Credit Rating Assignment Rating Procedure on Toll Road Industry Submitted by Dheeraj Singh Sujit Kumar Dharmesh Shharma Bipasha Ray Kartik Shetty

Transcript of Credit rating assignment

Page 1: Credit rating assignment

Credit Rating Assignment

Rating Procedure

on

Toll Road IndustrySubmitted by

Dheeraj Singh

Sujit Kumar

Dharmesh Shharma

Bipasha Ray

Kartik Shetty

Page 2: Credit rating assignment

Indian Road Sector - Overview

Page 3: Credit rating assignment

• India’s road network (3.3 Million Kms) is the world’s third largest.

• Road density - 770 Kms/1,000 sq Kms, against the world average of 840 Kms/1000 sq Kms.

• Country with diverse topographies and the world’s second largest population.

• The bid pipeline with projects worth around Rs 90,000 Cr, comprising approximately 13,000 Kms.

Page 4: Credit rating assignment
Page 5: Credit rating assignment

Sector Expected to Attract Investment of 6.3 trillion …..

• Investments of 6.3 trillion over the next 5 years (2010-11 to 2014-15) under various schemes

• Maximum investments from NH – Clarity in policy framework with changes in MCA, bidding policies.

National Highways

43

State Highways

30

Rural Roads

27

Investments in road sector (2010-11 to 2014-15)- Rs 6.3 trillion

per cent

(Rs 2.7 trillion)

(Rs 1.7 trillion)

(Rs 1.9 trillion)

Source: CRISIL Research

Page 6: Credit rating assignment

Policy Initiatives to Promote PPP…….

• Initiatives to upgrade and strengthen National Highways

through various phases of the NHDP

•  NHAI - mandated to implement the National Highways

Development Project (NHDP). 

• 100% FDI under the automatic route for road projects

• Viability Grant Funding - Entire VGF to be provided during construction period, maximum grant of 40% allowed(20% previously)

• Exit policy –permit complete disinvestment 2 years post completion of construction after obtaining NOC from lenders

Page 7: Credit rating assignment

CRISIL Rating Approach– Toll road projects

Page 8: Credit rating assignment

Rating factors for toll road projects

Page 9: Credit rating assignment

Construction phase risk

• Delays in construction phase impact the toll road project’s cashflows

and debt servicing capacity

• Key factors in assessing construction phase risk

– EPC contractor’s equity contribution in the project, past track record

– Clearances required and RoW from authority

– Schedule of construction work and land acquisition process

– Financial covenants for timely construction, including penalty payments by

contractors

• Promoter’s financial strength and ability to provide timely support, in

case of funding shortfall

Page 10: Credit rating assignment

Traffic risk

• Traffic forecast in terms of mix and volume on the toll road is key factor

– Traffic mix based on type of vehicle category

– Origin & destination and connectivity of road to important industrial and tourist areas

– Purpose and frequency of both passenger and freight traffic flow

• Correlation of traffic volume with the economic and industrial growth in the vicinity of toll road

• Seasonal variations in traffic flow such as festive period, post-harvest agricultural operations, etc

• Sensitivity analysis of impact of economic cycles and seasonal variations on traffic volume forecast

• Competition from parallel roads or other modes of transport on the same route

Page 11: Credit rating assignment

Toll risk

• Toll road user’s willingness to pay toll is an important factor in

determining toll revenues

• Ability to revise toll rates upwards as per concession agreement

– Acceptability by all users across vehicle categories

– Political influence/ local people tolerance to toll rate revision

• Toll collection efficiency

– Location of toll plaza and traffic diversion from parallel roads

– Minimum toll leakages

Page 12: Credit rating assignment

Structure of project SPV

• Legal and financial structure of the SPV

• SPV promoter’s technical capabilities, past experience and

commitment to the project

• Promoter’s financial strength and ability to raise additional funding

resources for the project, if required

• Forms of credit enhancement/ guarantees extended by the promoters

to the SPV

Page 13: Credit rating assignment

Legal or contractual risk/ Concession agreement

• Length of concession period and possibility of extension

• Concession period termination arrangements and payouts, in case of

event of default by either party

• Conditions for recourse to project lenders in case of specific events,

given that toll roads are on limited recourse basis

• Impact of ancillary land/ property development/ change in scope of

work on the project’s financial performance

• Provision for revision of toll rates –transparency, frequency and

quantum

• Clarity on role and responsibility of the parties

• Protection from construction of alternate roads, if any

• Provision for additional highway, if any

Page 14: Credit rating assignment

Financial analysis

• Assess cash flow adequacy for the project to meet its operation and maintenance charges and debt servicing obligations

– DSCR key determinant

– Liquidity support/Financial flexibility

• Key financial parameters under consideration– Toll revenues

– Debt Servicing Coverage Ratio (DSCR)

– Net cash accruals

– Extent of Debt Service Reserve Account for liquidity purpose

– Project gearing

– Traffic growth

– Toll rate revision

– Periodicity and quantum of Major Maintenance Expense

– O&M expense

• Stress testing cash flows for adverse economic developments impacting traffic flow or possibility of toll rate revision

• Financial flexibility in terms of accessing additional funding sources or support from government agencies/ promoters

Page 15: Credit rating assignment

Toll Road Industry – Traffic AnalysisCase Study – XYZ Co Ltd.

Page 16: Credit rating assignment

Traffic & toll revenue analysis (1/2)

• Traffic dependent on socio-economic conditions of Andhra Pradesh

– Hyderabad (IT hub and state capital) - major driver of freight and passenger traffic

movement

• Toll road protected from traffic diversion through build up of alternate road upto

August 2014

• Stable toll revenue generation of Rs. 1.1 million to Rs. 1.4 million per day

• Healthy growth in toll revenues of 20% yoy in 2010-11

• Upward toll rate revision of 11% yoy in Sept. 2010 – in line with the inflationary

environment

Page 17: Credit rating assignment

Traffic & toll revenue analysis (2/2)

Cars are the major traffic driver – single trip passenger traffic to Hyderabad Multi-axle vehicles (MAV) are the major drivers of toll revenue – single trip vehicular traffic on

account of freight movement between industrial areas and Hyderabad

Traffic volume mix

42% 45%

10% 11%

27% 23%

21% 21%

0%

20%

40%

60%

80%

100%

2009-2010 2010-2011

Cars LCVs 2-Axle Trucks/Buses Multi-Axle Vehicles (> 2 Axle)

Toll revenues

12% 17%7%

7%

34% 31%

47% 45%

0%

20%

40%

60%

80%

100%

2009-2010 2010-2011

Cars LCVs 2-Axle Trucks/Buses Multi-Axle Vehicles (> 2 Axle)

Page 18: Credit rating assignment

CRISIL Assumptions for Credit Assessment

Page 19: Credit rating assignment

CRISIL Assumptions

• Fixed interest rate of Eg; 9.75 per cent pa

• Cost of MMR incurred and time period of performing such MMR

• First major maintenance expense (MMR) to be incurred in 2013-14 and

2014-15 in the proportion of 25 per cent and 75 per cent respectively;

and thereafter with an interval of six years

• Maintenance of escrow account with following payment waterfall

– Dividend/other cash outflows to promoter/group companies to occur only after meeting

payment for taxes, O&M expenses, MMR expense, payout to investors, etc.

• Maintenance of debt service reserve account (DSRA) equivalent to debt

obligations for one quarter throughout the tenure of bonds

Page 20: Credit rating assignment

Credit Assessment

Page 21: Credit rating assignment

Key credit assessment drivers (1/2)

– Traffic drivers & toll revenues growth Impact of Economic Slowdown

Commercial or passenger traffic a major contributor to toll revenues

Ability to revise toll rates in line with increase in inflation

Traffic diversion risk from build up of alternate road/transport network

– Adequate debt protection measures Average DSCR of 1.4x over the debt payment tenure; DSCR below 1x in MMR

years

Healthy cash build up to provide liquidity support

Cash flows supported by escrow mechanism and DSRA

– Experienced sponsors Extensive group experience in infrastructure projects, including toll roads

Group track record in extending support to projects, in stress periods

Groups ability to win the bid for projects from NHAI or other State Authority

Page 22: Credit rating assignment

Rating Comparison in Toll Road Industry

Page 23: Credit rating assignment

Name of Entity Rating Gearing

OPBDITA

Net Margins ROCE Int-Coverage

Total Debt/OPBDITA

NCA/Total Debt

L&T

AAA 1.34 15.4 8.7 15.2 9.37 3.62 0.15GVK

AA+ 0.56 26.6 4.7 17.3 2.26 4.43 0.12NCC

AA- 0.68 10.5 4.9 15.2 2.49 0.16 0.16Viva

HighwaysA+ 1.1 75.8 49.9 22.0 4.39 2.15 0.31

Ramky

A 0.76 10.9 5.7 22.7 4.38 2.25 0.26Lanco

InfratechBBB+ 1.11 12.2 4.6 10.6 2.79 4.96 0.09

Page 24: Credit rating assignment

L&T GVK NCC Viva Highways Ramky Lanco Infratech0

10

20

30

40

50

60

70

80

15.4

26.6

10.5

75.8

10.9 12.2

OPBDIT

L&T GVK NCC Viva Highways Ramky Lanco Infratech0

0.2

0.4

0.6

0.8

1

1.2

1.41.34

0.56

0.68

1.1

0.760000000000001

1.11

Gearing

Page 25: Credit rating assignment

L&T GVK NCC Viva Highways RamkyLanco Infratech0

1

2

3

4

5

6

7

8

9

10 9.37

2.26 2.49

4.39 4.38

2.79

Interest Coverage

L&T GVK NCC Viva Highways Ramky Lanco Infratech0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

3.62

4.43

0.16

2.15 2.25

4.96

Total Debt/OPBDIT

Page 26: Credit rating assignment

L&T GVK NCC Viva Highways Ramky Lanco Infratech0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.150.12

0.16

0.31

0.26

0.09

NCA/Total Debt

L&T GVK NCC Viva Highways Ramky Lanco Infratech0

5

10

15

20

25

15.2

17.3

15.2

22 22.7

10.6

ROCE

Page 27: Credit rating assignment