C.V.Eng.Ahmed Badran

5
Eng. Ahmed Mohamed Badran Senior Architect, Egyptian, 11 years Experince, Jeddah Website Linkedin: https://sa.linkedin.com/pub/ahmad-badran/67/a11/61 E-mail: [email protected] Skype ID: a.badrana Mobile: +966-581805000 / +966-568672000 PERSONAL INFORMATION Residence Country: Saudi Arabia, Jeddah Nationality: Egyptian Date of Birth: 10 April 1982 Visa Status: Residency Visa Civil Status: Married Visa Expiry Date: August 2016 Religion : Muslim Driving License: Valid CAREER SUMMARY Graduate of the Faculty of Engineering - Architecture and Planning department, about 11 years of Experience in Construction Supervision and Project Management which cover the work and responsibilities on construction supervision, detailed engineering and project implementations. EDUCATIONAL BACKGROUND Preliminary Master Degree: Cairo University, Faculty of engineering Architecture department, Building Technology Section, Grade "Very Good". BSc from Faculty of engineering, Architecture and Planning department Suez canal University, Graduation year 2004-2005, Project "Very Good". GCC PROFESSIONAL EXPERIENCE Saudi Binladin Group SBGABCD Start Date End Date Duration July 2009 To Present 7 Years Type of Business: The Main Contractor Address : KSA - Jeddah - Head Office Position : (P.M.O.) Project Management Office - Lead Architect Number of Employees Supervised by me : 5 No. Project Job Description Duration 1 KAFP-King Abdullah Foundation - Riyad PMO-Senior Architect 4 Years 2 Kudai Towers - Mecca Value Engineering 1 Year 3 Riyadh Metro - Riyad Arch. Studies 4 Ring Road - Mecca Arch. Studies 5 PNU- Princess Noura University - Riyad Coordinator 2 Years

Transcript of C.V.Eng.Ahmed Badran

Page 1: C.V.Eng.Ahmed Badran

Eng. Ahmed Mohamed Badran

Senior Architect, Egyptian, 11 years Experince, Jeddah Website Linkedin: https://sa.linkedin.com/pub/ahmad-badran/67/a11/61 E-mail: [email protected] Skype ID: a.badrana Mobile: +966-581805000 / +966-568672000

PERSONAL INFORMATION

Residence Country: Saudi Arabia, Jeddah Nationality: Egyptian Date of Birth: 10 April 1982 Visa Status: Residency Visa Civil Status: Married Visa Expiry Date: August 2016 Religion : Muslim Driving License: Valid

CAREER SUMMARY

Graduate of the Faculty of Engineering - Architecture and Planning department, about 11 years of Experience in Construction Supervision and Project Management which cover the work and responsibilities on construction supervision, detailed engineering and project implementations.

EDUCATIONAL BACKGROUND

Preliminary Master Degree: Cairo University, Faculty of engineering Architecture department, Building Technology Section, Grade "Very Good".

BSc from Faculty of engineering, Architecture and Planning department Suez canal University, Graduation year 2004-2005, Project "Very Good".

GCC PROFESSIONAL EXPERIENCE

SaudiBinladinGroupSBG‐ABCDStart Date End Date Duration July 2009 To Present 7 Years

Type of Business: The Main Contractor Address : KSA - Jeddah - Head Office Position : (P.M.O.) Project Management Office - Lead Architect Number of Employees Supervised by me : 5

No. Project Job Description Duration 1 KAFP-King Abdullah Foundation - Riyad PMO-Senior Architect 4 Years 2 Kudai Towers - Mecca Value Engineering

1 Year 3 Riyadh Metro - Riyad Arch. Studies 4 Ring Road - Mecca Arch. Studies 5 PNU- Princess Noura University - Riyad Coordinator 2 Years

Page 2: C.V.Eng.Ahmed Badran

KAFP - King Abdullah Foundation Project (SOFITEL HOTEL) Site: Riyad Area : approximately 97,000 m2 Height : 150 m Started : April 2012 Scheduled Completion : October 2016 Duration of construction : 42 Months Green Certification : Silvar Construction Cost : 1,150 Billion SR Owner : King Abdullah International Foundation for Humanitarian Activities Client Representaive : EC HARRIS / K&A Construction Management : Turner Consulting : (SDC) Saudi Diyar Consultants Structural Engineer : Thornton Tomasetti MEP Engineer : ESD Interior Concept : Richmond International Landscape Architect : Cracknell

Façade & BMU : Meinhardt Façade lighting : grenald waldron associates LEED sustainability : Karpinski Vertical transportation : Cooper & Wilcock Geotechnical : Langan International Food service & laundry : Cini.Little Security Risk Assessment : Olive Group

DUTIES AND RESPONSIBILITIES

General Responsibilities:

Review the whole project documents to get clear full scope of work for employer to finalize the project within the impacted cost as well as the required quality standards within time required to implement the project with fully analysis and illustration the project activities.

Ensure that the whole resources devoted to completing a project goal are used appropriately and coordinate the whole activities, equipment and resources as well as information.

Support project Manager while typically expected juggle a combination of responsibilities and communication among team members, coordinating meeting and assisting members.

Regular site visits to monitors the site finishing progress, ensures the work done in the site is accordance with time schedule and compliance with standards required by the client.

Represent the company’s interests negotiating with relevant external parties. Reviews monthly look ahead schedules with site team; (material, equipment and manpower). Prepare the necessary documents for the claims/variation order.

Specified Responsibilities:

Review and Coordinate all Designs Issues between all sub-consultants and make comments for The Main Consultants to be release as final under IFC-Coordinated Design.

Managing and Coordination all Subcontractors scope of work documentation and Progress. Coordinating Architectural shop drawings with the other trades as per the project

specifications, contract drawings, bill of quantities and if it suitable to the site conditions. Responsible of External Works Hardscape & Landscape scope of work. Special Experince in Signage & Wayfinding starting from concept upto handing over.

Page 3: C.V.Eng.Ahmed Badran

ABRAJKUDAI Site: Mecca Area : Built up area 1.5 Million m2 Height : 400 m Started : August 2013 Duration of construction : 36 Months Owner : Ministry of Finance Consulting : dar al-handasah Construction Cost : 13,700 Billion SR

DUTIES AND RESPONSIBILITIES

As per Saudi Binladin Group High Management request to presenting a Full Value Engineering Report include all trades, All specialist Departements in headquarter cooperate to issue the Preliminary reports after discuss and explain all proposals through many coordination meetings. Regarding to Architectural studies we create a team to review the whole project document and finally submitt our final architecture report as example but not limited to: Podium & Towers heights. Number of Connection Bridges after

making sure that matching with fire plan.

Signage & Wayfinding Proposals.

Finishing Materials to be matching with The Operator Standards.

Kitchen, Pantries and Laundry spaces. FF&E Recommendations. Sanitary Ware & Hardware Proposals.

PNU–PRINCESSNOURAUNIVERSITY Site: Riyad Area : approximately 3 millions m² Started : July 2009 Duration of construction : 24 Months Owner : Ministry of Finance Consulting : dar al-handasah Construction Cost P4: 4 Billion SR

DUTIES AND RESPONSIBILITIES

Study, pre-engineered the IFC for the unforeseen discrepancies against execution. Keeps tab on documentation, generates and updates the project files and reports. Review & Monitor shop drawings, materials and method statements. Acts as medium between contractors, workers and project team. Providing technical design solutions to any problems encountered on site. Assists the Quantity Surveyor for the quantity take off of materials. Prepare technical schedules.

Page 4: C.V.Eng.Ahmed Badran

EGYPT PROFESSIONAL EXPERIENCE

GulfofSuezPetroleum‐GUPCOStart Date End Date Duration July 2007 July 2009 2 Year

Type of Business : Owner of Construction Projects Address : Hurghada - Egypt Position : Site Engineer

Projects : Administrative Building, Restaurant and Villas Mosque, Gem and playing hall

CanalCompanyforElectricityStart Date End Date Duration July 2006 July 2007 1 Year

Type of Business : Owner of Construction Projects Address : Ismailia - Egypt Position : Project Management Office

Projects : Sheben tower residential and office building in Ismailia Safya Zaghlool tower for control, residential, Computer and office building

EcoAssociatesStart Date End Date Duration Jan. 2006 July 2006 6 Months

Type of Business : Management of Projects Address : Cairo- Egypt Position : Technical Office Engineer

Projects : Katamia Heights Villas redesign

ConsultantOffice(Dr.M.Atwa) Start Date End Date Duration May 2005 Jan. 2006 6 Months

Type of Business : Engineering Consultants Address : Ismailia- Egypt Position : Technical Office Engineer

Projects : Projects of tourism village of TEVOLY HELEOPLES (Abo soltan) Project of re-design elev. of the Embassy of china in Egypt (Zamalek) Project of privet Academy in ismaillia Project of shohdy Office Building on the road between Cairo - Ismaillia

Page 5: C.V.Eng.Ahmed Badran

PROFESSIONAL DEVELOPMENT

Outline the content of the final research How Building Information Modeling is Contributing to Green Design and Construction

Outline the content of the final course Autodesk® Revit® Architecture 2013

Vocational Training by Cairo University: Construction’s Systems Projects Evaluation Basics of Project Management High-rise Buildings

Pre-Fabricated Systems Finishing Modern Materials Maintenance of Projects

TOOLS & TECHNOLOGY

BIM – Building Information Modeling : Revit Arcitecture 2014 CADD - Computer aided design and Drafting : AutoCAD 2015 ADOBE - photo imaging : Photoshop CS, Illustrator MS-OFFICE suite software : Microsoft Office 2010 plus Visio, MS Project Document management software : Adobe Acrobat professional

KNOWLEDGE

Building and Construction: Knowledge of materials, method statement, the tools involved in the construction of Building and construction industry.

Design: Knowledge of design techniques, tools, blueprints, drawings and models. Engineering and Technology: Knowledge of the practical application of

engineering science and technology , applying principles, techniques, procedures and equipment.

WORK ACTIVITIES

Coordination: Adjusting actions in relation to others' actions. Time Management: Managing one's own time and the time of others. Operations Analysis: Analyzing needs and product requirements to create a design. Making Decisions and Solving complex Problems: Analyzing information and

evaluating results to choose the best solution through thinking creatively. Updating and Using Relevant Knowledge: Keeping up-to-date technically.

REFERENCESFURNISHEDUPONREQUEST