determiancion de curva masa, para estudiantes de ingenieria- caminos II

Transcript of curva masa

  • QUISPE HILARIO, CIRILO

    FACTOR DE CONTRACCION = 0.9

    Progresiva D AC AR VCBm m2 m2 M30+000 0.00 0.00 0.00 0.000+020 20.00 0.00 1.00 0.000+040 20.00 1.00 9.00 10.000+060 20.00 0.00 11.00 10.000+080 20.00 1.00 11.00 10.000+100 20.00 2.00 8.00 30.000+120 20.00 3.00 10.00 50.000+130 10.00 4.00 2.00 35.000+140 10.00 5.00 2.00 45.000+150 10.00 6.50 5.00 57.500+160 10.00 6.40 6.00 64.500+180 20.00 8.00 5.00 144.000+200 20.00 9.00 4.00 170.000+220 20.00 10.00 5.00 190.000+240 20.00 16.00 3.00 260.000+260 20.00 13.81 4.00 298.100+280 20.00 12.00 2.00 258.100+290 10.00 0.00 10.00 60.000+300 10.00 10.00 10.00 50.000+310 10.00 9.09 11.00 95.450+330 20.00 3.00 11.00 120.900+350 20.00 4.00 10.00 70.000+370 20.00 5.00 9.00 90.000+390 20.00 6.00 8.00 110.000+400 10.00 8.03 7.00 70.150+410 10.00 8.00 6.00 80.150+420 10.00 9.00 5.00 85.000+430 10.00 10.00 4.00 95.000+450 20.00 11.00 3.00 210.00

    MOVIMIENTO DE TIERRAS DIAGRAMA DE MASA

  • 0+460 10.00 12.00 3.00 115.000+480 20.00 13.38 1.00 253.800+500 20.00 1.00 13.00 143.800+520 20.00 5.00 1.00 60.000+540 20.00 2.00 8.00 70.00

    VCB 3411.45 m3

    VLO 1309.48 m3

  • QUISPE HILARIO, CIRILO

    VRC VRB VLA SA OMM3 M3 M3 M3 M30.00 0.00 0.00 0.00 0.0010.00 11.11 0.00 -11.11 -11.11

    100.00 111.11 10.00 -101.11 -112.22200.00 222.22 10.00 -212.22 -324.44220.00 244.44 10.00 -234.44 -558.89190.00 211.11 30.00 -181.11 -740.00180.00 200.00 50.00 -150.00 -890.0060.00 66.67 35.00 -31.67 -921.6720.00 22.22 22.22 22.78 -898.8935.00 38.89 38.89 18.61 -880.2855.00 61.11 61.11 3.39 -876.89

    110.00 122.22 122.22 21.78 -855.1190.00 100.00 100.00 70.00 -785.1190.00 100.00 100.00 90.00 -695.1180.00 88.89 88.89 171.11 -524.0070.00 77.78 77.78 220.32 -303.6860.00 66.67 66.67 191.43 -112.2460.00 66.67 60.00 -6.67 -118.91

    100.00 111.11 50.00 -61.11 -180.02105.00 116.67 95.45 -21.22 -201.24220.00 244.44 120.90 -123.54 -324.78210.00 233.33 70.00 -163.33 -488.12190.00 211.11 90.00 -121.11 -609.23170.00 188.89 110.00 -78.89 -688.1275.00 83.33 70.15 -13.18 -701.3065.00 72.22 72.22 7.93 -693.3755.00 61.11 61.11 23.89 -669.4845.00 50.00 50.00 45.00 -624.4870.00 77.78 77.78 132.22 -492.26

    MOVIMIENTO DE TIERRAS DIAGRAMA DE MASA

  • 30.00 33.33 33.33 81.67 -410.5940.00 44.44 44.44 209.36 -201.24

    140.00 155.56 143.80 -11.76 -212.99140.00 155.56 60.00 -95.56 -308.5590.00 100.00 70.00 -30.00 -338.55

    Material de Eliminacion -16752.89

    VL 2101.97 m3

    MAT. DE PRESTAMO 0.00 m3

  • QUISPE HILARIO, CIRILO

    0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

  • 0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

  • 0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

  • ZONAS DE BALANCE

    0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

    1 2

    0+040

  • ZONAS DE BALANCE

    0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

    1 2

    0+040 0+4800+300

    0+280

  • ZONAS DE BALANCE

    0+000 0+100 0+200 0+300 0+400 0+500 0+600

    -1500.00

    -1000.00

    -500.00

    0.00

    500.00

    1000.00

    DIAGRAMA DE MASAS

    1 2

    0+040

  • RESULTADOS

    C2 ( Distancias) (ABS) C10

    0+000 0.00 0.000+020 20.00 11.110+040 20.00 112.22 112.22 0.00000+060 20.00 324.44 436.66 324.44000+080 20.00 558.89 995.55 883.33000+100 20.00 740.00 1735.55 1623.33000+120 20.00 890.00 2625.55 2513.33000+130 10.00 921.67 3547.22 3435.00000+140 10.00 898.89 4446.11 4333.89000+150 10.00 880.28 5326.39 5214.17000+160 10.00 876.89 6203.28 6091.06000+180 20.00 855.11 7058.39 6946.17000+200 20.00 785.11 7843.50 7731.28000+220 20.00 695.11 8538.61 8426.39000+240 20.00 524.00 9062.61 8950.39000+260 20.00 303.68 9366.29 9254.07000+280 20.00 112.24 9478.53 9366.31000+290 10.00 118.910+300 10.00 180.020+310 10.00 201.240+330 20.00 324.780+350 20.00 488.120+370 20.00 609.230+390 20.00 688.120+400 10.00 701.300+410 10.00 693.370+420 10.00 669.480+430 10.00 624.480+450 20.00 492.26

    CUADRO DE ANLISIS PARA HALLAR LAS AREAS- (metodo del trapecio) ZONA 1

    TRAMO A ANALIZAR [(abs) C10]

    REAS PARCIALES

  • 0+460 10.00 410.590+480 20.00 201.240+500 20.00 212.990+520 20.00 308.550+540 20.00 338.55

    VAL. MNIMO 112.220REA 1235347.55 m^2

    VOL. CORTE 9366.31 m^3DPA 131.89 m

    EQUIPO TRAILLA

    C2 ( Distancias) (ABS) C10

    0+000 0.00 0.000+020 20.00 11.110+040 20.00 112.220+060 20.00 324.440+080 20.00 558.890+100 20.00 740.000+120 20.00 890.000+130 10.00 921.670+140 10.00 898.890+150 10.00 880.280+160 10.00 876.890+180 20.00 855.110+200 20.00 785.110+220 20.00 695.110+240 20.00 524.000+260 20.00 303.680+280 20.00 112.240+290 10.00 118.910+300 10.00 180.02 180.02 0.00000+310 10.00 201.24 201.24 21.2200

    CUADRO DE ANLISIS PARA HALLAR LAS AREAS- (metodo del trapecio) ZONA 2

    TRAMO A ANALIZAR [(abs) C10]

    REAS PARCIALES

  • 0+330 20.00 324.78 324.78 144.76000+350 20.00 488.12 488.12 308.10000+370 20.00 609.23 609.23 429.21000+390 20.00 688.12 688.12 508.10000+400 10.00 701.30 701.30 521.28000+410 10.00 693.37 693.37 513.35000+420 10.00 669.48 669.48 489.46000+430 10.00 624.48 624.48 444.46000+450 20.00 492.26 492.26 312.24000+460 10.00 410.59 410.59 230.57000+480 20.00 201.24 201.24 21.22000+500 20.00 212.990+520 20.00 308.550+540 20.00 338.550+560 20.00 0.000+580 20.00 0.00

    VAL. MNIMO 180.020REA 55843.35 m^2

    VOL. CORTE 521.28 m^3DPA 107.13 m

    EQUIPO TRACTOR

  • RESULTADOS

    REAS

    0.0003244.400

    12077.70025066.60041366.60029741.65038844.45047740.30056526.150

    130372.300146774.500161576.700173767.800182044.600186203.800

    CUADRO DE ANLISIS PARA HALLAR LAS AREAS- (metodo del

  • REAS

    0.000106.100

    CUADRO DE ANLISIS PARA HALLAR LAS AREAS- (metodo del

  • 1659.8004528.6007373.1009373.1005146.9005173.1505014.0504669.6007567.0002714.0502517.900

  • MATERIAL 1.2METODO ZANJA 1.2DEMSIDAD MATERIAL SUELTO 1500 0.93OPERADOR 1CONDICIONES DE POCA VIS. 0.7EFICIENCIA 0.67VOLUMEN CORTE 521.28DISTANCIA PRO. ACARREO 107.13

    FT 0.628 MULTIPLICACION DE TODO EL AMARILLO

    DE TABLAStractor PI FT PRD8R-8U 98 0.628 61.544D10T-10SU 550 0.628 345.4D10T-10U 600 0.628 376.8

  • MULTIPLICACION DE TODO EL AMARILLO

    TP CE CP COSTO/M38.4700377 100 847.00377 1.62485376

    1.50920672 100 150.920672 0.28951941.38343949 100 138.343949 0.26539278

  • PESO ESPECIFICO SUELTO DEL TERRENO 1600COEF MIN DE EXPANSION DEL TERRENO 1.1MATERIAL 0.8FACTOR DE ESPONJAMIENTO 0.74TIEMPO DE CARGA (MIN) 0.85CAPACIDAD COLMADA 85%OPERADOR 1VELOCIDAD (KM/H) 8DITANCIA (M) 60

    ANALISIS TRAILLA 621GVcarga (m3B) 9.96336Wcarga(kg) 21542.4Wtotal(kg) 53792.4

    RESISTENCIA A LA RODADURA 3%RESISTENCIA A LA PENDIENTE 2%

    ZONA DE BALANCEVOLUMEN DE CORTE 1319.34DPA 147.04

    TIEMPO DE ACARREO TRAILLA 621GDISTANCIA(m) RR RP

    60 3% 2%27.04 3% -0.02

    60 3% -0.02

  • TIEMPO DE RETORNO TRAILLA 621GDISTANCIA(m) RR RP

    60 3% 2%27.04 3% 0.02

    60 3% -0.02

  • TIEMPO DE EMPUJE Y DE CICLOTempuje(min) 1.44Tciclo (min) 3.62013333EFICIENCIA 50

    ANALISIS TRAILLA 631E serie IIVcarga (m3B) 15.43344Wcarga(kg) 33369.6Wtotal(kg) 77579.6

    RESISTENCIA A LA RODADURA 3%RESISTENCIA A LA PENDIENTE 2%

    ZONA DE BALANCEVOLUMEN DE CORTE 1319.34DPA 147.04

    TIEMPO DE ACARREO TRAILLA 631E- SERIE IIDISTANCIA(m) RR RP

    60 3% 2%27.04 3% -0.02

    60 3% -0.02

  • TIEMPO DE ACARREO TRAILLA 631E- SERIE IIDISTANCIA(m) RR RP

    60 3% 2%27.04 3% 0.02

    60 3% -0.02

  • TIEMPO DE EMPUJE Y DE CICLOTempuje(min) 1.44Tciclo (min) 3.62494044EFICIENCIA 50

    TRAILLA N TRAILLAS PRODUCCION (m3 B/h)

    TRAILLA 621G 2 275.22080218043 345.95

    TRAILLA 631E-SERIE II 2 425.75706377893 535.8833333333

  • CARACTERISTICA TRAILLA 621Gpeso trailla vacia (kg) 32250capacidad colmada (m3s) 15.3

    CARACTERISTICA TRAILLA 631E serie IIpeso trailla vacia (kg) 44210capacidad colmada (m3s) 23.7

    ANALISIS TRAILLA 631E serie IIVcarga (m3B) 15.43344Wcarga(kg) 33369.6Wtotal(kg) 77579.6

    60 2%87.04 -2%

    TIEMPO DE ACARREO TRAILLA 621GRT VELOCIDAD(km/h) TIEMPO (min)

    5% 8 0.451% 54 0.030044441% 8 0.45

    TA 0.9300444

  • TIEMPO DE RETORNO TRAILLA 621GRT VELOCIDAD(km/h) TIEMPO (min)

    5% 8 0.455% 27 0.060088891% 8 0.45

    TA 0.9600889

    1%

  • FLOTA BALANCEADA 2.5139814815

    PRODUCCION (m3 B /h) 2 275.2208023 345.95

    60 2%87.04 -2%

    TIEMPO DE ACARREO TRAILLA 631E- SERIE IIRT VELOCIDAD(km/h) TIEMPO (min)

    5% 8 0.451% 54 0.030044441% 8 0.45

    TA 0.9300444

  • TIEMPO DE ACARREO TRAILLA 631E- SERIE IIRT VELOCIDAD(km/h) TIEMPO (min)

    5% 8 0.455% 25 0.0648961% 8 0.45

    TA 0.964896

    1%

  • FLOTA BALANCEADA 2.5173197531

    PRODUCCION (m3 B /h) 2 425.7570643 535.883333

    PRODUCCION (m3 B/h) TP C.TRAILLA C.TRACTOR275.2208021804 4.7937510157 120 80

    345.95 3.813672496 120 80425.7570637789 3.0988094203 150 80535.8833333333 2.461991105 150 80

  • CP S/.m31534.00033 1.16

    1678.0159 1.271177.54758 0.891304.85529 0.99

  • PESO UNITARIO SUELTO (kg/m3) 1305 CARGADOR FRONTAL 966GFACTOR DE ESPONJAMIENTO 0.74 CAPACIDAD NOMINAL (m3 S)RESISTENCIA A LA PENDIENTE 2% FACTOR DE LLENADORESISTENCIA A LA RODADURA 3% TIEMPO DE CICLO (seg)

    COSTO EQ + OPERADOR (S/h)CAMIONES 769D

    CARGA BRUTA (kg) 68180CARGA UTIL (kg) 37900 CARGADOR FRONTAL 950GCAPACIDAD COLMADA (m3 S) 24.2 CAPACIDAD NOMINAL (m3 S)PESO BRUTO (kg) 68180 FACTOR DE LLENADOPESO VACIO (kg) 30280 TIEMPO DE CICLO (seg)COSTO EQ + OPERADOR (S/h) 50 COSTO EQ + OPERADOR (S/h)TIEMPO DE DESCARGA (min) 1.2VC (m3) 6822.77DPA (m) 3107.42

    CARGADOR FRONTAL 966GCAPACIDAD DETRABAJO DE CUCHARON 3.23

    FLOTA BALANCEADA 7.4922600619

    CUCHARONES TC CARGA (min) VOLUMENIDA 1 7 3.5 22.61IDA 2 8 4 25.84RETORNO

  • CUCHARONES TC cucharon TC carga FB camion7 11.89 3.5 3.3978 12.93 4 3.23

    EFICIENCIA DEL CAMION (%) - 7 46.70EFICIENCIA DEL CAMION (%) - 8 50.00

    CUCHARONES CAMIONES P (m3 S/h) TP(h)

    7 3.000 285.1 23.9270464.000 323 21.1298556

    8 3.000 280.7424593968 24.3025944.000 302.5 22.5546116

    CARGADOR FRONTAL 950GCAPACIDAD DETRABAJO DE CUCHARON 2.805

    FLOTA BALANCEADA 8.6274509804

    CUCHARONES TC CARGA (min) VOLUMENIDA 1 8 4 22.44IDA 2 9 4.5 25.245RETORNO

  • CUCHARONES TC cucharon TC carga FB camion8 12.34 4 3.0859 13.37 4.5 2.97

    EFICIENCIA DEL CAMION (%) - 8 46.70EFICIENCIA DEL CAMION (%) - 9 50.00

    CUCHARONES CAMIONES P (m3 S/h) TP(h)

    8 3.000 274.8 24.83261124.000 283 24.1484064

    9 2.000 181.0022438295 37.69439463.000 268.8888888889 25.373938

  • CARGADOR FRONTAL 966GCAPACIDAD NOMINAL (m3 S) 3.8

    FACTOR DE LLENADO 0.85TIEMPO DE CICLO (seg) 30

    COSTO EQ + OPERADOR (S/h) 90

    CARGADOR FRONTAL 950GCAPACIDAD NOMINAL (m3 S) 3.3

    FACTOR DE LLENADO 0.85TIEMPO DE CICLO (seg) 25

    COSTO EQ + OPERADOR (S/h) 80

    PESO TOTALRT RIMPULL VELOCIDAD TIEMPO (min)29.50605 5% 1475.3025 30.53 6.11

    33.7212 5% 1686.06 28 6.6531.613625 1% 316.13625 50 1.08

  • 3.000 4.0003.000 4.000

    C.CAMION C.CARGADOR CP S/ m350 90 5742.49104 0.8450 90 6127.65812 0.9050 90 5832.62255 0.8550 90 6540.83736 0.96

    CARGADOR FRONTAL 950GCAPACIDAD NOMINAL (m3 S) 3.3

    FACTOR DE LLENADO 0.85TIEMPO DE CICLO (seg) 30

    COSTO EQ + OPERADOR (S/h) 80

    PESO TOTALRT RIMPULL VELOCIDAD TIEMPO (min)29.2842 5% 1464.21 30.79 6.06

    32.944725 5% 1647.23625 28.31 6.5931.1144625 1% 311.144625 1.08

  • 3.000 4.0002.000 3.000

    C.CAMION C.CARGADOR CP S/ m350 80 5711.50059 0.8450 80 6761.55379 0.9950 80 6784.99103 0.9950 80 5836.00574 0.86

  • Diagrama de MasaLineas de BalanceRESULTADOSTRACTORMOTRAILLASCAMIONES