Studying the factors affecting solar power generation systems performance ( SPGSP)
CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …
Transcript of CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …
![Page 1: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/1.jpg)
1 HTC
CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR MARKET IN OMAN – UNTAPPED POTENTIAL &
CURRENT HURDLES
![Page 2: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/2.jpg)
2 HTC
ABOUT US
HTC’s Solar PV track record in Oman
EXISTING SOLUTIONS
What do existing wheels look like, and do we need to reinvent?05
THE REALITY OF PV CONNECTION PROCESS IN OMAN
An EPC’s perspective
THE SOLAR PV CONNECTION PROCESS
Regulatory guidelines on paper
MARKET OVERVIEW AND POTENTIAL
Where does solar PV make sense in Oman?
QUESTIONS & ANSWERS
Looking forward to your feedback and questions06
01
04
03
02
![Page 3: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/3.jpg)
3 HTC
ABOUT US
![Page 4: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/4.jpg)
4 HTC
LEADING PRIVATE NETWORKS AND CARRIER GRADE SOLUTIONS
Since inception in 2006 HTC made its’ mark in the Telecom sector in Oman. HTC delivered
Oman’s first Private Network registered with the TRA, Oman’s first wireless mesh network,
Oman’s first TRA registered FSO (free space optics link), Oman’s first MMW (millimeter
wave) link, and Oman’s first L1 encrypted DWDM network. HTC has also collaborated with
telecom providers to deliver over 3,000 last mile installations
![Page 5: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/5.jpg)
5 HTC
LET’S KNOW
ABOUT US
LEADING EPC IN GRID-CONNECTED PV
In 2016 HTC diversified into Energy starting with grid-connected PV plants. HTC delivered
Oman’s first AER-compliant grid-connected plant. This was followed by Oman’s first East-West
ballasted system which withstood 173 km/hr cyclone, Oman’s first bifacial PV plant, and
subsequently Oman’s first tracker PV plant HTC’s currently leads the distributed solar PV market
with over 25MW contracted HTC’s clients include Shell, PDO, Engie, ACWA, OAMC and ROP.
![Page 6: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/6.jpg)
6 HTC
SOME OF OUR WORK
![Page 7: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/7.jpg)
7 HTC
MARKET OVERVIEWUtility Scale | Commercial & Industrial |
Residential | Off-grid
![Page 8: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/8.jpg)
8 HTC
Long-term policy
Evidence of Commitment
Continuous visible Progress
Economically viable and sustainable
Ease of doing business
Local capabilities to maximise ICV
DRIVING FACTORS FOR THE ADOPTION OF SOLAR PV
![Page 9: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/9.jpg)
9 HTC
Driving factors for the adoption of solar PVacross parts of Oman
![Page 10: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/10.jpg)
10 HTC
THE CONCEPTAER’s Guidelines on the Solar PV Connection
Process
![Page 11: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/11.jpg)
11 HTC
Live database of consultants/contractors across DCRP and Distribution Companies, clearly visible and accessible to End Clients
Single Portal linking all Stakeholders for the Initial Enquiry (NOC) including Solar Consultant/Contractor, End Client, Distribution Company, Municipality and if required PACA
Prompt online responses with clear SLAs on different stakeholders to respond
Simple transparent tracking of the process with clear lines of escalating and resolution
Reasonable, effort reflective fees.
Clear matrix of responsibilities & separation of internal processes
SOME SUCCESS CRITERIA FOR THE CONNECTION PROCESS
![Page 12: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/12.jpg)
12 HTC
Similarities of the Connection Processacross parts of the GCC
![Page 13: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/13.jpg)
13 HTC
THE REALITYOur perspective as an EPC of the Connection
Process
![Page 14: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/14.jpg)
14 HTC
Similarities of the Connection Processacross parts of Oman
![Page 15: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/15.jpg)
15 HTC
Similarities of the Connection Processacross parts of Oman
![Page 16: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/16.jpg)
16 HTC
EXISTING SOLUTIONS
Regional Implementations of the Connection
Process
![Page 17: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/17.jpg)
17 HTC
Existing Regional SolutionsShams Dubai example
![Page 18: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/18.jpg)
18 HTC
Existing Regional SolutionsShams Dubai example
![Page 19: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/19.jpg)
19 HTC
Existing Regional SolutionsShams Dubai example
![Page 20: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/20.jpg)
20 HTC
WISH LIST
![Page 21: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/21.jpg)
21 HTC
DCRP implementation of individual PV Professional licenses (Junior and Senior) and Solar PV Consultants
Requiring off-grid solutions to fall under AER regulations and guidelines; i.e. licensed contractors etc.
Seamless link of DCRP database of approved contractors / consultants with Distribution Companies
Single Small Scale Solar PV portal across ALL Oman as a one-stop shop processing site
Liberalisation of energy sale through tools such as Wheeling / PPAs
Unification of approved supplier lists across the GCC
WISH LIST
![Page 22: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/22.jpg)
22 HTC
QUESTIONS
![Page 23: CRITICAL FACTORS TO MAINTAIN A SUSTAINABLE SOLAR …](https://reader030.fdocuments.in/reader030/viewer/2022012423/6177708fa346634d361cdba9/html5/thumbnails/23.jpg)
23 HTC
THANK YOU