CWIPI KALOL

2
ANNEXURE-1 CENTRIFUGAL PUMP DATA SHEET (CWIP-I KALOL) JOB NO.:________ITEM NO_____ (SINGLE STAGE HORIZONTAL CENTRIFUGAL PUMP) RESUISATION NO _________________ PAGE__________OF_________BY______ APPLICABLE TO ◦ PROPOSAL ◦ PURCHASE ◦ AS BUILT FOR BOOSTER PUMPS-3nos. AT CWIP-I KALOL SITE_______________ UNIT _____________EFFLUENT TRANSFER PUMP SERVICE____________CONT. TRANSFER OF TREATED EFFLUENT/WATER REMARKS_____________SALINITY 10-12 GM/LIT NO OF PUMPS REQUIRED_________3(THREE) DRIVER TYPE_FLP SQ.CAGE.IND.MOTOR DRIVER FURNISHED BY_________________ MANUFACTURER_____**____REMARKS__________ SIZE AND TYPE________________________ PUMP SERIAL NO_______________________ OPERATING CONDITIONS(TO BE COMPLETED BY PURCHASER) LIQUID HANDLED : CONT. TRANSFER OF TREATED EFFLUENT/WATER PUMPING TEMPERATURE(C ) NORMAL________40 C____MINIMUM 15 C _____MAXIMUM 60 C SPECIFIC GRAVITY @ PT_______1.005__________ VAPOR PRESSURE AT PT( kg/cm 2 g)_____________ VISCOSITY @ PT (CST)__________1.0 TO 2.0______CP____ ACCELERATION HEAD (m)_________________ NPSH AVAILABLE (m)___FLOODED SUCTION WITHOUT ACCELERATION HEAD (m)______ACTUAL____ ELECTRICAL AREA CLASSIFICATION CLASS__II__GROUP___A/B________HAZARDOUS______ SITE TEMPERATURE(C ) NORMAL____30 C____MAXIMUM 50 C_____ MINIMUM 10 C CORROSION/ERROSION CAUSED BY _________________ pH : 7.5 TO 8.5 CAPACITY @ PT (M 3 /Hr) MAXIMUM _____ MINIMUM ____RATED 51.01M 3 /Hr OR (14.17 LT/SEC) DISCHARGE PRESSURE ( kg/cm 2 g) MAXIMUM _____ MINIMUM ____RATED 2.0 KG/CM 2 SUCTION PRESSURE ( kg/cm 2 g) MAXIMUM _____ MINIMUM ____RATED FLOODED DIFFERENTIAL PRESSURE ( kg/cm 2 g) MAXIMUM _____ MINIMUM ____RATED _______ LOCATION ◦ INDOOR ◦ HEATED ◦ OUTDOOR ◦ UNHEATED DIFFERENTIAL HEAD (m)_________________ REMARKS________________SUCTION IS FLOODED PUMP SHALL BE LOCATED IN HAZARDOUS AREA ___________________________________ PUMP CHARACTERISTIC (TO BE COMPLETED BY PURCHASER AND MANUFACTURER) DESIGN PRESSURE____________________ NO OF STAGES___SINGLE________ SPEED IN RPM ________2900_______________ EFFICIENCY__________________ RATED POWER(KW) : PRIME MOVER -2.1KW IMPELLER DIAMETER (mm)______________ CASING MAWP ( kg/cm 2 g) ______________ HYDROTEST PRESSURE ( kg/cm 2 g) ________ COUPLING MFR./TYPE _________/___________ MAKE/MODEL NO : 50/13 KPS SUCTION SIDE FLANGE : SIZE______ RATING_______ FACING______ POSITION______ DISCHARGE SIDE FLANGE : SIZE______ RATING_______ FACING______ POSITION______ LUBRICATION TYPE_____________ PACKING MFR./TYPE _________/___________ GLAND TYPE/MATERIAL _________/___________ PROPOSAL CURVE NO_________________ CASING TYPE/MOUNTING/SPLIT (HOR./VERT.)_HORIZONTAL___________________/________________ OWNER ONSHORE DESIGN GROUP,ONGC,BARODA LSTK CONTRACTOR ONGC LIMITED SAVAIR ENERGY LIMITED REV. NO. :0 TITLE: CENTRIFUGAL PUMP DATA SHEET (CWIP-I KALOL) PROJECT: SOUTH KADI GGS/CTF/WIP

description

datasheet

Transcript of CWIPI KALOL

Page 1: CWIPI KALOL

ANNEXURE-1

CENTRIFUGAL PUMP DATA SHEET(CWIP-I KALOL) JOB NO.:________ITEM NO_____

(SINGLE STAGE HORIZONTAL CENTRIFUGAL PUMP) RESUISATION NO _________________PAGE__________OF_________BY______

APPLICABLE TO ◦ PROPOSAL ◦ PURCHASE ◦ AS BUILTFOR BOOSTER PUMPS-3nos. AT CWIP-I KALOL SITE_______________UNIT _____________EFFLUENT TRANSFER PUMPSERVICE____________CONT. TRANSFER OF TREATED EFFLUENT/WATERREMARKS_____________SALINITY 10-12 GM/LIT

NO OF PUMPS REQUIRED_________3(THREE)DRIVER TYPE_FLP SQ.CAGE.IND.MOTOR

DRIVER FURNISHED BY_________________MANUFACTURER_____**____REMARKS__________SIZE AND TYPE________________________PUMP SERIAL NO_______________________

OPERATING CONDITIONS(TO BE COMPLETED BY PURCHASER)LIQUID HANDLED : CONT. TRANSFER OF TREATED EFFLUENT/WATERPUMPING TEMPERATURE(C◦)NORMAL________40◦C____MINIMUM 15◦C _____MAXIMUM 60◦CSPECIFIC GRAVITY @ PT_______1.005__________VAPOR PRESSURE AT PT( kg/cm2 g)_____________VISCOSITY @ PT (CST)__________1.0 TO 2.0______CP____ACCELERATION HEAD (m)_________________NPSH AVAILABLE (m)___FLOODED SUCTIONWITHOUT ACCELERATION HEAD (m)______ACTUAL____ELECTRICAL AREA CLASSIFICATIONCLASS__II__GROUP___A/B________HAZARDOUS______SITE TEMPERATURE(C◦) NORMAL____30◦C____MAXIMUM 50◦C_____ MINIMUM 10◦CCORROSION/ERROSION CAUSED BY _________________pH : 7.5 TO 8.5

CAPACITY @ PT (M3/Hr)MAXIMUM _____ MINIMUM ____RATED 51.01M3/Hr OR (14.17 LT/SEC)DISCHARGE PRESSURE ( kg/cm2 g)MAXIMUM _____ MINIMUM ____RATED 2.0 KG/CM2

SUCTION PRESSURE ( kg/cm2 g)MAXIMUM _____ MINIMUM ____RATED FLOODEDDIFFERENTIAL PRESSURE ( kg/cm2 g)MAXIMUM _____ MINIMUM ____RATED _______LOCATION ◦ INDOOR ◦ HEATED

◦ OUTDOOR ◦ UNHEATEDDIFFERENTIAL HEAD (m)_________________

REMARKS________________SUCTION IS FLOODEDPUMP SHALL BE LOCATED IN HAZARDOUS AREA ___________________________________

PUMP CHARACTERISTIC (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)DESIGN PRESSURE____________________NO OF STAGES___SINGLE________SPEED IN RPM ________2900_______________EFFICIENCY__________________RATED POWER(KW) : PRIME MOVER -2.1KWIMPELLER DIAMETER (mm)______________CASING MAWP ( kg/cm2 g) ______________HYDROTEST PRESSURE ( kg/cm2 g) ________COUPLING MFR./TYPE _________/___________MAKE/MODEL NO : 50/13 KPS

SUCTION SIDE FLANGE :SIZE______ RATING_______FACING______ POSITION______

DISCHARGE SIDE FLANGE : SIZE______ RATING_______FACING______ POSITION______

LUBRICATION TYPE_____________PACKING MFR./TYPE _________/___________GLAND TYPE/MATERIAL _________/___________PROPOSAL CURVE NO_________________

CASING TYPE/MOUNTING/SPLIT (HOR./VERT.)_HORIZONTAL___________________/________________

REMARKS :MATERIAL OF CONSTRUCTION ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER)

CASE CARBON STEEL_________IMPELLER SS316_________SHAFT SS316_________REMARKS _________________________________

BASE PLATE M.S____________SHAFT SLEEVE_________ SS316__________WEAR RING _________ SS316__________

MOUNTING PLATE ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER)◦ BASEPLATE ◦ SKIDPLATE ◦ SOLEPLATE◦ BY PUMP MANUFACTURER ____________◦ DECKING __________________________REMARKS ___________________________

◦ OPEN BEAM SUPPORT ___________________________◦ FULLY GROUTED ◦ UNGROUTED□ OVERALL SIZE _____________________________

DATE_________ REVISION__

OWNER

ONSHORE DESIGNGROUP,ONGC,BARODA

LSTK CONTRACTOR

ONGC LIMITED SAVAIR ENERGY LIMITEDREV. NO. :0 TITLE: CENTRIFUGAL PUMP DATA

SHEET (CWIP-I KALOL)

PROJECT: SOUTH KADI GGS/CTF/WIP