CREATIVE OFFICE FOR LEASE · 110 se 8th ave portland, or 97214 503 233 9856 2nd floor plan a1.1 3 c...
Transcript of CREATIVE OFFICE FOR LEASE · 110 se 8th ave portland, or 97214 503 233 9856 2nd floor plan a1.1 3 c...
![Page 1: CREATIVE OFFICE FOR LEASE · 110 se 8th ave portland, or 97214 503 233 9856 2nd floor plan a1.1 3 c a e 1 2 4 2nd floor plan scale: 1/4" = 1'-0" 1 legend (n) wall (e) wall grid line](https://reader034.fdocuments.in/reader034/viewer/2022042101/5e7dff62c6634778841fc197/html5/thumbnails/1.jpg)
CREATIVE OFFICE FOR LEASE CENTRAL EASTSIDE INDUSTRIAL DISTRICT
110-118 SE 8TH AVENUE
6,638 NET SQUARE FEET
11 DEDICATED AND FREE PARKING SPACES
PRIVATE COURTYARD
43 WORK STATIONS INCLUDED
AVAILABLE JANUARY 1, 2020
CALL DAVE OTTE: 503-233-9856
![Page 2: CREATIVE OFFICE FOR LEASE · 110 se 8th ave portland, or 97214 503 233 9856 2nd floor plan a1.1 3 c a e 1 2 4 2nd floor plan scale: 1/4" = 1'-0" 1 legend (n) wall (e) wall grid line](https://reader034.fdocuments.in/reader034/viewer/2022042101/5e7dff62c6634778841fc197/html5/thumbnails/2.jpg)
sheet:
title:
PRICING SET
PRELIMINARY
NOT FOR CONSTRUCTION
date:
09.02.2014
© 2012 HOLST ARCHITECTURE pc
09.02.2014
HOLST OFFICE
110 SE 8TH AVE.PORTLAND, OR 97214
issue:
PRICING SET
rev:
JOB NO. 12-033.00
110 SE 8th AvePortland, OR 97214www.holstarc.com
503 233 9856
1ST FLOORFF&E PLAN
A1.2
WH
cann
on
ST
EP
3
C
A
E
421
1ST FLOOR FURNITURE, FIXTURES AND EQUIPMENT PLANScale: 1/4" = 1'-0"1
KITCHEN
STUDIO
RECEPTION
LG CONF.
SM CONF.
WC 'C'WC 'A'
WC 'B'
STUDIO
REF.
LEGEND
(N) WALL
(E) WALL
GRID LINE
OVERHEAD
CPT-1
WH
2
6
6
CPT-1
C-2
UP
UP
(E) COLUMN
1
5
7
31'-3
"
WORKROOM
VESTIBULE
10
11
EXISTING TO REMAIN AREA OF WORK
3
C-2C-1
C-2
9
ALIGN
CPT-1C-1
8
10
A8.0
4
12
GENERAL NOTES:
A. COORDINATE LAYOUT OF NEW DATA AND ELECTRICAL WITH ARCHITECT.
SHEET NOTES:
1. RELOCATE PLOTTER.
2. (E) TELEPHONE PANEL AND SERVER.
3. OWNER PROVIDED REFRIGERATOR.
4. CARPET TILE START POINT.
5. (N) COAT HOOKS, SEE 3/A2.0
6. (E) ELECTRICAL PANEL.
7. (N) BIKE PARKING, SEE INTERIOR ELEVATION.
8. RELOCATED CUBBIES WITH (N) COUNTERTOP.
9. RESTROOM FIXTURES AND FINISHES TO REMAIN. PROTECT DURING CONSTRUCTION.
10. DISABLE SECURITY AT (E) DOOR, BY OWNER'S SECURITY CONTRACTOR.
11. EXTEND SPEAKER SYSTEM INTO NEW STUDIO SPACE, COORDINATE W/ ARCHITECT FOR SPEAKER LOCATIONS.
12. FEATHER TRANSITION FROM (E) TILE FLOORING TO REMAIN DOWN TO (E)CONCRETE. PREPARE TO ACCEPT NEW CARPET TILE.
N
FINISH LEGEND
C-1 CONCRETE: EXISTING
C-2 CONCRETE: EXISTINGDESCRIPTION: SEALED CONCRETECOLOR: NONENOTES: CLEAN AND SEAL CONRETE AS REQUIRED TO MATCH EXISTING
CPT-1 CARPET: TILEMANUFACTURER: INTERFACEPRODUCT: SUPERFLORCOLOR:WIDTH: 500MM X 500MMNOTES: QUARTER TURN INSTALLATION THROUGHOUT 1ST FLOOR STUDIO
P-1 PAINT: MANUFACTURER: COLOR: WHITE TO MATCH (E) WALLSFINISH: WALLS: EGGSHELL, CEILING: FLAT
P-2 PAINT:MANUFACTURER: COLOR: GRAY TO MATCH (E) DOORSFINISH: WALLS: EGGSHELL, CEILING: FLAT
sheet:
title:
PRICING SET
PRELIMINARY
NOT FOR CONSTRUCTION
date:
09.02.2014
© 2012 HOLST ARCHITECTURE pc
09.02.2014
HOLST OFFICE
110 SE 8TH AVE.PORTLAND, OR 97214
issue:
PRICING SET
rev:
JOB NO. 12-033.00
110 SE 8th AvePortland, OR 97214www.holstarc.com
503 233 9856
2ND FLOOR PLAN
A1.1
3
C
A
E
421
2ND FLOOR PLANScale: 1/4" = 1'-0"1
LEGEND
(N) WALL
(E) WALL
GRID LINE
OVERHEAD
SERVER
1
STUDIO
DN
DN
DN
2 2
201 202
A2.0
6
3
GENERAL NOTES:
A. LOUD OR DISRUPTIVE WORK TO BE COMPLETED DURING BUSINESS OFF-HOURS. COORDINATE WITH OWNER.
SHEET NOTES:
1. CLAD END OF SHELVES WITH TACK PANELS, TYP.
2. (N) WINDOW IN EXISTING OPENING (ALTERNATE #2)
3. ELECTRICIAN TO PROVIDE NEW OUTLETS AND DATA FOR FUTURE SERVER - COORDINATE WITH ARCHITECT AND OWNER'S IT CONSULTANT
N
OPEN TO BELOW
OPEN OFFICE
STORAGE
OPEN OFFICE
WORK ROOM
KITCHEN
OPEN OFFICEOPEN OFFICE
BIKE
RAC
KS
COURTYARD
LOBBY
CONF.ROOM
MTG.ROOM
2ND FLOOR
2,728 NSF
1ST FLOOR
3,910 NSF
NEIGHBORHOOD AMENITIES:
CANARD / LE PIGEON
JUPITER HOTEL / DOUG FIR LOUNGE
NONG’S KHAO MAN GAI / MARUKIN
RONTOMS / SIZZLE PIE
BASE CAMP BREWING
LA LUNA CAFE / BAR CASA VALE
CENTURY SPORTS BAR
CALL DAVE OTTE: 503-233-9856