COMPOSITE SCHEDULE OF RATES 2008 NWFPAs on Jan-Mar (QTR-1) 2009Chapter # 01 : CARRIAGE

Item Code01-01-a

Description UnitCarriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter

Rate (British System) Labour0.00

Rate (Metric System) Unit50 m

Composite58.84

Labour0.00

Composite58.84

Spec. No

Remarksa) Cement carried in containers other than bags will be paid according to this item b) Word, pipes and specials, covers GI , CI , AC, RCC,PCC, PVC and steel pipes and specials. c) Reduce the rate in case of carriage of 1000 NO. Tiles by:33% for 12"x6"x1" size 25% for 12"x6"x1.5" size 20% for 12"x6"x1.25" size

50 Meter

01-01-b

Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter

50 Meter

0.00

9.29

50 m

0.00

9.29

01-01-c

Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50 meter Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000 meter Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd - 5th kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th & subsequent kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent kilometer Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50 meter Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50 meter

50 Meter

0.00

6.20

50 m

0.00

6.20

01-01-d 01-01-e 01-01-f 01-01-g 01-01-h 01-02-a

250 Meter km km km km 50 Meter

0.00 0.00 0.00 0.00 0.00 0.00

28.91 103.24 24.02 20.23 16.63 37.07

250 m km km km km 50 m

0.00 0.00 0.00 0.00 0.00 0.00

28.91 103.24 24.02 20.23 16.63 37.07

Reduce the rate by 33% for tile size 9"x4.5"x1.5"

01-02-b 01-02-c 01-02-d 01-02-e 01-02-f 01-02-g 01-02-h 01-03-a 01-03-b

50 Meter 50 Meter 50 Meter km km km km Tonne/50 Meter Tonne/50 Meter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.85 3.90 18.21 65.04 15.13 12.75 10.47 11.77 1.86

50 m 50 m 250 m km km km km tonne/50m tonne/50m

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.85 3.90 18.21 65.04 15.13 12.75 10.47 11.77 1.86

NWFP CSR 2008 - Approved 25-Aug-2008

Page 1 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFPAs on Jan-Mar (QTR-1) 2009Chapter # 01 : CARRIAGE

Item Code01-03-c 01-03-d 01-03-e 01-03-f 01-03-g 01-03-h 01-04-a 01-04-b 01-04-c 01-04-d 01-04-e 01-04-f 01-04-g 01-04-h 01-05-a

Description UnitCarriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to 5th 50 meter Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to 1000 meter Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd - 5th kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th - 10th kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th & subsequent km Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent kilometer Carriage of small consignments upto 250kg 1st 50 meter

Rate (British System) Labour0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Rate (Metric System) Unittonne/50m t/250m tonne/km tonne/km tonne/km tonne/km 50 m 50 m 50 m 250 m km km km km 50 m

Composite1.24 5.78 20.65 4.80 4.05 3.33 35.31 5.58 3.72 17.34 61.94 14.41 12.14 9.98 2.94

Labour0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Composite1.24 5.78 20.65 4.80 4.05 3.33 35.31 5.58 3.72 17.34 61.94 14.41 12.14 9.98 2.94

Spec. No

Remarks

Tonne/50 Meter Tonne/25 0 Meter Tonne/1 Km Tonne/1 Km Tonne/1 Km Tonne/1 Km 50 Meter 50 Meter 50 Meter 250 Meter km km km km 50 Meter

For consignment weighing over 250 kg, the rate shall be increased on pro-rate basis.

01-05-b 01-05-c 01-05-d 01-05-e 01-05-f

Carriage of small consigmnments upto 250 kg 2nd 50 meter Carriage of small consignments upto 250 kg 3rd to 5th 50 meters Carriage of small consignments upto 250 kg 250 - 1000 meter Carriage of small consignments upto 250 kg 1st kilometer Carriage of small consignments upto 250 kg 2nd to 5th kilometer

50 Meter 50 Meter 250 Meter km km

0.00 0.00 0.00 0.00 0.00

0.46 0.31 1.45 5.16 1.20

50 m 50 m 250 m km km

0.00 0.00 0.00 0.00 0.00

0.46 0.31 1.45 5.16 1.20

NWFP CSR 2008 - Approved 25-Aug-2008

Page 2 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFPAs on Jan-Mar (QTR-1) 2009Chapter # 01 : CARRIAGE

Item Code01-05-g 01-05-h 01-06-a 01-06-b 01-06-c 01-06-d 01-07-a

Description UnitCarriage of small consignments upto 250 kg 6th to 10th kilometer Carriage of small consignments upto 250 kg 11th & subsequent kilometer Carriage of consignments (odd job) Coolie load Carriage of consignments (odd job) Donkey load Carriage of consignments (odd job) Cart Load Carriage of consignments (odd job) Camel load Hire Charges of Truck km km km km km km Day

Rate (British System) Labour0.00 0.00 27.90 0.00 0.00 0.00 0.00

Rate (Metric System) Unitkm km km km km km Day

Composite1.01 0.83 27.90 18.15 13.61 18.15 5,526.67

Labour0.00 0.00 27.90 0.00 0.00 0.00 0.00

Composite1.01 0.83 27.90 18.15 13.61 18.15 5,526.67

Spec. No

Remarks

a) This item shall be allowed with prior concurrence of Superintending Engineer b) The rate includes pay of driver and cleaner only. The cost of repairs shall be borne by the owner and the cost of POL, loading/unloading shall be paid by the borrower .

01-07-b 01-07-c 01-08-a 01-08-b 01-08-c 01-08-d 01-09-a 01-09-b 01-09-c 01-09-d

Hire charges of Tractor with trolley Hire charges of Tractor without trolley Hand shunting loaded railway wagons Upto 500 meter Hand shunting loaded railway wagons Upto 1 kilometer Hand shunting loaded railway wagons Upto 2 kilometer Hand shunting loaded railway wagons 3rd & subsequent kilometer Hand shunting empty railway wagons Upto 500 meter Hand shunting empty railway wagons Upto 1 kilometer Hand shunting empty railway wagons Upto 2 kilometer Hand shunting empty railway wagons 3rd & subsequent kilometer

Day Day Each Each Each Each Each Each Each Each

0.00 0.00 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

4,964.73 4,005.24 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

Day Day Each Each Each Each Each Each Each Each

0.00 0.00 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

4,964.73 4,005.24 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

NWFP CSR 2008 - Approved 25-Aug-2008

Page 3 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFPAs on Jan-Mar (QTR-1) 2009Chapter # 02 : LOADING, UNLOADING AND STACKING

Item Code02-01 02-02-a 02-02-b 02-03 02-04 02-05 02-06 02-07 02-08 02-09-a 02-09-b 02-10 02-11 02-12 02-13 02-14 02-15-a

Description UnitLoad into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc, laid & stacked Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or smaller size Load into or unload from railway wagons, cement in bags and stacking within 50m. Load into or unload from railway wagons, empty cement bags and stacking Load into or unload from railway wagons and stacking white lime in bags Load into or unload from railway wagons structural steel, RS joists, rails, rail fastenings etc Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto 50m Loading or unloading packages of all sorts upto 50 kg. Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad gauge Load or unload sleepers other than wooden, including stacking, lead upto 50 m : Metre gauge & Load or unload timber logs or shuttering into or from railway wagons, including stacking within 50m Loading or unloading bhoosa in railway wagons lead upto 50 m. Load or unload timber scrap or wooden plugs into or from railway wagons &a