Current Situation of Geothermal Power Generation in Japan
Mission
JOGMEC’s Mission and Activities 1
Metals Strategy &
Exploration, and
Technology
Development
Mine Pollution
Control
Stockpiling Coal Strategy &
Exploration, and
Technological
Support
Geothermal
Resources
Development
Oil & Gas
Upstream
Investment and
Research &
Development
Activities
Secure constant and stable supplies of oil, natural gas and mineralresources to support industries and citizens in Japan through variousactivities relating these resources. In 2012 Geothermal function wasadded to the role of JOGMEC.
Matsukawa 23,500kW
Mori 25,000kW
★Ohnuma
9,500kW
Sumikawa
50,000kW
Kakkonda 80,000kWUenotai
28,800kWOnikoube 15,000kW
Yanaizu Nishiyama
65,000kW
Ohtake 12,500kW
Hachijojima 3,300kW★Suginoi 1,900kW
★Kuju 990kW
Takigami 27,500kW
Hacchoubaru 110,000kW, 2,000kW
Ohgiri
30,000kW
Yamakawa
30,000kW ★Kirishima
100kW
Sugawara 5,000kW
in Operation★ for Private Use
Main geothermal power plants in Japan
2
Total Installed Capacity: 525MW
Decreasing gradually
for the past dozen years or soElectricity Generated
Installed Capacity
Source: TENPES,JOGMEC
Geothermal Power Plants in Japan
★Kirishima 100kW
Reserve of Geothermal Resources
0
5000
10000
15000
20000
25000
30000
35000
Resource
Installed Capacity(2015)
3 Japan has the world’s third largest reserve of geothermal
resources(23,400MW), however has only 520MW(2.2%) to have been developed.
Geothermal Potential Area in Japan
Category of Natural Parks Potential (MW)
Special Protection Zone 7,000MW (29.9%)
Special Zone I 2,600MW (11.1%)
Special Zone (II & III) 7,700MW (32.9%)
Ordinary Zone 1,100MW (4.7%)
Outside of Natural Parks 5,000MW (21.4%)
Total 23,400MW (100%)
Approximately 80% of energy potential of geothermal is located within the areas of Natural Parks stipulated by Natural Parks Act.
Consequently, Geothermal Power Plants have been developed mainly outside of these natural parks.
However, after the accident at nuclear power plants in Fukushima, Ministry of Environment issued the guideline which lifted restrictions on drilling at national parks.
4
Japan’s Feed-In-Tariff 5
Japanese government initiated Japan’s Feed-In-Tariff(FIT) in 2012 to accelerate the introduction of renewable energy.
Energy source Solar PV Wind power Geothermal powerSmall- and medium-scale hydraulic
power
Procurement
category
10 kW or
more
Less than10 kW
(purchase of excess
electricity)
20 kW or
more
Less than
20 kW
15,000 kW
or more
Less than
15,000
kW
1,000 kW or
more but less
than 30,000 kW
200 kW or more
but less than 1,000
kW
Less than
200 kW
Cost
Installation cost 280,000 yen/kW 427,000 yen/kW 300,000 yen/kW 1,250,000
yen/kW
790,000
yen/kW
1,230,000
yen/kW
850,000 yen/kW 800,000 yen/kW 1,000,000
yen/kW
Operating and maintenance
costs (per year)
9,000 yen/kW 4,300 yen/kW 6,000 yen/kW - 33,000 yen/kW 48,000
yen/kW
9,500 yen/kW 69,000 yen/kW 75,000 yen/kW
Pre-tax IRR 6% 3.2%(*1) 8% 1.8% 13%(*2) 7% 7%
Pro
cure
men
t
pri
ce p
er k
Wh
Tax
inclusive 38.88 yen 41.04 yen 23.76 yen 59.4 yen 28.08 yen 43.2 yen 25.92yen 31.32 yen 36.72 yen
Tax
exclusive36 yen 38 yen 22 yen 55 yen 26 yen 40 yen 24 yen 29 yen 34 yen
Procurement
period
20 years 10 years 20 years 20 years 15 years 15 years 20 years
Strategic Energy Plan in Japan
0
5
10
15
20
25
Hydro
Solar
Wind
Baio
Geothermal
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2013 2030
Renewable
Nuclear
Oil
LNG
Coal
Geothermal0.3%
Geothermal1%
Ministry of Economy, Trade and Industry, METI, announced “Long-term EnergySupply and Demand Outlook” pursuant to the policies of the Strategic Energy Plan,what mentioned Geothermal energy would be increased to 1.0-1.1% of Primaryenergy by FY 2030.
6
+1,000MW
■Our Big GoalPromote the activation of domestic geothermal development.
■ Action assignments Financial supports for cost issue
Reduce exploration risk (Geological aspect)
■ JOGMEC implements three approaches Financial supports
(Subsidy, Equity Capital, Finance, Liability Guarantees)
Technology development
Regional air-borne geophysical survey
7JOGMEC’s Mission
Subsidy
- Up to 50%~100%*of
necessary funds
Equity Capital Liability Guarantees
Exploration Operation
- Geological Survey
- Geophysical
Exploration
- Structural Boring
- Drilling of
Investigation
Well
- Discharge Test
- Drilling of
Production Well &
Reinjection Well
- Construction, Start-up
& Commissioning of
Power Plant
Potential Survey
- Environmental
Impact
Assessment
EIA
Resource Risk
- Up to 50% of equity capital
(JOGMEC is not allowed to
be the largest shareholder.)
- Up to 80% of loan
provided by
financial institutions
Development
Financial Assistance provided by JOGMEC
Outlines of Financial Assistance 8
Air-Borne
Geophysics
By JOGMEC
Regional Survey
- Commercial
Operation
Musa-Dake
Matsuo-Hachimantai
Kijiyama-Shitanotai
Higashihachimantai
Tsunagionsen
Wasabizawa-Akinomiya
Amemasu-Dake Toyoha
Oyasu
Iwakisan-Dake
Noya
Unazuki
Houreinoyu/Oguni
Okushiri
Tateyama
Ashoro
Kamikawa
Amihari
Bandai
Mutsu/Hiuchi
Hakkouda-Hokusei
Obeno
Adopted Projects form FY2012 to FY2015 9
BieiSobetsu/Bankei
Yakumo/namarikawa
Minamikayabe
IwakisanHakkouda-Seibu/Jyogakura
Itoigawa/oono
Isimatsunoen/Oguni
Hiiji-Dake
Noyahorita
Ohiradani
Arifukuonsen
TanabeshihonguSugawara-Binary
Shimogamo
Tsuchiyuonsen-Binary
Higashiizuchoatagawaonsen
Iwatechinetsu
Subsidized projects (47)
Liability Guarantee projects (3)
Currently, more than 40 exploration projects are on the road by electric companies, oil companies, mining companies, local government and other entities.
Equity Capital projects (1) Lake Toya
EsanShimofuro
Narukoonsen
Sakamakionsen
KaikeonsenHosenjionsen
Asosanseibu
Yunotani
Ibusuki/HigashikataIbusuki/healthy-land
Wasabizawa Geothermal Power Plant 10 Wasabizawa geothermal power plant ( in Yuzawa city, Akita prefecture ) under
construction and will be commenced to operate with a capacity of 42MW in 2019. This is the first large-scale project in about twenty years for constructing such a
plant with a capacity of 10,000 kW or more. JOGMEC provide a liability guarantee for 80% (about 21 billion yen) of the total
loan.
Time DomainElectromagnetic Survey
(HTEM)
Regional Air-Borne Geophysical Survey 11
Hachimantai
Kujyu
Kirishima
Yuzawa・Kurikoma
Air-borne Gravity Gradiometer(AGG)
JOGMEC conducts heli-borne geophysicalsurvey that aims to acquire basic data for theevaluation of geothermal resources in order topromote geothermal development start-up.
No limitation in national
parks!
Niseko
Kamikawa
Musadake
Active volcano
Completed
On going or Planed
Research & Development 12➢ Artificial recharge by river water(EGS
technology)
The research and development to stabilize the geothermal production by improving evaluation accuracy of fluid flow, and optimizing artificial recharge technique
This project is carried out under a collaborative research with EPRI (Electric Power Research Institute in USA)
Technology for Exploration of Geothermal Reservoirs
Improvement of exploration accuracy will be expected by applying the seismic method to image the geothermal reservoir structure by solving these issues.
➢ Drilling Technology
Develop the PDC* bit cutter and body for geothermal well drilling and conduct verification test in order to reduce a drilling cost.
*PDC : Polycrystalline Diamond Compact
Yanaizu-nishiyama power plant
Japanese Government has been trying to expandthe developable area, reduce investment risk andpromote understanding of local people.
JOGMEC has a important role to achieve abovemission.
These measures is expected to bring new interestand new investment in geothermal development inthe future.
13Conclusion
Thank you for your attention!