Creston Road: Complete Streets Study Opening Presentation ...

88
Designing Safe, Livable , Healthy Communities Diseñando Comunidades Seguras y Vivibles Creston Road: Complete Streets Study Estudio Calles Completas : Creston Road City y of f f of f Paso Robles s in partnership with the City y o f of aso Robl Pa Local Government partnership n es s i nt nt Commission, W p W W- th the it p w W W - -Trans, Michael Baker International Local Governmen nt ommission Co and North Coast Engineering and North Coast Engineering Funded by a Caltrans Sustainable Transportation Planning Grant

Transcript of Creston Road: Complete Streets Study Opening Presentation ...

Page 1: Creston Road: Complete Streets Study Opening Presentation ...

Designing Safe, Livable, Healthy CommunitiesDiseñando Comunidades Seguras y Vivibles

Creston Road: Complete Streets StudyEstudio Calles Completas: Creston RoadCity y offfoff Paso Robles s in partnership with theCityy ofof aso RoblesPaLocal Government

partnership wness intnt Commission, W

p wWW-

th theitp wWW--Trans, Michael Baker International Local Governmennt ommissionCo

and North Coast Engineeringand North Coast EngineeringFunded by a Caltrans Sustainable Transportation Planning Grant

Page 2: Creston Road: Complete Streets Study Opening Presentation ...

Study AreaArea de Enfoque

Page 3: Creston Road: Complete Streets Study Opening Presentation ...

Funded through a Caltrans Sustainable Transportation Planning GrantCreston Road between South River Road and Niblick Road (1.9 miles)Will utilize a public process which engages residents, property owners and other stakeholders (schools).Plan will address safety, access, and mobility for al modes of transportation including walking, bicycling, transit and motor vehicles.

Project Details

Page 4: Creston Road: Complete Streets Study Opening Presentation ...

Schedule Horario

Page 5: Creston Road: Complete Streets Study Opening Presentation ...

Next Steps

Page 6: Creston Road: Complete Streets Study Opening Presentation ...

Próximospasos

Page 7: Creston Road: Complete Streets Study Opening Presentation ...

Base Issues and Facilities

Temas base e instalaciones

Page 8: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes

3

3

52

5

5 5

Número de carriles

Page 9: Creston Road: Complete Streets Study Opening Presentation ...

Bike Lanes Carriles para bicicleta

Page 10: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes Carriles para vehículos

3

3

52

5

5 5

Page 11: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes Carriles para vehículos

3

3

52

5

5 5

Page 12: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes Carriles para vehículos

Page 13: Creston Road: Complete Streets Study Opening Presentation ...

5’

9’

5’

13’

13’

5’

9’

5’

Page 14: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes Carriles para vehículos

Page 15: Creston Road: Complete Streets Study Opening Presentation ...

5’

8’

5’

12’

12’

12’

6’

8’

Page 16: Creston Road: Complete Streets Study Opening Presentation ...

Travel Lanes Carriles para vehículos

Page 17: Creston Road: Complete Streets Study Opening Presentation ...

6’

12’

6’

13’

16’

13’

12’

6’

6’

Page 18: Creston Road: Complete Streets Study Opening Presentation ...

Traffic Volumes Volumen de tráfico

15,100 14,500 15,200

17,200

4,

Page 19: Creston Road: Complete Streets Study Opening Presentation ...

Traffic Volumes Volumen de tráfico

Page 20: Creston Road: Complete Streets Study Opening Presentation ...

Traffic Control Warrants Requisitos para semáforos

Page 21: Creston Road: Complete Streets Study Opening Presentation ...

Recent Improvements Mejoras recientes

Page 22: Creston Road: Complete Streets Study Opening Presentation ...

Pedestrian Crossing Cruces peatonales

Page 23: Creston Road: Complete Streets Study Opening Presentation ...

Missing Sidewalks Falta de aceras

Page 24: Creston Road: Complete Streets Study Opening Presentation ...

Missing Sidewalks Falta de aceras

Page 25: Creston Road: Complete Streets Study Opening Presentation ...

Hot Spot Repair Mejoras a corto plazo

Page 26: Creston Road: Complete Streets Study Opening Presentation ...

Hot Spot Repair Mejoras a corto plazo

Page 27: Creston Road: Complete Streets Study Opening Presentation ...

Parking Bays Estacionamientos irregulares

Page 28: Creston Road: Complete Streets Study Opening Presentation ...
Page 29: Creston Road: Complete Streets Study Opening Presentation ...
Page 30: Creston Road: Complete Streets Study Opening Presentation ...

Intersection Level of Service (Operations)

CB

A

CD

B

Nivel de servicio en cruces de calle (Operaciones)

Page 31: Creston Road: Complete Streets Study Opening Presentation ...

Speeds Velocidades

3338

Page 32: Creston Road: Complete Streets Study Opening Presentation ...

School Access Acceso a escuelas

Page 33: Creston Road: Complete Streets Study Opening Presentation ...

Trail Access Acceso a veredas

Page 34: Creston Road: Complete Streets Study Opening Presentation ...

Collisions Choques

Page 35: Creston Road: Complete Streets Study Opening Presentation ...

35Collisions

Page 36: Creston Road: Complete Streets Study Opening Presentation ...

36Collisions

Page 37: Creston Road: Complete Streets Study Opening Presentation ...

Input from Students at Lewis Middle SchoolIdeas de estudiantes en escuela intermedia Lewis

Page 38: Creston Road: Complete Streets Study Opening Presentation ...

What are Complete Streets?¿Qué son las Calles Completas?

Complete Streets are streets for everyone, no matter who they are or how they travelCalles completas son calles para todos, sin importar quienes son o como viajan

Page 39: Creston Road: Complete Streets Study Opening Presentation ...

Safe Comfortable ConvenientSeguras Cómodas Convenientes

Whether you’re walking, cycling, driving or taking transitSi camina, anda en bici, maneja o toma transporte público

Page 40: Creston Road: Complete Streets Study Opening Presentation ...

Safe Comfortable ConvenientSeguras Cómodas Convenientes

Whether you’re young, old, able or disabledDe cualquier edad, joven, adulto, o discapacitado

Page 41: Creston Road: Complete Streets Study Opening Presentation ...

Benefits: Safety Beneficios: SeguridadSlowing traffic improves safety for everybody, especially people walkingReducir la velocidad mejora la seguridad para todos,especialmente peatones

W.A. Leaf and D.F. Preusser, “Literature Review on Vehicle Travel Speeds and Pedestrian Injuries Among Selected Racial/Ethnic Groups,” US Department of Transportation, National Highway Traffic Safety Administration (1999).

Page 42: Creston Road: Complete Streets Study Opening Presentation ...

15 MPH20 MPH

Speed MattersLa velocidad es clave

25 MPH30 MPHAs speed increases, driver focuses less on surroundingsAl aumentar la velocidad el conductor se enfoca menos en su alrededor

Page 43: Creston Road: Complete Streets Study Opening Presentation ...

Curbs and sidewalks slow traffic more than speed sign

El borde de la calle y las banquetas reducen más la velocidad que el letrero con el límite de velocidad

Page 44: Creston Road: Complete Streets Study Opening Presentation ...

Benefits: HealthCenters for Disease Control and Prevention recommend adoption of Complete Streets policies as strategy to increase physical activity.

Beneficios: SaludLos Centros para el Control y Prevención de la Enfermedad recomiendan adoptar normas de Calles Completas como estrategia para aumentar la actividad física.

Page 45: Creston Road: Complete Streets Study Opening Presentation ...

People will walkLa gente sí caminará

Centers for Disease Control and Prevention 2012, newpublichealth.org

Page 46: Creston Road: Complete Streets Study Opening Presentation ...

The Tremendous PotentialEl enorme potencial

Walkability in Paso Robles:½ mile10 minute walk

Caminar enPaso Robles: ½ millaCaminata de10 minutos

Lewis Middle School

PiferElem. School

Page 47: Creston Road: Complete Streets Study Opening Presentation ...

The Tremendous PotentialEl enorme potencial

1.5 miles

Bicycling in Paso Robles:1.5 miles10 minute ride

Andar enbicicleta enPaso Robles:1.5 millasPaseo de 10 minutos

Page 48: Creston Road: Complete Streets Study Opening Presentation ...

People will bike: What the surveys show

Interested but concernedInteresados pero preocupados

60%

No Way, No HowDe ninguna manera

33%

Strong and FearlessFuertes y Sin Temor<1%

Enthused and ConfidentEntusiasmados y Confiados7%

Source: Scott Bricker, based on two separate online surveys with 2,000 respondents in Portland, OR

La gente sí andará en bicicleta: Lo que nos demuestran las encuestas

Page 49: Creston Road: Complete Streets Study Opening Presentation ...

But #1 reason people give for not biking is… Safety

Concern about riding with automobile traffic is the number one barrier to cycling.

Pero la razón principal para no andar enbicicleta es… la seguridad

“El obstáculo principal al ciclismo es la preocupacion de andar con los carros”.

Source: Recent Portland, OR poll of 2,000 respondentsFuente: Encuesta de 2,000 personas en Portland, OR

Page 50: Creston Road: Complete Streets Study Opening Presentation ...

Tools to Make Streets Safe and Comfortable for Walking

Técnicas para hacer calles másseguras y cómodas para caminar

Page 51: Creston Road: Complete Streets Study Opening Presentation ...

Need comfortable sidewalksNecesitamos banquetas cómodas

Page 52: Creston Road: Complete Streets Study Opening Presentation ...

Need sidewalks that are wide enough for 2 people to walk side-by-sidePara que dos personas puedan caminar lado a lado necesitamos aceras depor lo menos 5 pies de ancho.

Page 53: Creston Road: Complete Streets Study Opening Presentation ...

Sidewalks need good buffersLas banquetas necesitan buena separación

Page 54: Creston Road: Complete Streets Study Opening Presentation ...

Crossing width 5 feet

Grade slows traffic

Planter strip

Sidewalk with buffer to the street makes it much easier to meet ADA requirementsLa banqueta con separación hace más fácil cumplir con los requisitos para discapacitados

Page 55: Creston Road: Complete Streets Study Opening Presentation ...

Neighborhoods Need Good Street Crossings

West Sacramento

Los vecindariosnecesitanbuenos cruces de calle

Page 56: Creston Road: Complete Streets Study Opening Presentation ...

High visibility crosswalk markings

Cruces peatonales de alta visibilidad

Page 57: Creston Road: Complete Streets Study Opening Presentation ...

Some crosswalks stand outAlgunos cruces son muy visibles

Page 58: Creston Road: Complete Streets Study Opening Presentation ...

Curbextensions:Don’t just reduce crossing distance

Other advantagesBetter visibility (both ways)Traffic calmingRoom for street furniture

Las extensionesde banquetas:No solo reducen la distancia paracruzar

Otras ventajas:Más visibilidad (en ambasdirecciones)Apaciguamiento del tráficoEspacio para muebles de la calle

Page 59: Creston Road: Complete Streets Study Opening Presentation ...
Page 60: Creston Road: Complete Streets Study Opening Presentation ...

Illumination – essential for any crossingAlumbrado – esencial en los cruces peatonales

If you mark a crosswalk – light it.Almost 50% of pedestrian crashes occur at night

Si marcamos un cruce tambiéndebemos alumbrarloCasi el 50% de los choques con peatones ocurren en la noche

Page 61: Creston Road: Complete Streets Study Opening Presentation ...

Medians help cross the streetLos camellónes ayudan a cruzar la calle

Page 62: Creston Road: Complete Streets Study Opening Presentation ...

Medians and Crossing Islands

Camellones yRefugios Peatonales

Page 63: Creston Road: Complete Streets Study Opening Presentation ...

Rectangular Rapid Flashing Beacon (RRFB)Supplement warning signs at unsignalizedintersections or mid-block crosswalks.Increase driver yielding behavior

Page 64: Creston Road: Complete Streets Study Opening Presentation ...

Pedestrian Hybrid Beacon aka HAWK(High Intensity Activated Crosswalk)

Tucson AZ

Page 65: Creston Road: Complete Streets Study Opening Presentation ...

Hybrid Beacon Sequence1

2

3

4

5

Returnto 1

Flashing Flashing yellow

Blank forBlank fordrivers

Steady Steadyyellow

Steady Steadyred

Wigg-g-Wag

2009 MUTCD Section 4F.3

Page 66: Creston Road: Complete Streets Study Opening Presentation ...

Tools to Make Streets Safe and Comfortable for Bicycling

Técnicas para hacer calles másseguras y cómodas para andar en

bicicleta

Page 67: Creston Road: Complete Streets Study Opening Presentation ...

10 and 11 lanes are just as safe for vehicles as 12lanes on urban arterials with speeds < 45 mph

Find space to give bicycles a laneEncontrar espacio para darles un carril

Page 68: Creston Road: Complete Streets Study Opening Presentation ...

Buffered bicycle lanesCarriles para bicicleta con separación

San Jose, e, CA

Page 69: Creston Road: Complete Streets Study Opening Presentation ...

Buffered bicycle lanesCarriles para bicicleta con separación

Page 70: Creston Road: Complete Streets Study Opening Presentation ...

Protected/Separated Class IV bicycle lanesCarriles separados/protegidos para bicicleta

Temple City, CA

Page 71: Creston Road: Complete Streets Study Opening Presentation ...

Separated/Protected lanes in CaliforniaCarriles separados/protegidos para bicicleta

Long Beach Long Beach

Ripon Temple City

Page 72: Creston Road: Complete Streets Study Opening Presentation ...

Green bicycle lanesCarriles verdes para bicicletas

Sacramento, CA

Page 73: Creston Road: Complete Streets Study Opening Presentation ...

Bike ParkingEstacionamiento para bicicletas

Page 74: Creston Road: Complete Streets Study Opening Presentation ...

Tools to Make Streets Safe and Comfortable for Driving

Técnicas para hacer calles másseguras y cómodas para manejar

Page 75: Creston Road: Complete Streets Study Opening Presentation ...

Slow speed entry with yield

Slow speed exit

Truck apron

Splitter island

Crosswalk 1 car length back

Lots of deflection for slow speeds throughout

Separated sidewalk to direct peds to crosswalks

Roundabout Design CharacteristicsDiseño de Glorietas Modernas

Page 76: Creston Road: Complete Streets Study Opening Presentation ...

Roundabouts are saferLas glorietasmodernas son más seguras

“Results of this study indicate that converting conventional intersections from stop sign or traffic signal control can produce substantial reductions in motor vehicle crashes.”

March 2000 Study by theInsurance Institute for Highway Safety

32 vehicle-to-vehicle conflicts24 vehicle-to-pedestrian conflicts

Conflicts at a 4-Way Intersection

8 vehicle-to-vehicle conflicts8 vehicle-to-pedestrian conflicts

Conflicts at a Roundabout

35% Reduction in All Crashes76% Reduction in Injury Crashes

Page 77: Creston Road: Complete Streets Study Opening Presentation ...

Places to Sit Lugares para sentarnos

Page 78: Creston Road: Complete Streets Study Opening Presentation ...

WayfindingDirecciones

Page 79: Creston Road: Complete Streets Study Opening Presentation ...
Page 80: Creston Road: Complete Streets Study Opening Presentation ...

Trees and ShadeArboles y sombra

Page 81: Creston Road: Complete Streets Study Opening Presentation ...

Public Art Arte Público

Page 82: Creston Road: Complete Streets Study Opening Presentation ...
Page 83: Creston Road: Complete Streets Study Opening Presentation ...

2020

Can it be done?

Hombre camina en la luna Hombre camina en la calleprincipal

Page 84: Creston Road: Complete Streets Study Opening Presentation ...

Design Table ExerciseJoin a table, discuss and write or draw on the maps

What’s working well on Creston Road?Where are there challenges?Where is it difficult to walk, ride a bicycle or drive a car?Which intersections are difficult to cross?

Let’s Discuss! ¡Vamos a platicar!

Ejercicio en mesas de diseñoUnase a una mesa, discuta y escriba o dibuje enlos mapas

¿Qué funciona bien en la Calle Creston?¿Dónde hay problemas?¿Dónde es difícil caminar, andar en bicicleta o manejar?¿Qué cruces de calle son dificiles de cruzar?

Page 85: Creston Road: Complete Streets Study Opening Presentation ...
Page 86: Creston Road: Complete Streets Study Opening Presentation ...

Design tables Mesas de diseño

Page 87: Creston Road: Complete Streets Study Opening Presentation ...
Page 88: Creston Road: Complete Streets Study Opening Presentation ...

For More InformationDitas EsperanzaCity of Paso Roblesditas@ prcity.com805-237-3861

Ditas EsperanzaCiudad de Paso Roblesditas@ prcity. com805- 237- 3861

Para más información