cv

5
1 KHALED MOHAMED IBRAHIM Mob No.:+966-549922984 Nationality: Egyptian DOB: 03.July.1967 [email protected] Mechanical Engineer Professional Mechanical Engineer, Over 17 Year Experience in Oil and gas, Petrochemical, Industrial, as well as Water Treatment for the Following Area Of expertise, Project Management Construction management Material Control Design Inspection Cost Estimation &Tender Pricing Quantity Surveying invoicing Procurement Shutdown Shop Drawing Inspection Instillation and Commissioning Presentation Education • Bachelor of Mechanical Power Engineering , 1996, Alexandria University, Egypt Technical skills AutoCAD -2D,2007 MS Office Primavera P6 Training Course ASME 31.3 Experience Jan. 2012- Till Date Sr. Mechanical Design Engineer for Arab Steel Company (ALTUWARIQI), Dammam, KSA Perform engineering Stress calculations for pipelines According To International Codes and standards Perform engineering for procurement, including preparing material specifications, material and purchase requisitions Produce in house Detail Design Document, General Arrangement DWGs ,Piping Plan ,Piping Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class Generate Concept Design , Identified Problem & Solution Support The Construction Field Requirements Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation Prepare / Review PFD ,P&ID Provide Heat Balance and Mass Balance Calculation and Propose Design Modification To Optimized Existing System Operation and Running Cost Perform Design Calculation For Degusting System Along With Equipment Selection And

Transcript of cv

Page 1: cv

1

KHALED MOHAMED IBRAHIM

Mob No.:+966-549922984

Nationality: Egyptian

DOB: 03.July.1967

[email protected]

Mechanical Engineer

Professional Mechanical Engineer, Over 17 Year Experience in Oil and gas, Petrochemical,

Industrial, as well as Water Treatment for the Following Area Of expertise,

Project Management Construction management

Material Control Design

Inspection Cost Estimation &Tender Pricing

Quantity Surveying invoicing

Procurement Shutdown

Shop Drawing Inspection

Instillation and Commissioning Presentation

Education

• Bachelor of Mechanical Power Engineering

, 1996, Alexandria University, Egypt

Technical skills

AutoCAD -2D,2007 MS Office

Primavera P6 Training Course ASME 31.3

Experience

► Jan. 2012- Till Date Sr. Mechanical Design Engineer for Arab Steel Company

(ALTUWARIQI), Dammam, KSA

Perform engineering Stress calculations for pipelines According To International Codes and

standards

Perform engineering for procurement, including preparing material specifications, material

and purchase requisitions

Produce in house Detail Design Document, General Arrangement DWGs ,Piping Plan ,Piping

Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class

Generate Concept Design , Identified Problem & Solution

Support The Construction Field Requirements

Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation

Prepare / Review PFD ,P&ID

Provide Heat Balance and Mass Balance Calculation and Propose Design Modification

To Optimized Existing System Operation and Running Cost

Perform Design Calculation For Degusting System Along With Equipment Selection And

Page 2: cv

2

Supported DWGs

Produce/ check material quantity take-offs

Review Vendor Print and Design Calculation

► Aug. 2011-Jan.2012 Project manager, ITS Group Egypt

Project Description, EPC Contract for Fountains and Swimming Pools

Carry out Site Mobilization ,Organization and Resource Utilization

Attending Progress , Safety Meeting With Client

Carry Out Correspondence ,Communication With Client and Supplier

Coordination of Technical Submittal and Drawing Approval

Prepare Various Documentation Including, Project Schedule, Method of statement, Reports,

Cost Estimation, etc.

Ensuring all materials used and work performed are as per Contract specifications

Overseeing the selection and requisition of materials

Overseeing quality control, health and safety matters on site

Produce and Follow up Invoices , Payment and Variation Order

Monitor ,Review the work progress

- Project Name: Sharm El Sheikh Resort Client: MEP Contractor Drake & Scull, Main Contractor: CCC, Owner: Qatari Diar

► Aug. 2009-Aug.2010, Sr. Project Engineer, AES Arabia, RIYADH, KSA

Project Description, Chemical Injection Skid, RO &Sewage Treatment Plant Fountains and

Swimming Pools

Handle the Kick off Meeting for All Project

Produce Project Schedule

Review Engineering Document and Drawing

Manage Engineering Activity

Prepare Technical Submittal and Get Client Approval

Manage Procurement Activity

Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)

Manage Installation and Commissioning Activity

Communication with Client and Inside Company

Cost Control and Prepare Invoice

Prepare Project Final Dossiers

Prepare Material Data Sheet and Guide Material Selection

Communicate With Supplier for Local and Off Shore Material

- Project Name - Chemical Injection System (Manifa Gas Facilities), Saudi Aramco

- Acid Neutralization System (Corporate Data Center), Saudi Aramco

- Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco

- Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco

- STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park),GOSI

- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger

Page 3: cv

3

- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger

- Fountain and Swimming Pool (Ayhar Villa), Saudi Oger.

- Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger.

► Aug. 2004-July 2009, Site Manager, Trading and Agency Services LTD. (Trags),

Doha, Qatar

Managed a team of 150 people, and assigning them task

Liaised and assist contract manager in order to ascertain the cost for the construction

work

Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding,

Insulation, RT, PWHT, PMI,)

Dealing with day to day contract and site issue for construction

Plan, control and monitor the work progress, quantity and quality of the construction

work to ensure Compliance to design specification

Identified necessary corrective action and prepare the technical query

Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG,

Others)

Prepared reports for project manager

Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding,

and Steel Structure)

Prepared the costing of material and equipment related to the construction work

Performed Site Supervision for new modification (Equipment erection, piping

modification, Instrument and electrical Modification)

Quantity surveying, Material Take off and cost estimation

Measuring actual work and Produce as built drawing

Carried out preparation of lifting plan (LP), method statement (MS) and job safety

analysis (JSA) for Equipment Installation and Piping Fabrication and Erection

Dealing with subcontractor and supplier

Check subcontractor invoice and submitting CWR invoices to client

Prepare bill of material (piping, structure, instrument and electrical)

Manage, coordinated and follow up all material controlling at site

- Project Name -5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO)

- Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD

- Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO

- July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown

- May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown

- Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS -

Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS

- Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company

(QVC)

- Piping engineer for construction of New Caustic Soda line in (QVC)

Page 4: cv

4

► Oct. 2003-july 2004, Mechanical Engineer, Porcelain International, Alexandria,

Egypt

Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)

Provide site supervision for piping fabrication and erection

Produce fabrication Procedure for Tanks, Silo

Provided Installation supervision for piping fabrication and erection

Maintained of fluid power system

Planed and identified lubrication schedule

Prepare bill of material and purchase request

► June, 2001-Nov., 2002 Project Material Controller Manager, Samsung Engineering

CO., LTD. Tabriz, Iran (ABS Plant)

Monitor, coordinate and report on material related activities from estimates

through preparation of bill of materials, ordering, transportation, receiving,

installation and surplus disposition. Responsible for logistics, warehousing and

facility

Verifies that the documentation on each order matches the freight description

Maintain auditable records of receiving and issuance data, non-conformances,

shortage material and warranty necessary for documenting the material control

and warehousing processes.

Receive all incoming shipments. Make arrangements for and oversees unloading

and handling of goods. Prepare warehouse requests; removes goods from storage for authorized

consumption and utilization; bags, tags, and otherwise prepares goods for

issuance; and makes the goods available at the point and time of need.

Control issuance of equipment and goods to subcontractors.

Identify, receive approval for, and disposes excess materials. Prepares close-out

documents at the end of projects.

► Sep. - 2000-April-2001, Equipment Engineer , Daelim Industrial CO., LTD. at El-

Ameriya, free zone, Alexandria, Egypt

Performed Site supervision for equipment erection (Static Equipment & Machinery)

Carried out mechanical inspection for equipment installation (Static Equipment &

Machinery)

Implemented Mechanical Supervisor for pre-commissioning and commissioning

Mechanical Inspector for compressor ,Turbine and pump alignment, performed the

performance test of centrifugal Pump

Engineer in-Charge for refinery catalyst loading, and installation of structure packing

Working with vendors supervisor During Commissioning

- Project Name Middle East oil refinery, Midor Co., LTD.

Page 5: cv

5

► Sep., 1999-Aug., 2001, Mechanical engineer, Samsung Engineering CO., LTD. at El-

Ameriya, free zone, Alexandria, Egypt

Unpacking inspector (inspection of construction material, equipment and spare parts)

Material expeditor

Prepare martial issuing plan according to site demand

Mechanical Supervision for equipment erection

Jointed pre-commissioning and commissioning for mechanical supervision

Coordinate with vendor for equipment installation

Preparation of inspection document and close out document

- Project Name

Sidi Kerir Petrochemical CO., LTD., 200,000 MT/Y polyethylene

► March, 1998-June1999, Egyptian Air Force

• Maintenance of Diesel Generator

• Maintenance of electrical distribution Panel