ADDENDUM NO. 1 TO THE CONFORMED PROJECT MANUAL
CURB CUTS AND HANDICAP RAMP RECONSTRUCTION
for
JERSEY SHORE BOROUGH
Project No. 17-675
Date of Addendum: June 1, 2017
Date of Bid Receipt: June 12, 2017 (NO CHANGE)
Time of Bid Receipt: 1:00 p.m. (EDT) (NO CHANGE)
Date of Bid Opening: June 1, 2017 (NO CHANGE)
Time of Bid Opening: 1:00 p.m. (EDT) (NO CHANGE)
To All Bidders:
Bidders for the above named project shall take note of the following changes, additions, deletions, clarifications, etc., to the Conformed Project Manual, which shall become a part of and have
precedence over anything contrarily shown on or described in the Conformed Project Manual, and all such shall be taken into consideration and shall be included in the Bid Proposal.
This Addendum is hereby made a part of the Conformed Project Manual on which this contract will
be based and is issued to modify, explain, and/or correct the original Conformed Project Manual. Bidders are advised to attach this Addendum to your Conformed Project Manual and submit bids
and be otherwise governed accordingly.
Bidder must acknowledge receipt of this Addendum on page 00300-2 of the PROPOSAL Forms.
Please see the attached pages.
William M. Scott, PE CME Project Manager
Associate
Jersey Shore Borough Curb Cuts and Handicap Ramp Reconstruction
17-675 6/01/2017 Page 2 of 4
Concerning the Contract Drawings:
SHEET No. 1: Curb Cuts and Handicap Ramp Reconstruction Site Plan & Details REVISE AS NOTED BELOW:
Revised Elm & Walnut Street site plan and pavement restoration detail.
Clarifications from Pre-Bid Meeting and Site Visit:
1. Pavement Restoration -- HMA 9.5mm surface course will only be placed at Elm & Walnut Street, all
other locations to use 25mm base course instead of surface course.
2. Specification 01150, 1.05 General Notes; Item 9 - disregard cofferdam.
3. Borough will not accept demolition concrete or millings.
4. Walnut & Elm Street – Northwest ramp will also be replaced.
5. Oliver & Walnut Street – South side 2 ramps are Base Bid Item, North side 2 ramps are Alternate Bid
Item.
6. SEDA-COG – provides project sign.
7. No flowable fill allowed for subbase.
8. Stone under walks to be 2A, not crusher run.
9. TIF designs were completed, reviewed and approved by a 3rd party engineer.
10. Use red, cast-in-place Detectable Warning Surface Tile.
11. Bidders need to have either purchased bid documents from Bassett Engineering or submit their bids
on PennBid. Bidders may not download bid forms from PennBid and submit hard copies of these at the bid opening. Bid forms downloaded on PennBid need to be submitted on PennBid and bid forms
purchased from Bassett Engineering may be submitted at the bid opening.
12. The project is anticipated to be awarded at the June 12th Borough Council meeting. Contracts will be
prepared after this and a notice to proceed will be given the following week. Construction needs to
be completed before August when a street project will commence.
End of Addendum Number 1
Jersey Shore Borough Curb Cuts and Handicap Ramp Reconstruction
17-675 6/01/2017 Page 3 of 4
PRE-BID CONFERENCE MEETING MINUTES
June 1, 2017
Jersey Shore Borough
Curb Cuts and Handicap Ramp Reconstruction
Attendees: Bill Scott – Bassett Engineering, Inc.
Joseph Hamm – Jersey Shore Borough
James Brent – Glenn O. Hawbaker, Inc.
Jason Metzger – HRI, Inc.
Clay Kantz, Joyce Seno – Midstate Paving
Jamie Wacker – James Wacker, LLC Excavating
Matt Zinchini – Winfall Engineering
Agenda: Bill Scott started the meeting by reviewing the pre-bid agenda
1. Bid Opening 6/12/2017 @ 1 p.m. (@ Jersey Shore Borough Municipal Building)
a. Receive Bids up to 1 p.m. (@ Municipal Building or PennBid website)
b. Bid Bond 10%
c. Notice to Proceed 6/19/17 (anticipated)
2. Bid Form distributed with Contract Documents:
a. Bids will only be accepted from interested parties who have either purchased the
Conformed Project Manual from Bassett Engineering or those bidding online through the PennBid website.
3. Bid award to lowest responsive & responsible bidder:
a. Responsive – complete, correct bid package
b. Responsible – work history
4. Contract:
a. Contract Time: 45 days
b. Performance, Payment and Maintenance Bonds: 100% each
c. Liquidated Damages: one (1) to fifteen (15): $200 per calendar day; sixteen (16) to
thirty (30): $500 per calendar day; greater than thirty (30): $1,000 per calendar day
d. General Contractor must complete 50% of field labor with his own forces
e. Davis-Bacon Wages must be paid
5. Payment:
a. Monthly progress payments. Borough Council meets monthly the 2nd Monday. Pay
Application due to Engineer two (2) weeks in advance.
b. 10% retainage until Final Completion.
Jersey Shore Borough Curb Cuts and Handicap Ramp Reconstruction
17-675 6/01/2017 Page 4 of 4
6. Contract and Bid Item explanations:
a. Curb Cuts and Handicap Ramp Reconstruction: The Work covered under this
section shall consist of:
Removing the existing sidewalk and curb areas as designated on the plan and
installing approximately fifteen (15) new ADA-compliant handicap access concrete curb ramps with detectable warning surface at various intersections with associated
site clearing, traffic control and pavement and lawn restoration.
Lump Sum Base Bid Items
101: Walnut Street and Elm Street – 3 curb cuts
102: Oliver Street and Locust Street – 4 curb cuts
103: Oliver Street and Walnut Street – 2 curb cuts
104: Bastress Street and Locust Street – 2 curb cuts (South side)
Lump Sum Add Alternate Bid Items
201: Bastress Street and Walnut Street – 2 curb cuts
202: Oliver Street and Walnut Street – 2 curb cuts (North side)
7. Mobilization: Includes demobilization, storage, insurance, bonds, etc.
8. Limits of Work – No work shall be permitted outside the Borough’s Property. No equipment and
materials shall be stored, and sheds or storage trailers shall be placed outside of the Contract Limits.
9. Successful bidder shall submit construction schedule.
10. Addendum Item(s):
a. Pre-bid meeting minutes.
b. Contract Drawing
11. CDBG Requirements – Kristin McLaughlin (SEDA-COG), [email protected],
570-524-4491
12. A Site tour was conducted at the end of the meeting.
S
ELM & WALNUT
OLIVER & LOCUST
OLIVER & WALNUT
BASTRESS & LOCUST
BASTRESS & WALNUT
WV
D
Y
H
WV
S
CONC. STEPS
P
O
R
C
H
C
O
N
C
. S
ID
E
W
A
LK
CONCRETE CURB
CO
NC
. S
IDE
W
ALK
CO
NC
. S
ID
EW
ALK
CO
NC
. S
IDE
W
ALK
CO
NC
. W
ALK
OU
T
CO
NC
. S
ID
EW
ALK
MB
STUMP
CO
NC
. W
ALK
OU
T
CO
NC
. W
ALK
OU
T
GRAVEL RESTORATIO
N
CONCRETE CURB
CONCRETE CURB
WOOD STEPS
NOTE 5
NOTE 4
W
ALN
UT STREET
E
L
M
S
T
R
E
E
T
NOTE 7
NOTE 3
NOTE 3, REPLACE
SIDEWALK TO EX.
CONCRETE STEPS
NOTE 3
NOTE 12 (TYP.)
37'
41'
2'
NOTE 3, REPLACE SIDEWALK
TO EX. CONCRETE WALKOUT
1' TRANSITION TO
MATCH EX. REVEAL,
REPLACE CURB TO
END OF RADIUS
1' TRANSITION TO
MATCH EX. REVEAL,
REPLACE CURB TO
END OF RADIUS
1' TRANSITION TO
MATCH EX. REVEAL,
REPLACE CURB TO
END OF RADIUS
LOCR
LOCR
LOCR
LOCR
LOCR
NOTE 3
LOCR
NOTE 5
NOTE 8
LOCUST
STREET
BASTRESS STREET
NOTE 3
NOTE 3
NOTE 12
NOTE 12
16'
20'
LOCR
LOCR
LOCR
S
WV
WV
WV
D
Y
H
WV
NOTE 6
SLA
TE
SLA
TE
WALNUT STREET
OLIVER STREET
CONCRETE SIDEWALK
NOTE 6
STEPS
CONCRETE SIDEWALK
CONC.
PAD
CONC. CURB
CONC. CURB
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONC. STEP
PORCH COLUMN
IN SIDEWALK
STEPS
PORCH
PORCH
CHURCH
PO
RC
H
1' TRANSITION FROM
0-EXISTING CURB
REVEAL, REPLACE CURB
TO END OF RADIUS
DOWNSPOUT
TRENCH DRAIN
NOTE 3
NOTE 3
NOTE 3
MB
CONC. CURB
DOWNSPOUT
TRENCH DRAIN
NOTE 3
NOTE 12 (TYP.)
5'
7'
15'
10'
17'
14'
7'
10'
1' TRANSITION FROM 0 TO
EXISTING CURB REVEAL,
REPLACE CURB TO END OF
RADIUS
1' TRANSITION FROM
0-EXISTING CURB REVEAL
REPLACE TO END OF RADIUS
NOTE 3
LOCR
LOCR
LOCR
LOCR
LOCR
LOCR
LOCR
WV
S
WV
D
Y
H
WV
NOTES 4 & 5
NOTE 5
WALNUT STREET
BASTRESS STREET
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CO
NC
RE
TE
S
ID
EW
ALK
NOTE 3
NOTE 3
NOTE 12
NOTE 12
1' TRANSITION FROM
0-6" REVEAL
18'
10'
24'
1' TRANSITION FROM
0-EXISTING REVEAL
1' TRANSITION FROM
0-EXISTING REVEAL
NOTE 3
REPLACE HYDRANT PAD TO ALIGN
WITH NEW SIDEWALK ELEVATION
LOCR
LOCR
LOCR
LOCR
WV
WV
S
S
NOTE 6
NOTE 5
LOCUST STREET
OLIVER STREET
NOTE 3
NOTE 3
CONCRETE SIDEWALK
CONC. CURB
STEP (TBR)
CONC. CURB
CONC. CURB
NOTE 12 (TYP.)
13'
9'
NOTE 3
NOTE 3
CONC. CURB
1 TRANSITION FROM
DEPRESSED CURB TO
EXISTING REVEAL
1' TRANSITION FROM
DEPRESSED CURB TO
EXISTING REVEAL
1 TRANSITION FROM
DEPRESSED CURB TO
EXISTING REVEAL
12'
8'
NOTE 3
17'
20'
LOCR
LOCR
LOCR
LOCR
LOCR
LOCR
LOCR
COPYRIGHT 2017 BASSETT ENGINEERING ALL RIGHTS RESERVED
c
WITHOUT THE CONSENT OF BASSETT ENGINEERING IS PROHIBITED.
DESIGNATED HEREON. MODIFICATION, REVISION, DUPLICATION OR USE
PLAN IS PREPARED SPECIFICALLY FOR THE CLIENT AND PROJECT
SHOULD BE CONSIDERED OFFICIAL AND RELIED UPON BY USER. THIS
ONLY THOSE PLANS INCORPORATING THE SIGNED PROFESSIONAL SEAL
PLAN
NORTH
UTILITY NOTIFICATION
PER REQUIREMENTS OF PENNSYLVANIA ACT 287
AND SUBSEQUENT AMENDMENTS
NOTIFICATION WAS MADE TO THE PA ONE CALL
SYSTEM (POCS) BY BASSETT ENGINEERING INC.
SERIAL NUMBERS 20171291954-000,
20171291973-000, 20171291976-000,
20171291979-000, 20171291980-000,
20171291981-000.
PA ONE CALL 1-800-242-1776
CONTRACTOR IS ADVISED THAT PENNSYLVANIA LAW REQUIRES POCS BE
CONTACTED 2 BUSINESS DAYS PRIOR TO INITIATING AND EXCAVATION OF
DEMOLITION ACTIVITIES FOR THIS PROJECT.
PROJECT NO.
SHEET NUMBER
DRAWING FILE
SHEET TITLEPROJECT TITLE
DATE:
DATE:
DATE:
DATE:DESIGN BY:
CHECKED BY:
DRAWING BY:
CHECKED BY:
DATE:SURVEY BY:
DESCRIPTION
REVISIONS
NO. DATE
OF 1
17-675
CURB CUTS AND HANDICAP RAMP RECONSTRUCTION
JERSEY SHORE BOROUGH
LYCOMING COUNTY, PA
Site Plan
KAM 5/21/2017
WMS 5/21/2017
KAM 5/21/2017
WMS 5/21/2017
SH/KM 4/21/2017
ADDENDUM #1 - REVISE SITE PLAN AND PAVEMENT RESTORATION DETAIL1 6/2/2017 BassettEngineering
(570) 368-2131 bassetteng.com
1440 BROAD STREET MONTOURSVILLE PA 17754
SITE PLAN & DETAILS
F
O
I
A
H
T
L
A
M
O
W
N
REGISTERED
E
ENGINEER
PROFESSIONAL
O
E
P
C
M
A
V
LY
N
S
N
N
WILLIAM M. SCOTT
PE073262
0
Scale 1" =
20' 20' 60'40'
20'
Scale 1" = 500'
500' 500'0
1
GENERAL NOTES:
1. Construction on this project shall implement the following PennDOT Roadway Construction Standard
Details:
RC-20M CONCRETE PAVEMENT JOINTS
RC-21M REINFORCED CONCRETE PAVEMENT
RC-24M PAVEMENT RELIEF JOINT
RC-27M PLAIN CONCRETE PAVEMENT
RC-64M CURBS & GUTTERS
RC-65M CONCRETE MOUNTABLE CURBS
RC-67M CURB RAMPS AND SIDEWALKS
2. The referenced roadway construction details can be downloaded from
https://www.dot.state.pa.us/public/bureaus/design/pub72m/toc-index-chg1.pdf.
3. Limit of sidewalk replacement. Construction limits shall be assumed to be at the nearest pavement joint to
the limits shown on these plans.
4. Compliance with ADA standards is Technically Infeasible (TIF) in this area. Sidewalk slopes exceed ADA
standards.
5. Type 1A ramp as depicted on Sheet 2 of RC-67M.
6. Type 1A ramp as depicted on Sheet 3 of RC-67M.
7. Construct cheek wall. Top of wall to match existing lawn adjacent to back of sidewalk.
8. Sidewalk outside reconstruction area shall be removed and not replaced.
9. The contractor shall paint curbs yellow in on all curb areas that were painted yellow prior to demolition.
10. Hatching denotes limit of sidewalk replacement. Where sidewalk replacement abuts curbing, curbing shall
also be replaced.
11. All water valve boxes, and other existing structures affected by the proposed construction shall be adjusted
to match the proposed pavement grades.
12. Install detectable warning surface as shown.
13. Expansion material shall be provided between all retaining structures and sidewalks.
14. LOCR = Limit of Curb Removal. New curb shall match existing curb reveal at the limit of curb removal.
N.T.S
CONCRETE SIDEWALK SECTION
CLASS "A" CONCRETE
4" (TYP.), 6" IN DRIVEWAY AREAS
6" WELL COMPACTED 2A MODIFIED STONE
2% MAX. CROSS SLOPE
Notes:
1. Sidewalk shall have tooled 1/4" deep expansion joints spaced equal to the sidewalk
width.
2. A full depth pavement joint shall be provided every 20' and at the beginning of
transitions from 4" to 6" pavement thickness.
3. 6" pavement thickness shall be provided at points where driveways cross the sidewalk.
6" thick concrete shall be Class "AA".
4. A 5' transition shall be provided when the sidewalk thickness changes from 4" to 6".
4 x 4 x W5.5 WWF
EXISTING GROUND (COMPACTED TO 95% DENSITY)
OVERALL SITE PLAN
SITE PLAN - BASTRESS & LOCUST
SITE PLAN - BASTRESS & WALNUT
SITE PLAN - OLIVER & WALNUT
SITE PLAN - OLIVER & LOCUST
SITE PLAN - ELM & WALNUT
2'-0" MAX.
ROADWAY EXCAVATION & RESTORATION
VARIES
SLOPE VARIES
HOT MIX ASPHALT SURFACE
COURSE, 9.5 MM, 1.5" THICK
HOT MIX ASPHALT BASE
COURSE, 25 MM, 4" THICK
PRIME COAT
SAWCUT EXISTING PAVEMENT
FULL DEPTH, APPLY TACK COAT
WELL-COMPACTED SOIL SUB-GRADE
WELL-COMPACTED PENNDOT 2A MODIFIED STONE, 6" THICK
SEAL PAVEMENT JOINT
PLAIN CEMENT CONCRETE CURB
(CURB REVEAL VARIES)
CONCRETE SIDEWALK (SEE DETAIL)
N.T.S
PAVEMENT RESTORATION DETAIL
PROPOSED SIDEWALK
DOWNSPOUT TRENCH DRAIN
N.T.S
DOWNSPOUT TRENCH
DRAIN DETAIL
5' TO NEXT
JOINT (TYP.)
Notes:
1. Sidewalk trench drains shall be provided at all locations where existisng
building downspouts discharge via piping through the existing curb.
2. Downspouts shall be connected to trench drains using trench drain
manufacturer's couplings.
3. Trench drain subgrade shall be at least 6", but not less than the
manufacturer's specifications.
4. Trench drains shall be Polylok (SKU 164) or approved equal and shall be
installed per manufacturer's specifications.
TRENCH DRAIN SUBGRADE
FACE OF CURB
PIPE THROUGH CURB
GUTTER LINE
NEW STREET PAVEMENT
SECTION THROUGH SIDEWALK
FACE OF CURB SECTION
NOTES:
1. Suitable native material shall
be used for backfill above pipe
bedding to grade.
2. In lawn areas backfill trench
with native material to 3"
above existing grade and seed
according to specifications.
3. All material gradations must be
in accordance with PennDOT
Publication 408.
4. The trench dimensions identify
the minimum amount of pipe
bedding material required to
protect the pipe. If the
excavation of a wider trench is
necessary, there will be no
adjustment in the quantities
paid for.
N.T.S
EXISTING GRADE
12"
O.D.
12"
VARIES
6" MIN.
O.D.
12" MIN.
24"
SUITABLE
NATIVE
MATERIAL
3" WIDE
WARNING
TAPE
A.A.S.H.T.O.
#57 STONE
UNDISTURBED
SOIL OR ROCK
TYPICAL TRENCH SECTION - PLASTIC PIPE
TRENCH LIMITS
Notes:
1. HMA Surface Course, 9.5 mm will only be placed at the restoration of the curb
improvements at the intersection of Elm and Walnut Street. All other locations will be
restored using HMA Base Course, 25 mm to the depressed curb and adjacent pavement