CUADRO DE TUB
SECTOR CANAL Label Length (3D) (m) Start Node Stop Node
CONDUCCION P-1 28.09 29.16 R-1 J-1 110
CONDUCCION P-2 82.39 82.78 J-1 H-1 110
CONDUCCION P-3 43.49 43.54 H-1 J-2 110
PRINCIPAL 1 P-4 12.24 13.46 R-2 J-3 110
PRINCIPAL 1 P-5 150.02 150.22 J-3 J-5 90
PRINCIPAL 1 P-6 25.69 25.75 J-5 H-3 75
PRINCIPAL 1 P-7 27.09 27.20 H-3 H-4 75
PRINCIPAL 1 P-8 28.16 28.27 H-4 J-6 75
PRINCIPAL 1 P-9 11.80 11.83 J-6 H-5 75
PRINCIPAL 1 P-10 35.78 35.81 H-5 H-6 75
PRINCIPAL 1 P-11 32.50 32.50 H-6 H-7 75
PRINCIPAL 1 P-12 13.84 13.85 H-7 J-7 75
PRINCIPAL 1 P-13 21.44 21.46 J-7 H-8 63
PRINCIPAL 1 P-14 35.45 35.48 H-8 H-9 63
PRINCIPAL 1 P-15 25.04 25.46 H-9 H-10 63
PRINCIPAL 1 P-16 43.14 44.41 H-10 J-9 63
PRINCIPAL 1 P-17 16.24 17.51 J-9 H-11 50
PRINCIPAL 1 P-18 11.45 12.02 H-11 CRP TIPO 7-6 50
PRINCIPAL 1 P-19 32.08 34.49 CRP TIPO 7-6 H-12 50PRINCIPAL 1 P-20 14.44 14.49 H-12 H-13 50
PRINCIPAL 1 P-21 12.86 13.74 H-13 H-14 50
PRINCIPAL 1 P-22 16.70 16.97 J-3 J-4 110
PRINCIPAL 1 P-23 34.62 36.12 J-4 H-15 75
PRINCIPAL 1 P-24 8.85 9.26 H-15 H-16 75
PRINCIPAL 1 P-25 32.73 34.10 H-16 J-8 75
PRINCIPAL 1 P-26 10.06 10.24 J-8 H-17 63
PRINCIPAL 1 P-27 41.08 41.96 H-17 H-18 63
PRINCIPAL 1 P-28 71.14 72.37 CRP TIPO 7-2 H-19 63
Length(Scaled) (m)
DameterNom! (mm)
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
2/28
PRINCIPAL 1 P-29 8.04 8.37 H-18 CRP TIPO 7-2 63
PRINCIPAL 1 P-30 32.26 32.49 H-19 J-10 63
PRINCIPAL 1 P-31 8.50 8.55 J-10 J-12 50
PRINCIPAL 1 P-32 30.99 31.42 J-12 H-20 50
PRINCIPAL 1 P-33 26.14 26.38 H-20 H-21 50
PRINCIPAL 1 P-34 40.11 40.51 H-21 H-22 50
PRINCIPAL 1 P-35 21.51 21.65 H-22 H-23 50
PRINCIPAL 1 P-36 63.62 63.66 H-23 J-61 50
PRINCIPAL 1 P-37 40.56 44.00 J-4 H-24 90
PRINCIPAL 1 P-38 37.20 38.08 H-24 H-25 90
PRINCIPAL 1 P-39 13.52 13.58 H-25 H-26 90
PRINCIPAL 1 P-40 21.85 23.22 H-26 H-27 90
PRINCIPAL 1 P-41 31.41 31.87 H-27 H-28 90
PRINCIPAL 1 P-42 23.36 23.51 H-28 H-29 90
PRINCIPAL 1 P-43 7.88 8.26 H-29 CRP TIPO 7-1 90
PRINCIPAL 1 P-44 40.91 41.76 CRP TIPO 7-1 J-11 90
PRINCIPAL 1 P-45 15.62 16.65 J-11 H-30 50
PRINCIPAL 1 P-46 29.33 30.46 H-30 H-31 50
PRINCIPAL 1 P-47 28.09 28.59 H-31 J-14 50
PRINCIPAL 1 P-48 15.31 18.81 J-14 H-32 50
PRINCIPAL 1 P-49 46.93 47.61 H-32 H-33 50
PRINCIPAL 1 P-50 10.66 10.68 H-33 H-34 50
PRINCIPAL 1 P-51 30.54 30.57 H-34 H-35 50
LATERAL 1 P-52 33.38 36.43 J-1 H-2 50
LATERAL 1 P-53 19.92 25.52 J-5 H-36 50
LATERAL 1 P-54 20.08 26.48 H-36 H-37 50
LATERAL 1 P-55 23.31 23.71 J-6 H-38 50
LATERAL 1 P-56 22.38 23.14 H-38 CRP TIPO 7-4 50
LATERAL 1 P-57 34.37 37.37 CRP TIPO 7-4 H-39 50
LATERAL 1 P-58 30.60 33.33 H-39 H-40 50
LATERAL 1 P-59 29.44 30.56 J-7 H-41 50
LATERAL 1 P-60 36.33 37.67 H-41 H-42 50
SECTO
R"
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
3/28
LATERAL 1 P-61 33.59 34.33 H-42 H-43 50
LATERAL 1 P-62 3.68 4.21 H-43 CRP TIPO 7-5 50
LATERAL 1 P-63 17.24 20.27 CRP TIPO 7-5 H-44 50
LATERAL 1 P-64 18.71 19.60 H-44 H-45 50
LATERAL 1 P-65 7.37 7.75 H-45 H-46 50
LATERAL 1 P-66 20.99 21.44 J-9 H-47 50
LATERAL 1 P-67 19.43 19.48 H-47 H-48 50
LATERAL 1 P-68 31.96 32.61 J-8 H-49 50
LATERAL 1 P-69 33.39 34.07 H-49 H-50 50
LATERAL 1 P-70 44.68 45.19 H-50 H-51 50
LATERAL 1 P-71 65.41 65.47 J-12 H-52 50
LATERAL 1 P-72 78.52 79.38 J-10 H-53 50
LATERAL 1 P-73 18.84 18.96 H-53 H-54 50
LATERAL 1 P-74 38.48 38.56 H-54 H-55 50
LATERAL 1 P-75 25.17 25.97 H-55 H-56 50
LATERAL 1 P-76 20.86 21.07 H-56 H-57 50
LATERAL 1 P-77 16.98 17.39 H-57 CRP TIPO 7-3 50
LATERAL 1 P-78 35.19 37.24 CRP TIPO 7-3 H-58 50
LATERAL 1 P-79 16.58 16.99 H-58 H-59 50
LATERAL 1 P-80 20.78 21.57 H-59 H-60 50
LATERAL 1 P-81 32.48 32.50 J-14 H-61 50
LATERAL 1 P-82 34.10 35.31 H-61 H-62 50
LATERAL 1 P-83 56.59 56.72 J-11 H-63 75
LATERAL 1 P-84 45.54 47.22 H-63 H-64 75
LATERAL 1 P-85 78.77 80.12 H-64 H-65 75
LATERAL 1 P-86 38.22 38.24 H-65 J-17 75
LATERAL 1 P-87 21.16 21.16 J-17 H-66 63
LATERAL 1 P-88 14.72 14.72 H-66 H-67 63
LATERAL 1 P-89 12.15 12.15 H-67 H-68 63
LATERAL 1 P-90 7.65 7.66 H-68 J-16 63
LATERAL 1 P-91 20.56 20.60 J-16 H-69 50
LATERAL 1 P-92 15.59 15.62 H-69 H-70 50
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
4/28
LATERAL 1 P-93 30.16 30.82 H-70 H-71 50
LATERAL 1 P-94 32.45 32.45 H-71 H-72 50
LATERAL 1 P-95 20.18 20.31 J-17 H-73 50
LATERAL 1 P-96 19.55 19.86 H-73 H-74 50
LATERAL 1 P-97 61.79 61.80 J-16 J-15 50
LATERAL 1 P-98 14.10 14.12 J-15 H-75 50
LATERAL 1 P-99 18.01 18.01 J-15 H-76 50
PRINCIPAL 2 P-100 0.40 2.00 R-3 J-18 160
PRINCIPAL 2 P-101 83.04 83.07 J-18 J-19 110
PRINCIPAL 2 P-102 45.29 45.30 J-19 J-20 110
PRINCIPAL 2 P-103 55.66 56.28 J-20 H-77 75
PRINCIPAL 2 P-104 26.61 26.71 H-77 H-78 75
PRINCIPAL 2 P-105 18.82 18.96 H-78 H-79 75
PRINCIPAL 2 P-106 33.23 33.98 H-79 H-80 75
PRINCIPAL 2 P-107 16.77 16.97 H-80 J-26 75
PRINCIPAL 2 P-108 17.10 17.17 J-26 H-81 63
PRINCIPAL 2 P-109 41.07 41.23 H-81 H-82 63
PRINCIPAL 2 P-110 15.89 15.95 H-82 H-83 63
PRINCIPAL 2 P-111 15.83 16.46 H-83 CRP TIPO 7-10 63
PRINCIPAL 2 P-112 31.72 33.62 CRP TIPO 7-10 J-29 63
PRINCIPAL 2 P-113 66.89 68.08 J-29 H-84 50
PRINCIPAL 2 P-114 24.49 25.33 H-84 H-85 50
PRINCIPAL 2 P-115 24.59 25.09 H-85 H-86 50
PRINCIPAL 2 P-116 26.30 26.34 H-86 H-87 50
PRINCIPAL 2 P-117 20.81 21.64 H-87 H-88 50
PRINCIPAL 2 P-118 32.57 32.81 H-88 H-89 50
PRINCIPAL 2 P-119 70.03 70.04 H-89 H-90 50
PRINCIPAL 2 P-120 118.61 118.79 J-18 J-21 160
PRINCIPAL 2 P-121 37.25 37.39 J-21 H-91 160
PRINCIPAL 2 P-122 19.61 19.68 H-91 J-22 110
PRINCIPAL 2 P-123 14.05 14.09 J-22 H-92 110
PRINCIPAL 2 P-124 27.82 27.91 H-92 H-93 110
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
5/28
PRINCIPAL 2 P-125 3.89 3.92 H-93 J-23 110
PRINCIPAL 2 P-126 13.49 14.61 J-23 H-94 90
PRINCIPAL 2 P-127 8.04 8.37 H-94 J-25 90
PRINCIPAL 2 P-128 11.85 11.93 J-25 H-95 90
PRINCIPAL 2 P-129 17.89 17.99 H-95 H-96 90
PRINCIPAL 2 P-130 29.72 29.83 H-96 H-97 90
PRINCIPAL 2 P-131 8.04 8.07 H-97 J-27 90
PRINCIPAL 2 P-132 7.14 7.17 J-27 H-98 75
PRINCIPAL 2 P-133 23.18 23.27 H-98 H-99 75
PRINCIPAL 2 P-134 23.78 24.03 H-99 H-100 75
PRINCIPAL 2 P-135 31.64 31.66 H-100 H-101 63
PRINCIPAL 2 P-136 3.67 3.82 H-101 H-102 63
PRINCIPAL 2 P-137 36.23 37.39 H-102 H-103 63
PRINCIPAL 2 P-138 9.15 9.40 H-103 H-104 63
PRINCIPAL 2 P-139 6.15 6.22 H-104 VRP-01 50
PRINCIPAL 2 P-140 10.76 10.89 VRP-01 J-30 50
PRINCIPAL 2 P-141 9.68 9.71 J-30 H-105 50
PRINCIPAL 2 P-142 29.69 30.41 H-105 H-106 50
PRINCIPAL 2 P-143 19.70 19.76 H-106 H-107 50
PRINCIPAL 2 P-144 19.68 20.38 H-107 H-108 50
PRINCIPAL 2 P-145 28.72 28.73 J-23 H-109 75
PRINCIPAL 2 P-146 14.52 14.52 H-109 H-110 75
PRINCIPAL 2 P-147 8.51 8.51 H-110 H-111 75PRINCIPAL 2 P-148 16.42 16.44 H-111 H-112 75
PRINCIPAL 2 P-149 15.16 15.21 H-112 H-113 75
PRINCIPAL 2 P-150 19.94 19.94 H-113 J-24 75
PRINCIPAL 2 P-151 20.87 20.91 J-24 H-114 63
PRINCIPAL 2 P-152 26.82 28.34 H-114 H-115 63
PRINCIPAL 2 P-153 17.34 17.46 H-115 H-116 63
PRINCIPAL 2 P-154 17.32 17.36 H-116 H-117 63
PRINCIPAL 2 P-155 12.91 13.07 H-117 H-118 63
PRINCIPAL 2 P-156 3.56 3.69 H-118 J-28 63
SECT
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
6/28
PRINCIPAL 2 P-157 10.79 11.23 J-28 H-119 50
PRINCIPAL 2 P-158 23.81 24.75 H-119 H-120 50
PRINCIPAL 2 P-159 13.61 14.16 H-120 H-121 50
PRINCIPAL 2 P-160 13.68 14.22 H-121 H-122 50
PRINCIPAL 2 P-161 17.20 17.45 H-122 H-123 50
LATERAL 2 P-162 30.26 31.02 J-19 H-124 50
LATERAL 2 P-163 15.00 16.64 J-20 H-125 50
LATERAL 2 P-164 6.45 7.53 H-125 H-126 50
LATERAL 2 P-165 9.07 9.91 H-126 H-127 50
LATERAL 2 P-166 9.48 10.36 H-127 H-128 50
LATERAL 2 P-167 26.04 29.93 J-26 H-129 50
LATERAL 2 P-168 14.52 16.38 H-129 H-130 50
LATERAL 2 P-169 16.87 18.17 H-130 CRP TIPO 7-9 50
LATERAL 2 P-170 26.80 33.06 CRP TIPO 7-9 H-131 50
LATERAL 2 P-171 16.84 18.69 J-29 H-132 50
LATERAL 2 P-172 14.10 16.83 H-132 H-133 50
LATERAL 2 P-173 17.87 18.73 H-133 H-134 50
LATERAL 2 P-174 23.32 24.27 H-134 H-135 50
LATERAL 2 P-175 20.27 21.47 H-135 H-136 50
OR#
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
7/28
LATERAL 2 P-176 16.05 16.86 J-21 H-137 50
LATERAL 2 P-177 21.08 25.04 J-22 H-138 50
LATERAL 2 P-178 17.86 19.36 H-138 H-139 50
LATERAL 2 P-179 27.99 28.85 H-139 H-140 50
LATERAL 2 P-180 13.33 14.99 H-140 H-141 50
LATERAL 2 P-181 10.44 11.69 H-141 CRP TIPO 7-7 50
LATERAL 2 P-182 19.30 21.41 CRP TIPO 7-7 J-31 50
LATERAL 2 P-183 24.77 28.08 J-31 H-142 50
LATERAL 2 P-184 31.24 32.88 J-31 H-143 50
LATERAL 2 P-185 12.65 12.75 H-143 H-144 50
LATERAL 2 P-186 26.09 26.28 H-144 H-145 50
LATERAL 2 P-187 18.47 20.91 J-25 H-146 50
LATERAL 2 P-188 19.33 21.31 H-146 H-147 50
LATERAL 2 P-189 16.89 17.89 H-147 H-148 50
LATERAL 2 P-190 23.76 24.93 J-27 H-149 50
LATERAL 2 P-191 24.27 26.13 H-149 H-150 50
LATERAL 2 P-192 35.31 35.90 H-150 H-151 50
LATERAL 2 P-193 35.49 36.36 H-100 H-152 50
LATERAL 2 P-194 32.57 32.93 H-152 H-153 50
LATERAL 2 P-195 8.05 8.78 H-153 CRP TIPO 7-8 50
LATERAL 2 P-196 27.10 29.29 CRP TIPO 7-8 H-154 50
LATERAL 2 P-197 16.46 19.45 H-154 H-155 50
LATERAL 2 P-198 9.83 10.48 H-155 J-32 50LATERAL 2 P-199 28.61 35.36 J-32 H-156 50
LATERAL 2 P-200 14.36 15.27 J-32 H-157 50
LATERAL 2 P-201 35.63 35.63 H-157 H-158 50
LATERAL 2 P-202 36.62 37.33 H-158 H-159 50
LATERAL 2 P-203 10.78 10.93 H-160 J-30 50
LATERAL 2 P-204 41.86 42.11 H-161 H-160 50
LATERAL 2 P-205 28.61 28.76 H-161 H-162 50
LATERAL 2 P-206 29.21 29.52 H-162 H-163 50
LATERAL 2 P-207 19.45 19.61 J-24 H-164 50
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
8/28
LATERAL 2 P-208 16.77 17.31 H-164 H-165 50
LATERAL 2 P-209 14.40 14.88 H-165 H-166 50
LATERAL 2 P-210 29.31 30.30 H-166 H-167 50
LATERAL 2 P-211 10.95 10.95 J-28 H-168 50
LATERAL 2 P-212 22.48 22.48 H-168 H-169 50
LATERAL 2 P-213 16.42 16.46 H-169 H-170 50
TOTAL $%$"3!&' $%'!3
" SECT
RESU+EN CONDUCCION
50 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 3%#3$!0 0.00
63 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 '$$!' 0.00
75 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 1&1!1" 0.00
90 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 '$!30 0.00
110 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 31!&& 155.48
160 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 "$&!"& 0.00
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
9/28
ERIAS
+ateral
HDPE 150 8.00 0.84 3,437.40 3,437.23
HDPE 150 7.63 0.80 3,437.23 3,436.77
HDPE 150 7.27 0.76 3,436.77 3,436.55
HDPE 150 27.13 2.86 3,420.00 3,419.29
HDPE 150 9.17 1.44 3,419.29 3,416.17
HDPE 150 8.43 1.91 3,416.17 3,415.06
HDPE 150 8.07 1.83 3,415.06 3,413.97
HDPE 150 7.70 1.74 3,413.97 3,412.95
HDPE 150 6.60 1.49 3,412.95 3,412.62
HDPE 150 6.23 1.41 3,412.62 3,411.74
HDPE 150 5.87 1.33 3,411.74 3,411.02
HDPE 150 5.50 1.24 3,411.02 3,410.75
HDPE 150 3.30 1.06 3,410.75 3,410.36
HDPE 150 2.93 0.94 3,410.36 3,409.86
HDPE 150 2.57 0.82 3,409.86 3,409.58
HDPE 150 2.20 0.71 3,409.58 3,409.21
HDPE 150 1.47 0.75 3,409.21 3,409.01
HDPE 150 1.10 0.56 3,409.01 3,408.93
HDPE 150 1.10 0.56 3,369.36 3,369.13HDPE 150 0.73 0.37 3,369.13 3,369.08
HDPE 150 0.37 0.19 3,369.08 3,369.07
HDPE 150 17.97 1.89 3,419.29 3,418.83
HDPE 150 7.70 1.74 3,418.83 3,417.57
HDPE 150 7.33 1.66 3,417.57 3,417.27
HDPE 150 6.97 1.58 3,417.27 3,416.27
HDPE 150 5.87 1.88 3,416.27 3,415.75
HDPE 150 5.50 1.76 3,415.75 3,413.87
HDPE 150 5.13 1.65 3,375.98 3,373.11
.a4en56llam7 C
8lo9(Ab7ol:te)
(L;7)
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
10/28
HDPE 150 5.13 1.65 3,413.87 3,413.55
HDPE 150 4.77 1.53 3,373.11 3,371.97
HDPE 150 1.83 0.93 3,371.97 3,371.81
HDPE 150 1.47 0.75 3,371.81 3,371.43
HDPE 150 1.10 0.56 3,371.43 3,371.25
HDPE 150 0.73 0.37 3,371.25 3,371.11
HDPE 150 0.37 0.19 3,371.11 3,371.09
HDPE 150 0.00 0.00 3,371.09 3,371.09
HDPE 150 10.27 1.61 3,418.83 3,417.79
HDPE 150 9.90 1.56 3,417.79 3,416.90
HDPE 150 9.53 1.50 3,416.90 3,416.60
HDPE 150 9.17 1.44 3,416.60 3,416.14
HDPE 150 8.80 1.38 3,416.14 3,415.54
HDPE 150 8.43 1.33 3,415.54 3,415.12
HDPE 150 8.07 1.27 3,415.12 3,414.99
HDPE 150 8.07 1.27 3,366.50 3,365.83
HDPE 150 2.93 1.49 3,365.83 3,365.14
HDPE 150 2.57 1.31 3,365.14 3,364.13
HDPE 150 2.20 1.12 3,364.13 3,363.40
HDPE 150 1.47 0.75 3,363.40 3,363.22
HDPE 150 1.10 0.56 3,363.22 3,362.88
HDPE 150 0.73 0.37 3,362.88 3,362.84
HDPE 150 0.37 0.19 3,362.84 3,362.81HDPE 150 0.37 0.19 3,437.23 3,437.20
HDPE 150 0.73 0.37 3,416.17 3,416.10
HDPE 150 0.37 0.19 3,416.10 3,416.08
HDPE 150 1.10 0.56 3,412.95 3,412.78
HDPE 150 0.73 0.37 3,412.78 3,412.70
HDPE 150 0.73 0.37 3,389.77 3,389.65
HDPE 150 0.37 0.19 3,389.65 3,389.62
HDPE 150 2.20 1.12 3,410.75 3,409.98
HDPE 150 1.83 0.93 3,409.98 3,409.31
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
11/28
HDPE 150 1.47 0.75 3,409.31 3,408.90
HDPE 150 1.10 0.56 3,408.90 3,408.87
HDPE 150 1.10 0.56 3,369.58 3,369.46
HDPE 150 0.73 0.37 3,369.46 3,369.39
HDPE 150 0.37 0.19 3,369.39 3,369.39
HDPE 150 0.73 0.37 3,409.21 3,409.14
HDPE 150 0.37 0.19 3,409.14 3,409.12
HDPE 150 1.10 0.56 3,416.27 3,416.05
HDPE 150 0.73 0.37 3,416.05 3,415.93
HDPE 150 0.37 0.19 3,415.93 3,415.89
HDPE 150 0.37 0.19 3,371.81 3,371.75
HDPE 150 2.93 1.49 3,371.97 3,368.50
HDPE 150 2.57 1.31 3,368.50 3,367.86
HDPE 150 2.20 1.12 3,367.86 3,366.86
HDPE 150 1.83 0.93 3,366.86 3,366.39
HDPE 150 1.47 0.75 3,366.39 3,366.14
HDPE 150 1.10 0.56 3,366.14 3,366.02
HDPE 150 1.10 0.56 3,329.38 3,329.13
HDPE 150 0.73 0.37 3,329.13 3,329.07
HDPE 150 0.37 0.19 3,329.07 3,329.05
HDPE 150 0.73 0.37 3,363.40 3,363.29
HDPE 150 0.37 0.19 3,363.29 3,363.26
HDPE 150 5.13 1.16 3,365.83 3,364.85HDPE 150 4.77 1.08 3,364.85 3,364.17
HDPE 150 4.40 1.00 3,364.17 3,363.15
HDPE 150 4.03 0.91 3,363.15 3,362.72
HDPE 150 3.30 1.06 3,362.72 3,362.35
HDPE 150 2.93 0.94 3,362.35 3,362.14
HDPE 150 2.57 0.82 3,362.14 3,362.00
HDPE 150 2.20 0.71 3,362.00 3,361.94
HDPE 150 1.47 0.75 3,361.94 3,361.69
HDPE 150 1.10 0.56 3,361.69 3,361.57
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
12/28
HDPE 150 0.73 0.37 3,361.57 3,361.47
HDPE 150 0.37 0.19 3,361.47 3,361.44
HDPE 150 0.73 0.37 3,362.72 3,362.66
HDPE 150 0.37 0.19 3,362.66 3,362.64
HDPE 150 0.73 0.37 3,361.94 3,361.73
HDPE 150 0.37 0.19 3,361.73 3,361.71
HDPE 150 0.37 0.19 3,361.73 3,361.71
HDPE 150 34.76 1.73 3,340.00 3,339.99
HDPE 150 9.90 1.04 3,339.99 3,339.25
HDPE 150 9.53 1.00 3,339.25 3,338.86
HDPE 150 8.07 1.83 3,338.86 3,336.64
HDPE 150 7.70 1.74 3,336.64 3,335.67
HDPE 150 7.33 1.66 3,335.67 3,335.04
HDPE 150 6.97 1.58 3,335.04 3,334.03
HDPE 150 6.60 1.49 3,334.03 3,333.57
HDPE 150 5.50 1.76 3,333.57 3,332.79
HDPE 150 5.13 1.65 3,332.79 3,331.13
HDPE 150 4.77 1.53 3,331.13 3,330.57
HDPE 150 4.40 1.41 3,330.57 3,330.09
HDPE 150 4.40 1.41 3,301.15 3,300.19
HDPE 150 2.57 1.31 3,300.19 3,297.89
HDPE 150 2.20 1.12 3,297.89 3,297.25
HDPE 150 1.83 0.93 3,297.25 3,296.80HDPE 150 1.47 0.75 3,296.80 3,296.48
HDPE 150 1.10 0.56 3,296.48 3,296.33
HDPE 150 0.73 0.37 3,296.33 3,296.22
HDPE 150 0.37 0.19 3,296.22 3,296.15
HDPE 150 24.86 1.24 3,339.99 3,339.05
HDPE 150 24.49 1.22 3,339.05 3,338.76
HDPE 150 24.12 2.54 3,338.76 3,337.84
HDPE 150 21.19 2.23 3,337.84 3,337.32
HDPE 150 20.82 2.19 3,337.32 3,336.32
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
13/28
HDPE 150 20.46 2.15 3,336.32 3,336.19
HDPE 150 12.10 1.90 3,336.19 3,335.72
HDPE 150 11.73 1.84 3,335.72 3,335.45
HDPE 150 10.63 1.67 3,335.45 3,335.13
HDPE 150 10.27 1.61 3,335.13 3,334.67
HDPE 150 9.90 1.56 3,334.67 3,333.96
HDPE 150 9.53 1.50 3,333.96 3,333.78
HDPE 150 8.43 1.91 3,333.78 3,333.47
HDPE 150 8.07 1.83 3,333.47 3,332.55
HDPE 150 7.70 1.74 3,332.55 3,331.68
HDPE 150 4.40 1.41 3,331.68 3,330.72
HDPE 150 4.03 1.29 3,330.72 3,330.62
HDPE 150 3.67 1.18 3,330.62 3,329.84
HDPE 150 3.30 1.06 3,329.84 3,329.67
HDPE 150 2.93 1.49 3,329.67 3,329.40
HDPE 150 2.93 1.49 3,298.00 3,297.52
HDPE 150 1.47 0.75 3,297.52 3,297.40
HDPE 150 1.10 0.56 3,297.40 3,297.19
HDPE 150 0.73 0.37 3,297.19 3,297.12
HDPE 150 0.37 0.19 3,297.12 3,297.11
HDPE 150 8.36 1.89 3,336.19 3,334.96
HDPE 150 7.99 1.81 3,334.96 3,334.40
HDPE 150 7.62 1.73 3,334.40 3,334.09HDPE 150 7.26 1.64 3,334.09 3,333.55
HDPE 150 6.89 1.56 3,333.55 3,333.10
HDPE 150 6.52 1.48 3,333.10 3,332.56
HDPE 150 4.77 1.53 3,332.56 3,331.83
HDPE 150 4.40 1.41 3,331.83 3,331.02
HDPE 150 4.03 1.29 3,331.02 3,330.57
HDPE 150 3.67 1.18 3,330.57 3,330.19
HDPE 150 3.30 1.06 3,330.19 3,329.96
HDPE 150 2.93 0.94 3,329.96 3,329.91
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
14/28
HDPE 150 1.83 0.93 3,329.91 3,329.71
HDPE 150 1.47 0.75 3,329.71 3,329.42
HDPE 150 1.10 0.56 3,329.42 3,329.32
HDPE 150 0.73 0.37 3,329.32 3,329.28
HDPE 150 0.37 0.19 3,329.28 3,329.26
HDPE 150 0.37 0.19 3,339.25 3,339.22
HDPE 150 1.47 0.75 3,338.86 3,338.68
HDPE 150 1.10 0.56 3,338.68 3,338.63
HDPE 150 0.73 0.37 3,338.63 3,338.60
HDPE 150 0.37 0.19 3,338.60 3,338.59
HDPE 150 1.10 0.56 3,333.57 3,333.38
HDPE 150 0.73 0.37 3,333.38 3,333.34
HDPE 150 0.37 0.19 3,333.34 3,333.32
HDPE 150 0.37 0.19 3,283.17 3,283.14
HDPE 150 1.83 0.93 3,300.19 3,299.88
HDPE 150 1.47 0.75 3,299.88 3,299.71
HDPE 150 1.10 0.56 3,299.71 3,299.58
HDPE 150 0.73 0.37 3,299.58 3,299.50
HDPE 150 0.37 0.19 3,299.50 3,299.48
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
15/28
HDPE 150 0.37 0.19 3,339.05 3,339.03
HDPE 150 2.93 1.49 3,337.84 3,336.90
HDPE 150 2.57 1.31 3,336.90 3,336.29
HDPE 150 2.20 1.12 3,336.29 3,335.56
HDPE 150 1.83 0.93 3,335.56 3,335.32
HDPE 150 1.47 0.75 3,335.32 3,335.19
HDPE 150 1.47 0.75 3,286.49 3,286.26
HDPE 150 0.37 0.19 3,286.26 3,286.24
HDPE 150 1.10 0.56 3,286.26 3,286.03
HDPE 150 0.73 0.37 3,286.03 3,285.99
HDPE 150 0.37 0.19 3,285.99 3,285.97
HDPE 150 1.10 0.56 3,335.45 3,335.32
HDPE 150 0.73 0.37 3,335.32 3,335.26
HDPE 150 0.37 0.19 3,335.26 3,335.24
HDPE 150 1.10 0.56 3,333.78 3,333.61
HDPE 150 0.73 0.37 3,333.61 3,333.53
HDPE 150 0.37 0.19 3,333.53 3,333.49
HDPE 150 2.93 1.49 3,331.68 3,330.11
HDPE 150 2.57 1.31 3,330.11 3,328.99
HDPE 150 2.20 1.12 3,328.99 3,328.78
HDPE 150 2.20 1.12 3,285.91 3,285.21
HDPE 150 1.83 0.93 3,285.21 3,284.90
HDPE 150 1.47 0.75 3,284.90 3,284.78HDPE 150 0.37 0.19 3,284.78 3,284.76
HDPE 150 1.10 0.56 3,284.78 3,284.68
HDPE 150 0.73 0.37 3,284.68 3,284.56
HDPE 150 0.37 0.19 3,284.56 3,284.53
HDPE 150 1.47 0.75 3,297.39 3,297.52
HDPE 150 1.10 0.56 3,297.09 3,297.39
HDPE 150 0.73 0.37 3,297.09 3,296.99
HDPE 150 0.37 0.19 3,296.99 3,296.97
HDPE 150 1.47 0.75 3,332.56 3,332.33
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
16/28
HDPE 150 1.10 0.56 3,332.33 3,332.21
HDPE 150 0.73 0.37 3,332.21 3,332.16
HDPE 150 0.37 0.19 3,332.16 3,332.13
HDPE 150 1.10 0.56 3,329.91 3,329.83
HDPE 150 0.73 0.37 3,329.83 3,329.76
HDPE 150 0.37 0.19 3,329.76 3,329.74
R* SECTOR +U,UN # SECTOR* SECTOR ULL/I
/RINCI/AL " LATERAL " CONDUCCION /RINCI/AL # LATERAL #
467.79 1,157.16 0.00 448.51 1,162.44
292.24 55.69 0.00 307.53 0.00
254.69 222.30 0.00 310.72 0.00
374.50 0.00 0.00 90.80 0.00
30.43 0.00 0.00 193.97 0.00
0.00 0.00 0.00 158.18 0.00
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
17/28
CUADRO DE .IDRANTES
SECTOR Label Ele>aton (m) Demand (L;7)
H-1 3,421.60 0.367 3,436.77
H-2 3,415.00 0.367 3,437.20
H-3 3,404.89 0.367 3,415.06
H-4 3,402.48 0.367 3,413.97
H-5 3,399.10 0.367 3,412.62
H-6 3,397.68 0.367 3,411.74
H-7 3,397.16 0.367 3,411.02
H-8 3,396.07 0.367 3,410.36
H-9 3,394.71 0.367 3,409.86
H-10 3,390.09 0.367 3,409.58
H-11 3,373.02 0.367 3,409.01
H-12 3,356.69 0.367 3,369.13
H-13 3,355.57 0.367 3,369.08
H-14 3,350.72 0.367 3,369.07
H-15 3,401.09 0.367 3,417.57
H-16 3,398.35 0.367 3,417.27
H-17 3,386.88 0.367 3,415.75
H-18 3,378.30 0.367 3,413.87
H-19 3,362.69 0.367 3,373.11
H-20 3,352.56 0.367 3,371.43
H-21 3,349.04 0.367 3,371.25
H-22 3,343.39 0.367 3,371.11
H-23 3,340.90 0.367 3,371.09
H-24 3,394.31 0.367 3,417.79
H-25 3,386.20 0.367 3,416.90
H-26 3,384.93 0.367 3,416.60
H-27 3,377.07 0.367 3,416.14
H-28 3,371.69 0.367 3,415.54
H-29 3,369.00 0.367 3,415.12
H-30 3,352.36 0.367 3,365.14
H-31 3,344.12 0.367 3,364.13
H-32 3,327.89 0.367 3,363.22H-33 3,319.90 0.367 3,362.88
H-34 3,319.31 0.367 3,362.84
H-35 3,318.00 0.367 3,362.81
H-36 3,390.72 0.367 3,416.10
H-37 3,373.45 0.367 3,416.08
H-38 3,395.65 0.367 3,412.78
H-39 3,375.12 0.367 3,389.65
H-40 3,361.91 0.367 3,389.62
H-41 3,388.64 0.367 3,409.98
H-42 3,378.69 0.367 3,409.31H-43 3,371.61 0.367 3,408.90
H-44 3,358.92 0.367 3,369.46
.=dra:lc -rade(m)
SECTOR"
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
18/28
CUADRO DE .IDRANTES
SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade
(m)
H-45 3,353.09 0.367 3,369.39
H-46 3,350.70 0.367 3,369.39
H-47 3,375.20 0.367 3,409.14
H-48 3,373.88 0.367 3,409.12
H-49 3,382.33 0.367 3,416.05
H-50 3,375.54 0.367 3,415.93
H-51 3,368.77 0.367 3,415.89
H-52 3,354.97 0.367 3,371.75
H-53 3,347.10 0.367 3,368.50
H-54 3,344.99 0.367 3,367.86
H-55 3,342.57 0.367 3,366.86
H-56 3,336.14 0.367 3,366.39
H-57 3,333.15 0.367 3,366.14
H-58 3,317.20 0.367 3,329.13
H-59 3,313.49 0.367 3,329.07
H-60 3,307.71 0.367 3,329.05
H-61 3,339.91 0.367 3,363.29
H-62 3,330.75 0.367 3,363.26
H-63 3,354.26 0.367 3,364.85
H-64 3,341.75 0.367 3,364.17
H-65 3,327.12 0.367 3,363.15
H-66 3,328.60 0.367 3,362.35
H-67 3,328.96 0.367 3,362.14
H-68 3,329.20 0.367 3,362.00
H-69 3,327.90 0.367 3,361.69
H-70 3,326.97 0.367 3,361.57
H-71 3,320.60 0.367 3,361.47
H-72 3,321.00 0.367 3,361.44
H-73 3,326.00 0.367 3,362.66
H-74 3,322.49 0.367 3,362.64
H-75 3,329.30 0.367 3,361.71
H-76 3,329.76 0.367 3,361.71H-77 3,326.50 0.367 3,336.64
H-78 3,324.24 0.367 3,335.67
H-79 3,321.99 0.367 3,335.04
H-80 3,314.88 0.367 3,334.03
H-81 3,310.68 0.367 3,332.79
H-82 3,307.10 0.367 3,331.13
H-83 3,305.69 0.367 3,330.57
H-84 3,277.35 0.367 3,297.89
H-85 3,270.86 0.367 3,297.25
H-86 3,265.90 0.367 3,296.80H-87 3,264.60 0.367 3,296.48
H-88 3,258.68 0.367 3,296.33
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
19/28
CUADRO DE .IDRANTES
SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade
(m)
H-89 3,254.78 0.367 3,296.22
H-90 3,253.20 0.367 3,296.15
H-91 3,328.30 0.367 3,338.76
H-92 3,325.54 0.367 3,337.32
H-93 3,323.31 0.367 3,336.32
H-94 3,317.18 0.367 3,335.72
H-95 3,313.50 0.367 3,335.13
H-96 3,311.60 0.367 3,334.67
H-97 3,309.00 0.367 3,333.96
H-98 3,307.69 0.367 3,333.47
H-99 3,305.69 0.367 3,332.55
H-100 3,302.23 0.367 3,331.68
H-101 3,301.34 0.367 3,330.72
H-102 3,300.29 0.367 3,330.62
H-103 3,291.08 0.367 3,329.84
H-104 3,288.89 0.367 3,329.67
H-105 3,285.70 0.367 3,297.40
H-106 3,279.13 0.367 3,297.19
H-107 3,277.56 0.367 3,297.12
H-108 3,272.28 0.367 3,297.11
H-109 3,323.68 0.367 3,334.96
H-110 3,323.60 0.367 3,334.40
H-111 3,323.40 0.367 3,334.09
H-112 3,322.53 0.367 3,333.55
H-113 3,321.39 0.367 3,333.10
H-114 3,319.67 0.367 3,331.83
H-115 3,310.49 0.367 3,331.02
H-116 3,308.44 0.367 3,330.57
H-117 3,307.37 0.367 3,330.19
H-118 3,305.34 0.367 3,329.96
H-119 3,301.29 0.367 3,329.71
H-120 3,294.50 0.367 3,329.42H-121 3,290.62 0.367 3,329.32
H-122 3,286.71 0.367 3,329.28
H-123 3,283.80 0.367 3,329.26
H-124 3,329.00 0.367 3,339.22
H-125 3,327.63 0.367 3,338.68
H-126 3,323.75 0.367 3,338.63
H-127 3,319.76 0.367 3,338.60
H-128 3,315.59 0.367 3,338.59
H-129 3,297.49 0.367 3,333.38
H-130 3,289.91 0.367 3,333.34H-131 3,263.82 0.367 3,283.14
H-132 3,281.90 0.367 3,299.88
SECTOR#
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
20/28
CUADRO DE .IDRANTES
SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade
(m)
H-133 3,272.70 0.367 3,299.71
H-134 3,267.09 0.367 3,299.58
H-135 3,260.36 0.367 3,299.50
H-136 3,253.26 0.367 3,299.48
H-137 3,326.28 0.367 3,339.03
H-138 3,313.15 0.367 3,336.90
H-139 3,305.66 0.367 3,336.29
H-140 3,298.64 0.367 3,335.56
H-141 3,291.77 0.367 3,335.32
H-142 3,264.01 0.367 3,286.24
H-143 3,266.96 0.367 3,286.03
H-144 3,265.38 0.367 3,285.99
H-145 3,262.26 0.367 3,285.97
H-146 3,305.05 0.367 3,335.32
H-147 3,296.08 0.367 3,335.26
H-148 3,290.20 0.367 3,335.24
H-149 3,300.78 0.367 3,333.61
H-150 3,291.10 0.367 3,333.53
H-151 3,284.62 0.367 3,333.49
H-152 3,294.28 0.367 3,330.11
H-153 3,289.42 0.367 3,328.99
H-154 3,274.80 0.367 3,285.21
H-155 3,264.43 0.367 3,284.90
H-156 3,240.02 0.367 3,284.76
H-157 3,255.60 0.367 3,284.68
H-158 3,255.40 0.367 3,284.56
H-159 3,248.14 0.367 3,284.53
H-160 3,284.54 0.367 3,297.39
H-161 3,279.99 0.367 3,297.09
H-162 3,277.05 0.367 3,296.99
H-163 3,272.76 0.367 3,296.97
H-164 3,318.54 0.367 3,332.33H-165 3,314.24 0.367 3,332.21
H-166 3,310.49 0.367 3,332.16
H-167 3,302.80 0.367 3,332.13
H-168 3,304.71 0.367 3,329.83
H-169 3,304.11 0.367 3,329.76
H-170 3,302.90 0.367 3,329.74
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
21/28
? (m) @ (m)
15.14 262,819.64 8,941,506.18
22.15 262,844.65 8,941,442.74
10.15 262,780.98 8,941,722.80
11.47 262,787.22 8,941,748.44
13.49 262,805.00 8,941,770.00
14.02 262,790.58 8,941,802.39
13.83 262,782.13 8,941,833.72
14.27 262,768.90 8,941,865.82
15.12 262,751.74 8,941,896.74
19.45 262,744.01 8,941,920.55
35.92 262,701.84 8,941,953.80
12.41 262,658.70 8,941,949.16
13.49 262,648.06 8,941,939.39
18.31 262,643.47 8,941,927.38
16.44 262,763.04 8,941,587.03
18.88 262,760.35 8,941,595.46
28.82 262,739.20 8,941,624.42
35.50 262,739.17 8,941,662.22
10.40 262,727.14 8,941,736.90
18.84 262,658.61 8,941,756.21
22.16 262,632.53 8,941,758.04
27.67 262,593.61 8,941,767.22
30.13 262,575.19 8,941,778.25
23.43 262,745.69 8,941,574.00
30.64 262,710.04 8,941,584.61
31.61 262,698.72 8,941,591.69
39.00 262,677.12 8,941,594.98
43.76 262,646.74 8,941,602.94
46.03 262,632.45 8,941,621.42
12.76 262,596.77 8,941,671.79
19.97 262,575.57 8,941,691.91
35.26 262,544.08 8,941,721.6342.89 262,502.78 8,941,743.49
43.45 262,493.28 8,941,748.33
44.72 262,466.19 8,941,762.42
25.33 262,763.19 8,941,701.89
42.54 262,743.70 8,941,706.73
17.09 262,787.34 8,941,767.97
14.50 262,734.20 8,941,787.21
27.66 262,704.21 8,941,793.25
21.30 262,748.12 8,941,849.10
30.56 262,713.45 8,941,859.7037.21 262,682.72 8,941,873.13
10.52 262,663.95 8,941,882.37
/re77:re(m .#O)
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
22/28
? (m) @ (m)/re77:re(m .#O)
16.27 262,645.46 8,941,885.05
18.65 262,638.71 8,941,882.09
33.87 262,708.11 8,941,971.93
35.18 262,698.60 8,941,988.86
33.65 262,706.82 8,941,628.62
40.32 262,673.44 8,941,628.68
47.02 262,670.71 8,941,673.27
16.74 262,650.80 8,941,706.76
21.36 262,655.35 8,941,810.80
22.82 262,640.02 8,941,821.59
24.24 262,613.14 8,941,848.51
30.19 262,594.76 8,941,863.44
32.92 262,586.81 8,941,882.28
11.90 262,554.68 8,941,921.51
15.55 262,543.28 8,941,931.42
21.30 262,547.24 8,941,951.48
23.33 262,535.76 8,941,684.63
32.44 262,505.16 8,941,699.50
10.57 262,615.10 8,941,700.94
22.37 262,577.61 8,941,726.74
35.95 262,505.39 8,941,758.19
33.68 262,502.24 8,941,813.63
33.11 262,490.46 8,941,822.45
32.74 262,483.83 8,941,832.64
33.72 262,463.33 8,941,850.32
34.54 262,447.98 8,941,853.00
40.79 262,417.85 8,941,851.88
40.36 262,385.44 8,941,850.16
36.58 262,493.05 8,941,794.29
40.07 262,473.54 8,941,793.10
32.35 262,452.21 8,941,907.20
31.89 262,433.40 8,941,888.8610.12 262,650.80 8,941,977.01
11.40 262,657.17 8,942,002.85
13.03 262,654.10 8,942,021.35
19.11 262,639.10 8,942,050.54
22.07 262,619.63 8,942,077.48
23.98 262,589.03 8,942,104.27
24.83 262,575.83 8,942,113.10
20.50 262,503.33 8,942,197.62
26.34 262,483.26 8,942,211.49
30.84 262,464.08 8,942,226.5731.81 262,439.29 8,942,233.42
37.57 262,419.41 8,942,227.34
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
23/28
? (m) @ (m)/re77:re(m .#O)
41.35 262,394.93 8,942,248.77
42.86 262,334.80 8,942,284.67
10.44 262,509.28 8,941,922.71
11.75 262,487.87 8,941,942.00
12.99 262,460.88 8,941,946.61
18.50 262,448.38 8,941,954.09
21.59 262,428.80 8,941,955.26
23.02 262,411.78 8,941,960.77
24.91 262,392.35 8,941,983.13
25.73 262,378.00 8,941,988.02
26.80 262,355.44 8,941,990.20
29.39 262,336.19 8,942,003.87
29.32 262,308.78 8,941,988.47
30.27 262,305.51 8,941,990.14
38.68 262,282.76 8,942,014.67
40.71 262,274.95 8,942,019.39
11.68 262,292.82 8,942,038.52
18.02 262,289.05 8,942,067.74
19.53 262,280.59 8,942,085.49
24.77 262,270.66 8,942,102.48
11.26 262,433.02 8,941,934.58
10.77 262,418.77 8,941,936.56
10.67 262,410.30 8,941,936.05
11.00 262,395.40 8,941,930.16
11.68 262,381.48 8,941,935.69
12.14 262,351.04 8,941,914.85
20.48 262,328.35 8,941,925.48
22.08 262,313.73 8,941,934.80
22.78 262,299.35 8,941,944.45
24.57 262,289.95 8,941,951.67
28.37 262,275.90 8,941,954.62
34.85 262,259.11 8,941,969.2538.63 262,251.25 8,941,980.36
42.48 262,243.42 8,941,991.57
45.37 262,233.12 8,942,005.35
10.2 262,593.39 8,941,919.28
11.03 262,599.66 8,941,945.25
14.85 262,593.59 8,941,947.44
18.8 262,585.08 8,941,950.58
22.96 262,576.22 8,941,953.96
35.82 262,601.08 8,942,065.48
43.33 262,586.62 8,942,066.8719.28 262,543.31 8,942,072.26
17.95 262,525.10 8,942,148.74
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
24/28
? (m) @ (m)/re77:re(m .#O)
26.95 262,511.10 8,942,150.40
32.42 262,493.31 8,942,152.17
39.06 262,470.05 8,942,153.80
46.13 262,449.80 8,942,154.20
12.72 262,530.91 8,941,902.40
23.71 262,513.01 8,941,958.44
30.57 262,525.85 8,941,970.66
36.85 262,511.61 8,941,992.36
43.46 262,513.65 8,942,005.53
22.18 262,541.57 8,942,049.43
19.03 262,508.82 8,942,052.24
20.57 262,497.16 8,942,057.11
23.66 262,476.38 8,942,072.74
30.21 262,448.02 8,941,973.08
39.1 262,454.98 8,941,991.09
44.95 262,461.92 8,942,006.49
32.76 262,397.39 8,942,005.42
42.34 262,414.16 8,942,022.95
48.77 262,444.85 8,942,034.45
35.75 262,363.39 8,942,026.65
39.49 262,389.89 8,942,045.47
10.39 262,376.50 8,942,076.72
20.43 262,383.72 8,942,091.51
44.65 262,376.78 8,942,129.09
29.02 262,397.97 8,942,103.00
29.1 262,432.40 8,942,094.22
36.31 262,468.44 8,942,098.31
12.83 262,276.95 8,942,040.48
17.07 262,245.77 8,942,068.22
19.9 262,229.26 8,942,091.56
24.16 262,212.87 8,942,115.70
13.76 262,356.13 8,941,947.2117.93 262,343.03 8,941,957.67
21.62 262,331.77 8,941,966.65
29.27 262,303.54 8,941,974.56
25.08 262,278.30 8,941,945.28
25.6 262,268.86 8,941,925.11
26.78 262,265.36 8,941,909.07
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
25/28
CUADRO DE NODOS
Label Ele>aton (m) Demand (L;7)
J-1 3,429.60 0.00 3,437.23 7.61
J-2 3,419.60 7.27 3,436.55 16.91
J-3 3,414.40 0.00 3,417.73 3.32
J-4 3,411.37 0.00 3,417.40 6.03
J-5 3,406.66 0.00 3,416.03 9.35
J-6 3,400.00 0.00 3,414.18 14.15
J-7 3,396.85 0.00 3,412.77 15.88
J-8 3,388.80 0.00 3,415.30 26.44
J-9 3,379.57 0.00 3,411.49 31.85
J-10 3,358.76 0.00 3,372.99 14.2
J-11 3,358.14 0.00 3,366.04 7.88
J-12 3,357.80 0.00 3,372.88 15.05
J-13 3,340.90 0.00 3,372.42 31.45
J-14 3,338.82 0.00 3,364.69 25.82
J-15 3,330.08 0.00 3,362.38 32.23
J-16 3,329.07 0.00 3,362.59 33.45
J-17 3,328.28 0.00 3,363.37 35.02
J-18 3,338.04 0.00 3,339.70 1.65
J-19 3,335.83 0.00 3,339.27 3.43
J-20 3,334.82 0.00 3,339.05 4.23
J-21 3,331.46 0.00 3,339.10 7.62
J-22 3,326.66 0.00 3,338.35 11.67
J-23 3,322.80 0.00 3,337.28 14.46
J-24 3,321.00 0.29 3,335.12 14.09
J-25 3,314.87 0.00 3,336.82 21.9
J-26 3,312.25 0.00 3,336.43 24.13
J-27 3,308.33 0.00 3,335.75 27.37
J-28 3,304.40 0.00 3,333.80 29.34
J-29 3,290.00 0.00 3,300.70 10.68
J-30 3,286.33 0.00 3,297.80 11.44
J-31 3,277.22 0.00 3,286.36 9.12
J-32 3,260.80 0.00 3,285.39 24.54
.=dra:lc -rade(m)
/re77:re(m .#O)
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
26/28
? (m) @ (m)
262,877.43 8,941,449.06
262,813.84 8,941,548.99
262,799.49 8,941,555.37
262,783.34 8,941,559.41
262,782.55 8,941,697.16
262,808.78 8,941,758.82
262,777.32 8,941,846.71
262,735.72 8,941,614.98
262,718.07 8,941,953.49
262,697.16 8,941,747.88
262,602.44 8,941,657.24
262,688.78 8,941,749.28
262,575.19 8,941,778.25
262,554.63 8,941,710.56
262,450.89 8,941,893.17
262,480.96 8,941,839.73
262,513.18 8,941,795.58
262,611.12 8,941,828.53
262,616.66 8,941,899.94
262,614.26 8,941,941.78
262,520.70 8,941,890.02
262,501.84 8,941,940.57
262,457.00 8,941,946.36
262,364.51 8,941,930.68
262,440.61 8,941,956.17
262,626.86 8,942,062.00
262,384.85 8,941,986.02
262,286.47 8,941,952.43
262,541.68 8,942,145.82
262,284.80 8,942,033.08
262,526.32 8,942,032.40
262,383.71 8,942,101.34
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
27/28
CUADRO DE CA+ARA RO+/E/
Label Ele>aton (m) 8lo9 (L;7)
CRP TIPO 7-1 3,366.50 90 0.00 6.600
CRP TIPO 7-2 3,375.98 63 0.00 4.400
CRP TIPO 7-3 3,329.38 50 0.00 1.100
CRP TIPO 7-4 3,389.77 50 0.00 0.733
CRP TIPO 7-5 3,369.58 50 0.00 1.100
CRP TIPO 7-6 3,369.36 50 0.00 1.100
CRP TIPO 7-7 3,286.50 50 0.00 1.100
CRP TIPO 7-8 3,285.91 50 0.00 1.467
CRP TIPO 7-9 3,283.17 50 0.00 0.367
CRP TIPO 7-10 3,301.15 63 0.00 2.933
VRP-01 3,287.97 50 10.00 1.833
Dameter Interno(e) (mm)
/re77:re Settng(Intal) (m .#O)
-
7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx
28/28
ESION
.eadlo77 (m)
3,414.85 3,366.50 48.35
3,413.20 3,375.98 37.23
3,367.79 3,329.38 38.41
3,414.02 3,389.77 24.26
3,411.11 3,369.58 41.53
3,411.21 3,369.36 41.85
3,337.05 3,286.49 50.55
3,333.24 3,285.91 47.33
3,336.27 3,283.17 53.1