STC2 Marine Sewage Treatment Unit
Contract: 2009/W3103-2210
Hulls: S1192
Approving Authority: Shanghai Shipyard Co.,Ltd.
Date of delivery: 2012-11-27
FINAL DRAWINGS
TEL: +86-025-84769603-8012
EMAIL: [email protected]
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE CONTENT PAGE 1/1 STC SEWAGE TREATMENT UNIT
Main Technical Data ………………………………………………………………1
Schematic Diagram …………………………………………………………….…2
System Installation ………………………………………………………………..3
Typical Installation and Description ……………………………………………..4
Main Dimension ……………………………………………………………………7
Membrane System&Outline Drawing of Membrane……………………………8
Outline Drawing of Discharge Pump………………………………..……………9
ELECTRICAL DRAWINGS
Electrical Drawing. Circuit(1)……………………………………………..….……10
Electrical Drawing. Circuit(2) ………………………………………….……….…11
Electrical Drawing. Circuit(3) ………………………………………….……….…12
Electrical Drawing. Circuit(4) ……………………………………………….….…13
Outline Drawing of El.Control Panel…………………………………….….……14
DELIVERY SCOPE AND SPARES LIST
Delivery Scope ………………………………………………………………….…15
Spares List ………………………………………………………………………....16
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE INDEX PAGE 1/16
Product: STC2 Marine Sewage Treatment Unit
Quantity: 1set / ship
MAIN TECHNICAL DATA
1 Type: STC2
2 Capacity: 2.1 m3/d
3 Effluent:
BOD5 ≤ 25 mg/l
SS ≤ 35 mg/l
Coliform ≤ 100 mpn/100ml
COD ≤125 mg/l
PH [6~8.5]
CL- ≤0.5mg/l
4 Power source: 440V 60HZ 3P
5 Control power: 220V 60HZ
6 Protection for motor: IP44
Insulation: F
7 Air compressor: DLT- 10 13m3/h 0.06mpa 0.44KW
8 Discharge pump: 50CPW-10-15,10m3/h,0.15Mpa,1.5Kw
9 Circulation Pump: CR32-2-2, 29m3/h, 0.29Mpa, 5.0kW
10 Protection for El-control panel: IP44 with Cable Glands
11 External painting color of the Plant and El-control Panel: Munsell 2.5 G 7/2
12 Power consumption: 5.9Kw
13 Main Dimension: 2460×1552×1600 mm(L×W×H)
14 Certification: EC + EC Type Approval Certificate
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE TYPICAL INSTALLATION AND DESCRIPTION PAGE 4/16
SOIL MAIN
These are for handling the waste from Water Closets, Urinals and all Hospital waste
water as required by health codes. Inputs from this source not exceed 70
liters/person/day. Overboard by-pass line must be fitted. A Luzhou Transfer Unit can
be fitted if the final soil pipe position is below the sewage treatment plant. Ensure
that peak pumping flows or periods don’t exceed the peak handling capability of the
Sewage Treatment Plant. On Gravity sewage collection system, a Macerator is
recommended with units sized above 150 crews and on passenger vessels and
ferries.
SOIL WATER GRAVITY PIPELINE FALLS
This should be a minimum of 10mm per 300mm run in the direction of flow, after
allowing for the worst trim conditions Non-Return Valves or Valves which could
cause a flow restriction should not be fitted.
AIR VENT
It is important that no liquid pockets can from to impede the free run of the gasses.
Luzhou can supply a centrifugal fan for difficult pipe arrangements. A flame trap is
not required.
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE TYPICAL INSTALLATION AND DESCRIPTION PAGE 5/16
EMERGENCY OVERFLOW FROM TREATMENT TANK
This can only be effective when the tank overflows. Connection must be 1.5m above
maximum sea water levels to ensure that the Non-Return Valves can be lifted and
flow take place. If the available is less than this a back-up will occur in the system
until the required head is available. If emergency overflow connection is below
maximum water level then connect to bilge including a ”U” trap of 200mm to prevent
venting into the compartment.
GALLEY WASTE
This should be treated comply with the IMO resolution; normally drain it overboard
directly via a 25mm screen. If it is intended to connect into soil inlet of the sewage
treatment plant, LUZHOU must be consulted, as size of plant will be affected and a
grease trap must be fitted.
NOTE: THE GREY WASTE PIPELINES SHOULD NOT CONNECT TO THE
TREATMENT PLANT.
SIPHON PREVENTION
If the top of the sewage treatment tank is above minimum sea water level, then the
pump discharge pipeline must be looped above the top of the tank and a connection
taken from the top of the loop to a point in the air vent line above the discharge head of
the pump.
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE TYPICAL INSTALLATION AND DESCRIPTION PAGE 6/16
MEMBRANE SYSTEM
Pretreatment water (in primary treatment tank) is circulated under the function of
MEMBRANE SYSTEM, and the concentrated water will return to the bioreactor but
the filtrate, accordance with the IMO 159(55) latest regulations, will be collected into
the treatment tank and pumped overboard automatically. The function, BACKWASH
is provided to clean the system with the compress air, 0.4Mpa under the controlling
of El.Control Panel.
DUAL PUMP SET
This can be supplied to give a standby pump ready piped in.
AIR COMPRESSOR
When the sewage plant is offered, the dual air compressors have been installed.
PAINTING SCHEME
Inside Outside Item Name of
component Sandblasting Painting Sandblasting Painting
1 Treatment Tank
Sa2.5 846 Epoxy tar
paint
Sa2.5 Munsell 2.5 G 7/2
2 Aeration Tank
Sa2.5 846 Epoxy tar
paint
Sa2.5 Munsell 2.5 G 7/2
3 Clarifier Tank
Sa2.5 846 Epoxy tar
paint
Sa2.5 846 Epoxy tar
paint
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE DELIVERY SCOPE AND SPARES LIST PAGE 15/16
DELIVERY SCOPE
One set of STC2 Sewage Treatment Unit including:
Compressors (DLT-10) 2sets
Discharging pump (50CPW-10-15) 1sets
Circulation pump (CR32-2-2) 1set
Membrane module (CL-7M-19K) 1set
Control box 1set
Floating Switches 2set
Valves, fittings and so on.
User requirements
TYPE STC2 Marine Sewage Treatment Unit DATE
FINAL DRAWINGS Shanghai Shipyard Co., Ltd.
TITLE DELIVERY SCOPE AND SPARES LIST PAGE 16/16
SPARES LIST
1. Spares for compressors
(1)Vane 1set
2. Spares for discharging pump 1set
(1)"O" Seal (20×2.6GB1235-76) 1pc
(2)"O" Seal (130×3.1GB1235-76) 1pc
(3) Mechanical seal(MN108-40 GB6556-86) 1pc
(4)Bearing(Type:6205) 1pc
3. Spares for control box 1set
(1) AC Contactor LC1-D09M7C 1pc
(2) Mid-Relay CAD-32M7C 1pc
4 *Non-return Valve H11T-16 DN25 1pc
5 *Solenoid Valve DN25 ZS-25B 1pc
6. Measuring glass of 100ml 1pc
7. Acid and alkali resistant gloves 2pairs
NOTE: ‘*’ Means that it should be installed by shipyard.
TYPE STC2 Marine Sewage Treatment Unit DATE