Parametros ENE FEB MAR [m] [m] [m] Brownfield 961.5 740.7 1904.1 infill 0 0 2032.8 Total 961.5 740.7 3936.9 Parametros ENE FEB MAR [S/.] [S/.] [S/.] Brownfield S/. 215,405 S/. 96,021 S/. 813,482 infill S/. - S/. 54,275 S/. - M. Flexit S/. 4,536 S/. 1,722 S/. 11,315 Total $ 219,941 $ 152,019 $ 824,796 2.8 $ 76,930 $ 34,293 $ 290,529 $ - $ 19,384 $ - $ 1,620 $ 615 $ 4,041

description

Cuadro resumen DDH

Transcript of Cuadro Resumen DDH 2014

Hoja1AVANCE ACUMULADO ANUAL - PERFORACION DIAMANTINA 2014

ParametrosENEFEBMARABRMAYJUNJULAGOSEPOCTNOVDICTOTAL[m][m][m][m][m][m][m][m][m][m][m][m][m]Brownfield961.5740.71904.12336.353473.752974.92349.12606.3353.900017700.6infill002032.81458.6639.7255861564.41750.52181.21337561.711641.9Total961.5740.73936.93794.954113.453229.93210.13170.72104.42181.21337561.729342.5COSTO ACUMULADO ANUAL - PERFORACION DIAMANTINA 2014

ParametrosENEFEBMARABRMAYJUNJULAGOSEPOCTNOVDICTOTAL[S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.][S/.]Brownfield215404.8496020.961813481.647482760.0005717780.9625614703.587485394.533538539.76973126.3570.00.00.04037212.657infill0.054275.40.0286833.69125797.00550145.75169315.65110989.26344235.825428932.98262921.05110458.3051943904.915M. Flexit45361722.25511314.511247.667511686.28259128.558589.0459517.0056736.2656434099.441969.3586189.355Total$ 219,941$ 152,019$ 824,796$ 780,841$ 855,264$ 673,978$ 663,299$ 659,046$ 424,098$ 434,576$ 267,020$ 112,428$ 6,067,3072.8

$ 76,930$ 34,293$ 290,5290.0$ 19,3840.0$ 1,620$ 615$ 4,041