CV Jaco Terreblanche-1
-
Upload
jaco-terreblanche -
Category
Documents
-
view
74 -
download
0
Transcript of CV Jaco Terreblanche-1
CURRICULIM VITAE OF JACOBUS PETRUS TERREBLANCHE
Attached please find a copy of my CV along with reference letters
079 238 7169 [email protected]
Curriculum vitae
Jacobus Petrus Terreblanche
PERSONAL INFORMATION Surname Terreblanche First Names Jacobus Petrus
Date of Birth 29 November 1989
Identity Number 8911295066088 Postal Address P.O box 103 chrissiesfontein Meyerton Gauteng.
Residential Address 6 Sedert avenue Gholfpark Meyerton Guateng.
Contact Number 079 238 7169 Gender Male
Nationality South African
Bilingual Afrikaans& English (fluent) Health Excellent
Criminal offences none
Marital Status Single Drivers licence Code B
Passport Yes Willing to travel Yes
EDUCATION
Name of School Vereeniging High School Highest Qualification Grade 11 Subjects Passed English; Afrikaans; Maths; Biology; Steel work; History;
Life orientation Name of Training Institution International Corrosion Institute:
079 238 7169 [email protected]
Highest Qualification Certified NACE coating inspector level 2 Period 2015 certification number: 30464
Certified NACE level 1 coating inspector 2010
Certification number: 30464
ADDITIONAL KEY PERFORMANCE AREAS
Key Areas & Experience: 8 years’ inspection experience on pipelines, gas, petroleum &water pipelines refinery,
structural steel, tanks, pressure vessels, insulation.
Managing projects for client. Managing projects for contractor.
Worked abroad before.
Coordinating of inspectors on projects. Implementing of quality systems on projects to ensure quality.
Quality assurance.
Quality control. Inspection.
Preforming Non-destructive testing.
Preforming destructive testing. Inspection Lab testing.
Understanding of national & international standards.
Hands on inspection.
Reviewing method statements, data packs. Compiling of data packs.
Extensive inspection experience of coating.
Documentation. Report writing
Surveillance
Civil inspection concrete works, pipelines, foundations, concrete floors . Computer literate:
MS windows, Microsoft Office- Word, Excel, Power Point. Elcomaster Coating Inspection Software.
Pipelines and refineries worked on:
Rompco Loop line 2 Pipe manufacturer Salzgitter Germany 128 Kilometre (2015)
Rompco Loop line 2 Construction phase Ihambane / Gaza district Mozambique 128 kilometre. (2015 to 2016) (Rand Water) O6 Water pipeline Alberton pipe jacking represented Rand Water as a 3rd Party Inspector. Aseda Consulting. (2015)
Target Transport: Gas pipeline supply to industrials – Wadeville
ORDWP 2 (Water pipeline) – Steelpoort
S.N.1: Sasol 10” petroleum pipeline – Sasolburg to Secunda (2010)
G.N.P: Sasol natural 26” gas pipeline – Sasolburg to Secunda (2012)
Department of Water Affairs: Levuvhu government water scheme, water supply pipeline – Limpopo, Venda (2012)
079 238 7169 [email protected]
TMS Group: Sasol Wax plant, pressure vessels, tanks, pipes and fittings insulation. (2013)
Rompco Loop line 1 Gas pipeline for SASTECH – Mozambique Matola Pipe manufacturer 127 kilometre (2013)
Rompco Loop line 1 Construction phase Temane / Moabsa 127 kilometre (2013 to 2014)
06 Rand Water pipeline, section a, 14.6km water pipeline pipe diameter 2,321.
EMPLOYMENT HISTORY
Period 2015 September- Current Employer Pipetech Technical Services, Salzgitter -
Mannesman Germany.26” 5L-X70 Pipes for gas pipeline 128 kilometre.
Position Held Mobilized to Mozambique Inhambane / Gaza district for construction phase after
manufacturing was completed. Represented VGI Africa as a 3rd Party coating inspector in pipe mill and on construction
site.
Responsibilities:
Rompco loop line 2 construction phase (September 2016 to December 2016):
PQT approval for contractor to commence with coating activities.
Daily coating inspection.
Pipe receiving inspection.
Coordinating of coating inspectors.
Witnessing Adhesion testing on field joint coatings applied.
Witnessing of salt testing to ensure salt levels comply with requirements.
Implementing excel sheets to keep track of inspected and accepted pipes at laydown area.
Implementing excel sheets for Quarantined / rejected pipes.
Implementing excel sheets at laydown area to keep track of pipes offloaded and
received at laydown area.
Drafting all reports for entire project, welding reports, coating reports, ditching reports, weld mapping, valve inspection reports, and holiday reports as per client requirements.
Surveillance reports on all coating activities.
Witnessing and approving of cold bending procedure.
Daily inspection of pipes strung to determine coating damages extent.
Signing and compiling coating reports
Surveillance on field joints coating application
Final inspection on field joints after coating application
Surveillance on coating repairs being conducted on line pipe
Witnessing holiday day detection prior to lowering of line pipe, ensuring no pipe goes
into the trench with damages
Verifying calibration of equipment.
Witnessing field joint coating application.
Verification of grit blasted surface are in accordance with specification.
Verification of DFT readings are in accordance with required specification
Surveillance on QC and coating applicators, to ensure coating application an QC inspection is in accordance with specification
Surveillance on tie-in field joints coating application.
079 238 7169 [email protected]
Witnessing lowering to ensure pipe is centred accordingly and that no damages occur while lowering line pipe. If damages occur during civil activities on coating,
ensure coating is repaired in accordance with specifications
Coating system: surface blasted to Sa 3, Canusa e-epoxy & Canusa GTS 80 heat shrink sleeve, Canusa wrapped bound tape, Carbogaurd 859, carbogaurd 193 & carbothane 134.
Rompco loop line 2 Manufacturing phase (September 2015 to December 2016):
Third party client representative Coating inspector at Salzgitter Mannesman Germany,
manufacturer of steel and coated pipes. Surveillance of surface preparation.
Surveillance of 3 layer HDPE application FBE, adhesive and PE.
Verifying that blasted surfaces are to required specification.
Verifying that coating applied is to the required specification.
Witnessing laboratory testing, such as: Bend test, impact test, adhesion tests, Cathodic
Disbondment test, flexibil ity tests.
Final release & inspection of pipes coated.
Verifying QC documents.
Signing off on QC reports after verification.
Surveillance.
Weekly updates on progress made.
Witnessing ultrasonic testing.
Assisting management with quality issues.
Ensuring quality standards are met and maintained throughout duration of coating process.
Surveillance as well as photographic reporting on defects noted.
Witnessing Holiday testing.
Verifying temperatures are in accordance with specification, pr ior to any coating. Witnessing Adhesion Pull of test.
Witnessing PQT on coating application & Coating repairs.
Verifying Stencils, Barcodes and information on pipe, correlates with each other.
Verification of Material certs to ensure compliance with requirements.
Witnessing all QC tests being carried out, Blast profile readings, Dry fi lm thickness readings,
Holiday testing, Dust & debris, FBE curing tests, Cutback measurements.
Period 2015 February- 2015 August Employer Aseda Consulting engineers– contracted to
Rand Water R.S.A Position held QC coating, civil & welding 3rd party
inspector. Water pipeline (Client representative)
Responsibilities:
QA Third party coating, civil & welding inspector.
Daily coating inspection
Oversight, ensuring quality is maintained in accordance with client requirements.
Auditing of contractor’s data packs.
Vendor inspections at manufacturing suppliers.
Daily coating external and internal inspection. Daily welding inspection to API 1104
specification.
Daily civil inspection on trenches, bedding, padding, backfill & reinstatement.
Surveillance on field joints coating application
Surveillance on coating repairs being conducted on line pipe
079 238 7169 [email protected]
Witnessing Holiday Detection prior to lowering of line pipe, ensuring no pipe goes into the trench with damages
Witnessing wet sponge detection on internal linings.
Witnessing field joint coating application
Surveillance on QC and coating applicators, to ensure coating application and QC inspection is in accordance with specification
Attend weekly progress and technical meetings, giving valuable input on project quality improvements.
Witnessing of pre-welder qualification tests.
Witnessing all civil testing on project.
Compiling NCR reports (Where applicable) where contractor does not comply with specification.
Running entire project quality on behalf of the client.
Signing off on all documentation, reports from contractors.
Coating system internal: surface blasted to Sa 3, Stonecor St 100 epoxy applied.
Coating system external: surface to St 2, Denso adhesive & Denso HD Therm sleeve.
Period 2014 July- 2014 November
Employer Pipetech – contracted to Worley Parsons R.S.A
Position held QA coating, civil & welding 3rd party inspector. Gas pipeline 128 kilometre (Client representative)
Reason for leaving Project ended Responsibilities:
QA Third party coating/civil inspector
Rompco Loop line: 26” gas pipeline
Daily coating inspection
Signing and compiling coating reports
Surveillance on field joints coating application
Final inspection on field joints after coating application
Surveillance on coating repairs being conducted on line pipe
Witnessing holiday day detection prior to lowering of line pipe, ensuring no pipe goes into the trench with damages
Verifying calibration of equipment
Witnessing field joint coating application
Verification of grit blasted surface are in accordance with specification
Verification of DFT readings are in accordance with required specification
Surveillance on QC and coating applicators, to ensure coating application an QC
inspection is in accordance with specification
Surveillance on tie-in field joints coating application
Civil inspection daily
Ensuring bedding, padding and trenches are in accordance with specifications
Signing of trenches prior to lowering line pipe
Signing off trenches prior to bedding
Witnessing lowering to ensure pipe is centred accordingly and that no damages occur while lowering line pipe. If damages occur during civil activities on coating, ensure
coating is repaired in accordance with specifications
Compiling trench reports after and prior to completion
Assessment of trenches after lowering
Visual inspection of trench prior to lowering to ensure bedding and trenches meet with
specifications
079 238 7169 [email protected]
Coating system: surface blasted to Sa 3, Canusa e-epoxy & Canusa GTS 80 heat shrink sleeve, Canusa wrapped bound tape, Carbogaurd 859, carbogaurd 193 &
carbothane 134.
Period July 2013- July 2014 Employer Pipetech cc contracted out to Worley Parsons R.S.A/C.S.S Steel Mill. Position held QC 3rd party coating inspector Reason for leaving Mobilized to site for construction
phase of Rompco Loop line 1. Responsibilities
Third party client representative coating inspector at Capital Star Mozambique,
manufacturer of steel and coated pipes.
Surveillance of surface preparation.
Surveillance of 3 layer HDPE application Canusa primer, adhesive and pe.
Verifying that blasted surfaces are to required specification.
Verifying that coating applied is to the required specification.
Witnessing laboratory testing, such as: Bend test, impact test, adhesion tests, Cathodic
Disbondment test, flexibil ity tests. Final release & inspection of pipes coated.
Signing of load manifests
Witnessing ultra-sonic testing.
Assisting management with quality issues.
Ensuring quality standards are met and maintained throughout duration of coating process.
Compiling surveillance as well as photographic reporting on defects noted.
Witnessing Holiday testing.
Verifying temperatures are in accordance with specification, prior to any coating.
Coating system :3 layer pipes prewashed & degreased, pipes preheated to 40 degrees
Celsius, pipe pass through centrifugal blasting to achieve sa3, pipes pass through induction heaters pipes heated to 70 degrees Celsius, Canusa epoxy applied through spray systems, adhesive and HDPE applied by side extrusion.
Coating system: surface blasted to Sa 3, Coating system: surface blasted to Sa 3, Canusa e-epoxy & Canusa GTS 80 heat shrink sleeve, Canusa wrapped bound tape, Carbogaurd 859, carbogaurd 193 & carbothane 134.
REFERENCES
Department of water affairs Rand water Robbie Naidoo Quality manager Contact details: +27 82 389 2372
Sonartech Paul Nel Quality manager Contact Details: +27 82 761 8530
Hall Longmore Heine le Roux Project Quality manager Contact Details: +27 776 4125
Target Transport Jack Duvenhage Site manager Contact Details: +27 73 106 0652
WBHO Donnovan Seconds Quality manager Contact Details: +27 76 579 9967
Worley Parsons Phil Barker Project superintendent Contact Details: +27 82 714 3711 / +90 533 068 2082
079 238 7169 [email protected]
Contact details: Johan Venter Project manager
+27 83 702 353
Pipetech Johann Underhay chief mechanical inspector co-ordinator Contact details: +27 82 853 8439
Aseda consulting engineers: Justin Notnagel Quality co-ordinator.
+27 79 228 8377 Sasol technology Charlie Denny senior project manager
Contact details: +27 71 681 2767