C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot...

8
1 2 3 4 5 6 7 8 9 10 14 15 16 17 M1 M2 RWDP RWDP SVP RWDP RWDP RWDP RWDP 1:60 fa l l 1 : 6 0 fa ll 1 : 6 0 fa ll 1:60 fa l l 1:60 f all RWDP 1 : 6 0 fa ll 1:60 fa l l 1:60 fa l l 1 : 6 0 fa ll 1:60 fa l l 1 : 6 0 f a l l 1 : 60 fa ll 1 : 6 0 f a l l Bolton Street North 11 12 13 1 : 6 0 fa ll 1:60 fa l l RWDP RWDP Last SMH H 100mm Water Main M H H Comms Mains Power Power Transformer Comms Mains Power 100mm dia HPDE water ring main 100mm dia HPDE water ring main 100mm dia HPDE water ring main H SN1 1 : 80 Fal l SMH 2 with Sump SMH 4 SMH 5 SMH 3 SMH 1 with sump SMH 6 1:80 Fall Last FMH FMH FMH 1 FMH 2 FMH 3 Aco Brickslot drainage channel Surface water 225mm dia uPVC pipe @ Fall 1:80 Surface water 225mm dia uPVC pipe @ Fall 1:80 Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1: 60 F all 112m3 Aco StormBrixx SD surface water attenuation geocellular stormwater system with hydro brake control valve at outlet and air vents as per manufacturer's specification (8x7x2m) AOV AOV PV Panels Air handling units Sedum Roof Level +46.82 Roof Level +57.50 Roof Level +60.10 Level +28.65 Level +28.60 Level +28.80 Road Level +28.78 Path Level +28.78 Level +28.72 Level +28.68 Level +28.80 Comms MH Tobermore Hydropave Fusion Silver permeable paving Bike Stand Tobermore Hydropave Fusion permeable paving flags with Granite Radii Kerb edging Roof Level +46.75 Raised bedding area To Dublin City Centre To Dublin West Level +28.65 Level +28.56 Level +28.80 Foul water 100mm dia uPVC pipe @ Fall 1:60 BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL LS LS LS LS LS LS To soak away Aco Brickslot drainage channel Ventilation grille to Basement Ventilation grille to Basement Ventilation grille to Basement Aco drainage channel at bottom of ramp 28.78 CL 26.67 IL 28.78 CL 25.97 IL 28.78 CL 26.09 IL 28.79 CL 26.18 IL 28.80 CL 27.34 IL 28.79 CL 27.38 IL 28.56 CL 27.85 IL 28.60 CL 28.15 IL 28.66 CL 27.59 IL Level +28.77 Level +28.68 Level +28.73 Aco Brickslot drainage channel Mains water in pumped to storage tank Connection to Wet Riser Set out Dim to Gridline E-2 38005 Set out Dim to Gridline E-2 13095 28.78 CL 26.85 IL 28.72 CL 27.10 IL 28.79 CL 27.24 IL 28.67 CL 27.74 IL 100mm dia HPDE water ring main Concrete textured ramp to basement @1:10 gradiant Outline of Basement below Outline of Basement below Outlet Bolton Street Lore t o Roa d SN1 Site Notice in weatherproof frame fix to site hoarding @1.4m high Elm Road North **.** CL **.** IL SMH SURFACE WATER DRAINAGE: FOUL WATER DRAINAGE: COVER LEVEL: INVERT LEVEL: SPOT LEVEL DATUM: MANHOLE 600x600mm: COMMUNICATIONS: MAINS WATER: MAINS POWER: BASEMENT OUTLINE BELOW: LEGEND: LAMP STANDARD / BOLLARD LAMP: NOTES: ALL UTILITY AND SERVICE CONNECTIONS TO ONLY BE MADE WITH THE AUTHORISATION AND APPROVAL OF THE SERVICE PROVIDER AND LOCAL AUTHORITY. LOCAL AUTHORITY ROAD OPENING LICENCES TO BE OBTAIN PRIOR TO COMMENCEMENT OF CONNECTION WORKS. LS HYDRANT / METER: H FMH M SN1 PLANNING SIGN NOTICE ****** Level +**.** APPLICATION SITE OUTLINE: Tobermore Hydropave Fusion permeable paving 200x100x80mm Silver Tobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite with Granite Radii Kerb edging 780x125x25mm 112m Aco StormBrixx SD geocellular surface water attenuation system with hydro brake control valve at outlet and air vents as per manufacturer's specification (8m x7m x 2m deep) to comply with Local Authority SuDS strategy Provide adequate drainage to hard standing ground level areas above basement podium slab connected back to surface water system unless otherwise indicated Hard standing flat roof finished with bitimen capping sheet adhered to reinforced PVC underlayer membrane on (Bauder Thermofol PVC System) Sedum Extension Green Roof Area: Finish growing surface on WB vegitation matting on 100mm Extensive/Biodiverse substrate layer on filteration fleece membrane on water storage/ drainage layer (Bauder DSE20) to fall to boundary edges on polyester/polypropylene fibre protective layer Photovoltaic modules on galvinised mountings stand to and angle of 35 degrees South 2no. 22kW DC (fast charging points) for EV car charging Combination wall mounted unit with Mennekes and CCS outlets 3 BL SURFACE WATER DRAINAGE CHANNEL: Scale Checked by Drawn by Date Project number As indicated 18/05/2020 12:15:57 Proposed Site Layout & Location Plans TDS2200 04 DT175 02 TDS Planning DT175 02 19th May 2020 Aidan McKenna TU Staff 04/04 - P100 1 : 200 Proposed Site Layout Plan 1 1 : 1000 Proposed Location Plan 2 Site Notice in weatherproof frame fix to site hoarding @1.4m high

Transcript of C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot...

Page 1: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

1 2 3 4 5 6 7 8

9

10

14

15

16

17

M1

M2

RWDP

RWDP

SVP

RWDP

RWDPRWDP

RWDP

1:6

0 fa

ll1:60 fall

1:60 fall1:6

0 fa

ll

1:6

0 f

all

RWDP

1:60 fall 1:6

0 fa

ll

1:6

0 fa

ll 1:60 fall

1:6

0 fa

ll

1:60 fall

1:6

0 f

all

1:60 fall

Bolton Street

North

11

12

13

1:60 fall

1:6

0 fa

ll

RWDP

RWDP

Last SMH

H

100

mm

Wate

r M

ain

M

H

H

Com

ms

Main

s P

ow

er

Po

wer

Tra

nsfo

rme

r

Comms

Mains Power

100mm dia HPDE water ring main

100mm dia HPDE water ring main

100

mm

dia

HP

DE

wa

ter

rin

g m

ain

H

SN1

1:80 F

all

SMH 2with Sump

SMH 4

SMH 5

SMH 3

SMH 1 with sump

SMH 6

1:8

0 F

all

Last FMH

FMH

FMH 1

FMH 2

FMH 3

Aco Brickslot drainage channel

Surf

ace

wa

ter

22

5m

m d

ia u

PV

C p

ipe @

Fa

ll 1:8

0

Surface water 225mm dia uPVC pipe @ Fall 1:80

Aco Brickslot drainage channel

SMH

Fou

l w

ate

r 1

00

mm

dia

u

PV

C p

ipe @

Fall

1:6

0

1:60

Fal

l

11

2m

3 A

co

Sto

rmB

rixx S

D

su

rfa

ce

wa

ter

att

en

ua

tio

n

ge

oce

llu

lar

sto

rmw

ate

r syste

m

with

hyd

ro b

rake

co

ntr

ol va

lve

at

ou

tle

t a

nd

air

ve

nts

as p

er

ma

nufa

ctu

rer's s

pe

cific

atio

n

(8x7

x2

m)

AOV

AOV

PV Panels

Air handling units

Sedum Roof Level+46.82

Roof Level+57.50

Roof Level+60.10

Level+28.65

Level+28.60

Level+28.80

Road Level+28.78

Path Level+28.78

Level+28.72

Level+28.68

Level+28.80

Com

ms

MH

Tobermore Hydropave Fusion Silver permeable paving

Bik

e S

tan

d

Tobermore Hydropave Fusion permeable paving flags with Granite Radii Kerb edging

Roof Level+46.75

Raised bedding area

To Dublin City Centre

To Dublin West

Level+28.65

Level+28.56

Level+28.80

Fou

l w

ate

r 1

00

mm

dia

uP

VC

pip

e @

Fall

1:6

0

BL

BL

BL

BLBL

BL

BL

BL

BL

BL BL

BL

BL BL

BL BL BL

BLBL

BL

BLBL

BL

LS LS LS

LS

LS

LS

To soak away

Aco Brickslot drainage channel

Ventilation grille to Basement

Ventilation grille to Basement

Ventilation grille to Basement

Aco drainage channel at bottom of ramp

28.78 CL26.67 IL

28.78 CL25.97 IL

28.78 CL26.09 IL

28.79 CL26.18 IL

28.80 CL27.34 IL

28.79 CL27.38 IL

28.56 CL27.85 IL

28.60 CL28.15 IL

28.66 CL27.59 IL

Level+28.77

Level+28.68

Level+28.73

Aco Brickslot drainage channel

Mains water in pumped to storage tank

Connection to Wet Riser

Set out D

im to G

ridlin

e E

-2

38005

Set out Dim to Gridline E-2

13095

28.78 CL26.85 IL

28.72 CL27.10 IL

28.79 CL27.24 IL

28.67 CL27.74 IL

100

mm

dia

HP

DE

wa

ter

rin

g m

ain

Co

ncre

te te

xtu

red

ra

mp

to

basem

en

t @

1:1

0 g

radia

nt

Outline of Basement below

Outline of Basement below

Outlet

Bolton Street

Lore

to R

oa

d

SN1

Site Notice in weatherproof frame fix to site hoarding @1.4m high

Elm

Ro

ad

North

**.** CL**.** IL

SMH

SURFACE WATER DRAINAGE:

FOUL WATER DRAINAGE:

COVER LEVEL:INVERT LEVEL:

SPOT LEVEL DATUM:

MANHOLE 600x600mm:

COMMUNICATIONS:

MAINS WATER:

MAINS POWER:

BASEMENT OUTLINE BELOW:

LEGEND:

LAMP STANDARD / BOLLARD LAMP:

NOTES:ALL UTILITY AND SERVICE CONNECTIONS TO ONLY BE MADE WITH THE AUTHORISATION AND APPROVAL OF THE SERVICE PROVIDER AND LOCAL AUTHORITY. LOCAL AUTHORITY ROAD OPENING LICENCES TO BE OBTAIN PRIOR TO COMMENCEMENT OF CONNECTION WORKS.

LS

HYDRANT / METER: H

FMH

M

SN1PLANNING SIGN NOTICE

****** Level+**.**

APPLICATION SITE OUTLINE:

Tobermore Hydropave Fusion permeable paving 200x100x80mm Silver

Tobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite with Granite Radii Kerb edging 780x125x25mm

112m Aco StormBrixx SD geocellular surface water attenuation system with hydro brake control valve at outlet and air vents as per manufacturer's specification (8m x7m x 2m deep) to comply with Local Authority SuDS strategy

Provide adequate drainage to hard standing ground level areas above basement podium slab connected back to surface water system unless otherwise indicated

Hard standing flat roof finished with bitimen capping sheet adhered to reinforced PVC underlayer membrane on (Bauder Thermofol PVC System)

Sedum Extension Green Roof Area:Finish growing surface on WB vegitation matting on 100mm Extensive/Biodiverse substrate layer on filteration fleece membrane on water storage/ drainage layer (Bauder DSE20) to fall to boundary edges on polyester/polypropylene fibre protective layer

Photovoltaic modules on galvinised mountings stand to and angle of 35 degrees South

2no. 22kW DC (fast charging points) for EV car charging Combination wall mounted unit with Mennekes and CCS outlets

3

BL

SURFACE WATER DRAINAGE CHANNEL:

Scale

Checked by

Drawn by

Date

Project number

As indicated

18

/05/2

020

12:1

5:5

7

Proposed Site Layout &Location Plans

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P100

1 : 200

Proposed Site Layout Plan1

1 : 1000

Proposed Location Plan2

Site Notice in weatherproof frame fix to site hoarding @1.4m high

Page 2: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

1 2 3 4 5 6 7

E

D

C

B

A

M1 M2

1

2

3

4

5

6

7

8

9

10

11

12 13

14

15

16

17 18

19

20

Outline of Ground Floor above

Outline of Ground Floor above

Outline of Ground Floor above

Natural Ventilation Duct A

Natural Ventilation Duct B

Natural Ventilation Duct C

TD 20m

TD 20m

TD

9.2

m

TD

8.4

m

TD 9.7

m

TD 8.5m

TD 8

.2m

Fou

ls w

ate

r pip

e r

un

to b

e c

on

firm

ed

Foul soil vent pipefrom above WC Riser

Basement Level+25.70

F

27230 17570

6250

11000

12150

11000

Basement Car Park846.5sqm

StairCore 1

StairCore 2

PlantRoom

Store

LiftLobby

Ramp Up

Bik

e S

tan

d

Basement Level+25.70

Ou

tlin

e o

f G

rou

nd F

loo

r a

bove

SVPFMH

28.67 CL27.74 IL

31100

39800

15800

10800

1 2 3 4 5 6 7

E

D

C

B

A

19020 17660

4500 7000 25250

14155

5500

5500

11065

14090

F

100 m²Staff Cafe

88 m²Reception Lobby

265 m²Presentation Gallery

FemaleWC

MaleWC

36680

25155

Line of Basement below

Line of Basement below

Ground Floor Level+28.70

Level+28.65

Level+28.65

Level+28.57

Main Entrance

22 m²Stair Core

StairCore 2

Store

LiftLobby

Ramp Down

Bik

e S

tan

d

TD 21m

TD

21m

8030

13375

24400

13310

1 2 3 4 5 6 7

E

D

C

B

A

53 m²Open Office Area

274 m²

Green Roof & TerraceArea

AHU (4.2 x 1.3 x 1.6h)

AHU (4.2 x 1.3 x 1.6h)

AOV

26 m²Lobby

FemaleWC

MaleWC

StairCore

Sedum Level+46.82

Fifth Floor Level+46.70

Services Area+46.75

Paved Level+46.65

19495 17565

10970

14565

14530

11005

4500 32560

98 m²Plant Area

TD

14m

1 2 3 4 5 6 7

E

D

C

B

A

Comms/Stores

Gla

zed

part

itio

nin

g s

yste

m

FemaleWC

MaleWC

Second Floor Level+35.90

48 m²Meeting Room

37 m²Meeting Room

368 m²Open Office Area

26 m²Lobby

StairCore 1

StairCore 2

Store

Lift

19495 17565

10970

14565

14530

11005

4500 32560

30680

23705

12700

TD

21m

TD

12m

TD 26m

Scale

Checked by

Drawn by

Date

Project number

1 : 200

18

/05/2

020

12:1

6:0

0

Proposed Basement &Floor Plans

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P101

1 : 200

-01 Proposed Basement FFL1

1 : 200

00 Proposed Ground FFL2

1 : 200

05 Proposed Fifth FFL4

1 : 200

02 Proposed Second FFL3

N

Page 3: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

00 Ground FFL

28700

01 First FFL

32300

02 Second FFL

35900

-01 Basement FFL

25500

03 Third FFL

39500

04 Forth FFL

43100

05 Fifth FFL

46700

06 Sixth FFL

50300

07 Seventh FFL

53900

08 Eighth FFL

57500

09 Top of Core

60100

2830

2830

2830

2830

2830

2830

2830

3000

3150

3175

3180

3175

3175

3175

3180

3325

2650

31400

29530

2600

3600

3600

3600

3600

3600

3600

3600

3600

3200

Office

Office

Office

Office

Reception

Green Roof

Basement Car Park

Office

Office

Office

Extent of Proposed Development Site Bolton StreetAdjoining Site

2

1

3

5

2

4

00 Ground FFL

28700

01 First FFL

32300

02 Second FFL

35900

-01 Basement FFL

25500

03 Third FFL

39500

04 Forth FFL

43100

05 Fifth FFL

46700

06 Sixth FFL

50300

07 Seventh FFL

53900

08 Eighth FFL

57500

09 Top of Core

60100

Office

Office

Office

Office

GalleryReception

Plant AreaGreen Roof

Basement Car ParkRamp

26

50

33

25

30

00

31

75

28

30

31

75

28

30

31

75

28

30

31

75

28

30

29

95

0

19

55

0

Plant

Extent of Proposed Development Site Adjoining SiteAdjoining Site

2

1

4

3

2

1

Scale

Checked by

Drawn by

Date

Project number

1 : 200

18

/05/2

020

12:1

6:0

8

Proposed Sections

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P102

1 : 200

Proposed Section A-A1

1 : 200

Proposed Section B-B2

N

A

A

B B

MATERIALS LEGEND:

Selected double glazed window system with anodised aluminium frame - Bronze coloured

01

02

03

Fair faced concrete panels with polished horizontal and vertical strips

Roof plant enclosed - Grey colour

Concrete panel with polished faced finish04

Photovoltaic roof panels05

Page 4: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

00 Ground FFL

28700

01 First FFL

32300

02 Second FFL

35900

03 Third FFL

39500

04 Forth FFL

43100

05 Fifth FFL

46700

06 Sixth FFL

50300

07 Seventh FFL

53900

08 Eighth FFL

57500

09 Top of Core

60100

Extent of Proposed Development Site

31450

19500

Outline of Basement Below

Adjoining Site Loretto RoadAdjoining SiteLittle Lane

29450

01

02

04

03

01

04

02

00 Ground FFL

28700

01 First FFL

32300

02 Second FFL

35900

-01 Basement FFL

25500

03 Third FFL

39500

04 Forth FFL

43100

05 Fifth FFL

46700

06 Sixth FFL

50300

07 Seventh FFL

53900

08 Eighth FFL

57500

09 Top of Core

60100

Extent of Proposed Development Site

Outline of Basement Below

Adoining Site Bolton Street

Basement Car Park

31500

29500

19550

3100

04

01

03

04

06

01

01

02

Scale

Checked by

Drawn by

Date

Project number

1 : 200

18

/05/2

020

12:1

6:1

2

Proposed ContiquousElevations

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P103

1 : 200

South Contiquous Elevation B - B2

1 : 200

West Contiquous Elevation A - A1

MATERIALS LEGEND:

Selected double glazed window system with anodised aluminium frame - Bronze coloured

01

02

03

Fair faced concrete panels with polished horizontal and vertical strips

Roof plant enclosed - Grey colour

Concrete panel with polished faced finish04

N

Photovoltaic roof panels05

A

A

B B

Fair faced concrete ramp wall06

Page 5: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

19450

31450

04

02

01

02

05

04

19550

01

02

04

05

03

01

02

01

04

19450

2940031400

01

01

03

02

04

02

04

05

31450

19800

04

02

01

04

01

02

04

01

Scale

Checked by

Drawn by

Date

Project number

1 : 200

18

/05/2

020

12:1

6:1

9

Proposed Elevations

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P104

1 : 200

Proposed East Elevation4

1 : 200

Proposed North Elevation3

1 : 200

Proposed South Elevation1

1 : 200

Proposed West Elevation2

MATERIALS LEGEND:

Selected double glazed window system with anodised aluminium frame - Bronze coloured

01

02

03

Fair faced concrete panels with polished horizontal and vertical strips

Roof plant enclosed - Grey colour

Concrete panel with polished faced finish04

N

Photovoltaic roof panels05

Page 6: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

Scale

Checked by

Drawn by

Date

Project number

1 : 1

18

/05/2

020

12:1

6:1

9

Proposed 3DPresentation Views

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P105

1 : 1

Proposed View South East Corner2

1 : 1

Proposed View from Bolton Street1

1 : 1

Proposed View North West Corner3

N

Page 7: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

1 2 3 4 5 6 7 8

9

10

14

15

16

17

M1

M2

Brookfield Road

North

11

12

13

LP

SN1

AOV

AOV

Air handling unitsSedum Roof Level+46.82

Roof Level+**.**

Roof Level+60.10

Level+28.65

Level+28.60

Level+28.80

Road Level+27.80

Path Level+27.80

LP

LP

LP

LP LP

LP

LP

LP

LP

LP

LP

Level+28.72

LP LP

Level+28.68

LP

LPLP

LP LP

LP LP

LPLP

Level+28.80

Tobermore Hydropave Fusion Silver permeable paving

Bik

e S

tan

d

Tobermore Hydropave Fusion permeable paving flags with Granite Radii Kerb edging

Roof Level+46.75

Raised bedding area

01

01

01

0505

03

03

03

04

02

02

Outlin

e o

f B

ase

ment

be

low

Outlin

e o

f B

ase

ment

be

low

LANDSCAPING LEGEND:

SN1PLANNING SIGN NOTICE

APPLICATION SITE OUTLINE:

Tobermore Hydropave Fusion permeable paving 200x100x80mm Silver

Tobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite with Granite Radii Kerb edging 780x125x25mm

Rolled out lawn turf (Ryegrass locallysourced)

Stainless steel satin polished cycle stand with below surface fixing by Cyclepods

Semi mature tree:Poplar Lombarby

Selected outdoor timber seating bench by

Wall Cover Hedging:Photinia (red robin) & Laurel hedging semi-mature planted @600mm c/c

Heathers @4/5 per sqmPittaspuram @ 500mm staggered centresEuonynus @ 400mm staggered centres

Carex (Testalea) @ 450mm centresPampous grass @450mm centresMisscantous @ 600mm centres

Bulb (Tulips/Daffodils) planting

1.2 x 1.2m heavy duty cast iron tree grille coated in selected colour

Semi mature tree:Carpinus - White beech

1.5m Giove stone planter by Marshalls

Demetra module planter by Marshalls

01

02

03

04

05

Scale

Checked by

Drawn by

Date

Project number

1 : 200

18

/05/2

020

12:1

6:2

3

Proposed LandscapingGeneral Arrangement

Plan and Details

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P1061 : 200

Proposed Landscaping Layout Plan1

N

Page 8: C:UsersamckaDesktopRevit Practice filesProject 4B For Render … · 2021. 4. 1. · Aco Brickslot drainage channel SMH Foul water 100mm dia uPVC pipe @ Fall 1:60 1 : 6 0 F a l 112m3

Pedestrian Paving

Raised Planter

Tobermore Hydropave Silver Fusion paving 200x100x80mm on 50-100mm sand bed to provide fall to drainage channel

Tobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite on layed sand bed to incoporating fall to local drainage channel

Granite capping stone with overhang and drips on DPC layer

Hollow concrete block draft wall with selected rendered outer finish

Basement Area below

Two part flat roof rain water down pipe with DPM membrane dress down and sealed as per manufacturer's details set onto sand blinding surrounded by graded hardcore

Waterproof membrane on 400mm reinforced in-situ concrete floor/podium slab to Engineer's details

Aco Brickslot drainage channel set into concrete bed

Sandy/Organic soil for planting selected shrubs on 50mm clean sand on filteration fleece membrane on water drainage cell layer

Waterproof membrane on 400mm reinforced in-situ concrete floor/podium slab to Engineer's details

Tobermore Hydropave Silver Fusion paving 200x100x80mm on 50-100mm sand bed to provide fall to drainage channel

Trafficed Area

Waterproof membrane on 400mm reinforced in-situ concrete floor/podium slab to Engineer's details

Tobermore Granite Radii Kerb edging 780x125x225mmset in concrete bed

Connected to surface water drainage system

Pedestrian PavingTobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite

Tobermore Hydropave Silver Fusion paving 200x100x80mm

Trafficed Paving Area

350mm graded hardcore to engineer's specification layered in 150mm compacted layers

Tobermore Granite Radii Kerb edging 780x125x225mmset in concrete bed

50mm of 3-6mm washed grit bed to BS 7533-13 2009

50mm of 3-6mm washed grit bed to

Filtration textile layer

Filtration textile layer GeoGrid interlock layer for trafficed area

50mm of 3-6mm washed grit bed

350mm graded hardcore to engineer's specification layered in 150mm compacted layers

Grassed Area

Tobermore Hydropave Silver Fusion paving 200x100x80mm

Trafficed Paving Area

350mm graded hardcore to engineer's specification layered in 150mm compacted layers

Tobermore Granite Radii Kerb edging 780x125x225mm set in concrete bed

50mm of 3-6mm washed grit bed

Filtration textile layer

GeoGrid interlock layer for trafficed area

50mm of 3-6mm washed grit bedSandy/Organic soil for planting selected grass seed on gravel bed on layered site hardcore

Trafficed Area

Raised Planter Detail Permeable Paving Transition Detail

Paving Transition Over Podium Slab Detail Permeable Paving to Grass Detail

Pedestrian Paving

Tobermore Granite Radii Kerb edging 780x125x225mmset in concrete bed

Tobermore Hydropave Fusion permeable paving flags 600x300x80mm Graphite

50mm of 3-6mm washed grit bed to BS 7533-13 2009

Filtration textile layer

350mm graded hardcore to engineer's specification layered in 150mm compacted layers

Graded hardcore pit surround layered in 150mm compacted layers with root barrier membrane

1.2 x 1.2m heavy duty cast iron tree grille coated in selected colour

Slow release fertilised soil to landscaper's specification

Semi-mature tree root ball to be unwrapped

Semi mature tree: Carpinus - White beech

Scale

Checked by

Drawn by

Date

Project number

As indicated

18

/05/2

020

12:1

6:2

4

Typical Paving Details

TDS2200 04

DT175 02 TDS Planning

DT175 02

19th May 2020

Aidan McKenna

TU Staff

04/04 - P107

1 : 10

Typical Paving Details1

1 : 20

Tree Pit Detail2

N