condition

Loose Rock OverhangingChannel

Trees OverhangingChannel

Floor of ApproachChannelr:

b. Weir and Training Walls

General Condition of Soillway traning wall in fair condition, with- Concrete sane spalling noted.

I Rust or Staining None.

Spalling Sane spalling noted.

Any Visible Reinforcing No visible reinforcing.

Any Seepage or Seepage at base of left training wall.Efflorescence

A. Drain Holes None.

c. Discharge Channel

General Condition Natural streambed in fair condition

Loose Rock Overhanging None.ChannelTrees Overhanging Trees overhanging channel.Channel

Floor of Channel Trees growing in floor of channel.

* Other Obstructions None.

0A-$

Page 46: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PERIODIC INSPECTION CHECK LISTNATIONAL DAM INSPECTION PROGRAM

DAM: RIJCKINGHAM PP' PRVnTR DAM DATE: Nov- 7 1qgqAREA EVALUATED CONDITIONS

OUTLET WORKS - SERVICEBRIDGE

a. Superstructure None.

Bearings

Anchor Bolts

Bridge Seat

Longitudinal Members

Under Side of Deck

P , Secondary Bracing

Deck

Drainage System

Railings

Expansion Joints

Paint

b. Abutment & Piers

General Condition ofConcrete

Alignment of Abutment

Approach to Bridge

Condition of Seat andBackwall

A-9*. *

-6

Page 47: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

'C - - -

* I

I.

APPENDIX B

ENGINEERING DATA

S

r

k~. ~.0

1* I

* *- '...-..* p - - J

Page 48: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

iCN

r4 0

o z c

41

00E-45-

0,-4 B

4 02 49-Q)

HZ -4 U-u M

H

z V U 44 L 10H

-.-..

H~~4 0 z U c ) E' 4>r>-4

Ej

.. %. .. 4 (D6

>4 E-4 00 E-4 0 U I 0 H U IE-

U ZE-4Q 0 -4 U) IZ 0 D E- 0 0a > H H P4 A E4 >4

'.~. _ CDU'i

- H 4 U) m 0 24 H nWu 0 m) 0 0)~Z

,9. E- z-4 B

H 0 H , Z , H % 11 W 0

Uo E- 0 in ED a In ,co

Page 49: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

0Z4 03

00

H

40 >1

40 Ea

U OH U)

UH2 H P4

r4 a . 04404 04

Uf) -

P4 2 00 H

>42H H

U) E-1U H

w u U) 2 z 0

H 0 ~ U)z w cn P -E-4 P) U 0 E4 0 L Zgw 0i >4 U)4 U m~ H 0 Ut

4 (n H Z4 U H-O U 4 H

W4 02 4 P4 U)) UH 2 0- H o

8 0) H N 0 w HUE-4 W~ U4 H EH

El H E-1 in U 04 4

cn ~ Z HU2)0Z H H r-4 0 00 H 0E40

Page 50: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

7'0'q T iTv.

jaA

1vute

- - -- ----- ----- -----

f O~ut I et

7'7I

Page 51: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

NITS

- j-

BUKNGA IFIIT

Page 52: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

jo ..- ...

00

*OF DAMNIS

4865

458 7

445

4 *0 -5t0

~OF DAM BUCKINGHAM RESERVOIR DAM

-~~~ - 3

Page 53: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

Reservoir

PLAN OF SPILLWAYNTS

El. 458.7

0.

PROFILE OF SPILLWAYNTS

BUCKINGHAM RESERVOIR DAM8-4

Page 54: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-. - . IT -...........- ..- .-------

I

. .* -

* ~-..,

-a.'-' r-- 7.-

-~ --

4**

4.4-,

* I - I

I _ _ ~ ~f) -. t

-~ &.-- -,. - - It,,~,, ~ a -

ar3 .-*

I . I

7,e'a C

I .- - a.

* 5' / , .L - . - . . . - -

Page 55: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

T I I

TF r

L%.A NO~ DI D\'N t)~lKI \\.1(on

Page 56: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

D RA1- F A

I D23

1.\1 X

I <(~biN I ~~O~h. I 1 ~ ~N)I,

Page 57: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-% . .. ***.-. , 7 dgr. . -. . r r * r -r------r----

L'-

I KF

I / . .

* r

I-. .. . c\-. -

I'O - .

I. -I

I .- . 4,,

-'-.4.-.

L"- - -,,, ,-,- -- , ". . . . . . " " - '" '- ' . A-' " " '. .. ": "

IS

Page 58: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

*

I *~

r 6k" I~

-- . I -t cc 3 - - - - I

- .j~4 ,. - .. -

r .'- .

*5 q.-

'4-

5,/nt t '-I4 H'

t-~.

4) ~ffb ~ Cc,'- ~rcnr, . -

-, - *W 1 .4c.."a

- I ,>~ ,<v

, . ~ 'r ~ rrcfl . .t-.-

0 . - 1 -

,'- 'A:. -.

* D~'?AXV.WG3

'7

4 ,'q"**~ / ' ~~-4 ,t./a.',.Se.1<.

-

Page 59: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

r, 1'' 1 .' ? , ,

-P-.".D. - --

efJ

liet

"Ir tt-7 f PC.7 / C

411 -

c'A1,1 Or ),r ~dI/ ~ ~ '" -iit Iv

r''Cah -

Page 60: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

o, .U w r ' c .-;. o ~ cw r'--w--r-- 'v-r-j- - ----

i I : , .ji .. ., -

- r£ rr Cr

t - .T " • 9

-. tre .. - . ...

-- C .. c'tcr'-

S ,.°.

1,-

° '. '

I°.° /

-.' r c-s/

,-. , . .. . " ,. .' .' .. .. .. ... . .. ,. . .. ,., . . .. ., ,, .' ,-,. ' . ." ... ., ,- , .. • . ... .., ._. -. .. . ... . • . -'. -.. .. '

Page 61: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

0-

I

~

f~ 'p.; A ~ ~4'- L

~ .~ev.,' ~ 7 j~( ~

I.---------------------.~~---*~- ---- - -7: :V-wX *:4,,. 4

-- -- I -~i-

.9.- -- -

ytr')fcrO' -

~

N N

I'!AN C. ~f'IL44'AY -

I.

* A*F~~..7~tC ~~.1'

I, .. ~,* - - --0 .-

-. - I, ~ --- -

-l

-I-- -

-- - ,,4,5 -t -

7,-. '-..,-.- --

~ ,*-,~-.2 -- -,

* A . DA~

~'.Lft -, -.

& 'I/Al (N?, Ar-Vunsi

* . . .

Page 62: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

,~'s~sc ~

-v -~rtrr &r . 'C .4 -

'C r .- .- - . . - . 0 . .

-

.4 ,

1

'1

~

44

4. 'I -

b

* --

6.

I,

~ a~'U

~I

I.

s-.

.A..

I -.

p, .

,~?

'.4--

--1~*

~I,-,-* P

-

3 lj

U *AAt'..'4''' '

a.

nr

(.4atcT.4Cafl Tii. ,.r.aa), Dfl~V)/~'NG.~a'

I a,/fl

~ ~ 'I

,*. 4'0

/

I

A1 'a.2 f) '. -6' .4. -- . 4 . . .

.

* j). I\J .\*'4 /

''.4 .4

Page 63: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

FORM PUR STO 201DATE

,- It- . INTERDEPARTMENT MAIL March 29, 1968

S.TO DEPARTMENT

File0M DEPARTMENT

William H. O'Brien, III, Civil Engineer Water Resources Commission-. -"" BIUBJ ECTBuckinham or Roaring Brook Reservoir,

An unidentified person called this office on March 27, 1968

and reported a leak on the dam at Roaring Brook Reservoir in Glastonburywhich he thought was owned by the Manchester Water Company (actualowner: Town of Manchester Water Department - two separate companies).

• .Because of this call, the undersigned visited the site on March 28,1968.

The 350' + earth dike along the west of the reservoir seemed tobe in very good condition. There was a mixture of some moss withgood grass cover over the entire downstream slope but with no mushyareas on the slope. From the toe of the slope out for about 100 feetfrom the dam, there is water standing up to 6 inches deep in places ina very marshy area. The ground beneath the water had grass cover andwas not unduly soft and had been in this condition since the dam wasbuilt back in the 1920's per Mr. Lockwood of the Water Department.This is not considered a source of concern. There was a depression,however, about 10 feet out from the toe of the dam nearly in line withthe gate house and toe drain sump hole (see attached sketch). Theseitems brought to the attention of the Water Department in letter datedMarch 29, 1968.

The dam on the south side of the reservoir is an earth dam (75'+4 ilin length west of the spillway and 50' to the east). The spillway is

about 50' in length and is built in step fashion out of stone withconcrete wing walls. There are many trees growing on the downstreamside of the earth embankments pnd water was noticed boiling in a 6"

.. .- depth of water at the base of the westerly wing wall. These items" brought in the attention of the Water Department in letter dated

*0 March 29, 1968. There was no evidence of fine material being carriedout by this flow.

Civil Engineer

-* 'ItVM

Attached sketch

m~ "- 8

B-8

Page 64: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

:.:.,/d c.c , t ,, , s e Y /f, cor r f.* //: i'. .( /c "b rs 62 C T/ ~j ,

... 2 -

,,,,, \':

7,..\77

t\rIc / V fAle.. ,

1,6k ', ..

. "- .I 1NI~

\ \ ,, \ , -

'CA'

'"-d - '- -- -I// - - - L - " s-....,.,,..., ,, .

e r-. s

I\

i", "\ \

*~~~~~/ 06.4 c~' r~

.....~ ~ .. 9, ./

*-.. 01 M.. .~~9 ~ i 0. i/

........ .B..do,-9e, ,¥ f

Page 65: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

C . - *. . -. -- ' -. -. - - .- - - . - . - . • • . .. . .- . . . - - - - . - -. . - . . .

March 29, 1968

Mr. Lawrence Wittkofske, SuperintendentTown of Manchester Water DepartmentManchester, Connecticut

Dear Mr. Wittkofske: Re: Glastonbary - Dams

As a follow up to our telephone conversation on March 28, we aresending you tie results of our fielci inspection of Roaring BrookReservoir or Buckingham Reservoir on March 27, 1968.

"- Concerning the earth dike along the west side of the reservoir, adepression approximately one foot c(eep and four feet in (,iameter wasnoticed about ten feet out irom the toe of the slope almost in line withthe gate house and toe drain sump hole. Is this over the location of apipe? If so, an excavation should probably be made to uetermine it

- there is a hole in the pipe.

Although there was more water standing near the base of this dam- than is normally the casei this does not necessarily indicate any in-

stability of the structure especially since it has been very wet at tie;-4 base ever since the dam was built according to Mr. Lockwood. However,

you indicated in our telephone conversation that there seemed in havebeen an increase in this flow over the past few years, but that therehad been nothing noticed within the last few months to inuicate thatthere was any urgency involved. Please summarize yoir observations

- chronologically anu send us a copy of any plans which you may have.

At the dam on the south end of the lake, there were many smalltrees growing on the downstream earth embankment which shouli be cutdown to avoid damage to the dam from overtopping in a storm. ALso therewas water boiling up in a six inch depth of water at the base of tne

0 westerly wing wall. There was no evidence that any material was beingcarried from within the dam in this flow but this leak should be corrected.

8-10

- -- .- *- .- •

Page 66: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

Mr. Wittkofske -2 -March 29, 1968

May we hear from you in the near future in regard to these items?

Very truly yours,

;,q William H. O'Brien, IIICivil Engineer

WHQIII/tvm

B-1

Page 67: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

' r7 -{ ~ -

. ..

I..

REPORIT

to

- The Seleotmon, Towm of lanohoster

am. ?- . . .

S. iA. WATER COLTANY

and

B. U. SANITARY AND SZE ER DI3TRICTR . R C, . T

LE C E I V D

* .* ., , .

AP 1 116

* - om n ° * ,* 4o..

-4 ALFRED . TERRY C ANWERED ET

l .l 'm M. . ' . ' * *, in" ' S ' F + :+ ..

. .. .... . STATEWTER RESOURCES'

< l ' .". .. 4 t': l l ... ' APR 1 96. . ANSWERED

pREFERRED_ __ _ _ _

F I' '..- -- B6-12

m 4

*n 4 *'- in, .2i ~ . kn~~~.tinn~aiin~~in Atm Yin tin ~ **~ ... - _

Page 68: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

*O I.

b. t- influence of the geoge at Rouring Brook oan the store cnpacity

of the reservoir in ,nmon.

W We have, borevorp oondittona in the year 1931 an a WuAdeo

This aer, gaoording to tho 'Cater Comony's record,, wan tho lowoot

in total rainfall since 1037. Tho condition of the three reservoirs#

therefore, in 1931, in as much ao they are influanco& by tho loaknge

at oarinjr. Brook, pives a reasonable idea of what a- be esxzctod

from the comined. storage in an extremoly dry yoar.

.".. After glvinC due wotlt to the nozooW"t low quantity of

-.- water uet in 19316 we find that thene conditions indicate that the

pro ont suapl7 could haby cirod fox, a Populaticu of about 66 in

excoes of the 1931 population.

* The poputleon at Manboater he increased since 1890 at

the rate of 20 evory 10 years. This, of couro, Is banel on come

"- pounding the increase at each cnug, It seems 1i1uly that the

rate of growth is somewhat lbus at prevent and that it in safe to

ay that the supply is uffiolent for at least 20 years.

The design of the Roaring Brook dam is opon to soe

roiticism in that the shootinm driven to out off lea1mge Is not

" onolosed at its top by ths concrete core wall*. This aheating has

been rimuded with im-arvious mnterial which is designed to give

the neoecsary protection eTnst lea" o9 but I not go suro amethod of securing this result as vould have been the method of

surr'ouning the theetIng with concrete*

theft Is oonsiderable peroolatIon throuh t ho ooLl umder-

- .,, B- 13

Page 69: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

neath and arouad tis dam amounting to about 400. gllons per

C I minute with the pond at apillway elevation. Dinram 0 shows

the leakage in ralation to pond elevations for the years 1929

to 1933 inolusive. It will azpear from the diagram that the

elevation of the water In the ponA ban consid rable Influence

on the amount of leakage varying from 400 C.p.m. for pond at

elevation 4.9 to 150 g.p.m, for pond at elevation 422. While

the diagram i on too small a scale to chow the fluotuations

dze to variatioun in rainfall tho rcoords show that rainfall

has a influonce on the leakage. t eeens, therefore, a just-

ifiable conclusion that the main leaksgs coom from tho .etorage

area. but that a portion of the lea1 ae, perbaps donsiderable

in amoCnt, come from other sources.

-To do not think that thit leaknge is a mnaoe to the

stability of the dam, The dam his been in existence for about

* seven years, oaroful record of the amovat of leakage has been

,. ,kept for the last six years, This record does not indicate

•-that the amoaut of leakage is inoreasin. .

While it Is impossible to determine from available

information whether this leakage Is Concentrated or distributed

* "throuAout the length of the dxe, if it is distributed, it woull

amount to only one j llon per minute per lineal foot of dam for'

the oondition of 400 gallons per minute with the pond at spill-

W&,, elevation. ' . " . ";

-.. ' TSn stating that it t. out opinion that the leakage

B. - 14

Page 70: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

~I~si not a menace to the sta8bility of the dam, we recomize that

the responsibility for dc~.D In case of f'ailure#, woull rest

U'Oon the o-'ner of the prorert7 at the time of ounh failure*

The leaka,79 at Roearing Brzook dam, in our opinion,

While not a menace to the stability of the dp.zn, does decrease

* the available watter suipply xa ma~oe the useful life of the dam

tii

* loss than would otherwnise be the case. This fact is given weirh

* ~in applying depreciation to this ~Artiaulp-r structure*

r * *There is about fou~r ndiles of wood stays pipe laid from L -

* the Rloaring~ Brook 4am to the filter plant at. Ind Street. In as

mlach a a the probnble life of wood 9tave pipe to from 20 to 25

years it is evident that this -pipe will bave to be replaced about

1960.

This mpkea the date for replacing the wood stays pipe

approximmtely the a~w as that when additional storat:0 will be

required. About this time also the present bond issue of $500.000

It* duo for retirement.

5114 The Roaring Brook supply is filtered at Line Street.

This plant is rod for approximatoly twice it. precnt ue so that

additional erpense at this point Is not t* be aniticipated for some

time to co:W.

-. : tTh Porter Howard rp y is not at prenent fl tered altboue

- -it is sterilized. The prper part of the Porter water shed is of hf u

toheaIy17 the water fromI this portion of the shed is bypassed cnd not

Used. If used, wdor the pro nt eonditionso It is aerated to some

B - 15

-.-.- A -.% 2. .'- J.. ~

Page 71: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

I""-'-" : i

" * .- - " --- , .... .. . -. .... . .',. .... . :"- - .:. :

B BUCK & BUCKE N G I N E E R S

71 CAPITOL AVENUE, 1IAF TFORD, CONNECTICUT 051M3

JAIIIS A. T:IUMP OCN

RIBN$O.4 W. fl'CK

Comm. 5713-48 November 20, 1968

Mr. William H. O'Brien III

Water Resources CommissionState Office BuildingHartford, Connecticut 06115 £r/', 2-,

*t S , Dear Bill: !f 5 /)

*2- As requested, we made an inspection on even date of the

' " Buckingham Reservoir. As in previous inspections, the water level was

quite low, being 57 inches below the normal spillway level. We observed.- the depression near the downstream toe of the slope.. Powever, it was dry.

There is a two-inch diameter hole in the bottom of thedepression butit, too, was dry.

- "In general the entire base of the dike was drier than we hadexpected it to be. However, the underdrains were still quite active.

The downstream area of the spillway, at the southerly end of the reservoir

was also dry. We are sure these conditions are due to the relatively low

water level. We will continue to check the site periodically and

should we detect an alarming increase in the seepage rate or locate a

* . -possible "boil" we will notify you immediately.

Sincerely yours,

BUCK & BUCK

ames A. Thompson

STATE WATER R~s URCiCO Am, 'SS N

• ,RECEIVED

1OV 221968ANSWERED

REFERRED--

Fit I

Page 72: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

,- BUCK & BUCKE N C I N E E R S

71 CAPITOL AVENUE, HARTFORD, CONNECTICUT 06106

JAMUS A. THOMPSON

ROBINSON W. BUCK

Comm. 5713-48 August 6, 1969

Com. 71-41I C~,: i \. ° -

Mr. William H. O'Brien IIIWater Resources CommissionState Office BuildingHartford, Connecticut 06115

Re: Buckingham ReservoirRoaring BrookGlastonbury, Connecticut

Dear Bill:

Since our initial inspection of the subject dam, we have madeinspections on March 28, 1969 and July 31, 1969. During both of theseinspections the water level was at, or very close to, spillway discharge.The area immediately downstream of the toe of the principle dam wasE very wet during both inspections. We could not discern a definite flowor velocity in this water. Flow in the underdrainage system was veryactive a.,.. appeared to be at a greater rate than that witnessed duringour ins,_ction of November 20, 1968.

Your letter of April 17, 1969 requested ttt we report on thestability of this structure. With the information ailable to us at thepresent, it is impossible for us to make an accur. appraisal of thedam. To do so, we feel it would be necessary to determine the actuallocations of the phreatic surface, the structural characteristics of theembankment material, and the rate of seepage through the dam. We feel

.. this is outside the scope of our contract and is a determination the ownershould make.

This subject was discussed in the Terry & Bennett report tothe Town of Manchester in 1932. It was Terry & Bennett's opinion that thedam was safe. This was based on the fact that seepage was not increasing,

-6 and the dam had performed satisfactorily for seven years.

It is our opinion that measurement of the seepage should bereinstated and recorded weekly, along with the reservoir water surfaceelevation. These readings could be compared with those taken previously.A significant increase in the flow would act as a warning of possible

*I danger. To determine the phreatic line, it will be necessary to install

B -I7

Page 73: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

BUCK & BUCK ENGINEERS

Mr. William H. O'Brien III PAoz 2VATS o 5713-48

August 6, 1969

.'-

prizometers in the dam. It would be most informative if a series of- prizometers were installed on down the downstream slope and the water

levels recorded with the seepage rate and reservoir levels. Thiscombination of information, along with soil analyses, could then be usedby the owner's engineer to determine the structural stability of the dam.

In summary, we do not have enough information to make anaccurate determination of the safety of this dam and recommend the ownerprovide the previously mentioned information for review by theWater Resources Commission.

Sincerely,

Buck & Buck

James A. Thompson

0NCO

0'

0o.o

-0.

i*°- •

-....................................

Page 74: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

September 9, 1969

% Mr. Robert B. WeissGeneral ManagerTown of ManchesterMunicipal Building, 41 Center StreetManchester, Connecticut U6UL4

Subject: Roarin- Brook Reservoir DamGlastonbury

Dear Mr. Weiss:

We have recently received a report from an engineering consultantto this Commission on the subject darn.

There has been some concern about tho quantity of seepage emergingat the toe of this dam even tiouzh it has existed lor many years. Our

IJ )consultant has made many trips to tae reservoir but the water has albaysbeen below full pond so that conditions of maximum seepage could not beobserved. 'ur our letter of July 24, your Mr. William O'Neill, Directorof Publ , orks, notified us when the pond was full anud our consultant'srecomme. -tions, itemized below, are based on his observations underthose conditions.

I. That a series of piezometers be instuLled on the downstream- . -slope of the dam to record the uater levels within the dam.

2. That weekly records be kept of the water levels in thereservoir, and piezometer tubes and the seepage rate at thetoe of the dam.

3. That the Town have an engin -er, registered in the Stateof Connectiwu t, combine this information with a soils analysis

" "to determine the structural stability oi tne dam, and send areport thereof to the Water Resources Commission. A determina-tion should also be made of how hig;i tae water could be in thepiezometer tubes and still be insured of tne safety of the dam.The installation would then be a permanent safety monitoringdevice.

B-19..- .. / . • . . .....-.- - . . . . - ....- . . . . . -.- . . . . . . - ; . . ., . .- . . . . . ,

Page 75: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

Mr. Robert B. Weiss -2 -September 9, 06b9

Because of the great amount of seepage through or under this dam,we feel that this is the minimum effort required to definitely establisil

* the safety of the darn.

Please inform this office at your earliest convenience as to your* intentions.

Very truly yours,

William H. O'Brien, IIICivil Engineer

WHOIII/tVm

cc: James Thompson

B-20

bV -I . -1 - 1, -

Page 76: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-° 21

NATHAN G. AGOSTINELLI. MAYOR

1'; "DAVID 0. ODEGARD. OEPUTY MAYOR

JAMES F. FARR. SECRETARY

x-" ,,- DIRECTORSlo itu o, Iickwslr WILLIAM J. DIANAA." WILLIAM E. FITZGERALD, ESQ.

4% ,6 DONALD K. KUEHL

MAanester Conn. 06040 ANTHONY F. P!ETRANTONIODONALD D. WELLSRICHARD E. WYLIE

ROBERT B. WEISS. GENERAL MANAGER

April 28,S -0 V;%.TER RESOURCES

R C EEI V EDMr. William H. O'Brien III

*: . Civil Engineer AP 2 1970Water Resources CommissionState Office Building ........Hartford, Connecticut 06115 REFERRED

FILEDRE: Roaring Brook Reservoir Dam

Glastonbury, Conn

Dear Mr. O'Brien:

Please excuse the delay in answering your letterof September 9, 1969. We wanted to observe conditionsat the Reservoir during flood peaks this spring and wehave come to the conclusion that as a first step inanalyzing seepage conditions and the strength of the dam,we will take steps in. staff to reactivate the flowmeasuring devices at the toe of the dam and study thecorrelation between seepage elevation and depth ofreservoir. This will be compared with previous recordsto determine whether there is any material change.

Discussions have been held with consultantengineers and if it is determined, after examining theabove information, that further work is necessary, wewill undertake same, in all probability through a con-sultant. When we have developed more information, we

.-. ,will furnish you with same.

Thank you for your continued interest in the

0 safety of this dam.

Sincerely,

0 II

Robert B. Weiss.-General Manager

RBW:pcdcc: Mr. Graydon Lockwood, Superintendent of Water and Sewer Dept.

Mr. William D. O'Neill, Director of Public Works'::: B - 21I

Page 77: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

April 1, 1971

Mr. Robert B. WeissGeneral ManagerTown of Manchester

""- Municipal Buildinglvi ;41 Center Street

Manchester, Connecticut 06040

Res Roaring Brook Resevoir DamnGlastonbury

Dear Mr. Weisst

. On September 9, 1969 we wrote to you itemizing certain stepswhich should be taken to determine the safety of this structure. ItIs our engineering consultant's opinion that these steps should betaken in order to adequately determine the stability of the dam.

In your letter of April 28, 1970 you state that steps w.ould betaken in staff to reactivate the flow, measuring devices at the toe ofthe dam and study the correlation bet.-een seepage elevation ani depthof reservoir, and that this '.ould be compared i;ith previous record5 todetermine whether there is any material chance. You also stated that

"when we have developed more infozmation, we will furnish you withsame".

In our letters to you dated September 2, 1970 and January 20,1971 we have requested you to inform this department as to Y.hat stepsyou have taken in accordance with ydur letter of April 23, 1970. Unlesswe receive assurances that the items mentioned in our letter of September9, 1969 will be implemented in the near future, it will be our reco1.men-dation at the April 19, 1971 meeting of the Water Resources Cormiission thatan Order be issued to the Town of LM3nchester, to make sufficient investi-gations to demonstrate the safety of the structure or if the structure isfound to have only marginal safety to take whatever actions are necessaryto place this structure in a safe condition or to remove it.

Very truly yours,

William H. O'Brien, III

Civil Engineer

="'" " "" WHOilJg

c. .James Thompson• _Walter Senkow

B- 22* .•..x *", -

,,> : .. ' _' -. . - ,_ '. . " -'. __- -,_. - _- _,, :, - • __ .-- -- - ,. • ',, :- '- .. .. . :, '.. .'.. ., :, , . . . :ACl

Page 78: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

NATHAN G. AGOSTINELLI. MAYOR

- O, DAVID 0. ODEGARD. DEPUTY MAYOR

6*43)f. JAMES F. FARR. SECRETARY

: .i DIRECTORSol ; WILLIAM J. DIANA

. WILLIAM E. FITZGERALD, ESO

uDONALD K. KUEHLMaaceste, Coit. 6040ANTHONY F. PIETRANTONIO

DONALD 0. WELLSRICHARD E. WYLIE

* OSERT U. WEISS. GiNIRAL MANAGER

" April 8, 1971

Mr. William H. O'Brien, III

Civil EngineerState of Connecticut Water Resources CommissionState office Building

Hartford, Connecticut 06115

Re: Roaring Brook Reservoir Dam

Dear Mr. O'Brien:

,' ,I have enclosed a graph showing the correlation between

reservoir height elevation and seepage beneath the dam.

It appears that there has been no change over the years.

* I believe this data is conclusive in itself but we are

conducting one additional flow measurement.

I would welcome an opportunity to review this information

with you at your convenience.

Very truly yours,

William D. O'Neill

WDO'N:s Director of Public WorksEnc.

cc: Robert B. Weiss, General ManagerJames Thompson, Buck & Buck, Engineers, 71 Capitol Ave.

Hartford, Conn.

Walter J. Senkow, Town Engineer

Thomas Walsh, Junior Engineering Aide, Water & Sewer Dept.

STATE WATER RESOURCES

RECEIVED

APP

ANSWERED ----

FILEDB - 23

Page 79: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

STATE OF CONNECTICUT

DEPARTMENT OF ENVIRONMENTAL PROTECTION .STATE OFFICE BUILDING HARTFoRw, CONNECTICUT 06115

1 16 March 1977

Mr. Frank JodaitisWater and Sewer Dept.Town Hall41 Center StreetManchester, CT 06040

Re: Buckingham Res.(Roaring Brook Res.)

Gl astonbury

Dear Mr. Jodaitis:

0 atAccording to records maintained in this office, the above-mentioned dam is under your ownership.

Section 25-110 (Public Law No. 571, 1975 Revision of theGeneral Statutes), a copy of which is enclosed, places under thejurisdiction of this department all dams, which by breaking awayor otherwise, might endanger life or property. It has been deter-mined that this dam is under our jurisdiction.

In accordance with Section 25-111 (1975 Revision of theGeneral Statutes) this dam has been inspected. In order to main-tain your dam in a safe condition, the following maintenance workor deficiencies should receive attention:

1. Brush growth on dikes and adjacent to spillwayabutments should be removed.

I.°

The Ilater Resources Unit of the Department of Environmental'1-0 Protection shall be notified within two weeks as to what steps you

plan to take to accomplish this work.

-: -If you have any questions, please contact Victor Galgowski,Supt. of Dam Maintenance, at 566-7245.

Sincerely,

Edward J. Daly, DirectorI-later Resources Unit

EJ:ljkEnclosure:_ B-24, , ; ,,';

Page 80: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

APPENDIX C

PHOTOGRAPHS

Page 81: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

~c

41

Z4; 04E

2:4jr4((sO

02

0 .- 4

A (4/ C) *d 4

Page 82: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PHOTO #1: Upstream face from right side.

PHOTO #2: Crest of dam, ]I ouki,i t (wU id tA :mV

C-2

Page 83: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

6t

PHO1TO #3: Crest of dam, looking toward rightabutment.

4 l ) c

Page 84: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PHOTO i 5: Downstream slope, looking towaird ctabutment.

[II

Page 85: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PHOT ~7: Viewof dwnsteam reafrom cres.

The two structures in the photo ccntal

seepage collection chambers.

.0

Page 86: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

1111TO #9: Downstream slope looking toward leftabutment. Screen covered seepage col-lection chamber in foreground.

pA

Pln.41- 0

ec t f)I ch~mhe4

C-0

Page 87: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

a PH TO 11: los-up of wet area, downstream of

dam.

PHIOTO) #12: Blo (w-off .

*C -7

Page 88: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.I

PHT 1:Usra aesila n ie

PHOTO #13: Upstream face spillway and dike.

-0-

Page 89: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PHO0TO #15: Crest of spillway and dike, looking

toward left abutment.

L!

PHOTO #16: Spillway.

Page 90: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PHOTO #17: Left spillway training wall. (Noteflash boards in place.)

PHOTO # 18: Seeupav it- base -left training wall.

S I C-l0

Page 91: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

11110TO #19: Downstream spillway channel.

PHT 2: I'evoriei

Page 92: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

APPENDIX D

HYDROLOGIC AND HYDRAULIC

COMPUTATIONS

Page 93: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PRJECT 77 '0"10l FLAHERTY-GIAVARA ASSOCIATES SHEET NO -- OF

-A 9 ENVIRONMENTAL DESIGN CONSULTANTS By_ -7 DATE __OONE COLUM48US PLAZA NEW HAvEN. CONN 06510,23 1789-126 CHK'D. BY3#C DATE

DETERMINATION OF SPILLWAY TEST FLOOD

... "

U. A. SIZE CLASSIFICATION

Storage Volume (Ac.-Ft.) 3 O"

Height of Dam (Ft.) 30

Size Classification SMALL

B. HAZARD POTENTIAL CLASSIFICATION

I.T. Category Loss of Life Economic Loss

Low None expected Minimal

*ignficant Few CAppreci ab le

High More than few Excessive

Hazard Classification 16lFIC.ANT

C. HYDROLOGIC EVALUATION GUIDELINES

Hazard Size Spillway Test Flood

Low Small 50 to 100-Year FrequencyIntermediate 100-Year Frequency to 1/2 PMFLarge 1/2 PMF to PMF

-Significant . SmaT1 0Fto 1/2 PMFIntermediate 1/2 PMF to PNIFLarge PMF

High Small 1/2 PMF to P.MFIntermediate PMFLarge PMF

Spillway Test Flood loci 'yp

*Based upon "Recommended Guidelines for Safety Inspection ofDams" Department of the Army, Office of the Chief of Engineers,November 1976.

Page 94: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

VPROJECT-7 79: 9 0 FLAHERTY-GIAVARA ASSOCIATES SHEET NO. 2 OFt .YtNCtiAM RES.. DAMV * ENVIRONMENTAL DESIGN CONSULTANTS By L(±L-1DATE

____ -___-______ONE COLUMBUS PLAZA. NEW HAVEN CONN 065 1012030789-1260 CHKOD.BYZAr- 'DATE !I ~ I

SPILLWAY TESV FLOOD

YE~rFLOcAU FEMu)?R' FRFG~VNCy- 100 >'EAFZS

*flE PEAK FLow RATE,5 ARE To SE

cS/~~~B/~'J U-S.- SOIL CLN'7EIZvATil\I

Ss~v IrE ME.1THODS) AS 1)ES r-I1: ;aZ it,1T4

-BOOK~-SC~ OF SMN t WAI 0$ BY~ ThE

A) T TZ .Z tOF V S~apMAT c~~zAmo

RANA -720 INICLIeS FCR ZqHIZZ ,UiA7o0

SA U ATt fl: -LL SOILS.

R\.OF 4/ .7 UCH. FC1. A-H')

TIMEoF CONCENTIZAti'ON

I S I Goo.

*,77

+~ 40g(o1 Tc- z o.(o,(Ia')= IZo H9~

* .. 98Y A a ___ _____

RAIN~FALLw S0 iNC HCS

* " ,t)MFr- -z,7 itN4coe CFIG. A-4i)

4 8 S)q (~)Z.7) C.- lCF

Page 95: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PROJECT -7 -C --t FLAHERTY-GIAVARA ASSOCIATES SHEET NO. 3 __ OF____- ~ ~LNJ~1AA1 ~ENV'RONMENTAL DESIGN CONSULTANTS BY i DATE J 7LZZ&

* - - ____ONE COLUMBUS PLAZA NEWV HAVEN CONN 0651O1203/789 1260~ CHKO.BY:-' DATE~ JiI.

ATpLiA, juL.Ap- 4 p~iaoc~iaAvt* W ILL 6C ':CP

Wri Vh- A ;LA. I-.l 0-rpp" A" L-- A ?ASC.

::~ 534+

qua~

35 IZ3

. . . . .. .Z

Page 96: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.PROJ~r_1~1O.LO UFLAHERTY GIAVARA ASSOCIATES SHEF T %u -OF -

* -'2C~~t~~~iJj ~~LP~i ~ ENVIRONMENTAL Dr-SIGN CONSULTAN4TS B1 ,A A -Am-_ _ ONE COUuMBUS PLAA NEW ,EN CONN L-6',.39 j CHK ,AT

?-4 t~ Nue rCO-M- (c;ik ePAI F4*L. 4

5

25 r.~

42 i 1

2 62 73q4

(2k.50L~g~

Page 97: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

P PROJECT L - L FLAHERTY-GIAVARA ASSOCIATES SHEET NO. 5 OF

-" c . I A -.. 4CH'- iT.,-- *ENVIRONMENTAL DESIGN CONSULTANTS BY --- DATEi.z,27-'___.... ONE COLUMBUS PLAZA NEW HA.EN CONN 06510,203,789 1260 CHK'D. BYJGr' DATE 3 '

Htz4 __ u. T

-kTOA- E:c

-7

• -I ' l s

_ _ _ __"

K. .

a '..

; ..... 5oc' -A = a37 Ac s ~ .... ..

CI

_." '-" i : . '' _, .- - - - - -

Page 98: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.PROJECTJ33-qC LI cQ FLAHERTY-GIAVARA ASSOCI-PTES SHEET NO, - OF____

-- ~ JA4 ?it1 J~~~vA*~ ENViRONMENTAL DESiGN CONSULTANTS 8 - DATE~1A

K -- -- N - BUS PLAZA "NEV AE CCNN 0651C 203 789 1260 CH KID. BY J-~A DATE

~ I TA~ci )tC'A~~c~DATA

QL~CD

6e'Z= CZL /

L3 kL

1~L AA~ 1 5 Z~ 4 7 -7 1 120 1677 I 4/ 477

S ALL E.LE\JAM~tlcN ES7ir17ED O~~~'N AN ASSVMF.Z? E2 SF 7'1 N.-GV -D.

PILS

Page 99: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

FRD-RI43 703 NATIONAL PROGRAM FOR INSPECTION OF NON-FEDERAL DAMS 2/2BUCK(INGHAM RESERVOIR..(U) CORPS OF ENGINEERS WALTHAM MANEW ENGLAND DIV APR 88

EDCL F/G 13/13 N

Page 100: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

11111 1.08

11111L2 1 . 40 112

MICROOPY ESOLTIONTESTCHARAII,,-RM O 11NEAD,

Page 101: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

F. o-RJECT21n 3 qo FLAHERTY-GIAVARA ASSOCIATI!S SHEET NO. - OP._ENO ENVIRONMENTAL DESIGN CONSULTANTS 8 AE:!-7aMg ONE COLUMBUS PLAZA. NEW HAVEN. CONN 0661012031789-1280 CHKD.BY____ DATE

'Y- At TJ ~ t lCV W5C A VC Zk p

zIt'

Ed_

Page 102: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

PROJECT 3FLAHERTY-GIAVARA 49SOCIATES SHEET NO. - F 7A

~ B ________ ~! En ENVIRONMENTAL DESIGN CONSULTANTS BY IX DATEZ27?. g ONE COLUMBUS PLAZA. NEW HAVEN. CONN 06510/2031709-12W. CH'.B AE!

FLOW IAJE Al-%JA

fGROOtbWATEZ DR~AINAE SVSTEfr

14:a t&F'F~r OPF FLOWVAT CRELST"L 3.0' LEt4I6T] OF VJ-l.

2.- KIrNG~S HANDBOOKi TALF. E~3 DE

THIS REPRESEI4TF) ONLY ONE OF_SEF JE) F-\ PaOINTS

Page 103: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

.. .... . .. .. ...

... # c~ A..... .S R& .............

..........

... .. . . .. . .

::.. . . . .......... ...... ............ . . ........ ... .:.:... .... 7-. .....

.. .. . .. .. :m--- .

............................ ................ ........ ... .... ............ 7 .7 I ..... ?w......... ....

. . . . . . . ...... - - -- - .

... ............................ .... ... . . . . . . . . .

Page 104: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

'9. ~~ ~ ~ ~ ~ ..... ----- ------.... - -. .----. . . .

- . -4--- . -7- 7

... ._ ._ _ _ .. ...

............ . . . .

L i - . -.-...................... ........-. ..

w ~ . . .

---------- ..4 ..... I ....... .. .

.......... 4 ... . t ......- . . . .

......... . .. ... ...

-- --- ---- -_ -- - -- - - . .. .......0 -- --- .-. -.- ......... ..-. . - .

.. Z. .... : ... . ...:

.. .. . . . .. . . . . . . -- - - - - - - -

.. .. .. . . . ..... .. . . .

Page 105: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

ccd.1 6 x *L 06 *F ;& "4fP4.% gu L9L L

C- L; U, IL L. L: L; L

-441-4wbraw

a, r -1 % C, QC r'N .4 4 f-%C1-I-I-I < -r4r1 . I -ar

U: A

0 0 0i0 .g g . e

C -4 %n V- %C 9-f 0Y' a, c -4 a

0. C-UC ;C; IL ;uCDr Ceo r- r-%cc , % % &

m wtIl 00 LnWcw%

C4 C 94 N -4-4---4 %

'-44

E- L-CO E- Fcoc ococ-c-olcl-EE

cco cocccccccccc

* E- 1-4 E-4 I- I- I- I- E- & 6- L- E-

tn ~ ~ ~ -Ln i inBABP %Tcc 94 O In cnaB A

E0 0

* 4~.4I( C" ~ U U )U CP* .4 41;JJU

IL r- .1 r4 % I I *4

*~~~0 w0 IQ C-ABCN000 *z9 c U ) gn cn cn cn n Or g -w w t G

4Lc4c.4 0c 40 4 4 N 44P4 . LO D0P6ow* IAPQ

U L P 0TO C%1LnnO00.0M(n Inu n0% nrlt o0C1%

Z"HO-4 1. T n DLr nuO r T -

CoIHl M *4 fn P*~BmN% co l a

000 C Hm a- e

* 14

Page 106: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

W;. W

0- I P IL 9 LF L9 &9 LI -P L LDU-~ C- L :r LLLf< .4 at < at L l < < < -it < C

C cc c- i~ r -

1:4 C, C.C 71;071

A]c *. 0 * . . 0 .* . . . . . . . . . . .C. CI-. ccc CC-ar*rc ce wa.,

*.* * -W < 1r99r-9-1- It2. P,, I-I >-~p-

(IC 4% c c- % % a r r- cN ,- -aCC CI q * j * u* *, vs %* q a *- c * r * a v4

0-4--4- -C C Cc -r C C , CC'.c % r-C

CL Ia. r Lf C rC -

C 1 1 1 1 1 11 7 1 :

l~ ~ ~ *r *l *c . * FL 6 P-9.9 .9& Fl *L P . . L 4 9 .U * 9 *S

u -l QC:u -L C :CL;r :C L c .cL; - mC-L06 e . m,4rtnJ'arL Cr--wvOCC,4

I Ema..V Cf _VC WM C n

H 1-4 1-4

o ecr- I- C I-ftCCCCiCC

Zn 4C~% C, ; - 7czC 7 -C7 C7

C) W 0r cc4CC o -tc4% r c, Ia L c4 c LILt-.1CIni COCC In CoC CC r oN 1C cacCc 04C- C%

".C 4V C1 a k OnmcCOCCC CCL; C CCCCt- in' um l V) V) S n m * n LS S r r V) U* in * m * " U-

1 0 cc O .cC0r m% oV- 0 4~ 'C r-4 0 .T 'r- ll

oQ 01 6 kP

"4 eq e^ geg&Mtir or 01 C r4 V

U- 914 )U Ia. 04444.

Ia: 4cI.I g 4. 4C *C .w wP P. Ow w P6 4 P. 4 P. w * P. IL w

U u W 0 L0 CI 0Jw 0 L 4 m CM4m 4 o#..C000 *4 VI N Tf-01V4

~UU.C1 4 0OCCC COOCC.-4r

1a~ 0 a0 I

V-4 F4u V4I V-. t- - C C- 4.

in 2S-4 -4 -4 -4 m -

SD

W Q 0 0 9= n

Page 107: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-I .' . L -'

,. .:•* - .- . ." ' . . : " " , - ' . - , , . ,, . , . . , ,, - • n

8UCK INGAM R- 79010 RAC APRIL 7 1980

I F" C t" LX IL)J F Gt;-I... .'CLU"I I %P:" (2 "9 1i - r,. A- 1'^ UA -' l .-."

.FI.-C.,.M L LOUrU WAlV l.JUL Ir 1\L .-.L U lf'U4 U.S. ARMY CR'OF ENGLL, IL.C IUR L :I 11-4GDOWN, REPAM DAM IAILURE HL R_,1 ,O :1 Ho I,] LL) APIiL, 1:)IS.

INII IAL STI rN 0 +0*-.. IN TVIAL 'L...L U414 .. "Ci

INITIAL WA','" [-iLAHT 30. U F-1ASSUMLD L0IEA tH WiDI -0.W FD 1 3 1

INITIAL RL *' % " "''N ' 80 .C.L"

COMPUT..E__ WY, !EAl< FLLJL = ,""1011TOTAL FLOOD WAVE' P'"I'LOW 4, 1""D i CI"

n,

OFF SET ELLV. OFFSEf ELEV. OFFSE- ELLV.

N = 0.020

0.0 FT 500.0 FT 700.0 FT 440.0 F-f

N = O.OSO700.0 FT 440.0 FT 1500.0 FT1 440.0 FT

N = 0.0801500.0 FT 440.0 FT 1"*700.0 Fl 470. 0 F7

AREA WETTED PER I METER N VELOC I TY FLOW

" 46.4 SF 33.0 FT 0.080 4.0 F PS 17CFS2,257.2 StF 800.0 FT 0.050 10. 2 H" a:, 202CFS

26.5 SF 19.0 FT 0.030 4.0 FPS I06CFS

INVERT DEPTH W. SURFACE AR:iEA VELOC 1TY FLOW SLOPE

440.0 FT 2. FT 442. 8 FT 2,330 SF1 0.0 FPS 2J9496 CFS 0.0300

i "a BASE FLOW " 2,041 CFS BASE STAGE = 440.6 FT.

I. S

* % *

Page 108: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

- ~ ~ ~ ~ ~ ~ ~ ~ z -7 .- - 7.-. .

.° L

1 r.4 .3 -4C)

-FF SE'l ELEV. OFFSET ELEV. OFFSET ELEV.

N 0. OO80.0 FT 4S0.0 FT 100.0 F-f 4"'-0.0 FT aSO.0 FI 4120.0 F-I

400.0 FT 41 .0 FT

N = 0.050400.0 FT 41E..0 F 404.0 FT 414.0 F 414.0 F 414.0 FT418.0 FT 41 G. 0 FT

N O. 020

418.0 FT 41..0 F"T ,O.0 FT -420.0 rT .E00.0 FT 430.0 FT% 750.0 FT 450.0 FTr .

-i' AREA WETTED PER 1 ME.ER N VELUC ITY FLOW

1,1:30.3 SF 217.9 FT 0.0-0 E P5 9,746,CFS181.2 SF 1S. FT 0.050 iO.7 FPS 3,62CFS746.2 SF 132.4 FT 0.080 8. I vPL 6,59CFS

INVERT DEPTH W. SURFACE AFEA VELULC ITY FLW SLOPE

414.0 FT 10. 5 FT1 424.5 FT 2,05-/ SF 9.7 FPS 20,108 CFS 0.0240

BASE FLOW 2,041 CFS UASE STAGE = 418.9 Ff

. oi .:' -

, . •

p , *.-. _

Page 109: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

"-. OFFSET ELEV. OF F S ET ELEV. OFFSET ELEV.

.

j N = 0.0Oa00". 0 FT 4.0 F: 300.0 F" 400.0 I-':"f

NA

300. 0 T 4fEL 0F7 4. OFL 39.LLFV4.OFT 3L98. -"N = 0.080

310.0 FT 45if,0.0 FVT 400.0 FT 410.0 FT 62.0FT44.0F

AREA NETL F=RA.T ERN ELCIY LO

* -- 300.0 FT 400.0 F- 304.0 F 30.00 F .314.0 FT 393C.0 F• 31.0 FT 400.0 F-T

*,j N = 0.030'"-; 313.0 FT 400.,.0 FT 430.0 FT 410.0 FT 620.0 FT 440.0 FT

AREA WETTED P'ER I METER N VELOC ITY FLOW

• 482.!5 SF 77. 0 F'T 0. 030 6.3 FPS 3,093CFS

257.6 SF 13.9 FT 0.050 16.9 FPS 4,36."'""

" 1,27S.0 SF 17S.4 .FT -,--o.OaO 0..* sP5

INVERT DEPTHI W. SURFACL AMLA VELOCITY FLOW SLOPE

39. 0 FT 14.7 FT 412.7 FT 2,0 I2 SF 8.0 FPS 165342 CFS 0.0100

BASE FLOW = 2,041 CFS BASE STAGE 404.8 FT.-u

L _ -_~

', .::---;:.;

.,*-*---.------.------ -

."

'*.. .. . . . ......... s.... . ~ *~

Page 110: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

. ... - - - *-,', , . ,-, • " -" . . r r r-' r g".-'"

... - - - . "' . '

.... ^'F,1 ,, 4o 4-

F'-L OFFSET ELEV. OFFSET ELEV.

N =0.080

0.0 FT 450.0 FT :O0.0 i-'T 400.0 -f '950. 0 FT 400.0 FT'

"" N = 0.050.

9S0. 0 F-f 400.0 FT "S4.0 FT Bg.0 Ff 11 SO. 0 FT 396. 0 FT1154. 0 FT 400.0 F'T

N = 0.0 ..,

IIS4.0 FT 400.: FT 1200.0 I--f 400.0 FT 1400.0 FT 430.0 FT- 17S0.0 I-:T 440.0 T 2'000.0 FT 4'50.0

-- AREA WE'r7'"D PERI ILT-ER N VELOCITY FLOW

1, .E29.2 S-F 402.1 FT 0.080 1.8 FPS 2,978CF'S... 1,,-1. 9 S '07.3 I - 0.050 4.6 VI:PS 7,832CFS

2 261.9 SF 7'.5.2 FT" 0.080 1.6 FPS 432CFS

S I NVER'T DEF"TlH W. SURFACL AREA VELOCITY FLOW SLOPE

396.0 F ' 3.3 F1 404.3 Fl 3,5Th SF -3.1 FPS 11,244 CFS 0.0015

o BASE FLW = 2,041 CFS BASL STAGE = 399.7 FT.

-1"

-- J

.9.M

.i .. . . . . .. . . . . . . . . . . . . . . . . . . . . . .

* . e.'.Y.~ .. ~r _ _ ~ ~ * -. . . . . . . . . . . ..

Page 111: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

. S *., i. ..... - 1. - • -. -. - --. ~ ; s '- - - -..- ,, .--. r.---.' --- ' , r- - " I r ' - .," . ..- r- ';w--n -iI3 ' "

OFFSE" ELLV. OFFSE f ELEV. OFT SEI ELEV.

N = 0.050

0.0 FT 420.0 FT ' 00 . ,

N 0.8C,- . r FT 400. 00 F 4 .0 FT 1

E-0 0. 3- .0 1:

N = 0.0S0•000 F- "".0 F.T 604.0 FT 39L''. 0 F-[ C14.0 FT 392.0 F-61S. 0 I--'T 4. 0 F- 00.0 F' 400.0 I-T '300.0 FT 410.0 FT

1000.0 FT 420.0 FT[

--- AREA WETTED PEPIMETER N VELOC I TY FLOW

25.S SF 27.9 FT 0.0so 2.3 FPS 59CFS1,45,1 S!- 300.0 IF O.00 4.3 FPS 6.3S3CFS

602. 3F 13,.3 FT 0.050 6.4 FPS 3,90SCFS

INVERT DETH W. SURM:'ACE AREA VELOC I TY FLOW SLOPE

" 92.0 F'( 9.8 FT 401.8 F'f 2, 085 SF 4.9 FPS 10,,3113 CFS 0.0067

BASE FLOW = 2,041 CFS BASE STf'AGE = 398.0 FT.

* '" .. . . . .. S .* * ' ' '* . . . .

Page 112: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

CJF3~T ELLV. OF FSI&I LLEV. UFFSE1f ELEV.

*L0. 0 FT 450.0 nr SO -0 F" 410. 0 FT ?SO.O 0 r- 3:)2. 0 FT

N O.0!s0* ~750. 0 F-T 2 "nx 1-Tj "?40F 3. V 6. 300F-.- 763. 0) FT 13,t )74 T:':0 0 FT

7 0 FT .0 F-1N O0-9530.() F 1 4 10.0 F'T

N = 0.Oso9S0.0 F*T 4 10. 0 F1T 13SO-0 V"T 440. 0

AREA WETTED PL:R1ML'TLR~ N VELOC17Y FLOW

11E. F179. 7 FT 0.080 3. S FPS 4qJ72CFS26..3 sf- 18.9 FzT 0.050 9. 3 Fps 2,431CFS842. 2 13 131. 1 FT 0.030 3. S FPS 2,960CF5 pAr* INVrRTI UEPTH W.- SUI**%W:AGEL AkRLA VELUCITY FLOW. SLOPE

390. 0 FRr 14.9 1-'1 404-9 FT* 2,2!5,:) 4.1 FPS 9,464 CFS 0.0030

1 BASE FLOW = 2,041 CF3" I3ASL STAGL 38 FTf.

Page 113: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

-ED I3

OFFSET ELEV. OFF SET ELEV. OFFSET ELEV.

Im N = O. 0600.0 FT 400. 0 FT "1--0.0 FT 3T .0 F"T 9S0.0 FT 362.0 FT

N - 0. 050-S.0 FT 362.0 FT 9S4.0 FT 360.0 FT '364.0 FT 360.0 FT'96,3. F 36,.0 FT

N = O.o0o

9.0 Fr '362. 0 FT 1100.0 F'f 370.0 FT 1S00.0 FT 400.0 FT

AREA WETTED PERIIE'ER N VELOCITY FLOW

2'36.0 SF 8. C. F'T 0. 060 8.4 FPS 11 91SCFS174.3 SF 18.9 FT 0.0SO 17.5 FPS 3,OS3CFS

. 54S.3 SF 133.9 F: -0.0so 6.3 FPS 35464CFS

S INVERT DEPTH W. SURFACE AREA VELOCITY FLOW SLOPE

360.0 FT 10.1 FT' 370. 1 FT 9S5 SF 8.8 FPS 81S03 CFS 0.0180

BASE FLOI = 2,041 CFS UASE STAGE = 366.0 FT.

0I_

-*

Page 114: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

!EIy ^'Y wt*ic C) 3CD <D -CD

JFF2DET ELEV. CFFSE-I ELEV. OFFSET ELEV.

-N = 0. 0800. 0 FT 35C0.0 VF7 100. 0 F'T 330. 0 FT1

N = 0. 050100. F 3C).0 F-T 104. 0 FT 328. 0 Fr 114.0 Fl 2.0F

11I8. 0 FT 3'30 .0 FT

N = 0. 08011S. 0 FT 330.0 FT 300. 0 FT 340. 0 FT 650. 0 FT .3s0.0 F.

.4

AREA WETTLD PER'l .LMLILR N VELUC I.'1 FLOWK 139.-3 41.9 FT 0.080 5.7 FPS 976CFS17C..1 SF 18.9 FT 0.050 16.0 FPS 2,8.3SCF-S616.6 SF 10.0 FT -- 0080 5.8 Fps 3983CFS

I NVERT DEPTH W SURFACE ARE A VELOCITY FLOW SLOPE

0328.0 FT 10. FT 338.2 FT 962 SF 7.17 FPS 7411 CFS 0.0150

.BASE FLOW 2,,041 CFS SASE STAG 334.3 FT.

0-201

9--. .169. SF"4.*I .8057FS96F

Page 115: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

77 . 707. ,

'4

S'8Te~T "I "'4~ 1 1 1 +-0

- OFFSET ELEV. OFFSE'f ELEV. OFFSET ELEV.

N = 0. 0,0oL 0. 0 FT 30.0 FT 100.0 FT .320.0 F T 150.0 FT 316.0 FT

N = 0.050150.0 FT 316.0 F' 154.0 Fr 314.0 FT 164.0 FT 314.0 FT168.0 FT 316.0 FT

N = 0.080

168.0 FT 316.0 F" 300.0 FT 320.0 FT 420.0 Fl 330.0 FTS500.0 FT 340.0 FT .

AREA WETTED PER IMETER N VELOCITY FLOW

291.5 SF 62. 1 FT Q.080 4.2 FPS 1S242CFSS161.9 S" 1S.9 Fr -0.050 10.1 FPS 1,E,45CFS

755.6 SF 173.4 FT 0.080 4.1 FPS 3,e3OCFS

INVERT DEPTH W. SURFACE AREA VELOCITY FLOW SLOPE

. -. 314.0 FT 9.4 FT 323.4 FT 19242 SF 4.9 FPS 6&179 CFS 0.0067

BASE FLOW 2,041 CFS BASE STAGE = 320.4 Fl.

. D4

Page 116: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

OFFSLI ELEV. OFFSET ELEV. OFFSET ELEV.

- N = 0.0800.0 FT 35O.0 FT 100.0 FT 310.0 FT"

-- N= 0.050100.0 FT 310.0 FT 104.0 F-f 308.0 FT 114.0 FT 308.0 FT11S.0 FT 310.0 F'T

N = 0.080118.0 FF 310.0 F 280.0 Fl 310.0 FT 380.0 FT 320.0 F*T500.0 FT 350.0 FT'

AREA WE ED PERIMETLR . N VELOCITY FLOW

49.7 SF 16.9 FT 0.080 2.2 FPS 111CFS-" 141.5 SF 18.9 FT - 0.050 6." -FPS 9SOCFS

1,220.3 SF ;2.3 FT 0.080 3.3 FPS 4,135CFS

i INVERT DEPTH W. SURFACE ARLA VELOCITY FLOW SLOPE

-_- - 308.0 FT a.3 Fl 316.3 FT- I,411 SF 3. 6 FPS -5,197 CFS 0.0035

BASE FLOW = 2,041 CFS BASE STAGE = 313.5 FT.

, I

'-?." %' ,*- %. "2-,7- _, -.-

,.

.'W

Page 117: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

OFF SET ELEV. OFFSET ELEV. OFFSET ELEV.

N =0.050IL0. 0 F*T :320. 0 FT 210.0 Fl 21:0.0 FT 214.0 FT 288.0 FT

- ~ 224.0 FT 283.0 FT 223.0 FT 290.0 FT 300.0 FT 230.0 FT- 420.0 FT 300.0 FT 600.0 F1 340.0 FT

- AREA WETTED PEN I IETER N -VELOC ITY FLOW

* 706.3 SF 185.5 FT 0.050 6.6 FPS 49G662CFS

SINVERT' DEPTH W. SURFACE AREA VELOC ITY FLOW SLOPE

*288. 0 FT 6. 9 FT 294. 9 FT '706 SF 6.6 FPS 41662 CFS 0.003

- BASE F-LOW = 2,041 CFS BASE STAGE =293. 0 F-f.

b-2

Page 118: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

/- IBrch Mourtain ';72

Red Gate / ''001N£ E' :R .~Popr:A N

ST 'N'3. ..

-!-

1If

dy i- e~)

94', d#; jhar

r55'

AUKNGA REEROI DAM-.

FLHET GIAGra ASOCAES C.-

oib-24t

Page 119: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

7- -m --

r0.o .5..

B cagvmr ,

JYNE0/ ~ :j" ~4,

~~ ~ .DAM'

o .dd y Mf G aiel

3'3

Ol Eastburyu97

600

MW(Sir.

* -] ~ \hDK.~ 1

sic RABUKNHMREEVI A

East .1 ..7 ngu Pa*4

Page 120: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

0' t

APPENDIX E

3NFORMATION AS CONTAINED IN THE

NATIONAL INVENTORY OF DAMS

Page 121: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

77.-7 .7

40

0 C*.

w,. I2x

tx0 I.-

0 Ila

I.w C 2I .40 4.

to -0~' 4..~W

*1 C )*. IClcm.

W~~o cc C~%

1 2 <~ t

I - I 7=

W ~ NA

Page 122: D-Ri43 BUCKINGHH RESERVOIR..(U) CORPS OF ENGINEERS ...d-ri43 783 national program for inspection of non-federal dams / buckinghh reservoir..(u) corps of engineers walthami ma new england

nA I '.~~ 4 t~~.~~n

A' .~-

Vt,,~~ -o 5.A

',Th,

. .- .. . * .4 . .....

I 4t

4. 5.MR"