Current Baseline - gov.uk · 2019-06-04 · 2DE02-ACI-GL-DSK-L000-900300 View 2 Austrey P00.3 AS...
Transcript of Current Baseline - gov.uk · 2019-06-04 · 2DE02-ACI-GL-DSK-L000-900300 View 2 Austrey P00.3 AS...
Drawn Checked Approved
Drawing No.
Date Scale Size
Rev.
Project/Contract
Discipline/Function
Zone
Creator/Originator
Drawing Title
Design Stage
Technical Information Key Plan
Current Baseline
Assessment.
stages of design and Environmental Impact
defined and developed as part of the next
local mitigation measures. These will be
verifiable photomontage does not include
The railway alignment displayed in the
subject to change in response to consultation.
may look. The proposed scheme may be
illustration of how the proposed scheme
This verifiable photomontage provides an
Proposed Scheme
Birmingham, B4 6GA
2 Snow Hill, Queensway,
Registered office:
Registration No. 06791686
Registered in England
Photomontage
A116/05/2019
CLE
2DE02-ACI-GL-DSK-L000-900300
View 2
Austrey
P00.3
AS SHOWN
Hybrid Bill - Draft Initial Preliminary Design
Leeds Leg Whole
Geography and Land Survey
CDES Area 2 (CE2)
Aecom Capita Ineco Joint Venture
images do not lend themselves to direct comparison out in the field.
over time to further integrate the Proposed Scheme into the landscape. At this scale the
Where new planting is proposed, it has been shown as immature plants which would mature
and/or 15 years after opening to help inform the visual impact assessment.
provide an illustration of how the Proposed Scheme may look in the opening years
Environmental Statement. A number of verified photomontages will be produced to
details of the visual impact assessment at the select viewpoints in Volume 5 of the
For the Hybrid bill submission, the supporting Environmental Statement will include full
consultation.
may be subject to change through ongoing design development and in response to
These are produced as a snapshot of the current work in progress as the Proposed Scheme
This visualisation is provided for illustration purposes only to help inform the DRC events.