![Page 1: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/1.jpg)
CYCLE TIME REDUCTION IN MANUFACTURING OF KNUCKLE
Presentation on-
By-Sudhanshu SengaonkarDigvijay Phadke
Guided by-Mr. D. S. Patil
![Page 2: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/2.jpg)
Rough Turning
Facing and centering
Finish TurningInspection
Knuckle Storage
Module 1 : Layout
Number Punching
![Page 3: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/3.jpg)
Module 2: Layout
Fillet Rolling Taper Bore
Crack Detection Complete
Inspection Area
Bush Pressing and
Broaching
Keyway Broach
(Vertical Broaching)
Wash/Anti- Rust
Application
PackagingNumber Punching
![Page 4: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/4.jpg)
Problems Faced on Knuckle Line
• Number Punching operation being done manually• Doors of CNC machines need to be closed manually• One person doing multiple jobs on module 1• Center drill remains idle• Checking for tooling problems• Insert wear • Turret shifts downwards when idle for long times on FMS
![Page 5: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/5.jpg)
Process Time(T1)(Seconds) T2 T3 T4 T5 T6 T(avg) in sec
1. Pick up job and place on center drill
41.6 37.4 43.7 31.3 48.2 46.1 41.38
2. Center drill operation 66 64 62 63 63 64 63.66
3. Pick up job from central drill and place for rough turning
25.9 32.9 30 37 33.8 31.2 31.8
4. Rough turning 248 240.078 240.076 240.078 240.08 240.07 241.4
5. Remove and Punch 22.6 21.2 18.1 42.8 20.9 21 24.43
6. Pick and place for finishing and complete operation time
212 235 206.3 210.5 205 207.6 212.73
7. Inspection after finishing(Includes picking job from FMS)
137 57 29.8 44 43 62.16 62.15
Total Average time 677.56
Process Time Evaluation (Module 1)
![Page 6: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/6.jpg)
Process Time T1 T2 T3 T4 T5
T(avg) in sec
1. Pickup job and place on Centering machine 53.6 54.2 68.9 92 72
68.14
2. centering machine operation time 60.1 59.6 55.8 62 60.2
59.54
3. Pickup from centering machine and place on Proteck 45 32 33.1 36 44
38.02
4. Proteck operation time 248 248 248 248 248 248
5. Pickup job from Proteck and place for number punching 25 19.1 18.6 20 23
21.14
6. Pickup job from punch and place on FMS 30 54 32.9 52 29.3 39.64
7. FMS operation time 216 209 210 212 205 210.4
8. Pickup from FMS place for inspection/complete inspection 70.2 70.8 78 65 72
71.2
Total average time 756.08
Process Time Evaluation(Module 1)
![Page 7: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/7.jpg)
Error Proofing – MCD II
Source of Defect Knuckle Line
Problem Statement Number punching operation missing & Number punching location shift
Analysis Number punching missing & location shift due to number punching activity is manual.
Occurred at Knuckle Line
![Page 8: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/8.jpg)
Lift the job from input pallet.
Keep the job on stand manually with proper
orientation for number punching –
(Unsafe working condition )
Manual number punching operation done
by holding number punching machine in
hand
Process Flow at job loading stage - Before
Facing & centering
Rough turning
Finish turning
![Page 9: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/9.jpg)
Lift the job from input pallet.
Facing & centering operation Rough turning
Process Flow at job loading stage - After
Automatic number punching operation with button start.
Finish turning operation
![Page 10: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/10.jpg)
Error Proofing – Checklist
Principles Questions to be asked to the process Solution Effectiv-ness Cost
Implimentation
SPN
Elimination Can we eliminate the error-prone process in totally? NoCan we eliminate the error from process partially? No
Replace-ment
Can we automate the process? Yes , automation can be done for number punching operation 3 3 3 27
Can we provide supporting tools like checklists/gages/samples?
Yes 1 3 3 9
Facilitata-tionCan we simplify the operation or introduce changes in the operation? (standardization, color coding, unique shape, etc)
No
Detection
Can we record the outcome / product parameters of the earlier operation and verify it before starting next operation
No
Can we restrict the motion in such way that the operator will see the abnormality?
No
Can we verify the outcome / product parameters of the said operation before passing the part to next operation ?
No
MitigationCan we make detection at multiple levels? No
Can we make ergonomic condition better so as not to produce / miss the defects?
Yes 1 2 3 6 Solution Priority Number (SPN) CriteriaEffecive-ness 1 : Less Effective 2 : Effective 3 : Very Effective Solution Cost 1 : High 2 : Medium 3 : Low
Automation is required at number punching stationImplemen-tation 1 : Difficult 2 : Easy 3 : Very Easy
![Page 11: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/11.jpg)
Error Proofing – Before
Before Counter measure :. Job is kept on table as per required orientation & number punching is done manually by hand.
![Page 12: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/12.jpg)
Error Proofing – After
After Counter measure :
Automatic number punching operation
Automation setup with pneumatic cylinder & solenoid valve mounted on stand .
![Page 13: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/13.jpg)
Error Proofing – Design Review
Sr. No.
Design Review Parameter Description
1 Fail-Safe performance
Unsafe working condition eliminated at manual number punching
2 Cost effectiveness Proposed solution is cost effective.
3 Ease of operation Easy to operate as button start.
4 Protection from external damage
Automation setup is mounted on stand hence no chance of damage.
5 Simplicity in design Proposed solution is simple to implement.
![Page 14: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/14.jpg)
Grinding Operation
Time
T1 T2 T3 T4 T5 Average
Loading 22.5 64 53 61 47 49.50
Commands 6.3 4 14.01 10.58 8.4 8.66
Operation time 180 181 180 180 181 180.40
Inspection 73 63 68 71 62 67.40
Unloading 32 29 31 26 27 29.00
Rotate Job 12.26 12.15 12.33 12.01 11.48 12.05
Input Job Number on record 12.17 12.35 12.48 12 13.2 12.44
Total time 359.44
Time in min 5.99
![Page 15: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/15.jpg)
Hardening Operation
Time(sec)
T1 T2 T3 T4 T5 Average
Loading 47.37 25.28 65 50 54 48.33
Operation Time 170 172 170 171 170 170.60
Unloading 97 54 34 45 68 59.60
Total time 278.53
Time in min 4.64
![Page 16: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/16.jpg)
16
Action plan
Sr. no Machine ActivitiesTime saved by (sec) Remark
Grinding and Hardening
1Make provision for parking crane near operator for ease of operation 6
2 Job should be ready prior to operation 8
3Fixture for resting job and air nozzle for removal of central burr 5
4Provide stand near grinding operation for inspecting the job 40
5Provide conveyor along with coolant after hardening 15
6 Stand for log book for better ergonomics 4
7 Combine two snap gauges 12
![Page 17: Cycle time reduction](https://reader035.fdocuments.in/reader035/viewer/2022062401/58f1742d1a28ab01688b45ad/html5/thumbnails/17.jpg)