Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug...

83
Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    220
  • download

    2

Transcript of Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug...

Page 1: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

Critical Design Review

AAE490

Project

1 March 2003Nicholas BakerBrian ChernishAndrew FaustDoug HoldenMara PrentkowskiNicholas Setar

Page 2: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

2

AAE 490

Overview

• Design Requirements • Last Semester’s

Design• Walk around• Landing Gear• Fuselage• Wing

• Horizontal Tail• Vertical Tail • Avionics Pod• Engine• Radio Instillation • Color Scheme

Page 3: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

3

AAE 490

Design Requirements & Objectives• Maximum weight < 55 lbs

• Cruise speed > 50 ft/sec

• Stall speed < 30 ft/sec

• Climb angle > 5.5°

• Operating ceiling > 1000 ft

• Flight time > 30 minutes

• Payload of 20 lbs in 14”x6”x20” pod

• Carry pitot-static boom

• Spending limit < $300

• T.O. distance < 106 ft (~60% of McAllister Park runway length)

• Rough field capabilities

• Detachable wing

• Easy construction

Page 4: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

4

AAE 490

Aircraft Walk Around

•Low wing – Clark Y•Tricycle Gear

•T-Tail – NACA 0012

•Pusher

•Wing Span = 14.4 ft

•Wing Chord = 2.9 ft

•A/C Length = 10 ft

•Internal Pod

Page 5: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

5

AAE 490

Walk Around

Page 6: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

6

AAE 490

Landing Gear

• Nose Gear– Mounting Hardware

• Main Gear– Mounting Hardware

Page 7: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

7

AAE 490

Nose Gear

• Fults Tooling Dual Strut (RF800)

• Mount: 1/4” plywood bulkhead

• Weight: 9 oz• Cost: $33.94• Servo Actuated for

steering

Page 8: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

8

AAE 490

Main Gear

• Carden Edge 540 40% CE54040

• Mount: 1/4” Plywood • Weight: 23 oz• Cost: $89.95

Page 9: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

9

AAE 490

Fuselage

• Size

• Materials/Construction

• Articles that Mount to Fuselage

Page 10: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

10

AAE 490

Fuselage

• Outer Fuselage– 1/8” Plywood Formers – 1/4” x 1/4” Balsa Stringers– 3/32” Balsa Sheeting 4-6 lbs/ft3 Contest grade

• Keel– 1/8” Plywood Formers– 1/2” x 1/2” Basswood Stringers– 1/4” x 1/4” Balsa Truss – 3/32” Balsa Sheeting 4-6 lbs/ft3 Contest grade

Page 11: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

11

AAE 490

Fuselage

• Things that attach to the keel– Nose Gear– Main Gear– Wing – Horizontal/Vertical Tail– Engine Nacelle – Nose Cone

Page 12: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

12

AAE 490

Fuselage

Nose Cone Attachment/Removal

Page 13: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

13

AAE 490

Wing

• Size

• Materials/Construction

• Wing Mounting

Page 14: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

14

AAE 490

Wing

• Size – The wing was sized to

the following constraint

Where;• W = 53 lbs• Vmin = 30 ft/sec• CL = 1.19• r= .002309 slug/ft3

S = 41.7 ft2

2min

2*

* * L

WS

V C

Page 15: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

15

AAE 490

Wing

• Materials – 1/8” Balsa Ribs– 1/8” Plywood Root Rib– 1/2” x 1/2” Spruce Spare

(2)• with 1/8 balsa shear web

– Leading and Trailing edge stock

– Aluminum Main Spar 2024 T3

– 3/32” Balsa Sheeting 4-6 lbs/ft3 contest grade

Page 16: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

16

AAE 490

Wing Mounting

• Wing is Plug in style– Main Spar stays in

plane– Wings Panels

removable for ease of transportation and maintenance

– 2 Anti-rotation bolts keep wing attached

Page 17: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

17

AAE 490

Wing

Aluminum Wing Spar• 2024 T3 Aluminum

Tube– 1.75” Diameter– .049” thickness– 46” Length – 5 degree dihedral

angle• To get proper location

of wing

Page 18: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

18

AAE 490

Horizontal Tail

• Size

• Materials/Construction

• Horizontal Tail Mounting

Page 19: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

19

AAE 490

Horizontal Tail

Size

• Assume cg is locate at the quarter chord

• Assume ηh = 0.9

• ARwing = 5

• Swing = 41.7 ft2

• ARh-tail = 3• Find: Sh and AR => bh and ch

Page 20: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

20

AAE 490

Horizontal Tail

• xc/4 = 0 ft ≈ xcg

• Static Margin = 15%

• SM = (xac – xcg)/c• Solve for xac

• xac = 0.435 ft

Page 21: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

21

AAE 490

Horizontal Tail

acac

wing

XX

c

1

1 1

h

WB h

WB

Aircraft

h

WB

L h hac h ac

L

ac

L h hh

L

C d SX X

C d SX

C d S

C d S

Roskam Eq. 3.18

0.49hd

d

13.896WB

LC rad

Raymer Fig 16.12

Roskam Figure 3.3

12.69h

LC rad

Page 22: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

22

AAE 490

Horizontal Tail

Results

• Sh = 8.5 ft2

• bh = 5.051 ft

• ch = 1.683 ft

Page 23: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

23

AAE 490

Horizontal Tail

Materials

• 1/8” Balsa Ribs• 1/8” Plywood Root

Rib• 3/4” x 3/8” Bass

Spar (2)• Machined Ribs, Trailing

Edge, and Leading Edge• 1/16” Sheeting on

Leading Edge and Center Section

Page 24: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

24

AAE 490

Rocker

Page 25: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

25

AAE 490

Vertical Tail

• Size

• Materials/Construction

• Vertical Tail Mounting

Page 26: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

26

AAE 490

Vertical Tail

• lV = 5.47 ft• Swing = 41.8 ft2

• bwing = 14.4 ft• VV = 0.031

V VV

wing wing

S lV

S b

Page 27: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

27

AAE 490

Vertical Tail

• TR = 1.5

• Sweep Angle = 22.25o

Page 28: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

28

AAE 490

Vertical Tail Construction

• 1/2” x 1/2” Bass Center Spar

• 1/2” x 1/4” Bass Front Spar

• 1/4” Balsa Vertical Webs

• 1/8” Balsa Ribs

• Balsa Leading Edge and Trailing Edge

Page 29: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

29

AAE 490

Avionics Pod

• Air Data Boom Attachment

• Pod Attachment

• Camera

Page 30: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

30

AAE 490

Avionics Pod

Air Data Boom Placement– On the Fuselage for Protection– In Front of the Plane for Accurate Data

Collection– Near the Pod for Easy Integration– Camera Placement

Page 31: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

31

AAE 490

Avionics Pod

Pod Construction– Pod Dimensions 14” X

11” X 20”– 1/8” Plywood Base– Balsa Sides

• Similar to Fuselage Construction

Page 32: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

32

AAE 490

Avionics Pod

Pod Attachment – Variable placement for CG

adjustment– Vibration isolated for clearer

pictures and electronics protection– Easily mounted with six bolts at the

top of the Pod

Page 33: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

33

AAE 490

Avionics Pod

Camera Placement– Mounted just above the Keel– 30° look down angle when level allowing for an in

flight banking look down angle of 45°

Page 34: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

34

AAE 490

Engine

• Engine

• Engine Mount

• Engine Mount Pylon

• Additional Hardware

• Propeller Selection

Page 35: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

35

AAE 490

Engine

DA-50-R– 5 Hp– 3.13 lbs– Length 6.7”– Bore 1.6771”– Stroke 1.3779”– Clockwise Rotation

Page 36: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

36

AAE 490

Engine

• Engine Mount– ¼” Plywood Firewall

3” X 4”– Standoff Mounts

Shown in Blue

Page 37: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

37

AAE 490

Engine

• Engine Mount Pylon– 1/2” square Bass

Wood stringers– Balsa Ribs– 4” X 3” plywood

mounting plate– 14” tall providing 12.5”

of prop clearance

Page 38: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

38

AAE 490

Engine

• 50 oz Dubro Fuel Tank

• Fuel Delivery– Fuel tank located at CG– Fuel line run through pylon to the engine– Vacuum created by engine stroke draws fuel

• Good for up to 30 feet

Page 39: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

39

AAE 490

Engine

• Additional Required Hardware– Throttle Servo– Ignition Battery– Ignition Switch

Page 40: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

40

AAE 490

Engine

• Propeller Choices– Manufacturers

• Bolly• Menz• Mejzlik

– Sizes• 24” X 8”• 22” X 10”• 23” X 10”

Page 41: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

41

AAE 490

Aircraft Maintainability

• Service Hatches– Top Hatch – Servo Access Hatches

• Exposed Engine for Ease of Maintenance

Page 42: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

42

AAE 490

Radio Instillation

Page 43: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

43

AAE 490

Color Scheme

Page 44: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

44

AAE 490

APPENDIX

• Parts Drawings

• Single Receiver Instillation

• Material List

Page 45: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

45

AAE 490

Single Receiver

Page 46: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

46

AAE 490

Page 47: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

47

AAE 490

Page 48: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

48

AAE 490

Page 49: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

49

AAE 490

Page 50: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

50

AAE 490

Page 51: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

51

AAE 490

Page 52: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

52

AAE 490

Page 53: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

53

AAE 490

Page 54: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

54

AAE 490

Page 55: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

55

AAE 490

Page 56: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

56

AAE 490

Page 57: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

57

AAE 490

Page 58: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

58

AAE 490

Page 59: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

59

AAE 490

Page 60: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

60

AAE 490

Page 61: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

61

AAE 490

Page 62: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

62

AAE 490

Page 63: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

63

AAE 490

Page 64: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

64

AAE 490

Page 65: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

65

AAE 490

Page 66: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

66

AAE 490

Page 67: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

67

AAE 490

Page 68: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

68

AAE 490

Page 69: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

69

AAE 490

Page 70: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

70

AAE 490

Page 71: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

71

AAE 490

Page 72: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

72

AAE 490

Page 73: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

73

AAE 490

Page 74: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

74

AAE 490

Page 75: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

75

AAE 490

Page 76: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

76

AAE 490

Page 77: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

77

AAE 490

Page 78: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

78

AAE 490

Page 79: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

79

AAE 490

Page 80: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

80

AAE 490

Page 81: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

81

AAE 490

Page 82: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

82

AAE 490

Page 83: Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.

83

AAE 490