CV_SUPARMAN_TERUPDATE.pdf baru
-
Upload
achmad-suparman -
Category
Documents
-
view
164 -
download
0
Transcript of CV_SUPARMAN_TERUPDATE.pdf baru
CURRICULUM VITAE
Name : AHMAD SUPARMAN
Place/Date of Birth : Cilacap, November 10, 1973
Sex : Male
Marital Status : Married
Nationality : Indonesia
Address : Nusawangkal RT.02/04 Kec. Nusawungu
Kab. Cilacap Jawa Tengah
Mobile : +62 822 264 835 63
Email : [email protected]
Formal Education : STM ( Technical High School )
Non Formal Education : Training Structural at BLK Cilacap
PROFESSIONAL EXPERIENCES
1. Company : PT. BAHARU PENTA KENCANA
Project & Location : Mecanical Works EPCI Production Facilities
In senoro Luwuks, Central of Sulawesi
Classification : Millwright Supervisor
Period of service : November 28, 2014 – July 31, 2015
Reason of leaving : Job Completed
Worked performed : Install,Assembling, Setting, Leveling and Alignment, Flushing and
Commissioning Steam Turbine Generator, Hot Oil Unit
Pump, Propan unit pumps, Steam cooler fan,Compresor, Water
pump, Oil pump, Fire Water pump,Condensate pump, Pit
pumps, Plinke unit pump,Water treatment unit pump, Lean aminine
boster pump unit, Lean amine circulation pump
2. Company : TRUBA ARABIA.CO.LTD
Project & Location : Qurayyah Combine Cycle Power Plant Project – Dammam
Kingdom of Saudi Arabia
Classification : Millwright Supervisor
Period of service : November 28, 2011 until January 19, 2014
Reason of leaving : Contract Completed
Worked performed : Install, Assembling, Setting, Leveling and Alignment, Flushing and
Commissioning Steam Turbine Generator.
3. Company : PT. TRUBA JAYA ENGINEERING
Project & Location : PLTU Tanjung Jati “B” Expansion unit 3&4 Coal Fired
Steam Power Plant Project – Sekuping Ds. Tubanan Kec. Kembang
Kab. Jepara Central Java.
Classification : Millwright Supervisor
Period of service : March 18, 2010 until July 15, 2011
Reason of leaving : Project Completed
Worked performed : Install, Setting, Levelling and Alignment Motor Pump, Crusher,
Reclaimer, Ship Unloader, Conveyor, Limestone, Bucket Elevator,
Ballmill, Dewatering Pump, Booster Pump, Booster Fan, ID fan.
4. Company : PT. TRUBA JAYA ENGINEERING
Project & Location : PLTU 2 BANTEN LABUAN 2 X 300 MW CFSPP
Jl. Laba Terusan Panimbang Ds. Sukamaju Kec. Labuan Banten.
Classification : Millwright Supervisor
Period of service : October 22, 2008 until February 05, 2010
Reason of leaving : Project Completed
Worked performed : Install, Setting and Alignment Turbine Auxiliary, BFPM Motor,
Booster Pump, Vertical Pump, Coalmill, Hoist Crane.
5. Company : PT. SATYAMITRA SURYA PERKASA
Project & Location : Indralaya Combined Cycle Addition Project
Palembang – South Sumatera
Classification : Millwright Supervisor
Period of service : October 25, 2007until May 31, 2008
Reason of leaving : Project Completed
Worked performed : Install Turbine, Generator, Assembling, Alignment, Pump, SWP,
Pump Boiler Feed, Install Cooling Tower, Install WTP Pump,
Commissioning, Start Up.
6. Company : PT. SUKWON INDUSTRIAL.CO.LTD
Project & Location : PT. SEMEN CIBINONG EXP. PROJECT UNIT #6
Classification : Millwright Supervisor
Period of Service : June 05, 1997 until May 30, 1998
Reason of Leaving : Job Completed
Worked Performed : Install, Setting and Alignment Rawmill, Booster Fan, Preheater,
Clinkercooler, Ballmill, Finishmill, Water Pump, Conveyor.
7. Company : PT. CHIYODA INTERNATIONAL INDONESIA
Project & Location : Suralaya Steam Power Plant C – 55 Wastewater Treatment ( WWT )
Area Suralaya – Merak, West Java
Classification : Millwright Foreman
Period of Service : March 03, 1996 until February 20, 1997
Reason of Leaving : Job Completed
Worked Performed : Install, Setting and Alignment Water Treatment Unit, Motor Pump,
Booster Pump, Cooling Waterpump, Oil Pump.
8. Company : GENERAL ELECTRIC POWER GENERATION
Project & Location : PT. Cikarang Listrindo Power Plant – Cikarang West Java
Classification : Millwright Foreman
Period of Service : June 1994 until December 1995
Reason of Leaving : Job Completed
Worked Performed : Install, Setting and Alignment Gas Turbine Unit, Flushing and
Commissioning.
9. Company : PT. SATYAMITRA SURYA PERKASA
Project & Location : CIKARANG LISTRINDO – JABABEKA West Java
Classification : Millwright Foreman
Period of Service : June 01, 1995 until December 09, 1995
Reason of Leaving : Job Completed
Worked Performed : Install, Setting and Alignment Gas Turbine Unit, Flushing, and
Commissioning.
10.Company : PT. SATYAMITRA SURYA PERKASA
Project & Location : CHANDRA ASRI PETROCHEMICAL CENTER PROJECT –
TECHNO FRONTIER – ANYER West Java.
Classification : Millwright Foreman
Period of Service : July 05, 1994 until February 18, 1995
Reason of Leaving : Job Completed
Worked Performed : Setting Pump, Lube Oil, Compressor, Vessel, Blower, Alignment,
Levelling and Commissioning.
11.Company : PT. WOOIL INDONESIA
Project & Location : ISP – III POLYMER FACTORY – PT. SUNKYONG KERIS
INDONESIA Cihuni - Tangerang
Classification : Millwright ( L/H )
Period of Service : March 21, 1994 until July 09, 1994
Reason of Leaving : Job Completed
Worked Performed : Install, Setting and Alignment Chemical Unit Pump, Sea Water
Pump, Water Treatment Unit Pump, Cooling Water Pump.
I hereby certify that information provided here in is true and completed to the best of my
knowledge.
Sincerely Yours,
AHMAD SUPARMAN