Implementation Procedures
CW Implementation (North)
-
7/30/2019 CW Implementation
2/26
Steps of Construction
Work Package Received
Site Kick off
Excavation
Lean concrete
Steel fixing
Concrete Pouring
Backfilling
Tower Erection
Diesel Generator Inspection
AC Power Inspection
Shelter Installation
Guardroom Inspection
-
7/30/2019 CW Implementation
3/26
Work Package Received:
WP should be approved by TP Design .
Thorough study of WP before CW kickoff
SITE KICK OFF:This is the first and most important step for the BTS
site construction.
Following Points are observed.
Coordinates matched with SAR.
Demarcation and layout of area in front of owner.
-
7/30/2019 CW Implementation
4/26
Excavation
-
7/30/2019 CW Implementation
5/26
Lean Concrete
Function of Lean concrete to provide a plane and level plate formand its the base of whole structure.
Steel Fixing
It should be of specified Grade.
It should be free from rust
Concrete Pouring
-
7/30/2019 CW Implementation
6/26
Material for Concreting
-
7/30/2019 CW Implementation
7/26
Fixation of Steel for Raft
-
7/30/2019 CW Implementation
8/26
Concrete Pouring in Progress
-
7/30/2019 CW Implementation
9/26
POURING OF PEDESTAL COLUMNS
Pouring for columns
-
7/30/2019 CW Implementation
10/26
After Column Pouring
-
7/30/2019 CW Implementation
11/26
Back Filling & Compection
Back filling is very important, if its not done
properly it can cause settlement.
-
7/30/2019 CW Implementation
12/26
Top slab steel fixing and pouring
-
7/30/2019 CW Implementation
13/26
Top Equipment Slab
-
7/30/2019 CW Implementation
14/26
TOWER INSPECTION:
Torque check to be done for all bolts both for maximum andminimum torques.
All braces and joint plates should be properly seated there shouldnot be any gap b/w two overlaying members.
Galvanization should be up to standards.
Fall arrestor should be properly installed.
There should be no rust on tower components.
At least two threads of each anchor bolt should be exposed.
No extra holes be present in tower main legs or braces.
Lightning arrestor should be installed on the opposite side of BTS.
ACWL should be installed and commissioned.
Climbing ladder and rest platform installed and secured properly. No member/bolts should be missing.
All four legs of the tower should be connected to the earthing ringburied underneath.
-
7/30/2019 CW Implementation
15/26
Tower Parts on Site for Erection
-
7/30/2019 CW Implementation
16/26
Tower Erection in progress
-
7/30/2019 CW Implementation
17/26
Tower erection complete
-
7/30/2019 CW Implementation
18/26
Shelter installed at site
Generator & Fuel tank
-
7/30/2019 CW Implementation
19/26
Generator & Fuel tankInstallation/Inspection:
DG set must be of required rating.
Vibration dampers rubber pads should be provided undergenset body.
The exhaust of generator should not be interfering andpointing outward not toward the equipment.
Check for any fuel, water or oil leakage inside.
DG set must be grounded both internally and externally. DG set counters (hour meter, frequency meter, voltmeter
and oil pressure gauge )
Fuel alarm cable should be connected.
Cables arrangement should be proper inside the canopy.
No evidence of leakage and corrosion in any part of fueltank.
Fuel tank gauge should be serviceable.
Check the cycle of transfer from main power source toemergency.
-
7/30/2019 CW Implementation
20/26
Generator and fuel tank at site
-
7/30/2019 CW Implementation
21/26
Guard room
-
7/30/2019 CW Implementation
22/26
Earthing
-
7/30/2019 CW Implementation
23/26
Fencing
-
7/30/2019 CW Implementation
24/26
BOUNDARY WALL UNDER CONSTRUCTION
Boundary wall in progress
-
7/30/2019 CW Implementation
25/26
Main Gate
-
7/30/2019 CW Implementation
26/26