Government of India Ministry of Water Resources
River Development & Ganga Rejuvenation Central Water & Power Research Station
Khadakwasla, Pune – 411 024
Issue No.: 12 December 2015 ________________________________________________________________
CWPRS MONTHLY INFORMATION BULLETIN __________________________________________________________________________
1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 04
2. REPORTS SUBMITTED 05
3. RESEARCH PAPERS
3.1 Submitted 05
3.2 Published 05
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 08
5. LECTURES DELIVERED 08
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 09
6.2 Other Committees 09
7. TRAINING OF PERSONNELS 09
8. IMPORTANT VISITORS 10
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 10
10. OTHER INFORMATION 11
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: Http://cwprs.gov.in
![Page 2: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/2.jpg)
2
Summary Information For 2007-2015
Years Jobs Awarded
_____________________
Nos. | Amount (`)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnels
Training Programmes Organized
2007-08 131 12,23,51,446 106 44 30 31 19 34 02
2008-09 130 15,74,38,098 89 41 24 36 20 38 01
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
FOR CURRENT YEAR 2015-2016
Till Nov-15 53 8,99,08,898 49 26 20 38 09 25 03
During Dec-15 09 1,46,53,134 08 34 21 08 00 17 01
Total 62 10,45,62,032 57 60 41 46 09 42 04
![Page 3: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/3.jpg)
CWPRS Information Bulletin December, 2015
3
1. ESTIMATES
1.1 Submitted (15 Nos. totaling to Rs. 1,54,22,858 /-)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1. Site visit for inspection of the dam and discussions towards undertaking studies for the rehabilitation of Ujani Dam, Solapur, Maharashtra
The Executive Engineer, Ujani Dam Maintenance Division, Bhimanagar, Tal - Madha, Dist Solapur, Maharashtra - 413212
CT 50,180
2. Site survey using integrated bathymetry system at lower lake Kateri
Garrison Engineer, Wellington, Nilgriris - 643231
Inst 3,44,990
3. Organising a training course on "Coastal Erision & Protection Methods" for Harbour Engineering Department Govt. of Maharashtra at CWPRS Pune
Harbour Engineer, Harbour Engineer Division (North) Kokan Bhavan, Navi Mumbai - 400615
CHS 3,56,040
4. Mathematical model studies for hydrodynamic and siltation for the proposed Coast Guard Jetty at Cochin Port, Cochin
Chief Engineer, Cochin Port Trust, Cochin - 682009
PH 12,54,580
5. Desk studies for the design of Coastal protection works along the coast of Kerala State
Chief Engineer, Officer of the Chief Engineer, Irrigation & Administration, Thiruvananthapuram, Kerala - 695009
CHS 48,94,260
6. Desk and Mathematical Model Studies for stability of Eden Channel in Hooghly Estuary from Siltation Point of view for KOPT, West Bengal
Project Manager, WAPCOS, Swastik, Gulmohar Path, Behind SNDT, Erandwane Pune - 411004
PH 9,06,990
7. Mathematical Model Studies for Wave transformation of deep water waves near Hooghly estuary, W.B. for KOPT
Project Manager, WAPCOS, Swastik, Gulmohar Path Behind SNDT, Erandwane, Pune - 411 004
PH 8,56,770
8. Mathematical model studies for General circulation model of Bay of Bengal to generate offshore boundary conditions near Hooghly Estuary for the Hydrodynamic Conditions for KOPT
Project Manager, WAPCOS, Swastik, Gulmohar Path, Behind SNDT, Erandwane, Pune - 411 004
PH 13,08,830
9. Mathematical model studies to assess the impact of discontinuing in lower Auckland Bar (Upper) and continuation of dredging at lower Auckland Bar (Lower) and Jellingham and using Eden Channel for navigation to Kolkata and Haldia for KoPT, West Bengal
Project Manager, WAPCOS, Swastik, Gulmohar Path, Behind SNDT, Pune - 411004
PH 13,07,140
10. Revised estimate for Non-destructive testing for the masonry dams of Vihar, Tulsi and Powai Lakes of MCGM, Mumbai, Maharashtra
The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai - 400028, Maharashtra
VT 4,92,068
11. Geotechnical studies for recommendation of seepage Control measures for eastern dam in premises of Adlabs
The Deputy General Manager - Infrastructure, Adlabs Entertainment Pvt. Ltd. 30/31, Sangdewadi, Khopoli, Pali Road,
GE 4,62,600
![Page 4: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/4.jpg)
CWPRS Information Bulletin December, 2015
4
Entertainment Pvt. Ltd. Khopoli, Maharashtra
Tal - Khalapur, Dist. Raigad, Maharashtra – 410203
12. Geophysical studies for delineating Zone susceptible to seepage at the Earthen Dam, Adlabs, Khopoli, Maharashtra
The Deputy General Manager - Infrastructure, Adlabs Entertainment Pvt. Ltd. 30/31, Sangdewadi, Khopoli, Pali-Road, Tal. Khalapur, Dist. Raigad, Maharashtra - 410 203
GD 6,68,610
13. Borehole logging in Earthen Dam at Khopoli for Adlabs Entertainment Pvt. Ltd. Maharashtra
The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai - 400028, Maharashtra
IH 3,08,150
14. Third Party inspection of testing, installation and commissioning of SCADA based automated gates control system at site for mordenisation and automation of Naraura Barrage, Naraura, Uttar Pradesh
Executive Engineer, Barrage Yantrik Anurakshan Prabhag, Sichai aur Jal Sansadhan Vibhag, Narraura, Uttarprades
HMC 3,99,870
15. Site calibration of ultrasonic flow meter installed at Rajiv Gandhi Lift Canal for Public Health Engineering Department, Jodhpur Rajasthan
Executive Engineer, PHED, RGLC Division - II, Jodhpur, Rajasthan
HMC 18,11,780
1.2 Awarded (09 Nos totaling to 1,39,57,488 /- + 6,95,646 /- for calibration works 10 Nos.)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1. Running and maintenance of Mumbai Port Model at CWPRS, Pune (Sep 2014 to Aug 2015)
The Chief Engineer, Mumbai Port Trust, Mumbai Port Bhavan, Shoorji Vallabhdas Marg, Ballard Estate, Mumbai 400 001
PH 26,67,230
2. Hydrodynamic studies on integrated mathematical model for Visakhapatnam Outer Harbour, Andhra Pradesh
Chief Engineer, Visakhapatnam Port Trust, Visakhapatnam 530 035
PH 25,84,160
3. Desk and wave flume studies for the design of restoration of damage breakwater at outer harbour, Visakhapatnam Port, Visakhapatnam, Andhra Pradesh
Chief Engineer, Visakhapatnam Port Trust, Visakhapatnam 530 035
CHS 15,49,510
4. Visit to Nathpa Jhakri Dam Spillway, Himachal Pradesh for inspection of Spillway, Discussion with Project Engineers and to finalise scope of model studies
Additional General Manager, SJVNL Ltd., Devsari, O&M Cell, Civil Design Department, Verma Nivas, New Simla 171 009, Himachal Pradesh
SED 4,72,598
5. Calibration/testing of open channel ultrasonic non-insertion type flow meters at Delhi Jal Board, NCR of Delhi
Executive Engineer (E&M), HP-II, Delhi Jal Board, NCR of Delhi, Haiderpur Water Works, Delhi 110 085
HMC 3,20,320
6. Running and maintenance of New Mangalore Port random wave physical model during 2015-16
Chief Engineer (Civil), New Mangalore Port Trust, Mangalore 575010
PH 24,96,490
7. Running and maintenance of Chennai Port regular wave physical model during 2015-16
Chief Engineer, Chennai Port Trust, Rajaji Salai, Tamil Nadu
PH 16,59,640
8. Desk studies for the shore protection work at village Suva,
Director, Siddhi Vinayak Shipping Corporation Ltd., Office Block, First
CHS 8,39,880
![Page 5: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/5.jpg)
CWPRS Information Bulletin December, 2015
5
Dist. Bharuch, Gujarat Floor, Plot No. 237/2&3, Plot No. A/25, Central Part Soc., GIDC, Pandesara, Surat 394 221
9. Monitoring of blast vibrations during excavation of rock for construction of Integrated Nuclear Recycle Plant (INRP) project for BARC, Tarapur, Maharashtra, for M/s Hindustan Construction Co. Ltd.
Environmental Officer, Hindustan Construction Company Ltd., Hincon House, 247 Park, LBS Marg, Vikhroli West, Mumbai - 400 083
VT 13,67,660
2. REPORTS SUBMITTED (08 Nos.)
Sl. No.
Title Report No
Month/Year
1. Study for diversion of two nalas passing through plant of Jindal Steel and Power Ltd. at Patratuy, Ranchi, Jharkhand
5332 12/2015
2. 2-D Numerical Model Studies for reservoir sedimentation of 900 MW Arun-III, HE Project, Nepal
5333 12/2015
3. Surge analysis and suggesting anti-surge device on rising main of Tedhawa Shivani Lift Irrigation Scheme, Dist Gondia, Maharashtra
5334 12/2015
4. 2-D Numerical model studies for reservoir sedimentation of Kwar HE Project, Jammu & Kashmir
5335 12/2015
5. Hydraulic model studies for modified design of spillway & energy dissipator for Mangdechhu HE Project, Bhutan (Alternative - II) 1:60 Scale 3-D Comprehensive model
5336 12/2015
6. Vetting of Mathematical model studies for Hydro dynamics, siltation and shoreline Evolution due to proposed extension of Jetty at Daheg, Gujarat
5337 12/2015
7. Mathematical Modeling of hydrodynamic and sediment transport for relocation of sand trap to reduce siltation in the approach channel at Chennai Port
5338 12/2015
8. Integrated 1-D and 3-D mathematical model studies for reservoir sedimentation of Teesta-IV HE Project, Sikkim
5339 12/2015
3. RESEARCH PAPERS
3.1 Submitted – (02 No.) 1. Ghule S. J., P. M. Abdul Rahiman, M.S.R. Naidu, P. K. Goel Watter Hammer “Analysis for a typical
lift irrigation scheme: a case study,” Uploading at Website/ Mail,,21-22 December 2015 2. Palei P. K., G. R. Tripathy, R. R. Shirke, N. B. Varshikar, V. K. Ghodake, Ms. Varsha Jain
“Development of statistical relationship between Schmidt Hammer Rebound Number, P-Wave Velocity and Number of Joins in the Rocks,” For possible publication in the journal.
3.2 Published – (34 Nos.) 1. Verma M K., M Z Qamar., Mrs Neena Isaac., Dr (Mrs) V V Bhosekar “Design optimization of
desilting chamber by model studies”, Proceedings of 20th international Conference of Hydraulics, water Resources and River Engineering, IIT Roorkee, ,December 2015
2. Vivekanandan N, Dr C Ramesh, R S Jagtap, N Madusudana, K Giridhar, “Addl Assessment of
adequate probability distribution for extreme wind speed analysis under missing data scenario”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
3. Gupta R P, Mrs H R Khandagalae, P K Goel, “Experimental studies for drag evaluation in towing
tank”, Proceedings of 20th International Conference of Hydraulics, Water Resources and River Engineering, IIT Roorkee, ,December 2015
![Page 6: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/6.jpg)
CWPRS Information Bulletin December, 2015
6
4. Ghule S J, P M Abdul Rahiman, M S R Naidu, P K Goel “Surge analysis of rising main of lift
irrigation scheme : a case study”, Proceedings of 20th International Conference of Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
5. Rajkumar G R, B Krishna, L R Ranganath, M D Kudale “Numerical model studies for evaluating
flow conditions, siltation and identification of dumping grounds for proposed jetty”, Proceedings of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
6. Pardeshi G R, S P Jagtap, P K Dorale, M D Kudale “Estimation of design wave and water level
conditions for the development of a port - a case study”, Proceedings of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
7. Ranganath L R ., A K Singh, M Karthikeyan, M D Kudale “Siltation and effect of development of
fish landing jetty in tidal”, Proceedings of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
8. Purohit A A, A Basu, K. A. Chavan, M. D. Kudale “Importance of hydraulic modelling in the
development of mega container terminal in wide macrotide dominated estuarine harbour”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, ,December 2015
9. Balan Selva M., S Dhayalan., S B Salunke., Ajay Sonavane “Sedimentation survey of Tawa
reservoir -a case study”, Proceedings of 20th international conference on Hydraulics, water Resources and River Engineering, IIT Roorkee, December 2015
10. Malik Kuldeep, N. A. Sonawane, Mrs. K V Katte, Dr. R. G. Patil, M. K. Pawar, T. Nagendra
“Hydraulic design of a major bridge across river Narmada”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
11. “Agrawal A K., Dr K C Sahu., B S Chavan., K Rajesh Performance of vertical lift Slide gates”,
Proceedings of 20th international Conference on Hydraulics, water Resources and River Engineering, IIT Roorkee, December 2015
12. “Sahu, K.C., G V R Murthy., V K Tripathi., K Rajesh, Surge analysis on water conductor of lift
irrigation schemes : a case study”, Proceedings of 20th International Conference of Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
13. Gupta R. P., B. Muralidhar “Dynamic Analysis oF Lakya Iron ore tailing dam at Kudremukh,
Karnataka”, 50th Indian Geotechnical Conference (IGC) - 2015,College of Engineering, Pune, December 2015
14. Muralidhar.B., Dr. K.R. Dhawan., Mrs. J.S. Edlabadkar., “Assessment of Mine Slope Stability at
Talabira-I coal mine, Odisha”, 50th Indian Geotechnical Conference (IGC) - 2015,College of Engineering, Pune, December 2015
15. Muralidhar. B., Dr. K.R. Dhawan., Mrs. J.S. Edlabadkar., A.D. Khot. “Stability of Hill slopes along
the Rim of Reservoir at Bunakha H.E. Project, Bhutan”, 50th Indian Geotechnical Conference (IGC) - 2015,Pune, December 2015
16. Solanki Pratap Singh “Data Mining Techniques for Predicting Rainfall and Climate change: A
literature Review”, MANIT, Bhopal, December 2015 \ 17. Singh A K., B Krishna., L R Ranganath., M D Kudale “Assessment of siltation for development of
fisheries harbour in open coast”, Proceedings of 20th International Conference on Hydraulic, Water Resources and River Engineering, IIT Roorkee, December 2015
18. Sunderlal B S, Mrs. Sangeeta Patnaik, Dr(Mrs) V V Bhosekar “Selection and design of a suitable
energy dissipator through hydraulic studies for Teesta low dam spillway. Stage-IV, West Bengal, A Case Study”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
19. Gopikrishna B, B R Tayade, A V Mahalingaiag, M D Kudale “Development of a fishing harbour in a
![Page 7: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/7.jpg)
CWPRS Information Bulletin December, 2015
7
small tidal - a case study”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
20. Jha S N, V B Sharma, J Sinha, M D Kudale “Mathematical modeling to assess littoral drift and
shoreline changes at a marine terminal”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
21. Rao V S Rama, K T More, Dr M R Bhajantri, Dr (Mrs.) V V Bhosekar “Optimizing the design of
breastwall spillway and energy dissipator for a Himalayan Dam”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
22. Borkar A S, Santosh Kori, Mrs. A. M Vaidya, M. D. Kudale “Numerical modelling of wave
propagation in Gulf of Khambat”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
23. Bhatem R R, Dr M R Bhajantri, Dr (Mrs.) V. V. Bhosekar “Numerical simulation of flow through
breast wall spillway”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, ,December 2015
24. Patnaik S R (Mrs.), K T More, Dr M R Bhajantri, Dr (Mrs.) V V Bhosekar “Physical and numerical
modelling of Indira Sagar Dam spillway”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, ,December 2015
25. Manivanan R, J. Sinha, T. Nagendra, M D Kudale “Simulation of peak flood and estimation of scour
depth for a bridge using model instead of measured velocity - a case study”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
26. Bobade K B, S G Manjunatha, M D Kudale “Comparison and correlation of air temperature of
coastal and inland area - a case study”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
27. Srivastava Y N, Mrs S J Vyas “Vertical drop shaft desecrator for a hydro power project”,
Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
28. Chandra Prabhat, S S Chavan , B K Gautam, T Nagendra “Wave tranquility studies for 2nd stage
development of Karwar Port, Karnataka”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
29. Chaudhari R K, Mrs. Sadhana Kurkarni , Mrs. A M Vaidya, M D Kudale “Wave model studies for
feasibility of a passenger jetty at Kashid, Maharashtra”, Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
30. Chandra Prabhat , P L Patel , P D Porey “Sediment management modeling in Upper tapi basin”,
Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
31. Sharma V B , Prabhat Chandra , M D Sawant, T Nagendra “Studies for hydrodynamics and
siltation for deepening of approach channel at Marmugao Port, Maumugao” Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
32. Gadge Prajakta (mrs.),Prof.V. Jothiprakash ,Dr (Mrs) V V Bhosekar “Optimization of gride size and
time step for simulation of flow through orifice spillway” Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
33. Ambekar J. S. (Ms.), B. Raghuram, Dr. R. G. Patil “Design of embankments and bank protection
works for Pabbar river” Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
34. Shimpi J A, A V Mahalingaiah, M D Kudale “Role of field studies for the development of berthing
facilities in complex tidal flow conditions” Proceeding of 20th International Conference on Hydraulics, Water Resources and River Engineering, IIT Roorkee, December 2015
![Page 8: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/8.jpg)
CWPRS Information Bulletin December, 2015
8
4.���� PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES - (21 Nos)
Sl. No.
Title Event, Place, Date Name of Officer
1. 20th International Conference on Hydraulics, Water Resources and River Engineering (HYDRO-2015)
IIT, Roorkee 17-19 December, 2015
Shri B. Gopikrishna, Sci-B
Dr. K. C. Sahu, Sci – B
Mrs. Prajakta Gadge, Sci-B
Mrs. S. R. Patnaik, Sci-B
Shri A. K. Agrawal, Sci-D
Shri V. S. Rama Rao, Sci-B
Shri B. S. Sunderlal, Sci-B
Shri K. B. Bobade, Sci - B
Shri R. R. Bhate, Sci - B
Shri M. Z. Qamar, Sci – B
Shri S. A. Burele, Sci-B
Shri R. P. Gupta, Sci-D 2 Geotechnical Conference (IGC-
2015) Govt. College of Engineering, Pune 17-19 December, 2015
Dr. B. Muralidhar, Sci – D
Mrs. J. S. Edlabadkar, Sci-B
Dr. K. R. Dhawan, Sci-D
Shri M. S. Chaudhari, Sci-C 3 18th Annual cum 1st
International Conference of Vijana Parishad of India on Computational and Integrative Science & International Symposium on Computational Biology
MANIT, Bhopal 11-14 December, 2015
Shri Pratap Singh Solanki, Sci-B
4 National Seminar on R&D Perspective for Rejuvenation of River Ganga
NIH, Roorkee, Uttarakhand 16-17 December 2015
Shir Jiweshwar Sinha, Sci-D
5 National Symposium on Geomatics for Digital India
JK Lakshmipat University, Jaipur 16-18 December 2015
Ms. Suneeta Jatwa, Sci-B
6 Meeting cum seminar of ITRA CWPRS 30
th December 2015
Shri R. S. Jagtap, JD Shri Srishailam, Sci-B
5. LECTURES DELIVERED – (08 Nos.)
Sl. No. Title Event, Place, Date Name of Officer
1. Role of Central Water & Power Research Station in water resources development and management
Training module on "Orientation to perspectives in Water Resources Sector" NWA, Pune 9
th December 2015
Dr. M. R. Bhajantri, Sci - D
2. Right to Information Act 2005 Training module on "Office
Administration and Procedures" NWA, Pune 18
th December 2015
Shri Rajendra Aswale, CAO
3. DSS Studies in Water Resources carried out by CWPRS
Visiting Bangladesh Supreme Audit Party CWPRS, Pune 18
th December 2015
Dr. C. Ramesh, Sci-C
![Page 9: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/9.jpg)
CWPRS Information Bulletin December, 2015
9
4. Concrete Technology, additives admixtures etc
Basic Sciences-Hydrology, Hydraulics, Structures, Soil and Rock Mechanics" NWA, Pune 23
rd December 2015
Shri S. J. Pillai, Sci - B
5. Rock Mechanics: Geological considerations, rock mass classifications, failure criteria, various tests for rocks and its applicability in design of underground openings
Basic Sciences-Hydrology, Hydraulics, Structures, Soil and Rock Mechanics" NWA, Pune 23
rd December 2015
Dr. K. R. Dhawan, Sci - D
6. Soil Mechanics: Soil Properties (Hydraulics and Mechanical, permeability & seepage; stress in soils, compaction consolidation etc.
Basic Sciences-Hydrology, Hydraulics, Structures, Soil and Rock Mechanics" NWA, Pune 23
rd December 2015
Mrs. J. S. Edalabadkar, Sci - B
7. Challenges of Water Resources Management
Plenary Session of Symposium on Hydrology, New Delhi 22 - 23 December 2015
Dr. Mukesh Sinha, Director
8. Karyaleen Hindi Kamkaj Induction Training Course
NWA, Pune 29
th December, 2015
Shri K. K. Gupta, Sci - C
6. PARTICIPATION IN MEETINGS 6.1 Technical Committee Meetings: Nil
6.2 Other Meetings: Nil
7. TRAINING OF PERSONNEL - (17 Nos.)
Sl. No.
Title Event, Place, Date Name of Officer
1. In-house customized training course on 'HECRAS' for Research Cadre
CWPRS, Pune
28-30 December 2015
Ms. Savitri Hansada, Sci-B
Dr. V. Mark Prabhakar, Sci-B
Shri Babu Balasaheb Chaudharee, Sci-B
Shri Prayag Kashyap, Sci-B
Shri Ashok S. Chalwadi, ARO Shri Virendra K. Barodiya, ARO
Shri B. K. Girish, ARO
Shri Siddharth P. Hedaoo, ARO
Ms. Jhuma Rano, ARO
Shri Azharuddin G. Golandaj, RA
Shri Mahesh D. Sawant, RA
Shri K. G. Walke, RA
Shri K. A. Chavan, RA
Shri A. B. Bharde, RA
Shri M. Karthikeyan, RA
Shri Jamir S. Bagwan, RA
Ms. Mansi Madhukar Mulay, RA
![Page 10: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/10.jpg)
CWPRS Information Bulletin December, 2015
10
8. IMPORTANT VISITORS: Nil
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No. Name of Person Designation Division Date
New Entrants
1. Shri Vivel Saxena Research Assistant CFI 01.12.2015
2. Smt. Pranjal V. Mane Research Assistant SED 01.12.2015
3. Kum. Sheetal S. Wagmare Research Assistant GE-II 09.12.2015
4. Shri Ganesh N. S. Research Assistant CHS-II 09.12.2015
5. Shri Shailesh P. Thonte Research Assistant IINST-I 14.12.2015
6. Shri Pankaj Sahebrao Khairnae Research Assistant INST-I 14.12.2015
7. Shri Hanegaonkar M. A. Research Assistant RSA 14.12.2015
8. Shri Prashant S Janrao Research Assistant GP 16.12.2015
9. Shri Naval Sanjay Jagtap Research Assistant MMCE 16.12.2015
10. Shri Tamrakar Dheeraj Research Assistant SWH 23.12.2015
11. Shri Rocky Research Assistant CFI 29.12.2015
12. Shri Chaman Singh Sci – B 31.12.2015
13. Shri Anil D. Sangar C’man ‘C’ CSWCS 01.12.2015
14 Kumari Kureshi Pravin Shaikh LIA LIBIS 31.12.2015
Promotions
1. Shri R. R. Ashtikar Superintendent Bills 01.12.2015
Retirement
NIL
Repatriation/Transfer
NIL
![Page 11: CWPRS MONTHLY INFORMATION BULLETIN 2015_MIB.pdf · The Deputy Chief Engineer, Water Supply Project (Planning & Design) Engineering Hub, 1st Floor, Dr. E. Moses Road, Worli, Mumbai](https://reader034.fdocuments.in/reader034/viewer/2022051915/60070ce322720a6ef862bd58/html5/thumbnails/11.jpg)
CWPRS Information Bulletin December, 2015
11
10. Other Information:
• Training programme on “Controlling Environmental Impact of Rock Excavation by Blasting” was conducted during 08-09 December 2015.