CTS Transportation Seminar Series, January 13, 2006 Aaron Breakstone
-
Upload
idona-booth -
Category
Documents
-
view
23 -
download
0
description
Transcript of CTS Transportation Seminar Series, January 13, 2006 Aaron Breakstone
January 13, 2006CTS Transportation Seminar Series
Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages
CTS Transportation Seminar Series, January 13, 2006
Aaron Breakstone Master of Urban and Regional Planning CandidatePortland State University
Chris Monsere, Ph.D., P.E.Research Assistant Professor Portland State University
Robert L. Bertini, Ph.D., P.E.Associate ProfessorDirector, Center for Transportation StudiesPortland State University
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Project Overview
Goals
1. Evaluate Oregon Department of Transportation (ODOT)’s travel time estimating and reporting capabilities
2. Identify locations where additional detectors might improve estimates
January 13, 2006CTS Transportation Seminar Series
Project Overview
• ODOT Region 1 Traffic Management Operations Center (TMOC) – 485 inductive loop detectors – Advanced Traveler
Information Systems (ATIS): www.TripCheck.com
– 19 dynamic message signs (DMS) 3 display travel times
January 13, 2006CTS Transportation Seminar Series
Project Overview
• Funded by NSF• Direct fiber-optic
connection between ODOT and PSU
• 20-second loop detector data– Volume– Speed– Occupancy
• Customized travel time area
Portland Regional Transportation Archive Listing (PORTAL)
http://portal.its.pdx.edu
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Summary of Test Area
• 15 directional freeway links– I-5 (6)– I-205 (3) – I-84 (2)– US-26 (2)– OR-217 (2)
Downtown Portland
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Experimental Design• Analysis of PORTAL
estimates to determine required number of runs
• Data collection plan– 5-10 runs required for
most links– 4 routes designed– Transitional periods
targeted– Groups with 5-7 minute
headways– Standard probe vehicle
instructions
217 Southbound: US26 Interchange to I-5 Interchange [Link 9]
0
10
20
30
40
50
60
0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00
Time
Tra
ve
l T
ime
s
Cu
mu
lativ
e T
rav
el T
ime
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Data Collection• Hardware
– Palm handheld computers
– Magellan GPS devices
• Software– ITS-GPS
Free Available at www.its.pdx.edu
• Individual runs and groups of probe vehicles
• Variety of traffic conditions
January 13, 2006CTS Transportation Seminar Series
Data Collection• 87 probe vehicle runs• 904 minutes (~15 hours) of collection time• 516 miles of data• 12 drivers• 7 daysdate time elapsed latitude longitude dist mi vel mi/h
2005.04.08 16:17:12 3 45.50830 -122.66865 0.036 43.0982005.04.08 16:17:15 3 45.50865 -122.66806 0.037 44.9632005.04.08 16:17:18 3 45.50902 -122.66749 0.038 45.1932005.04.08 16:17:21 3 45.50944 -122.66705 0.036 43.2472005.04.08 16:17:24 3 45.50995 -122.66680 0.037 44.7582005.04.08 16:17:27 3 45.51050 -122.66676 0.038 45.7102005.04.08 16:17:30 3 45.51106 -122.66690 0.039 47.1882005.04.08 16:17:33 3 45.51161 -122.66719 0.041 48.6672005.04.08 16:17:36 3 45.51222 -122.66750 0.045 53.7452005.04.08 16:17:39 3 45.51289 -122.66770 0.047 56.8142005.04.08 16:17:42 3 45.51360 -122.66776 0.049 59.034
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Data Comparison• Probe data
– Individual runs downloaded
– Runs plotted on freeway network map showing link endpoints
– Pertinent data segments extracted
last point on Link 9
last point on Link 2
first point on Link 3
January 13, 2006CTS Transportation Seminar Series
Data Comparison• Detector data
– Assignment of influence areas1. Midpoint method
2. ODOT modified midpoint method
– Aggregation1. Nearest 20-second interval
• e.g. 9:15:34 9:15:20
2. Average of nearest interval and 1 minute before
3. Average of nearest interval and 3 minutes before
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Results• ATMS estimates reasonably accurate
P- Value -Statistical Significance
Link Number Midpoint ODOTMidpt -1
minMidpt -3
minODOT -1
minODOT -3
minLINK 2 - I-5 NB 0.073 0.103 0.034 0.071 0.038 0.079LINK 3 - I-5 NB 0.272 0.012 0.214 0.202 0.010 0.035LINK 4 - I-5 NB 0.651 0.665 0.545 0.287 0.560 0.301LINK 5 - I-5 SB 0.470 0.470 0.503 0.256 0.503 0.256LINK 6 - I-5 SB 0.435 0.095 0.676 0.605 0.052 0.045LINK 7 - I-5 SB 0.009 0.009 0.021 0.016 0.021 0.016LINK 8 - OR-217 NB 0.016 0.011 0.012 0.024 0.009 0.011LINK 9 - OR-217 SB 0.381 0.040 0.199 0.159 0.146 0.205LINK 10 - I-205 NB 0.532 0.460 0.277 0.040 0.896 0.965LINK 12 - I-205 SB 0.537 0.020 0.478 0.731 0.003 0.003LINK 13 - I-84 EB 0.273 0.070 0.518 0.402 0.098 0.077LINK 14 - I-84 WB 0.736 0.736 0.754 0.530 0.754 0.530LINK 16 - US 26 EB 0.026 0.026 0.009 0.012 0.009 0.012LINK 17 - US 26 WB 0.013 0.013 0.014 0.012 0.013 0.011
January 13, 2006CTS Transportation Seminar Series
Results• ATMS estimates reasonably accurate
Run 1
303.5
304.0
304.5
305.0
305.5
306.0
306.5
307.0
307.5
308.0
8:03:00 8:05:00 8:07:00 8:09:00 8:11:00 8:13:00 8:15:00 8:17:00 8:19:00 8:21:00
Time
Mile
po
st
Run 9
0.3
0.8
1.3
1.8
2.3
2.8
3.3
16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00 16:44:00 16:46:00 16:48:00
Time
Mile
post
Probe Vehicle
Other Projections
Projected Trajectory
January 13, 2006CTS Transportation Seminar Series
Results• Detector density and location critical
Run 7
292.3
293.3
294.3
295.3
296.3
297.3
298.3
299.3
300.3
8:05:00 8:10:00 8:15:00 8:20:00 8:25:00 8:30:00
Time
Mile
post
Run 1
303.5
304.0
304.5
305.0
305.5
306.0
306.5
307.0
307.5
308.0
8:06:00 8:08:00 8:10:00 8:12:00 8:14:00 8:16:00
Time
Mile
post
Run 6
68.9
69.4
69.9
70.4
70.9
71.4
71.9
72.4
72.9
8:17:00 8:18:30 8:20:00 8:21:30 8:23:00 8:24:30 8:26:00 8:27:30
Time
Mile
post
}~ 11 minutes (8 miles)
}~ 2 minutes (4 mi.)
Probe
Projection
Influence Area Limit
January 13, 2006CTS Transportation Seminar Series
Results• Incidents difficult to capture
Run 1
69.7
70.2
70.7
71.2
71.7
72.2
72.7
73.2
73.7
16:26:00 16:28:00 16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00
Time
Mile
post
Run 3
0.3
1.1
1.9
2.7
3.5
4.3
5.1
5.9
6.7
8:18:00 8:23:00 8:28:00 8:33:00 8:38:00 8:43:00 8:48:00 8:53:00 8:58:00
Time
Mile
post
January 13, 2006CTS Transportation Seminar Series
Results• No uniform difference between methods• Aggregation improves accuracy
Travel Time Observations (95% CI)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
Probe Midpoint ODOT Midpt -1
min
Midpt -3
min
ODOT -1
min
ODOT -3
min
Travel Time Differences
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
Midpoint ODOT Midpt -1
min
Midpt -3
min
ODOT -1
min
ODOT -3
min
AVG MIN MAX
0
5
10
15
20
25
30
35
0 5 10 15 20 25 30 35
Observed Probe Vehicle Travel Tim e
Est
imat
ed T
rave
l Tim
e
(a) Nearest 20 second estimate
0
5
10
15
20
25
30
35
0 5 10 15 20 25 30 35
Observed Probe Vehicle Trave l Tim e
Est
imat
ed T
rave
l Tim
e
0
5
10
15
20
25
30
35
0 5 10 15 20 25 30 35
Observed Probe Vehicle Travel Tim e
Est
imat
ed T
rave
l Tim
e
(b) Average of previous 1 minute (c) Average of 3 previous minutes
January 13, 2006CTS Transportation Seminar Series
ResultsCandidate locations for increased detection
– Recurring congestion– Detector spacing > 1 mile
1. Hwy 217 NB at MP 3.22. US-26 EB at MP 703. US-26 WB at MP 694. US-26 WB at MP 705. I-5 NB at MP 298.56. I-5 SB at MP 306.57. I-84 EB at MP 2.0
January 13, 2006CTS Transportation Seminar Series
Outline
• Project Overview
• Summary of Test Area
• Experimental Design
• Data Collection
• Data Comparison
• Results
• Next Steps
January 13, 2006CTS Transportation Seminar Series
Next Steps
• More data– Incidents– Transitions
• Different algorithms– Historical data– Other detectors (e.g. Coifman)