CRESSWIND - PHASE Iww.charmeck.org/Planning/Subdivision/Approvals/2016/Cresswind_Ph1(SF).pdfC-7.1...

2
COVER SHEET LDI NTS C-1.0 REVISIONS: DATE: DESIGNED BY: DRAWN BY: CHECKED BY: Q.C. BY: SHEET #: SCALE: PROJECT #: 1014398 APRIL 29, 2016 KH MINT HILL LLLP; MECKLENBURG COUNTY, NC SINGLE FAMILY RESIDENTIAL DEVELOPMENT CRESSWIND - PHASE I SEAL NC Eng. Firm License C-0658 05/9/16 - PER STAFF COMMENTS 05/23/16 - PER STAFF COMMENTS 06/30/16 - PER STAFF COMMENTS 09/12/16 - PER STAFF COMMENTS VICINITY MAP NTS SITE CRESSWIND - PHASE I SINGLE FAMILY SUBDIVISION ALBEMARLE ROAD DEVELOPER LANDSCAPE ARCHITECT / CIVIL ENGINEER SURVEYOR LandDesign, Inc. 223 North Graham St. Charlotte, NC 28202 704.333.0325 Contact: Dale Stewart, PE CHARLOTTE, NORTH CAROLINA Sheet Index: C-2.0 Overall Layout Plan C-1.0 Chapter 1 - Existing Conditions Chapter 3 - Roadway & Storm Drainage Plan C-3.0 Chapter 2 - Site Cover Sheet Chapter 4 - Grading Plan C-4.0 Overall Grading Plan Chapter 6 - RESERVED Land Development Submittal: March 2, 2016 Chapter 7 - Planting C-7.0 Overall Planting Plan C-3.1 Roadway Plan & Profile Sheet Index Cresswind Blvd Plan & Profile C-7.1 Detailed Planting Plan C-2.1 Detailed Layout Plan C-3.2 Cresswind Blvd Plan & Profile KH Mint Hill LLLP 701 S Olive Ave #104 West Palm Beach, FL 33401 561.682.9500 Contact: Bob Daurity Chapter 5 - Erosion Control C-5.0 Erosion Control Plan - Phase I Overall C-5.1 Erosion Control Plan Phase I C-2.2 Detailed Layout Plan C-3.3 Road B Plan & Profile LDSI, Inc. 508 W 5th St. #125 Charlotte, NC 28202 704.337.8329 Contact: David Boyles, PE, PLS C-2.3 Site Details C-2.4 Site Details C-4.1 Detailed Grading Plan C-4.2 Detailed Grading Plan C-7.2 Detailed Planting Plan C-7.4 Planting Details Rezoning Petition RZ-2.0 - Rezoning Petition RZ-3.0 - Rezoning Petition RZ-4.0 - Rezoning Petition RZ-4A - Rezoning Petition RZ-5.0 - C-8.0 Albemarle Road Driveway Chapter 8 - Offsite Roadway C-8.1 Intersection Sight Distance C-5.2 Erosion Control Plan Phase I C-5.3 Erosion Control Plan Phase I Trunk Sewer C-5.4 C-3.4 Pre Development Drainage Map C-3.5 Overall Stormwater Management Plan C-3.7 Drainage Area Plan C-3.8 Out of Roadway Storm C-3.10 BMP Design C-3.11 BMP Details C-5.10 Erosion Control Details Erosion Control Plan Phase I Trunk Sewer Storm Drainage Details C-3.6 Drainage Area Plan C-3.9 C-8.3 Traffic Control Plan & Details March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 C-5.5 Erosion Control Plan - Phase II Overall C-5.6 Erosion Control Plan Phase II C-5.7 Erosion Control Plan Phase II C-5.8 Erosion Control Plan Phase II Trunk Sewer C-5.9 Erosion Control Plan Phase II Trunk Sewer March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 March 2, 2016 C-5.11 Erosion Control Details March 2, 2016 C-3.3A Future EW Connector Plan & Profile C-2.5 Site Details C-2.6 Overall Tree Save Exhibit Existing Albemarle Road Plan & Profile C-3.3B Land Development 2nd Submittal: Rezoning Petition RZ-1.0 - April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 April 24, 2016 NCDOT 2nd Submittal: June 2, 2016 C-8.2 Phase I - Turning Movement Plan March 2, 2016 April 24, 2016 C-7.3 Wet Pond Planting Plan June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 Land Development 3rd Submittal: June 30, 2016 June 30, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 2, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 June 30, 2016 C-3.12 Pavement Marking Details June 30, 2016 - - - - - - June 2, 2016 Land Development 3rd Submittal: September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 September 12, 2016 - - - - - -

Transcript of CRESSWIND - PHASE Iww.charmeck.org/Planning/Subdivision/Approvals/2016/Cresswind_Ph1(SF).pdfC-7.1...

  • CO

    VER

    SH

    EET

    LDI

    NT

    S

    C-1

    .0

    REV

    ISIO

    NS:

    DA

    TE:

    DES

    IGN

    ED B

    Y:

    DRA

    WN

    BY

    :C

    HEC

    KED

    BY

    :Q

    .C. B

    Y:

    SHEE

    T #

    :

    SCA

    LE:

    PRO

    JEC

    T #

    :10

    1439

    8

    APR

    IL 2

    9, 2

    016

    KH M

    INT

    HIL

    L LL

    LP; M

    ECKL

    ENBU

    RG C

    OU

    NTY

    , NC

    SIN

    GLE

    FA

    MIL

    Y R

    ESID

    ENT

    IAL

    DEV

    ELO

    PMEN

    TC

    RES

    SWIN

    D -

    PH

    ASE

    I

    SEAL

    NC

    Eng

    . Fir

    m L

    icen

    se C

    -065

    8

    05/9

    /16

    - PE

    R ST

    AFF

    CO

    MM

    ENTS

    05/2

    3/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    06/3

    0/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    09/1

    2/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    VICINITY MAP

    NTS

    SITE

    CRESSWIND - PHASE ISINGLE FAMILY SUBDIVISION

    ALBEMARLE ROAD

    DEVELOPER

    LANDSCAPEARCHITECT /

    CIVIL ENGINEER

    SURVEYOR

    LandDesign, Inc.

    223 North Graham St.

    Charlotte, NC 28202

    704.333.0325

    Contact: Dale Stewart, PE

    CHARLOTTE, NORTH CAROLINA

    Sheet Index:

    C-2.0 Overall Layout Plan

    C-1.0

    Chapter 1 - Existing Conditions

    Chapter 3 - Roadway & Storm Drainage Plan

    C-3.0

    Chapter 2 - Site

    Cover Sheet

    Chapter 4 - Grading Plan

    C-4.0 Overall Grading Plan

    Chapter 6 - RESERVED

    Land DevelopmentSubmittal:

    March 2, 2016

    Chapter 7 - Planting

    C-7.0 Overall Planting Plan

    C-3.1

    Roadway Plan & Profile Sheet Index

    Cresswind Blvd Plan & Profile

    C-7.1 Detailed Planting Plan

    C-2.1 Detailed Layout Plan

    C-3.2 Cresswind Blvd Plan & Profile

    KH Mint Hill LLLP

    701 S Olive Ave #104

    West Palm Beach, FL 33401

    561.682.9500

    Contact: Bob Daurity

    Chapter 5 - Erosion Control

    C-5.0 Erosion Control Plan - Phase I Overall

    C-5.1 Erosion Control Plan Phase I

    C-2.2 Detailed Layout Plan

    C-3.3 Road B Plan & Profile

    LDSI, Inc.

    508 W 5th St. #125

    Charlotte, NC 28202

    704.337.8329

    Contact: David Boyles, PE, PLS

    C-2.3 Site Details

    C-2.4 Site Details

    C-4.1 Detailed Grading Plan

    C-4.2 Detailed Grading Plan

    C-7.2 Detailed Planting Plan

    C-7.4 Planting Details

    Rezoning PetitionRZ-2.0-

    Rezoning PetitionRZ-3.0-

    Rezoning PetitionRZ-4.0-

    Rezoning PetitionRZ-4A-

    Rezoning PetitionRZ-5.0-

    C-8.0 Albemarle Road Driveway

    Chapter 8 - Offsite Roadway

    C-8.1 Intersection Sight Distance

    C-5.2 Erosion Control Plan Phase I

    C-5.3 Erosion Control Plan Phase I Trunk Sewer

    C-5.4

    C-3.4 Pre Development Drainage Map

    C-3.5 Overall Stormwater Management Plan

    C-3.7 Drainage Area Plan

    C-3.8 Out of Roadway Storm

    C-3.10

    BMP Design

    C-3.11

    BMP Details

    C-5.10 Erosion Control Details

    Erosion Control Plan Phase I Trunk Sewer

    Storm Drainage Details

    C-3.6 Drainage Area Plan

    C-3.9

    C-8.3 Traffic Control Plan & Details

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    C-5.5 Erosion Control Plan - Phase II Overall

    C-5.6 Erosion Control Plan Phase II

    C-5.7 Erosion Control Plan Phase II

    C-5.8 Erosion Control Plan Phase II Trunk Sewer

    C-5.9 Erosion Control Plan Phase II Trunk Sewer

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    March 2, 2016

    C-5.11 Erosion Control Details March 2, 2016

    C-3.3A Future EW Connector Plan & Profile

    C-2.5 Site Details

    C-2.6 Overall Tree Save Exhibit

    Existing Albemarle Road Plan & ProfileC-3.3B

    Land Development2nd Submittal:

    Rezoning PetitionRZ-1.0-

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    April 24, 2016

    NCDOT2nd Submittal:

    June 2, 2016

    C-8.2 Phase I - Turning Movement Plan March 2, 2016 April 24, 2016

    C-7.3 Wet Pond Planting Plan

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    Land Development 3rdSubmittal:

    June 30, 2016

    June 30, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 2, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    June 30, 2016

    C-3.12 Pavement Marking Details June 30, 2016

    -

    -

    -

    -

    -

    -

    June 2, 2016

    Land Development 3rdSubmittal:

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    September 12, 2016

    -

    -

    -

    -

    -

    -

    BSMITHApproved

    JFWEAVERApproved for Construction

    JFWEAVERText BoxBy: Joshua Weaver 9-26-2016 1 of 2

    BSMITHSubdivision Approval

    BSMITHApproved

    BSMITHApproved

    BSMITHApproved

  • SILVER SPRINGS COURT

    (56' PUBLIC R/W)

    12

    11

    10

    9

    8

    7

    6 5

    4

    3

    2

    1

    PHASE I LIMITS, TYP.

    PHASE I LIMITS, TYP.

    CR

    ES

    SW

    IND

    BO

    ULE

    VA

    RD

    (VA

    RIA

    BLE

    W

    IDT

    H P

    UB

    LIC

    R/W

    )

    C

    R

    E

    S

    S

    W

    IN

    D

    B

    O

    U

    L

    E

    V

    A

    R

    D

    (V

    A

    R

    IA

    B

    L

    E

    W

    ID

    T

    H

    P

    U

    B

    L

    IC

    R

    /W

    )

    PCO NATURAL AREA, TYP.

    LAWN

    PCO NATURAL AREA

    24" SOLID WHITE

    STOP LINE

    30" X 30" STOP

    SIGN (R1-1)

    30" X 30" STOP

    SIGN (R1-1)

    PHASE I LIMITS, TYP.

    EXISTING TREE LINE

    TYP.

    NEW TREE LINE,

    TYP.

    EXISTING TREE LINE,

    TYP.

    NEW TREE LINE,

    TYP.

    TREE PROTECTION FENCE

    SILT FENCE

    LIMITS OF DISTURBANCE, TYP.

    NEW TREE LINE,

    TYP.

    EXISTING TREE LINE,

    TYP.

    END OF STREET

    BARRICADE

    WET

    POND

    PHASE I LIMITS, TYP.

    POST CONSTRUCTION

    CONTROLS EASEMENT (PCCE)

    EXISTING UNION POWER

    LINE TO BE RELOCATED.

    OWNER/CONTRACTOR TO

    COORDINATE WITH POWER

    UTILITY.

    TREE SAVE AREA

    484.81'

    144.17'

    1

    4

    5

    .

    0

    0

    '

    230.0

    0'

    1

    8

    7

    5

    .

    4

    4

    '

    8

    5

    4

    .

    5

    5

    '

    205.51'

    4

    3

    3

    .

    7

    2

    '

    2

    8

    0

    .8

    2

    '

    159.97'

    3

    4

    9

    .9

    4

    '

    3

    6

    3

    .

    2

    0

    '

    3

    2

    3

    .

    5

    5

    '

    391.13'

    1

    7

    1

    .2

    7

    '

    END OF STREET

    BARRICADE

    A

    L

    B

    E

    M

    A

    R

    L

    E

    R

    O

    A

    D

    (V

    A

    R

    IA

    B

    L

    E

    P

    U

    B

    L

    IC

    R

    /W

    )

    EXISTING PARCEL

    BOUNDARY, TYP.

    EXISTING DRIVE

    L

    =

    3

    1

    7

    .

    8

    1

    6

    R

    =

    2

    3

    4

    4

    .

    8

    3

    S

    7

    3

    5

    1

    '

    3

    8

    .

    7

    9

    "

    W

    C

    H

    =

    3

    1

    7

    .

    5

    7

    2

    L

    =

    2

    0

    .11

    6

    R

    =

    9

    2

    2

    0.3

    2

    S

    8

    0

    0

    5

    '

    0

    7

    .2

    5

    "W

    C

    H

    =

    2

    0.11

    6

    ZO

    NIN

    G B

    OU

    ND

    AR

    Y M

    X-1

    ZO

    NIN

    G B

    OU

    ND

    AR

    Y N

    S

    L

    =

    8

    0

    3

    .

    4

    5

    9

    R

    =

    1

    1

    8

    0

    .

    0

    3

    S

    4

    4

    0

    9

    '

    3

    9

    .

    1

    1

    "

    E

    C

    H

    =

    7

    8

    8

    .

    0

    2

    9

    2

    0

    5

    .8

    4

    '

    30" X 30" STOP

    SIGN (R1-1)

    END OF STREET

    BARRICADE

    24" SOLID WHITE

    STOP LINE

    24" SOLID WHITE

    STOP LINE

    TREE PROTECTION FENCE

    SILT FENCE

    LIMITS OF DISTURBANCE, TYP.

    TREE PROTECTION FENCE

    SILT FENCE

    LIMITS OF DISTURBANCE, TYP.

    TREE PROTECTION FENCE

    SILT FENCE

    LIMITS OF DISTURBANCE, TYP.

    30" X 30" STOP

    SIGN (R1-1)

    REV

    ISIO

    NS:

    DA

    TE:

    DES

    IGN

    ED B

    Y:

    DRA

    WN

    BY

    :C

    HEC

    KED

    BY

    :Q

    .C. B

    Y:

    SHEE

    T #

    :

    SCA

    LE:

    PRO

    JEC

    T #

    :10

    1439

    8

    APR

    IL 2

    9, 2

    016

    KH M

    INT

    HIL

    L LL

    LP; M

    ECKL

    ENBU

    RG C

    OU

    NTY

    , NC

    SIN

    GLE

    FA

    MIL

    Y R

    ESID

    ENT

    IAL

    DEV

    ELO

    PMEN

    TC

    RES

    SWIN

    D -

    PH

    ASE

    I

    NC

    Eng

    . Fir

    m L

    icen

    se C

    -065

    8

    9-12-16

    05/9

    /16

    - PE

    R ST

    AFF

    CO

    MM

    ENTS

    05/2

    3/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    06/3

    0/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    09/1

    2/16

    - P

    ER S

    TAFF

    CO

    MM

    ENTS

    OV

    ERA

    LL L

    AY

    OU

    T P

    LAN

    MEK

    MEK LD

    ILD

    I1"

    =10

    0'

    C-2

    .0

    0'50' 50' 100' 200'

    LAYOUT NOTES:

    1. AT TIME OF STAKING, CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT FOR DIGITAL SITE PLAN FILE FOR COORDINATION

    OF STAKING.

    2. SHOULD ANY DISCREPANCIES OR ERRORS BETWEEN COORDINATE POINTS AND DIMENSIONS OR OMISSIONS OF CRITICAL

    STAKING INFORMATION BE DISCOVERED, CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY FOR A COORDINATED

    SOLUTION.

    3. ALL DIMENSIONS AND RADII ARE TO THE BACK OF CURB UNLESS OTHERWISE NOTED.

    4. ALL SIDEWALKS SHALL BE FIELD STAKED FOR APPROVAL BY THE LANDSCAPE ARCHITECT.

    5. LAND DEVELOPMENT ENGINEER TO BE GIVEN 24 HOURS NOTICE PRIOR TO START OF CONSTRUCTION.

    6. ALL CONSTRUCTION SHALL COMPLY WITH CHARLOTTE/MECKLENBURG LAND DEVELOPMENT STANDARDS AND

    SPECIFICATIONS.

    7. ALL PATCH WORK WITHIN LIMIT OF CONSTRUCTION SHALL BE CONSISTENT WITH ASSOCIATED ASPHALT PAVEMENT DETAIL.

    8. ELECTRICAL, TELEPHONE, AND CABLE LINES AND POLES TO BE ELIMINATED OR RELOCATED, SHALL BE COORDINATED WITH

    DUKE POWER, AT&T, AND TIME WARNER.

    9. ALL TRAFFIC SIGNS AND MARKINGS TO BE INSTALLED AND COMPLY CURRENT CLDSM AND MUTCD STANDARDS AND

    SPECIFICATIONS.

    10. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.

    11. RIGHT -OF-WAY ENCROACHMENT AGREEMENT IS REQUIRED FOR THE INSTALLATION OF ALL NON-STANDARD ITEMS

    (IRRIGATION SYSTEMS, DECORATIVE CONCRETE PAVEMENT, BRICK PAVERS, ETC.) WITHIN A PROPOSED/EXISTING CITY

    MAINTAINED STREET RIGHT OF WAY BY A PRIVATE INDIVIDUAL, GROUP, BUSINESS, OR HOMEOWNER'S/BUSINESS

    ASSOCIATION.

    12. PER SECTION 18-175(e) OF THE CITY CODE AND SECTION 10.0 OF THE CITY'S POST CONSTRUCTION CONTROLS EASEMENTS

    (PCCEs) MUST BE RECORDED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY.

    13. REFER TO ELECTRICAL PLANS FOR FINAL SITE LIGHTING LOCATIONS.

    14. DEVELOPER WILL PROVIDE STREET SIGNS PER CLDSM# 50.05 (9" SIGNS ONLY).

    15. THE GARAGE SETBACK FOR ALL FRONT-LOADED SINGLE-FAMILY DETACHED HOMES SHALL BE 20 FEET FROM THE BACK OF

    SIDEWALK TO ENSURE VEHICLES DO NOT OVERHANG AND OBSTRUCT THE USE OF THE SIDEWALK.

    16. NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY

    ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF

    TRANSPORTATION BEFORE INSTALLATION. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT CDOT AT (704) 336-3888.

    17. SIDEWALK WITHIN THE CITY'S R/W THAT REQUIRES REPLACEMENT AS PART OF THE DEVELOPMENT AND/OR STREET

    IMPROVEMENTS SHOULD BE PHASED IN SUCH A WAY AS TO MINIMIZE THE DURATION OF THE SIDEWALK CLOSURE TO THE

    EXTENT FEASIBLE. THE DEVELOPER SHOULD MAKE EVERY ATTEMPT TO HAVE SIDEWALK REPAIRED AND REOPENED FOR

    PUBLIC USE WITHIN 30 DAYS OF REMOVAL.

    18. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF THE SIDEWALK OR TRAVEL LANE FOR LESS THAN 30 DAYS

    REQUIRES A R/W USE PERMIT. TRAFFIC CONTROL PLANS FOR ANY SIDEWALK OR TRAVEL LANE CLOSURES MUST BE

    SUBMITTED AS PART OF THE R/W USE PERMIT REQUEST. TRAFFIC CONTROL PLANS MUST BE IN ACCORDANCE WITH CDOT'S

    WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND MUST BE REVIEWED AND APPROVED. CONTRACTOR SHALL

    CONTACT CDOT AT LEAST 5 BUSINESS DAYS IN ADVANCE OF BEGINNING OF WORK AT (704) 432-1562.

    19. RIGHT-OF-WAY CLOSURES LONGER THAN 30 DAYS REQUIRE A R/W LEASE AGREEMENT WHICH WILL INCLUDE THE SUBMITTAL

    OF A TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLANS REQUIRED THROUGH A LEASE AGREEMENT MAY BE DIFFERENT

    FROM THE ONE REQUIRED DURING THE LAND DEVELOPMENT PLAN REVIEW AND ARE SUBJECT TO REVISIONS. THE REVISED

    TRAFFIC CONTROL PLANS MUST BE SUBMITTED AS PART OF THE LEASE AGREEMENT PROCESS FOR APPROVAL PRIOR TO

    START OF R/W CLOSURES. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348.

    20. CONSTRUCTION STAGING WITHIN CITY R/W LASTING MORE THAN 30 DAYS REQUIRES A R/W LEASE AGREEMENT. CONTRACTOR

    SHALL CONTACT CDOT AT (704) 336-8348.

    DEVELOPMENT SUMMARY:

    PARCEL ID#: 11120104

    11120105

    11120108

    11122101

    11122102

    11122103

    11120104

    11120106

    11120107

    11120108

    PROPERTY OWNER: KH MINT HILL LLLP

    701 S. OLIVE AVE., SUITE 104

    WEST PALM BEACH, FL 33401

    CONTACT: JOHN MORGAN

    (843) 696-6907

    [email protected]

    EXISTING ZONING: MIXED USE (MX-1) DISTRICT

    NEIGHBORHOOD SERVICES (NS) DISTRICT

    USE

    EXISTING: VACANT

    PROPOSED: SINGLE FAMILY, DETACHED

    SITE ACREAGE:

    OVERALL:

    PHASE I:

    MX-1 ZONING:

    NS ZONING:

    LOT REQUIREMENTS / YARDS (MX-1 ZONING)

    MAXIMUM RESIDENTIAL DENSITY: 6.0 DUA

    MINIMUM LOT AREA: 4,500 SF

    MINIMUM LOT WIDTH: 40 FEET

    MINIMUM SETBACK FROM R/W: 17 FEET

    -GARAGE SETBACK FROM R/W: 20 FEET

    MINIMUM SIDE YARD: 5 FEET

    MINIMUM SIDE YARD CORNER LOT: 10 FEET

    MINIMUM REAR YARD: 30 FEET

    MAXIMUM BUILDING COVERAGE:

    -UP TO 4,000 SF 50%

    -4,001 - 6,500 SF 45%

    -6,501 - 8,500 SF 40%

    -8,501 - 15,000 SF 35%

    -15,001 OR GREATER 30%

    MAXIMUM HEIGHT (AT SIDE YARD): 35 FEET*

    MAXIMUM HEIGHT (AVERAGE): 40 FEET*

    * ONE ADDITIONAL FOOT OF HEIGHT IS ALLOWED FOR EACH

    ADDITIONAL ONE FOOT IN DISTANCE THE PORTION OF THE BUILDING IS FROM

    THE REQUIRED SIDE YARD LINE.

    PCO NATURAL AREA (GREATER THAN 50% BUA)

    TOTAL ACREAGE: 24.41 AC

    10% REQUIRED: 2.44 AC

    PROVIDED: 3.55 AC (14.54%)

    TREE SAVE REQUIREMENTS FOR SINGLE-FAMILY:

    TOTAL ACREAGE: 24.41 AC

    10% REQUIRED: 2.44 AC

    PROVIDED: 3.55AC (14.54%)

    NOTE:

    PER REZONING PETITION 2015-101 UP TO 10 RESIDENTIAL DWELLINGS AND

    ALLOWED ACCESSORY USES MAY BE DEVELOPED AND OCCUPIED WITHIN

    DEVELOPMENT AREA A UPON SUBSTANTIAL CONSTRUCTION OF PHASE I ROAD

    WAY IMPROVEMENTS. DEVELOPER PROPOSES TO PERMIT 12 LOTS IN PHASE I

    BUT AGREES TO ONLY PLAT 10 LOTS PRIOR TO SUBSTANTIAL COMPLETION OF

    THE ROADWAY IMPROVEMENTS DESCRIBED PER THE REZONING.

    A

    A

    B

    B

    D

    D

    C

    C

    C-2.1

    C-2.2